Stuart Street Planning Study Development Review Guidelines to supplement Back Bay Downtown IPOD (1987) October 15, Preface

Similar documents
The underlying goals of the study and resultant zoning recommendations are to:

WEST LOOP DESIGN GUIDELINES CHECKLIST

Highland Village Green Design Guidelines

4.1.3 LAND USE CATEGORIES

Incentive Zoning Regulations Florida Municipal City of Orlando

MIXED-USE VILLAGE OVERLAY FLOATING DISTRICT

FRUITVALE TRANSIT VILLAGE (Phase 2) Residential Project

PLAN ELEMENTS WORKSHOP. April 5, 2016

ARTICLE 6: Special and Planned Development Districts

Future Five. Design/ Development Guidelines. January 2008 Amended June 08 per City Council motion

(DC1) Direct Development Control Provision DC1 Area 4

ARLINGTON COUNTY, VIRGINIA

MEMORANDUM. I2 District Downtown Parking Overlay District 24,000 square feet /.55 acres. Industrial Employment District North Loop Small Area Plan

DRAFT Northeast Quadrant of Kipling Avenue and Highway 7 DRAFT AUGUST 29, Goals Land Use. The goals of this Plan are to:

Urban Design Manual PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction. Station Study Areas

Policies and Code Intent Sections Related to Town Center

BACKGROUND, GOALS, STUDY AREA, EVALUATION CRITERIA, ORGANIZATION

New-Cast Mixed-use Development Proposal King Street West, Newcastle, Ontario

B. Blocks, Buildings and Street Networks

Residential Commons at Barry s Corner. Boston civic design commission February 5, 2013

Clairtrell Area Context Plan

STAFF REPORT TO COUNCIL PLANNING AND DEVELOPMENT

CONTENTS 8.0 LAND USE 8.1 GENERAL LAND USE 8.2 RESIDENTIAL 8.3 MIXED USE 8.4 COMMERCIAL 8.5 EMPLOYMENT LANDS

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose:

A. Background Summary of Existing Challenges and Potential Possibilities. 1. Summary of Existing Assets and Potential Opportunities

Town of Portola Valley General Plan. Nathhorst Triangle Area Plan

The broad range of permitted and special uses allowed in the district remain, but some descriptions have been clarified.

FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN. Official Plan Amendment XX to the Official Plan for the City of Ottawa

Urban Design Manual 2.0 DRIVE-THROUGH FACILITIES. Background. Urban Design Challenges

[PLANNING RATIONALE] For Site Plan Control and Lifting of Holding Zone By-Law 101 Champagne Avenue. May 23, 2014

178 Carruthers Properties Inc.

DRAFT DESIGN GUIDELINES

Sketch Plan. MNCPPC Plan No: A

VILLAGE OF SKOKIE Design Guidelines for Mixed-Use Districts NX Neighborhood Mixed-Use TX Transit Mixed-Use CX Core Mixed-Use

TRANSIT ORIENTED DEVELOPMENT PINELLAS COUNTY MPO LIVABLE COMMUNITIES INITIATIVE PINELLAS COUNTY COMPREHENSIVE PLAN AMENDMENTS

SUBCHAPTER 4-B GUIDELINES FOR THE B-3 COMMERCIAL CHARACTER AREA

PORT WHITBY COMMUNITY

Hudson Group North America LLC

Central Village Design Guidelines Westport, MA

WATERFRONT DISTRICT DESIGN STANDARDS

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018

Courthouse Square Planning & Urban Design Study. Courthouse Square Working Group #13 October 15, 2014

Staff Report to the North Ogden City Planning Commission

expectations for new development W A T E R F R O N T D R I V E

Mark-up of the effect of the proposed Bronte Village Growth Area OPA No.18 on the text of section 24, Bronte Village, of the Livable Oakville Plan

ARLINGTON COUNTY, VIRGINIA

PROPOSED WATERFRONT DISTRICT DESIGN STANDARDS

ARLINGTON COUNTY, VIRGINIA

Workshop 3. City of Burlington Waterfront Hotel Planning Study. September 14, The Planning Partnership

QUEEN-RIVER SECONDARY PLAN

4. Shape Transitions. 4. Shape Transitions

Public Open House. Overview of the Downtown Plan Official Plan Amendment April 23, 2018

CITY OF PUYALLUP. Background. Development Services

CITY OF FARGO PARKING RAMP SITE EVALUATION

4.9 Mendocino Avenue Corridor Plan Design Guidelines

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Subject: 30 Otis Street, Evaluation of Shadow on Proposed 11th and Natoma Park

A. WHAT IS A GENERAL PLAN?

CPD Rules and Regulations. Arapahoe Square Zoning and Design Standards/Guidelines

The Five Components of the McLoughlin Area Plan

RESIDENTIAL DISTRICTS

ARTICLE 8 DESIGN STANDARDS

Bloor St. W. Rezoning - Preliminary Report

New Street Proposed Redevelopment Architecture & Urban Design Brief

Derry Green Corporate Business Park

McDonald s Restaurant - Purcellville Town of Purcellville Special Use Permit Statement of Justification July 24, 2014

HIGHLAND VILLAGE GREEN URBAN DESIGN PRINCIPLES/GUIDELINES

POLICY AMENDMENT AND LAND USE AMENDMENT TUXEDO PARK (WARD 9) CENTRE STREET N AND 26 AVENUE NE BYLAWS 36P2017 AND 234D2017

Gateway commercial MIXED USE MASTER SITE PLAN. CITILAND AIrDRIE GATEWAY VENTURE INC. airdrie GATEWAY COMMERCE CENTRE. airdrie, ALBERTA FEBRUARY 2012

Allston Brighton Boston College Task Force Meeting. Brighton Marine Health Center March 27, 2013

Be it enacted by the Town Board of the Town of Guilderland that the following new A (Transit Oriented Development (TOD) District) is adopted:

Uptown Rideau Street Secondary Plan [Amendment #166, January 12, 2016]

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

City Center Specific Plan Amendments And Background Report City of Richmond. PLANNING COMMISION FINAL DRAFT January, 2001

SECTION TWO: Overall Design Guidelines

Downtown / Ballough Road Redevelopment Board

REZONING POLICY FOR CHINATOWN SOUTH (HA-1A) Adopted by City Council on April 19, April 2011

Bel-Air Lexus Automobile Service Station

Tyvola & Archdale Transit Station Area Plan. June 5, 2008

A Context-Based Design Code for Pedestrian & Transit-Oriented Development RAIL~VOLUTION NOVEMBER 2006

13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154

ARCHITECTURAL DESIGN REVIEW For submission with development proposals in the City s Tourist Area

Planned Development Review Revisions (Project No. PLNPCM )

Architectural Review Board Report

EXHIBIT A. Chapter 2.7 SPECIAL PLANNED DISTRICTS. Article XVIII 15th Street School Master Planned Development

Draft for Public Review. The Market and Octavia Neighborhood Plan

Historic Preservation Preserve, restore or adaptively re-use historic structures and landscapes.

appendix and street interface guidelines

burlington mobility hubs study Downtown Burlington Mobility Hub

Town Center (part of the Comprehensive Plan)

From: Mayor Sam Liccardo Councilmember Chappie Jones Councilmember Dev Davis Subject: SEE BELOW Date: June 23, 2017

ARLINGTON COUNTY, VIRGINIA

3.0 URBAN DESIGN. December 6, OVERVIEW

City of Woodinville Planning Commission Study Session. Development Regulations 101: An Overview of Specific Regulatory Items To Help You in 2012

NORTH LAKE SPECIFIC PLAN AREA

Buildings may be set back to create small plazas provided that these setbacks do not substantially disrupt the street wall s continuity.

Forest Hills Improvement Initiative A Partnership for Building a Better Community. Use & Design Guidelines September 23, 2008

Planning & Zoning Commission Staff Report

SDOT DPD. SDOT Director s Rule DPD Director s Rule DCLU DR SED DR of 7 CITY OF SEATTLE

Transcription:

Stuart Street Planning Study Development Review Guidelines to supplement Back Bay Downtown IPOD (1987) October 15, 2015 Preface Background The Stuart Street Planning Study area, bound by St. James Avenue to the north, Dartmouth Street to the west, Columbus Avenue/ Cortes Streets to the south, and Arlington Street to the east, represents a 12+ block mixed-use area totaling more than forty acres. A number of significant Boston landmarks define the area: the 790 foot Hancock Building (now referred to as 200 Clarendon), 200 Berkeley Street (the old John Hancock Building), Copley Square, and Trinity Church. The area is also identified by the diagonal intersection of Columbus Avenue and sits adjacent to the historic neighborhoods of Bay Village and South End. Recent additions to the area include the 10 Saint James and 131 Dartmouth Street office buildings, the Bryant on Columbus, and the Clarendon residential project, at the intersection of Stuart and Clarendon Streets, and the Liberty Mutual Headquarters expansion. Purpose The BRA, its consultants, and the Stuart Street Planning Study Advisory Group spent over 3 years examining potential development opportunities, identifying and defining height, density, and use recommendations, and developing scenarios for future development in the area. This work included an assessment of the impacts of density and height on the surrounding neighborhoods, including the impacts on the transportation infrastructure, transit system, parking supply, and the environmental impacts such as wind, shadow, and groundwater. Provisions for and protection of open space, pedestrian access, historically significant buildings, and view corridors were also considered. Goals The guidelines went through a series of iterations, during which time the concepts/ideas were refined, and are now organized into two categories (base and tower), with subcategories that have been informed by qualitative statements. The underlying process goal of the study and resultant guidelines is to: Create more certainty and transparency in the development, permitting, and approval process: Establish a clearly defined set of regulations that reflect the agreed upon urban design and planning goals. The underlying general goals are to: Provide an area for economic growth and urban vitality: Promote a thriving and vibrant day/night, live/work area by improving the district s public realm and pedestrian experience and by encouraging mixed uses. Allow additional height, density, and public benefits when appropriate. Improve the district s quality of character and environmental sustainability: Minimize negative impacts any new development shall have on shadow, wind, traffic, groundwater and public infrastructure. Use existing transportation and urban infrastructure to reduce energy consumption and to improve air quality. Preserve and protect both the immediate area and adjacent neighborhoods: Respect the historic context and the scale of abutting neighborhoods. Boston Redevelopment Authority 1

Approach These guidelines have been designed for flexibility in approach but predictability in impacts. This back and forth between flexibility and predictability is a constant theme in the history of zoning and is particularly relevant to mature, nearly built-out area with a strong existing context like the Stuart Street Study area. The approach describes criteria for responsible development while allowing for the marketplace and the community to engage in structured conversations about individual development expectations. It combines elements of performance and form-based zoning mechanisms, taking attributes from each method, while striking a balance between flexibility and prescribed outcomes. These proposed guidelines aim to foster collaborative citizen involvement, minimize conflict, and maximize cooperation. The strength of this approach is that certain objectives, deemed to benefit the community, are strongly encouraged by economic incentives and disincentives built into the system rather than by rigid codes, which typically restrict innovative solutions and creativity in the urban setting. Finally, these guidelines have the potential to rationalize the development application and approval process for everyone involved. Proposed Categories The proposed guidelines have been organized into two categories: Base and Tower. The Base category is informed by the original underlying zoning, the adjacent building context (cornices, historic fabric, etc.) as well as establishing an appropriate plinth for potential upper portions of a building to sit upon. The Tower category is defined by setbacks to the building form in response to environmental concerns (shadow and wind), and a height range of 280 feet to 400 feet (max), out of deference to existing historic buildings in the adjacent area, in particular, the Old Hancock Building, also known as 200 Berkeley Street. Overall, the proposed guidelines provide: Form-based code strategies that will ensure high-quality sustainable architecture; Performance standards to mitigate environmental impacts; and Flexible strategies that enable economic viability and architectural creativity; Base: 10 FAR & 155 feet height limit The recommended base height for the Stuart Street Planning Study Area (with the exception of those parcels contained within the Bay Village and South End Neighborhood Zoning District) is a height limit of 155 feet, with a maximum of 10 Floor Area Ratio (FAR). Proposals must adhere to the following conditions: Building Preservation All new development over 50,000 gross square feet (GSF) is required to preserve any building on the development site that meets National Register criteria for individual listing at the time of PNF filing under Article 80, in a manner that respects the architectural character of the original building, pursuant to consultation with Boston Landmarks Commission staff. Increasing the City s Affordable Housing Supply All new development over 50,000 GSF is required to create residential units within the project s immediate impact area that exceed the minimum level of affordability required by the City s guidelines on affordable housing then in effect by 2.5%. Careful consideration should be given to the distribution of unit types and sizes. Specifics to be determined through the Article 80 review process. Review process By adhering to these guidelines, projects will be able to benefit from a clearer review process and be eligible for enhanced Article 80 review process, potentially resulting in a streamlined review schedule. Boston Redevelopment Authority 2

Article 80B All projects over 50,000 GSF are subject to the provisions of Article 80B Large Project Review of the Boston Zoning Code. As is customary, an Impact Advisory Group (IAG) or Citizens Advisory Committee (CAC) will be set up as part of the development review process. Public Realm/ Pedestrian Experience (Applicable to all Article 80B Large Projects or rehabs of over 500 GSF of exterior façade modifications or 1,000 GSF of existing ground floor building.) GOAL: New development should animate the public realm and create a lively, vibrant and engaging street-level experience for the pedestrian. Street Wall Frontage Achievement (Required) New development should infill at least 75% of the street frontage, to achieve a continuous ground level experience for pedestrians. Street frontage should either meet the property line or be aligned to adjacent buildings. The height of the street frontage shall reflect that of adjacent buildings or those in close proximity. Active programmed open space that engages with the sidewalk may be included in the street frontage percentage. Transparency Achievement (Required) Maintain 50-65% transparency of ground-floor street wall along Columbus Avenue, Dartmouth, Clarendon, Berkeley, and Arlington Streets. Transparency calculations do not include garage entrances, loading docks, egress doors, utility vaults, and service areas. The following sub-categories allow for greater flexibility in interpreting how they are achieved, however the essence of the form concepts should be met. The underlying intent is to animate the public street experience and building edge. Additionally, each large project development will be allowed flexibility to develop creative and contemporary ways to animate the street edge if they elect to not provide street-level retail or meet the specific guidelines listed below. Publicly Accessible Space (Required/ Alternate Options Allowed) New development with a street frontage that is 200 feet or longer should include a publicly-accessible throughblock connection if such a connection is possible. The connection may be indoors or outdoors. Through block corridors are encouraged to coordinate with existing corridors and open-space. If a through-block connection is not possible, a minimum 15,000 GSF publicly-accessible space is an acceptable alternative. The space may be indoors or outdoors. Ground Floor Pedestrian Entrances (Required/ Alternate Options Allowed) The desired distance between ground-level pedestrian entrances in new development projects is 75 feet. Ground Floor Use (Required/ Alternate Options Allowed) In order to help ensure active, diverse ground floor uses, for every 50,000 GSF of ground floor leasable retail space, a 2,000 GSF or smaller leasable retail space must be provided. Require between 50 to 70% street retail frontage along Columbus Avenue, Dartmouth, and Clarendon Streets. Additionally, where possible, retail frontage on Stuart Street is strongly encouraged. Environment (Required) GOAL: New development should achieve innovation in the area of energy conservation and management. The following are required of all new developments over 50,000 GSF. Sustainability Incorporating advanced sustainability methods and/or accreditation that achieve certifiable status at LEED silver level or equivalent, whichever meet or exceed environmental standards in effect. Wind Buildings should be designed to avoid excessive and uncomfortable downdrafts on pedestrians. Each proposed project will be shaped via setbacks, plinths, and building orientation or other wind-baffling measures, so that the Boston Redevelopment Authority 3

proposed project will not cause ground-level ambient wind speeds to exceed the standards of Article 80. Post occupancy evaluation of wind impact at key locations is required of all new development in the district; mitigation is required if building is determined to have worsened pedestrian conditions at key locations. Key locations (i.e., building entries, exterior seating areas, and crosswalk intersections) will be determined through the Article 80B Large Project Review process. Shadow Each proposed project shall be arranged and designed in a way to assure that it does not cast any net new shadows for more than two hours from 8:00 a.m. through 2:30 p.m., on any day from March 21 through October 21, in a calendar year, on any portion of Copley Square Park (bounded by Boylston Street, Clarendon Street, St James Avenue, and Dartmouth Street, excluding land occupied by Trinity Church.) Ground Water All projects must conform to Article 32 of the Boston Zoning Code: the Groundwater Conservation Overlay District. Multi-modal Access GOAL: New development should integrate state-of-the-art transportation policies and technologies and innovations in demand management. The list of performance criteria is a summary of the requirements expected from the Boston Transportation Department (BTD) which will be officially memorialized in the department s Transportation Access Plan Agreement (TAPA.) Traffic Studies Project Area Any new development over 50,000 GSF located in the study area must include the surrounding area bordered by Storrow Drive to the north, Harrison Ave to the South, Massachusetts Ave to the west and Albany Street to the East in their traffic impact analysis, or as determined by BTD. Off-Street Parking Ratios Parking supply must adhere to the current BTD MAXIMUM parking ratios: 1.0 per dwelling unit 0.50 per 1,000 sq ft of commercial development 0.40 per hotel key No parking minimum Parking/Service Access Curb cuts should be minimized in locating service and parking access points. A maximum entrance width of 30 feet and minimum distance between entrances of 60 feet are preferable. Careful consideration should be given to evening illumination levels of parking garage entries. Service doors, when not in use, should be closed to maintain the street wall. Off-Street Parking/Service Location Parking should not be visible from any location on the street. Except for access to the parking, service and parking areas must be set back a minimum of 20 feet from the building face. This liner space should contain active building uses. Bicycle Accommodations Provide bicycle racks in secure sheltered spaces as per BTD ratios, for example one space per dwelling unit (or 0.3 parking spaces per 1,000 SF). Additionally, no fewer than 5 outside bicycle spaces per building are required. A minimum number of shower stalls must be provided based on the number of commercial building occupants or the equivalent of free access to on-site health club shower facilities. Bicycle parking locations should be as accessible as the closest automobile space, or within 50 feet of the primary entrance of a retail establishment. Alternative Transportation Off-Street Parking Include at least 1 car-share parking space per 50 parking spaces, at least 1 parking space for vanpool parking and at least one parking space per 50 parking spaces for zero emission vehicles (hybrids, electric vehicles, etc.). In addition, provide parking for scooters and motorcycles. Boston Redevelopment Authority 4

Traffic Management Through a required site plan and traffic management analysis for future development projects, BTD will determine appropriate traffic management projects such as new signage, signal improvements and traffic camera installation required by the proponent. Loading For projects over 50,000 GSF, the proponent will be required to provide off-street loading to minimize on-street commercial vehicle activity. Parking and loading access, where possible, will be provided off of alleys to enhance pedestrian safety, maximize commercial frontage, and accommodate queuing. Transportation Demand Management For projects over 50,000 GSF, the proponent is required to join the local Transportation Management Association (TMA) and participate in their programs such as Guaranteed Ride Home and car pools. Streetscape Improvements Through a required site plan BTD will determine appropriate public right-of-way streetscape improvements to be designed and built in the vicinity of the proposed building including at a minimum the sidewalks along each side. Transit Proponents will be required to provide pre-payroll deduction and distribution for T passes. Boston Redevelopment Authority 5

Tower: 17.5 FAR & Above 155 feet up to 400 feet height limit Proposed projects are eligible for additional build out (FAR of 17.5) as well as height beyond the 155 feet (up to a maximum of 400 feet; see attached graphic for specific demarcations), if such proposals (a) undergo review pursuant to Article 80B of the Boston Zoning Code, (b) achieve performance criteria identified below and (c) provide public benefits; those benefits at a minimum include the following: BUILDING ACHIEVEMENT Given the variety of constraints on development in the district, very few sites will be able to achieve the maximum height/far. The goal of the development guidelines is to make the level of achievement commensurate with the scope, scale and impact of the proposed project. Sustainability (Required) Incorporating advanced sustainability methods and/or accreditation that achieve certifiable status at LEED gold level or net zero energy consumption or meets or exceeds comparable environmental standards in effect. Complete Streets Fund (Chose either one) In addition to the requirements outlined under Multi-modal Access in the Base section, and in coordination with BTD, contribute to a Complete Streets fund for improved safety, connectivity, and beautification of the public realm at locations other than in the abutting streets of the building but within the area- thereby increasing vitality and encouraging pedestrian and bicycle travel in the immediate area. Specifics will be determined through the Article 80 review process and should be of a value equal or greater than one half of one percent (1/2%) of the cost of building construction. Public Art (Chose either one) New development should provide publicly accessible art or provide a donation to the Fund for Boston Neighborhoods (a 501(c)(3) administered by the Boston Arts Commission) that has an invoiced or appraised value equal to or greater than one half of one percent (1/2%) of the cost of building construction. Specifics to be determined through the Article 80 review process. * Mitigating Development Impacts Additionally, the assessment of the proposed project s impacts on the immediate area will be determined through the Article 80 review process. The Article 80 process will determine if additional mitigation (otherwise exceeding the City s requirements for community benefits) is needed to offset development impacts. PERFORMANCE CRITERIA The following performance criteria requirements must be met in order to reach the Tower status. Building Form (Required) GOAL: New development should help create a varied skyline for commercial Back Bay, allow individual buildings to be visually distinct while also creating a family of buildings around the new Hancock Tower, and create a clear animated pedestrian/public realm distinctly delineated from the tower. Tower GSF For portions of new development that extend above the base level street wall height, the maximum commercial floor plate is 30,000 GSF. For residential building, the average residential floor plate above 200 feet high is 12,000 GSF. Tower Length For portions of new development that extend above the base level street wall height, the maximum length is 200 feet. Boston Redevelopment Authority 6

Massing Setback For portions of new development that extend above the base level street wall height along Berkeley and Clarendon Streets, massing must setback from the property line at least 15 feet. For portions of new development that extend above the base level street wall height along Dartmouth Street, massing must setback from the property line at least 25 feet. The base should acknowledge adjoining cornice lines and context. Environment (Required) GOAL: New development should minimize shadow impacts and mitigate against wind impacts, one of the most significant environmental concerns in the district. New development should also contribute to establishing the Stuart Street district as a model for multi-modal transit options. Shadow Performance Each proposed project shall be arranged and designed in a way to assure that it does not cast net new shadows for more than two hours from 8:00 a.m. through 2:30 p.m., on any day from March 21 through October 21, in a calendar year, on any portion of Copley Square Park (bounded by Boylston Street, Clarendon Street, St James Avenue and Dartmouth Street, excluding land occupied by Trinity Church.) Wind Performance Wind studies will be conducted which demonstrate that there will be, on average, a net overall positive impact on existing conditions or conditions which would result from the construction of structures built to the base zoning limits. Post occupancy evaluation of wind impact at key locations is required of all new development in the district; mitigation is required if building is determined to have worsened pedestrian conditions at key locations. Key locations (i.e., building entries, exterior seating areas, and crosswalk intersections) will be determined through the Article 80B large project review process. Multi-modal Access GOAL: The proponent, in consultation with BTD, is expected to determine the appropriate combination of achievement based upon the scope scale and impact of the development project. The final selection of items will be officially memorialized in the Transportation Access Plan Agreement (TAPA) issued by BTD. Boston Redevelopment Authority 7

UPDATED Boston Redevelopment Authority 8