ARLINGTON COUNTY, VIRGINIA

Similar documents
ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of July 15, 2017

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of July 15, 2017

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of July 15, 2017

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of July 21, 2012

ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA

Improve the appearance of off-street parking areas, vehicular use areas, and property abutting public and private roads;

5.1 Commercial and Industrial Development. (Effective April 1, 2006)

CARVER COUNTY DIVISION OF PUBLIC WORKS LANDSCAPE POLICY. Adopted by the Carver County Board of Commissioners March 3, 2015

City of Sheridan Landscape Plan Checklist

ARLINGTON COUNTY, VIRGINIA

5.1.1 The streetscape along US Highway 64 (Brevard Road); and, The built environment within new residential developments; and,

4.500 Preston Road Overlay District

SECTION RESIDENTIAL LANDSCAPING, STREETSCAPING, AND AMENITY STANDARDS

Project Name: MELWOOD HOTEL. Date Accepted: 1/12/04. Waived. Planning Board Action Limit: Plan Acreage: 1.7 Zone: Dwelling Units:

CITY OF ZEELAND PLANNING COMMISSION

BUFFERS, TREE PROTECTION AND LANDSCAPING. Sec Purpose and Intent.

F. Driveways. Driveways which provide access to off-street parking or loading from public streets shall comply with the following:

COUNCIL POLICY. 1. Removals. a) Dead or Hazardous Trees

4 January 11, 2012 Public Hearing APPLICANT:

Zoning Ordinance Section 1.100

ARLINGTON COUNTY, VIRGINIA

The purpose of the requirements in this Article is to provide for landscaping and screening of parking and other outdoor areas that will:

providing proof of liability insurance, indemnifying the City from any claims or liabilities arising from use of City property.

ARTICLE 3 LANDSCAPING AND SCREENING REQUIREMENTS

The following specific definitions shall apply to the landscaping and screening regulations contained in this article:

CHAPTER 4: GENERAL LANDSCAPING STANDARDS 4.1 ALL PLANT STOCK 4.2 TREES

PLANNING APPROVAL & SIDEWALK WAIVER STAFF REPORT Date: December 1, 2016

ARLINGTON COUNTY, VIRGINIA

Application for Site Plan Review

Chapter PEDESTRIAN COMMERCIAL (PC) ZONING DISTRICT

ARTICLE 9: Landscaping

CHAPTER 26 LANDSCAPING (Chapter added in its entirety 05-08)

GENERAL LANDSCAPE PROVISIONS. The following landscape provisions shall be adhered to by all land uses unless otherwise noted:

Project phasing plan (if applicable) 12 copies of site plan

COMMUNITY DESIGN. GOAL: Create livable and attractive communities. Intent

1. Request: The subject application requests the construction of a single-family home in the R-R Zone.

LANDSCAPE STANDARDS PURPOSE AND INTENT OF LANDSCAPE ORDINANCE

VEHICULAR AND PEDESTRIAN CIRCULATION

Figure Example of out door dining in the public right-of-way.

DEPARTMENT OF PLANNING JEFFERSON PARISH, LOUISIANA

Landscape and fencing requirements of this Chapter shall apply to all new landscaped areas.

Article 7.05 Manufactured Home Park Districts

LONDONDERRY PLANNING BOARD MINOR SITE PLAN APPLICATION & CHECKLIST

Harmony Technology Park Third Filing, Second Replat Custom Blending, Project Development Plan/Final Development Plan - FDP #130021

PLANNED UNIT DEVELOPMENT Date: April 5, 2018

D1 September 11, 2013 Public Hearing APPLICANT:

Construction and Landscaping on Public Property

Required Internal Landscaping Percentage of Ground Cover in Living Materials Percentage of Tree Size

PARKLET PROPOSAL PACKAGE & PROCESS

Department of Planning & Development Planning Unit

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1300 OF PUTNAM COUNTY, WEST VIRGINIA Page 119 ARTICLE 1300 LANDSCAPING AND SCREENING

Note: Staff reports can be accessed at Special Permit Application No.

City of Aurora Planning Department DESIGN STANDARDS FOR MOTOR VEHICLE FUEL DISPENSING STATION. August 3, 1998

COMMERCIAL DESIGN REVIEW APPLICATION

Sec Intent and purpose.

Approved: CITY OF ARDEN HILLS, MINNESOTA PLANNING COMMISSION WEDNESDAY, AUGUST 5, :30 P.M. - ARDEN HILLS CITY HALL

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of June 16, 2018

Agenda Item # 1. Meeting Date September 21, Prepared By. Approved By

ARLINGTON COUNTY, VIRGINIA

ZONING AMENDMENT & PLANNED UNIT DEVELOPMENT STAFF REPORT Date: April 4, 2013

CITY PLANNING COMMISSION AGENDA ITEM: C STAFF: ROBERT TEGLER FILE NO: CPC PUD QUASI-JUDICIAL

SITE PLAN REVIEW APPLICATION

Urban Design Manual 2.0 DRIVE-THROUGH FACILITIES. Background. Urban Design Challenges

CAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU 10/21/2013

PLANNED UNIT DEVELOPMENT APPLICATION

g) "Minor repair" means repairs dealing primarily with nonstructural portions of the fence, as well as appearance.

S I T E P L A N A N D A R C H I T E C T U R A L R E V I E W A P P L I C A T O I N

Section 511: 11 th Street Overlay District 1. Intent: 11 th Street is the primary entrance route into the city from the south, providing direct

SECTION 21. MU-VS MIXED USE VIRGINIA SQUARE DISTRICTS

ARTICLE 17 SITE PLAN REVIEW

SITE PLAN SUBMISSION AND APPROVAL GUIDELINES

Request Alternative Compliance to the prescribed criteria of the Oceanfront Resort District Form-Based Code. Staff Planner Kristine Gay

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: March 15, 2012

PLANNED UNIT DEVELOPMENT STAFF REPORT Date: June 2, 2016

A. Site plan notes. Include the heading Site Plan Notes.

REQUEST Current Zoning: O-15(CD) (office) Proposed Zoning: TOD-M(CD) (transit oriented development mixed-use, conditional)

Ephrata Municipal Code, Chapter 19.07, Landscaping Regulations DRAFT January 28, 2013 Page 1

LANDSCAPE ORDINANCE 1. LANDSCAPE PLAN REVIEW REQUIREMENTS

Staff Planner Ashby Moss. Location 4752 Virginia Beach Boulevard GPIN Site Size acres AICUZ Less than 65 db DNL

PLANNING APPROVAL & PLANNED UNIT DEVELOPMENT Date: November 2, 2017

Grafton Street < N September 2, 2015

Bylaw A Bylaw to amend Bylaw 12800, as amended, The Edmonton Zoning Bylaw Amendment No. 2239

CITY PLANNING COMMISSION AGENDA. ITEM NO: 6.a 6.b STAFF: LONNA THELEN

CHAPTER 11 HC HIGHWAY COMMERCIAL DISTRICT

LONDONDERRY PLANNING BOARD SITE PLAN APPLICATION & CHECKLIST

DRIVEWAY LOCATION APPROVAL RULES AND REGULATIONS

V. Streetscape Standards

E. Natural areas include habitats such as wetlands, tidal marshes, waterways, natural drainage-ways, woodlands and grassland meadows.

SITE PLAN REVIEW APPLICATION AND CHECKLIST

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1150 OF PUTNAM COUNTY, WEST VIRGINIA Page 95 ARTICLE 1150 SITE PLAN REVIEW

GENERAL INFORMATIONaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa

3.13. Development Guidelines

D. Landscape Design. 1. Coverage Intent: To provide adequate landscaping materials that enhance the appearance of development projects.

MIXED-USE ZONING DISTRICT DESIGN GUIDELINES

The Town Board of the Town of Vienna, County of Dane, State of Wisconsin, does ordain and adopt as follows.

DEVELOPMENT STANDARDS

12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH

Transcription:

ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of January 27, 2007 DATE: January 12, 2007 SUBJECT: U-3101-04-2 Use Permit Review for drive-through facilities; premises known as 5222 Lee Highway (RPC #08-004-005) Applicant: Chevy Chase Bank, FSB, By: Robert F. Flinn, Attorney Flinn and Beagan 8300 Boone Boulevard, Suite 225 Vienna Virginia 22182-2630 C.M. RECOMMENDATION: County Manager: Staff: Rasheda R. DuPree, DCPHD, Planning Division Renew, the use permit for a drive-through facility subject to all previously approved conditions and with a review by the County Board in one (1) year (January 2008). ISSUES: None. SUMMARY: The applicant requests renewal of a use permit for the Chevy Chase Bank drivethrough ATM facility. This request was previously deferred to allow the applicant time to complete recordation of easements. The easements have been recorded and the drive-through now operates in compliance with the conditions of the use permit. Therefore, staff recommends renewal of the use permit for a drive-through facility with a review by the County Board in one (1) year. BACKGROUND: The was approved by the County Board in December 2004. The drive-through was to serve the bank use which was to occupy a new building on this site. The development proposal included substantial site improvements including sidewalk and streetscape improvements, landscaping and screening, and other pedestrian and street improvements including dedication of a west-bound left turn lane on Lee Highway. The site is located on the south east corner of the intersection of Lee Highway and North George Mason Drive, adjacent to the Garden City commercial development to the northwest, the United

States Post Office to the west, commercial uses to the north and east, and single-family residences to the south. The 39,449 square foot site was previously developed with a Friendly s Restaurant. Construction of the Chevy Chase bank building was completed in October 2005. DISCUSSION: The Chevy Chase Bank site is developed with a one-story 3,650 square foot building and a 32-space surface parking lot with ten stacking spaces for the drive-through automatic teller machines (ATMs) The drive-through serves two ATMs only and does not include drive-through window service for the bank. The drive-through is accessed via a one-way entrance on North George Mason Drive. Site access and egress is facilitated by a two-way driveway on Lee Highway just east of bank building. The site is zoned C-1, Local Commercial Districts. The bank use has occupied the building on this site since May 2006. As part of this use permit, the developer installed a number of sidewalk and streetscape improvements at the perimeter of the site. The streetscape adjacent to the Lee Highway frontage includes a 5-foot-wide utility and planting strip adjacent to the curb and a 10-foot-wide concrete sidewalk. The streetscape adjacent to North George Mason Drive was developed with a 5-footwide planting strip adjacent to the curb and a 6-foot-wide concrete sidewalk. Street trees and pedestrian oriented lighting have been provided around the site. Since the County Board Approval (December 2004): Use Permit Conditions: The drive-through use is in compliance with all use permit conditions. Community Code Enforcement: The Code Enforcement Office states that the use is in compliance with the use permit conditions and notes that a determination regarding signs is under the Zoning Administrator s review. Fire Marshal s Office: The Fire Marshal s Office has not expressed any concerns regarding the continuation of this use. Police Department: The Police Department has not expressed any concerns regarding the continuation of this use. Civic Associations: The drive-through use is located in the Langston-Brown Citizens Association boundary. The civic association has not expressed any concerns regarding the continuation of this use. CONCLUSION: The developer has implemented a number of site and streetscape improvements which improve pedestrian circulation both in and around the site. Staff has not received any complaints regarding the drive-through use on this site. However, since the use has only been in operation for approximately six months, staff recommends a one year review to examine the use once it has been more fully established. Therefore, staff recommends renewal of the use permit, subject to all previously approved conditions, and with a County Board review in one (1) year. U-3101-04-2 Use Permit - 2 -

PREVIOUS COUNTY BOARD ACTIONS: December 8, 1956 December 14, 2004 December 9, 2006 Approved use permit (U-1246-56-1) for operating a drive-in restaurant. Approved use permit (U-3101-04-2) for a drivethrough facility a review in one (1) year following issuance of the Certificate of Occupancy or December 2006 whichever occurs first. Deferred use permit (U-3101-04-2) to the January 27, 2007 County Board meeting. U-3101-04-2 Use Permit - 3 -

Approved Conditions: 1. The developer agrees to comply with plans and building façade elevations dated October 27, 2004 and October 29, 2004 as reviewed and approved by the County Board at its December 11, 2004 meeting and made a part of the public record, together with any modifications proposed by the developer and accepted by the County Board or vice versa. The approval of this use permit expires two years after the date of County Board approval if the approved plan is not under construction. 2. The developer agrees to comply with all state and local laws and regulations not modified by the County Board s action on this plan and shall obtain all necessary permits. 3. The developer agrees to file five (5) copies of a site development plan which complies with the final approval of the County Board with the Zoning Administrator within 90 days of County Board approval and before issuance of the Clearing, Grading, and Demolition Permit. 4. The developer agrees to submit a detailed final site development and landscape plan at a scale no larger than 1/16 inch = 1 foot before issuance of the Excavation/Sheeting and Shoring Permit of first Building Permit, whichever comes first, and the plan shall be approved by the County Manager or his designee before issuance of the final Building Permit. In order to facilitate comparison with the final site engineering plan, the landscape plan shall be at the same scale as the engineering drawing. The County may require more detailed plans appropriate to landscape installation at a larger scale (1/16 inch = 1 foot, 1/8 inch = 1 foot, or 1/4 inch = 1 foot). The County may permit minor changes in building, street, and driveway locations and other details of design as necessitated by more detailed planning and engineering studies if such changes are consistent with the provisions of the Zoning Ordinance governing administrative approval and with the intent of the site development plan approval. The landscape plan shall include a Street Tree Plan which shall be reviewed by the Department of Parks, Recreation and Community Resources (DPRCR) and shall be accompanied by the site engineering plan and the two (2) plans shall be compared to ensure that there are no conflicts between street trees and utilities. Neither plan shall be approved until the landscape plan and the site engineering plan agree. The installation of all plant materials shown on the final landscape plan shall take place before issuance of the First Certificate of Occupancy. The final site development and landscape plan shall include the following details: a. The location and dimensions of traffic signal poles and control cabinets, utility meters, utility vaults and boxes, transformers, mechanical equipment, fire hydrants, standpipes, storm water detention facilities, and the location of all existing and proposed utility lines and of all easements. The location of traffic control cabinets shall be shown on the final site engineering plan and placed so as not to obstruct pedestrian travel or be visually obtrusive. Traffic control cabinets shall not be located in the public sidewalk. Transformers shall be screened and shall not be placed in the setback area between the building and the street; U-3101-04-2 Use Permit - 4 -

b. The location, dimensions, and materials for driveways, driveway aprons, parking areas, interior walkways, and sidewalks as well as for address indicator signs; c. The location and types of light fixtures for the building, streets, parking, and walkway areas: Lighting fixtures and lighting plan shall not result in any glare beyond the property line; d. Topography at two (2)-foot intervals and the finished first floor elevation of all structures; e. Landscaping for internal circulation areas, raised planters, and surface parking areas, including a listing of plant materials and showing details of planting, irrigation, and drainage; and f. The location and planting details for street trees and shrubs in accordance with Department of Environmental Services (DES) Standards and Specifications for planting in public rights-of-way along Lee Highway and North George Mason Drive as shown on the approved final site engineering and landscape plans. g. The applicant agrees that the architectural and streetscape details shall be consistent with the urban design recommendations of the Arlington County Planning Division and as shown in elevations as reviewed and approved by the County Board at its December 11, 2004 meeting. Final design of the building, consistent with the approved elevations of the building, shall be subject to the approval of the County Manager or his designee. h. Prior to approval by the County Manager, the applicant shall send a copy of the final landscape plan to the President of the John M. Langston Citizens Association for review and comment. 5. Landscaping shall conform to Department of Public Works Standards and Specifications and to the following requirements: a. Planting materials shall be of good nursery stock. A nursery guarantee shall be provided by the developer for two (2) years including the replacement and maintenance (to include but not be limited to pruning, feeding, spraying, mulching, weeding, and watering) of all landscape materials following issuance of the Master Certificate of Occupancy; b. Planting materials and landscaping shall meet American Standard for Nursery Stock Z50.1-73 and shall also meet the following standards: 1) Major deciduous trees (shade or canopy trees such as Oaks, Maples, London Planes, Japanese Zelkovas, etc.) - a height of 12 to 18 feet with a minimum caliper of 3 to 3 1/2 inches. U-3101-04-2 Use Permit - 5 -

2) Evergreen trees (such as Scotch Pines, White Pines, Hemlocks, etc.) - a minimum height of 8 to 10 feet. 3) Ornamental deciduous trees (such as Cherries, Dogwoods, Serviceberries, Hornbeams, etc.) - a height of 10 to 14 feet with a minimum caliper of 1 1/2 to 2 inches. 4) Shrubs - a minimum spread of 18 to 24 inches. 5) Groundcover - in 2 inch pots. c. All new lawn areas shall be sodded; however, if judged appropriate by the County Manager or his designee, based on accepted landscaping standards, seeding may be substituted for sod. All sod and seed shall be state certified; d. Exposed earth not to be sodded or seeded shall be well-mulched or planted in ground cover. Areas to be mulched may not exceed the normal limits of a planting bed; e. Soil depth shall be a minimum of four feet for trees and tall shrubs and three feet for other shrubs. f. Finished grades shall not exceed a slope of three to one or the grade that existed before the site work began. g. The developer agrees to maintain the site in a clean and well maintained condition before issuance of the Clearing, Grading, and Demolition Permit and agrees to secure and maintain the site throughout the construction and phasing process. Further, the developer agrees to submit a maintenance agreement which shall ensure that all landscaped areas located on private property are kept in a clean and well-maintained condition after the expiration of the two (2) year guarantee required in condition number 5.a. above and to follow the terms of the maintenance agreement approved for that purpose by the Zoning Administrator. h. The developer agrees to notify the DPRCR Urban Forester at 703-228-6557 at least 72 hours in advance of the scheduled planting of any street trees in the public right-of-way and to be available at the time of planting to meet with the staff of the DPRCR to inspect the plant material, the tree pit, and the technique of planting. Soil used in the tree pit must meet the specifications for street tree planting available from DPRCR Urban Forester. i. The applicant agrees to coordinate with the Arlington County Urban Forester to develop, install, and maintain a supplemental planting plan for the Lee Highway frontage subject to review and approval of the Virginia Department of Transportation. U-3101-04-2 Use Permit - 6 -

6. The developer agrees to contact all utility companies, including the electric, telephone, and cable television companies, and offer them access to the site at the time of utility installation to install their cables. To comply with this condition, the developer agrees to submit to the Zoning Administrator letters from the developer to the utility companies offering them access as stated above before the issuance of any building permit. 7. The developer agrees that the final sidewalk pattern/design and final selection of materials and colors to be used shall be as determined by the County Manager or his designee on the final site development and landscape plan and final engineering plan, in accordance with the Lee Highway/Cherrydale Revitalization Plan Standards or other applicable urban design standards approved by the County Board and in effect at the time of the final landscape plan approval. The developer further agrees to construct the sidewalk improvements detailed below prior to the issuance of the first Certificate of Occupancy for occupancy of the applicable phase of the project. The sidewalks along the street frontages of this development shall be concrete with brick banding and shall be placed on a properly-engineered base approved as such by the Department of Environmental Services (DES). The sidewalk treatments shall continue across all driveway aprons for loading and garage entrances along all frontages of the site plan, and there shall be no barriers to impede the flow of pedestrian traffic. The sidewalks shall contain street trees placed in either tree pits, tree grates or planting strips, consistent with the Standards for Planting and Preservation of Trees in Site Plan Projects, and as specified below. Placement, planting and root enhancement options shall be consistent with the Standards for Planting and Preservation of Trees in Site Plan Projects, and as specified below. Street trees shall not be placed within the vision obstruction area. All public walkways shall be constructed to County Standard. The developer agrees to maintain and replace the street trees and sidewalks for the life of the site plan. The sidewalk sections and street tree species shall be as follows: Lee Highway A minimum five-foot-wide utility/planting strip adjacent to the back of curb and a minimum 10-foot-wide concrete sidewalk. George Mason Drive - A minimum five-foot-wide utility/planting strip adjacent to the back of curb and a minimum 6-foot-wide concrete sidewalk. 8. The developer agrees to submit final site engineering plans to the Department of Public Works. The plans shall be drawn at the scale of 1 inch = 25 feet and be 24 inches by 36 inches in size. The Excavation/Sheeting and Shoring Permit shall not be issued for this site until final site engineering plans and the sequence of construction has been approved by the Department of Public Works. 9. The developer agrees to provide at his total expense, underground utility services to the bank including any transformers needed to serve the proposed bank, such as electric, telephone services, etc. No new aerial utilities shall be permitted along the periphery of the site, and any utility link shall not result in the installation of any new utility poles and/or aerial lines on or off-site. The applicant agrees to cooperate with future County U-3101-04-2 Use Permit - 7 -

utility undergrounding projects along Lee Highway and North George Mason Drive including any easements that may be necessary in the future so that existing utility lines and overhead transformers can be placed underground. The plan shall be designed so that there are no new utility poles or pole mounted transformers provided on or off-site. 10. The developer agrees to install address indicator signs which comply with Chapter 27-12 of the Arlington County Code, or successor provision, in a location visible from the street and as shown on the final site development and landscape plan. 11. The final design and materials of the proposed signs, along with their location and associated landscaping, shall be reviewed and approved by the County Manager or his designee before the issuance of any sign permits. 12. All required easements and right-of-way agreements shall be submitted to the DES for approval and be recorded by the developer before issuance of the Footing to Grade Structure Permit or first Building Permit, whichever comes first. 13. The developer agrees to submit a performance bond estimate for the construction of all facilities (to include street trees and all landscape materials) within the public rights-ofway or easements to the DES for review and approval upon approval of the final engineering plan and before issuance of the Footing to Grade Structure Permit. Upon approval of the performance bond estimate, the developer agrees to submit a performance bond and agreement for the construction or installation of all these facilities (to include street trees and all landscape materials) within the public rights-of-way or easements to the DPW and this bond shall be executed by the developer in favor of the County before the issuance of the Footing to Grade Structure Permit. 14. The final design and materials of the drive-through aisle, any trash storage and loading areas, retaining and screening walls and adjacent landscaping shall be subject to the approval of the County Manager or his designee before issuance of any building permit. 15. The developer agrees to ensure that all parking spaces comply with the requirements of Section 33 of the Zoning Ordinance. Drawings showing that these requirements are met shall be approved by the Zoning Administrator before issuance of the Footing to Grade Structure Permit. 16. Mechanical equipment shall be screened so as not to be visible from public rights-of-way. 17. The developer agrees to identify a community liaison for the Chevy Chase Bank who will be available to the adjacent residential community during the hours of operation to discuss any concerns of the community associated with the bank and the operation of the two (2) drive-through ATMs. The developer agrees to provide the name and telephone number of this representative to the John M. Langston Citizens Association and the Zoning Administrator before issuance of the Certificate of Occupancy. U-3101-04-2 Use Permit - 8 -

18. The developer agrees to show on the final engineering plans street lighting along all frontages of the site prior to the issuance of the Excavation/Sheeting and Shoring Permit. The plans shall include the height and color of the street light poles. The developer agrees, at its cost, to purchase and install approved Arlington County street lighting along the frontages of the site prior to the issuance of the Shell and Core Certificate of Occupancy. In addition, the developer agrees to furnish and install all conduit and junction boxes necessary for the lighting system. All construction shall meet Arlington County standards. 19. The developer agrees to purchase and install Virginia Power "Carlyle" standard street lights along all frontages of the site in accordance with adopted County Street Lighting Policy. The height of the street lights shall be 16 feet. 20. The applicant agrees to construct Arlington County Standard driveway entrances to the site as shown on the final engineering plan approved by the County Manager or his designee. 21. The developer agrees to install and maintain five (5) bicycle parking spaces on site. 22. The applicant agrees to dedicate an easement for public sidewalk and utilities purposes to the proposed back of sidewalk along both street frontages as shown on the final engineering plan approved by the County Manager or his designee prior to the issuance of the Certificate of Occupancy. The applicant agrees to dedicate an easement for public street and utilities purposes to the proposed back of curb along both street frontages as shown on the final engineering plan approved by the County Manager or his designee prior to the issuance of the Certificate of Occupancy. 23. The applicant agrees to work with the Department of Environmental Services (DES to relocate the bus shelter and construct all improvements as shown on the final engineering plan approved by the County Manager and to execute the bus shelter agreement in favor of the County for the term of the use permit prior to the issuance of the Certificate of Occupancy. The applicant agrees to construct the pad for relocation of the bus shelter and DES agrees to provide the bus shelter structure in the public right -of-way. 24. The applicant agrees to show on the final engineering plans and construct pavement, sidewalk, curb and gutter along all frontages of this site in accordance with the thencurrent Arlington County Standard for concrete sidewalk with brick banding, concrete curb and gutter and the then-current standards. The pavement, curb and gutter shall be constructed prior to issuance of the first Certificate of Occupancy for occupancy of the applicable phase of the project as follows: Lee Highway Face of curb shall be located approximately 38 feet south of the survey centerline or as approved by the County Manager on the final engineering plan with the appropriate transition at the east property line back to the existing curb alignment. U-3101-04-2 Use Permit - 9 -

George Mason Drive Construct new curb and gutter in its present alignment and location as approved by the County Manager on the final engineering plan. 25. Subject to the approval of the United States Postal Service (USPS), the applicant agrees to make a location available to the USPS for a U.S. Postal Service drop-off box that will meet their requirements. 26. The applicant agrees to develop a plan to permit shared use of the bank s parking lot during the bank s non-business hours. The plan shall address hours of availability, security, maintenance, insurance, lighting, signage and potential users. The plan shall be submitted for review to the Arlington County Parking Manager and approval by the County Manager or his designee prior to the first review of the use permit. U-3101-04-2 Use Permit - 10 -

U-3101-04-2 Use Permit - 11 -