SFMTA PHELAN LOOP AND PUBLIC PLAZA PHELAN OCEAN AVENUE

Similar documents
Cleveland Park Streetscape and Drainage Improvement Project 1

Fifth and Detroit Street Design May 2017 Capital Improvements Committee. DOWNTOWN Street Design

SOUTH UNIVERSITY Street Design Alternatives in Progress

GREENING THE BOULEVARD Master Plan Concepts for Venice Boulevard between Lincoln and Sawtelle

Though functionally a part of the Ocean Avenue Neighborhood Commercial

SOUTH UNIVERSITY Street Design Setting a Direction for Schematic Design

Dogpatch/22nd Street Greening

BRADENTON RIVERWALK EXPANSION MASTER PLAN

Maplewood Avenue Downtown Complete Street Project

PUBLIC RIGHT-OF-WAY IN THIS CHAPTER PUBLIC REALM

AvalonBay Communities + BRIDGE Housing. Mission Housing Habitat for Humanity Pacific Union Development Corporation

VEHICULAR AND PEDESTRIAN CIRCULATION

Main Street Reconstruction From Ninth Line to Stouffer Street. Town of Whitchurch-Stouffville. Public Information Centre

Lambeth Main Street Streetscape Improvements

FROM DUPONT CIRCLE NORTH TO CALIFORNIA STREET, NW. Welcome!

REPORT TO BOARD ON PREFERENCES tbp/architecture CCSF Facilities Master Plan, October 23, 2016

Pedestrian and Bike Bridge LOGO

COMPLETE GREEN STREET CHECKLIST

DRAFT. 10% Common Open Space

HOOVER-UNION TRIANGLE

Lower Merion Commercial Districts Issues and Characteristics Handbook November 2013

The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape..

Millbrae TOD #2 Project Analysis

4.9 Mendocino Avenue Corridor Plan Design Guidelines

Johnson Street Bridge Public Realm Update

Inner Sunset Streetscape Improvement Project. Operations and Customer Service Committee July 11, 2017

Figure Example of out door dining in the public right-of-way.

Hamilton Road Corridor Streetscape Master Plan. Open House October 4 th, 2017

PHASE 3-4 PARKS SOUTH PARK AND CHANNEL PARK

Design Guidelines for the Route 30 Corridor Master Plan: Subdivision and Land Development Elements

Roanoke Rapids Streetscape Master Plan. City Council Presentation

Chapter 14 Streetscape Improvements

MISSION STREETSCAPE PLAN. Neighborhood Commercial Streets handle continuous activity. Neighborhood Commercial STREET ROW: Main Design Treatments

ANCHOR TO ANCHOR. Rescale the street to create an iconic boulevard.

RESEDA - WEST VAN NUYS COMMUNITY PLAN

VISION AND GUIDING DESIGN PRINCIPLES

Division VI Community Mixed Use (CMU) Architectural Guidelines and Standards

V. Gateways GATEWAYS / V-1

Commercial Node Plan Devine Street/Jackson Blvd. COLUMBIA, SC

University of the District of Columbia Van Ness Campus Master Plan Community Open House 3. December 8, 2010

CAMPUS MASTER PLAN DRAFT PLAN UPDATE JANUARY

open house 3 CITY OF SALEM Downtown Streetscape Plan

ROCKTON DOWNTOWN STREETSCAPE MASTER PLAN. Plan Commission Presentation April 10, 2018 Teska Associates Christopher Burke Engineering

Bow to Bluff Public Realm Plan Design Update

CONTEXT + PROGRAM. CONTEXT - Site Photos RIALTO THEATRE STATION DEPOT HOTEL CONGRESS GREYHOUND SITE 4TH AVENUE BROADWAY BOULEVARD

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

2. reimagine kings way undercroft as a community space

Review of Opportunity Area C Draft Comprehensive Plan and Draft BOS Follow-On Motions. Special Working Group Meeting March 4, 2015

TOWN COUNCIL / PLANNING COMMISSION

WINDSOR GLEN DESIGN GUIDELINES

New Park / Entry Court & Plaza Concept Design

W O R K S H O P S U M M A R Y

Charles P. Johnson and Associates. Annapolis Landscape Architects

III. PROJECT DESCRIPTION

Technical Advisory Committee

Figure 3-1: Public Realm Plan

3.1 community vision. 3.3 required plan elements

FOUNTAIN SQUARE RENOVATIONS JOINT WARD 1 & 4 PUBLIC MEETING EVANSTON PUBLIC LIBRARY JUNE 7, 2016, 7:00 PM

CIVIC CENTER PUBLIC REALM PLAN OVERVIEW

Design Guidelines and Standards for Sight Triangles. Sight Triangle MANUAL

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2.

LOMA VISTA ROUND 1 - COMMUNITY WORKSHOP AND OPEN HOUSE SUMMARY

Lehigh Acres Land Development Regulations Community Planning Project

Jewel. Platte. of the. Plattsmouth Main Street Landscape Architecture by HDR

Carson Street Streetscape Improvements. Request for Proposals

lakeway mixed use tract open space plan

CHAPTER 12 DESIGN GUIDELINES FOR PUBLIC IMPROVEMENTS

Community Mixed Use Zone Districts (CMU)

Complete Streets Master Plan for Downtown New Britain CRCOG Transportation Committee Meeting Monday, December 9, 2013

Transportation. Strategies for Action

TOM ELIOT FISCH/KnappArchitects with. 141 CIVIC DESIGN SUBMITTAL 14 May 2012

LELAND & VISITACION PARK COMMUNITY MEETING

The Project. In 2013, construction was completed between 100 Street and 102 Street.

PROPOSED REDEVELOPMENT OF THE GLEN ABBEY GOLF CLUB. STREETSCAPE DESIGN STUDY (excerpt from the Urban Design Brief) TOWN OF OAKVILLE.

GROUND LEVEL ENLARGEMENT / STREETSCAPE AT PIER AVENUE STRAND & PIER HOTEL HERMOSA BEACH HARDSCAPE MATERIAL KEY MAP PIER AVENUE

Reconfiguration of The Six Points Interchange. Community Update #2 June 18, 2014

NOVEMBER 2016 AARP IN ST. LOUIS & CITIZENS FOR MODERN TRANSIT PLACEMAKING STRATEGIES FOR ST. LOUIS TRANSIT DRAFT

Civic Center District

Streets Vision

THE NEIGHBORHOOD TODAY

STREETSCAPE IMPROVEMENTS - RECOMMENDATIONS

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Standards (R-3) Figure B-11: R-3 Residential Standards Exhibit

Public input has been an important part of the plan development process.

SPRINGHILL LAKE TRANSIT VILLAGE

Program Schedule, Budget and Scope

Project Status. Construction is underway for Phase 3. Overall Project Area and Schedule. Schedule of Current Construction Phases.

More than 30 adults and 19 children were involved in these community workshops.

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016

Landscape and Streetscape Design 2.5

Status Report: MD 355 Project

Official Community Plan Bylaw No. 4360, 2004, Amendment Bylaw No. 4897, 2016 (Sewell s Landing)

PART TWO: PROJECT SPECIFIC DESIGN GUIDELINES

REBUILD GUTTER AND ROLLED CURB TO MATCH EXISTING DETAIL. (TYPICAL) REPAIR EXISTING BENCH FINISH. RETURN TO EXISTING LOCATIONS.

lot flankage Y street 16m 6m landscape strip for large site 3m landscape strip for small medium site

DRAFT. October Wheaton. Design Guidelines

REDLANDS TRANSIT VILLAGES SPECIFIC PLAN

UNION STUDIO Greater Kennedy Plaza!

Courthouse Square Planning & Urban Design Study. Courthouse Square Working Group #13 October 15, 2014

CITY OF BOYNTON BEACH SE 1 ST STREET COMPLETE STREETS IMPROVEMENTS

Transcription:

SFMTA Municipal Transportation Agency Image: a bus in front of the Palace of the Legion of honor SFMTA PHELAN LOOP AND PUBLIC PLAZA PHELAN AVENUE @ OCEAN AVENUE Community Meeting May 23, 2012 San Francisco, CA

Agenda Phelan Loop Relocation Project Update 10 Minutes Phelan and Ocean Ave. Reconfiguration Questions 10 Minutes Public Plaza Design Concepts 20 Minutes Questions / Discussion 30 Minutes Breakout Period 10 Minutes Cast Your Vote for Preferred Concept Next Steps 10 Minutes Phelan Loop 2

Phelan Loop Project and Phelan & Ocean Ave. Reconfiguration Project Team San Francisco Municipal Transportation Agency Department of Public Works Office of Economic and Workforce Development San Francisco Planning Department San Francisco Fire Department Phelan Loop 3

Context Ingleside Branch Public Library Avalon Bay Development Future Multi-Family Housing Public Plaza Fire Station & Future Phelan Bus Loop City College Phelan Loop & Public Plaza 4

Ocean Avenue Today Neighborhood Context Phelan Loop & Public Plaza 5

Phelan Loop Relocation Project Objectives Relocate the current Phelan Bus Loop to better accommodate existing loop routes: 49 Mission/Van Ness and 8X Express buses improved bus loop operations Improve customer amenities Facilitate a Transit-Oriented Development (TOD) with multimodal transit surrounded by mixed-use/ affordable housing (up to 72 units of low income housing) and a public open space plaza to revitalize the area Phelan Loop 6

Phelan Loop Relocation Project: Scope of Work New Bus Loop New clockwise bus loop behind firehouse New overhead trolley coach system New light poles New boarding islands and sidewalk with shelters New operator restroom New landscaping Firehouse Upgrades New sound wall New window and ventilation system New reconfigured parking area Reconfigure Ocean/Phelan Intersection 8 parking spaces on Phelan Ave near Ocean Ave to be eliminated Phelan Loop 7

Phelan Loop Relocation Project Plan Bus Loop Phelan Loop 8

Phelan Loop Relocation Project: Operation Impacts There will be little if any effect on MUNI running times or costs in transitioning from the existing loop to the new one. They are operationally equivalent. The new loop will be closer to City College Passenger transfers between the 49/8X and K-line (EB) will be somewhat less convenient. Transfers between the 43 and the 49/8X will be more convenient. Phelan Loop 9

Phelan Loop Visualization Phelan Loop 10

Phelan Loop Visualization Phelan Loop 11

Phelan & Ocean Avenue Reconfiguration Objectives To facilitate bus movements exiting the new Phelan Loop To improve pedestrian safety To improve southbound traffic flow on Phelan Avenue Scope of Work Create 3rd southbound lane on Phelan Move median on Phelan 8 feet west Remove pork-chop islands at NE & NW corners Shorten crossing distance across Phelan Ave. by bulbing out sidewalk corners. Improving traffic signal sight line. Eliminating 4 parking spaces on east side of Phelan. Phelan Loop 12

Phelan & Ocean Avenue Reconfiguration Phelan Loop 13

Phelan Loop Relocation Project Schedule Phase Start Finish Duration Conceptual Design Fall 2009 Spring 2010 + 6 Months Detailed Design Winter 2011 Spring 2012 + 7 Months Bid/ Award Summer 2012 Fall 2012 + 4 Months Construction Fall 2012 Spring* 2013 + 10 Months ALL CONSTRUCTION COMPLETE: FALL 2013 *Bus Operations begin in March 2013 Phelan Loop 14

Questions? Public Plaza 15

Public Plaza Project Project Team San Francisco Municipal Transportation Agency Department of Public Works Office of Economic and Workforce Development San Francisco Planning Department City College of San Francisco Bernal Heights Neighborhood Center and Mercy Housing California Public Plaza 16

Context Ingleside Branch Public Library Avalon Bay Development Future Multi-Family Housing Public Plaza Fire Station & Future Phelan Bus Loop City College Phelan Loop & Public Plaza 17

Public Plaza Project Description The public plaza project is one of several projects that resulted from a community planning effort to organize and envision Ocean Avenue in the context of the larger Balboa Park Station Area Plan. Balboa Park Station Area Plan, 2008 Public Plaza 18

Public Plaza Project Community Planning History 2008: Balboa Park Station Area Plan Drafted 2009: Community Planning for the Multi-Family Housing 2010: Plaza Early Conceptual Design Community Process led by Bernal Heights Neighborhood Center and Mercy Housing California, 2009-2010 Public Plaza 19

Public Plaza Early Conceptual Design 2010 Public Plaza 20

What is the function and character of the Plaza? Neighborhood / Community Gathering Space Front Door to the Mixed-Family Housing Development Gateway to City College Transit Node All of the Above Public Plaza 21

Public Plaza Dimensions Phelan Avenue Public Plaza 22

Local Scale Comparisons Balboa Park Set of Four Tennis Courts (120 x 200 ) (Plaza scale) 19 th Avenue Width (at Ocean Ave Intersection) (80 wide ) (Plaza scale) Civic Center UN Plaza Farmer s Market Space (65 x 360 ) (Plaza scale) Public Plaza 23

Permitted Uses at Public Plaza Passive Seating / Resting Areas Outdoor Seating for Ground floor Restaurant /Café at Multi- Family Housing Development Performing / Entertainment Space Safe & Inviting connection for People walking to and from City College and the Bus Loop Temporary Vending/Retail Uses as permitted City College Uses for Educational and Informational Purpose Public Plaza 24

Public Plaza Site Analysis Public Plaza 25

Public Plaza Design Concept 1 Public Plaza 26

Public Plaza Concept 1 Visualization Design Concept 1 Public Plaza 27

Public Plaza Concept 1 Visualization Design Concept 1 Public Plaza 28

Public Plaza Design Concept 2 Public Plaza 29

Public Plaza Concept 2 Visualization Design Concept 2 Public Plaza 30 30

Public Plaza Concept 2 Visualization Design Concept 2 Public Plaza 31

Public Plaza Site Design Concept 3 Public Plaza 32

Public Plaza Concept 3 Visualization Design Concept 3 Public Plaza 33

Public Plaza Concept 3 Visualization Design Concept 3 Public Plaza 34

Landscaping Plant Palette Deciduous Trees Palm Trees Native Grasses Public Plaza 35

Paving Options Unit Pavers Scored Concrete Etched Concrete Custom Design Patterns Colored Concrete Public Plaza 36

Plaza Feature Options Public Art Climbable Structures Ornamental Trees Pavement Art Public Plaza 37

Materials: Seating Options Benches Custom Public Plaza 38 38

Planter Options Planter Benches Stone Cast-in-place Concrete Corten Steel Public Plaza 39

Lighting Options Public Plaza 40 40

Metal Gatework & Accessories Low Custom Gates Trellis Structures Tree Grates Site Drainage Public Plaza 41 41

Site Furnishings Bollard Lighting Bike Racks Sculptural Bollards Public Plaza 42 42

Summary of Design Options Design 1 Design 2 Design 3 Public Plaza 43

Multifunctional Plaza: Farmers Market Concept Design 1 Design 2 Design 3 Public Plaza 44

Questions? Public Plaza 45

Breakout Session Public Plaza 46

Public Plaza Project Timeline Baseline Project Schedule Phase Start Finish Duration Conceptual Design Spring 2012 Fall 2012 +7 months Design Winter 2012 Summer 2013 +9 months Bid/Award Fall 2013 Winter 2013 +4 months Construction Summer 2014* Spring 2015 +9 months OPENS TO THE PUBLIC: SPRING 2015 *Estimated date of time when Housing Project is almost completed Public Plaza 47

Summary and Next Steps Public Plaza 48