Pre-Installation n Guide For Ultrafast Amplifiers

Similar documents
Newport's Laser and Detector Selection Guide

ARES-G2 Rheometer. Site Preparation Guide. Revision A Issued June 2016 Page 1

The Participant will select one of the two Approval Categories (below) and submit the appropriate documentation.

SAMPLE SPECIFICATIONS CONTINUOUS MONITORING SYSTEM (Insitu)

Modernist Warming Drawer

DHR Accessories Requirements. Site Preparation Guide

Cavitator Ultrasonic Cleaner Instruction Manual Model 20G

BACK BAR REFRIGERATION Installation, Operation and Maintenance Instructions

In-line Oil in Water Analyser - Model OIW-EX100P and OIW-EX1000P

BOTTOM MOUNT REFRIGERATORS & FREEZERS Installation, Operation and Maintenance Instructions

MDH Series Air Dryer. User s Guide

University of California Santa Barbara Department of Chemistry and Biochemistry Optical Characterization Facility. Safe operations manual

Cavitator Ultrasonic Cleaners

Preinstallation Manual Coherent Legend Elite HE+ and Legend Elite Duo HE+ Ultrafast Amplifier Laser Systems

ZLINE FRY ELECTRONICS INSTALL

BOTTOM MOUNT REFRIGERATORS AND FREEZERS Installation, Operation and Maintenance Instructions

Gerber Innovations M Series Laser. Site Preparation & Installation Manual

CLIMAGUARD Air-to-Air Outdoor Heat Exchangers INSTRUCTION MANUAL. Rev. I 2017 Pentair Equipment Protection P/N

PLEASE DO NOT DISCARD THE ATTACHED DOCUMENT IS NECESSARY FOR THE INSTALLATION OF YOUR GREASE TRAP.

SOP SF SOP for LN2 Freezers

TA Instruments Installation Requirements for Rheology Systems

IQ/OQ Protocol Installation Qualification/ Operation Qualification

Site Requirements ADVANTAGE PLUS

Chiller installation, contractor s scope of work:

On-line Side Stream Oil in Water Analyser - Model OIW-EX 100 or OIW-EX 1000

SCIENTIFIC WARMING CABINET Installation, Operation and Maintenance Instructions

T3/E3 Fiber Optic Line Drivers

Installation, Operating & Maintenance Instructions. Horizontal Models: LH & HL

SECTION ULTRASONIC TRANSIT TIME CLAMP-ON FLOW MEASURING SYSTEM

ClimaGuard Outdoor Heat Exchanger All Models

OPERATION & MAINTENANCE MANUAL TC670

SECTION 1: STARTING 1.1 UNPACKING AND INSPECTION

M Series Fan Filter Units

TA Instruments Installation Requirements for Rheology Systems

Over-the-Range Microwave professional series

Instruction Manual for the Revolutionary Science RS-IF-203 Incufridge

Installation, Operation, Maintenance, & Troubleshooting Model: CLS36-440V Electric Cruise Line Salamander Serial:

Product Dimensions Page 1 of 7. DA Downdraft Ventilation Hood

The FEL Facility Optical Diagnostics and FEL Characterization

SECTION ph/orp Sensors

CH250 AND CH251 CHILLERS

SECTION Fluorescent Dissolved Oxygen Measuring System

Installation Guide. P1500W Series Air Dryer

BLG-HGP Model Bottom Mounted Full-Length Swing Glass Door Freezer Merchandisers

DIRECT DRAW BEER COOLERS Installation, Operation and Maintenance Instructions

Revolutionary Science RS-IF-202

Laser Safety and Classification Full Version (CA-1110) Advanced Version (CA-1111) Basic Version (CA-1112)

P10KW / P15KW Air Dryer Installation Guide

REFRIGERATED PREP TABLES Installation, Operation and Maintenance Instructions

Holiday Shutdown Checklist 2017/2018

PIP PCTPA001 Testing of Process Analyzer Systems

Laser Registration Requirements: EH&S must be notified after the purchase any class 3B or 4 lasers through the online Laser Registration Form.

Rev B, 9/2/2009. Kodiak Chiller Overview

FG7T (C and L Series)

SECTION INDUCTIVE CONDUCTIVITY ANALYZERS

OPERATIONS MANUAL DALPH1002, DALPH1503 PELLET HEATERS PALPH1002, PALPH1503 PLATE HEATERS. Alliance Products, LLC Murfreesboro, TN

Aluminum Heating Mantles

Thermolizer TZ6 & TZ17. Operators Manual

CLIMAGUARD Air-to-Air Outdoor Heat Exchangers INSTRUCTION MANUAL. Rev. H 2015 Pentair Equipment Protection P/N

TA Instruments Installation Requirements for Rheology Systems

CxA to Answer this Section

Installation, Operation and Maintenance Manual

PROAIR Air Conditioner. CR29 Model INSTRUCTION MANUAL nvent Rev. I P/N

SECTION Process and Immersion Turbidity and Total Suspended Solids Sensor

FORM ACCL-PC1 ACCL WITNESS TEST PROCEDURE AND CHECKLIST

NOVALYNX CORPORATION MODEL A EVAPORATION PAN AUTOMATIC REFILL SYSTEM INSTRUCTION MANUAL

Code 542 Peltier Rack User's Guide

OPERATION & MAINTENANCE MANUAL TX600

Instruction Manual. Self-Leveling Combination Cross-Line Laser and Five-Beam Laser Dot Model No , &

PROAIR Air Conditioner. CR23 Model INSTRUCTION MANUAL nvent Rev. D P/N

HOT WORK OPERATIONS March 23, 2018

Powerohm Resistors Digital HRG System

Evacuation Fire Safety Program

Operation Manual v Fax: +33 (0) U.K.: +44 (0)

DESIGN CLASS FUNCTION

SECTION Free/Available Chlorine Analysis System

Tooling Assistance Center

Verde GSE PCA Bridge and Ground Mount Units 30/45/60/90/120 Tons. Installation and Maintenance Manual

CHILLER. Operator s & Installation Manual

Drop-In Refrigeration System

40LM Hz INSTALLATION, START-UP AND SERVICE INSTRUCTIONS CHILLED WATER FAN COIL UNIT

Instruction Manual for HX-DX and HX-DXHP Heat Exchangers 3 / 2017

Dear Valued Customer:

REFRIGERANT PROCEDURE

Daikin Water Cooling, Heating, and High Capacity Booster Coils

Cavitator Ultrasonic Cleaner Instruction Manual

Tank, Heater, and Control Operation Manual REV. E DATE: 04May2015

UNDERCOUNTER REFRIGERATORS AND FREEZERS Installation, Operation and Maintenance Instructions

EHA Hoffmann International GmbH

IQ/OQ Protocol Installation Qualification/ Operation Qualification SteamScrubber & FlaskScrubber Laboratory Glassware Washers

2 INLET / HIGH HEAD DRAIN PUMP SYSTEMS MODELS , INSTALLATION INSTRUCTIONS PREINSTALLATION CHECKLIST

MME Standard Operating Procedure (SOP)

Snapshot. User Manual. Use on Dimmer Outdoor Use Sound Activated DMX Master/Slave Voltage Switch Replaceable Fuse User Serviceable Duty Cycle

CH750, CH751 & CH951 CHILLERS

R.I.S. (Remote Intelligent Sensor)

Air Resource Specialists, Inc.

IQ/OQ Protocol Installation Qualification/ Operation Qualification zz FreeZone Stoppering Tray Dryer & Bulk Tray Dryer Freeze Dry Systems

Installation Instructions. Warming Drawer

Certificate: _01 / 22 March 2013

VANTAGE. Installation Manual. Release Date: April 16, 2003 Publication Number: INS Revision Date: January 22, 2015 Revision: E

Transcription:

Pre-Installation Guide For Ultraf ast Amplifiers Spectra-Physics, Inc. 3635 Peterson Way Santa Clara, CA 95054 June 2014

Table of Contents Introduction... 3 1. When the System Arrives... 4 1.1. Inspection... 4 1.2. Review Instruction Manuals... 4 1.3. Laser Safety Considerations... 4 1.4. Diagnostics... 4 2. Pre-installation Considerations 2.1. Location and Environment... 5 2.2. Physical Description... 5 2.3. Amplifier Utilities... 6 2.4. General Specifications... 6 2.5. Useful SP Part Numbers.7 3. Pre-Installation Checklist... 8

Introduction 3 Congratulations on your purchase of a Spectra-Physics system. This guide describes preinstallation information for your laser system. Some preliminary planning is essential to avoid unnecessary delays during installation and to ensure easy operation and access to your system. You are requested to carefully consider your operating environment prior to installation. Proper water, power and room temperature are required for each system. A checklist of pre-installation considerations is provided in this guide. You are responsible for meeting these requirements prior to installation, with due consideration given to all applicable building and safety codes. We at Spectra-Physics intend to provide you with responsive support so that you can derive great satisfaction and value in using our systems for your applications. We are available to you at 1-800-456-2552.

When the System Arrives 4 1.1 Inspection When the system arrives, any sign of damage to the shipping crates should be brought to the attention of the delivering freight company. A claim must be filed with that commercial carrier (usually within 30 days). Notify the originating Spectra-Physics office of any shipping damage. Shipping damage is not covered by Spectra-Physics. Your packing list will show all items that you have ordered. Open all the packages and check each item for possible damage during shipping. Check the items against your packing list. Some items may have been installed at the factory. Each major component of the Amplifier system comes with a manual, verify that you have received these items. Some manuals are now electronic only. Please report any missing or damaged items to Spectra-Physics, or you may contact your Spectra- Physics Sales Engineer. 1.2 Review Instruction Manuals Please read the manual to get vital information about your system. Familiarize yourself with the system. You are encouraged to spend as much time as possible reviewing the system components before your Spectra-Physics Service Engineer arrives for the installation and training. 1.3 Laser Safety Considerations In addition to reviewing the sections in the manual regarding laser safety, be sure to have the proper safety glasses available for ALL lab personnel present during the installation and testing of your system. For more information, please call Spectra-Physics at 1-800-456-2552. Ultrafast laser systems consist of multiple class 4 lasers and laser harmonic generation units. Proper understanding of the wavelengths and energy levels of any option is required. The setup and operation of any laser laboratory is subject to Federal and State regulation. Be sure to follow all applicable laws and regulations in the setup and operation of your system. 1.4 Diagnostics During the course of installation, power measurements will be demonstrated on all of the appropriate wavelengths. Your Service Engineer can identify which specifications will be demonstrated and the equipment necessary to conduct such tests. A non-standard system may require special consideration. To have other published specifications demonstrated, consult with your Service Engineer to determine whether additional diagnostic equipment will be required. Daily operation of a regenerative amplifier requires a dedicated oscilloscope with a minimum of 300MHz analog bandwidth or a digital scope with a minimum of 4Gs/s sample rate with a 500MHz front end. An appropriate power meter and spectrometer are basic diagnostic tools..

Pre-installation Considerations 5 2.1 Location and Environment The location of the system and environment of your lab should have the following features: A. A safe location that meets all applicable building codes. B. Easy access with adequate clearance around the instrument. C. Proper air conditioning could be critical for the performance of the laser. For certain applications ambient room temperature changes may be an important factor for the laser system s performance. Air ducts should not blow directly on laser or optical path. This laser system is meant for indoor use Altitude: up to 3000 m Temperatures: 18degC to 28degC Maximum Relative Humidity: 85% at 18degC decreasing to 45% at 28degC to maintain a noncondensing humidity. Mains supply voltage: do not exceed +/ 10% of the nominal voltage Insulation category: II Pollution degree: 2 The system's optical table should not be directly under any active heating or air conditioning vent. In general, we recommend having a shelf above the optical table to place the power supplies and diagnostic oscilloscope and to have the chillers away from the optical table, in a separate room if possible. Longer hoses are available for the systems chillers. Check with your sales engineer to be sure hoses of the appropriate length have been ordered with your system. D. In some applications vibration isolation may be required for your system. Structural integrity of the flooring could play an important role. E. Please note that an Amplifier system must be installed on a proper optical table. F. Consider room requirements for future maintenance and upgrades by your Spectra Physics Field Service Engineer as well as the safety of the system's operators. 2.2 Physical Description Amplifier Height Width Length Weight (lbs) Solstice 10.5" 27" 49" 480 Solstice Umbilical length 12' Spitfire ACE 9.36" 24.0" 60" 400 Spitfire ACE Umbilical Length (x2) 9.5' Spitfire ACE PA 9.36" 30.0" 60" 400 Spitfire ACE PA Umbilical Lengths (x3) 9.5' Empower * Height Width Length Weight (lbs) Laser Head 7.0" 10.0" 19.75" 50 Power Supply 6.9" 17.9" 19" 45 Umbilical Length 10' High Capacity Chiller 22.7" 14.5" 27.7" 189 Standard Empower hose lengths are ~ 2 M. 5 and 10 M hoses are available Mai Tai * Height Width Length Weight (lbs) Laser Head 5.8" 13.8" 23.4" 70 Mai Tai Power Supply 6.9" 17.9" 19.0" 55 Umbilical Length 10' Chiller 22.7" 14.5" 27.7" 189 OPA Height Width Length Topas 6.6" 8.7" 22.8"

Pre-installation Considerations 6 OPA 800c 9.3" 24" 36" * Part of Solstice, external to Ace A Spectra Physics regenerative amplifier has a TDG timing delay generator control unit and a TCU temperature control unit (2 TCUs for an ACE PA) and a control computer associated with it. Each Empower has a control computer and High Capacity Chiller. The TDG, and the TCU(s) are standard rack mount 17.9" x 19" x 3.5" boxes. Spectra Physics Amplifier Systems come with laptops preloaded and tested with the proper GUIs and all required cables. Spectra Physics will try to support but does not guarantee any other control scheme. 2.3 Amplifier Utility Services Each Spectra-Physics laser system has its own water, electrical, nitrogen and room air requirements. To ensure smooth uninterrupted operation, each system should have dedicated utility services. All chiller cooled lasers specified here not using the special Nalco cooling solution require steam-distilled water to be provided on site at installation. Nalco is required for Empower chillers. In the United States, the Empower High Capacity Chillers require a NEMA 5-20R T slot receptacle. All other power supplies, chillers and control units can use standard NEMA 5-15R receptacles. We recommend using a separate circuit for each power supply and chiller and at least one other circuit for the control units. NEMA 5-20R T receptacles work with both types of plugs that come with the system. Take into account the layout of your system when planning the utilities for your lab. Electrical drops that minimize cords stretching across the floor are highly recommended to protect the safety of the system operators and to protect the equipment from unintended power interruption or misalignment. Please be aware that a Spectra-Physics service engineer cannot perform electrical or plumbing work at your site. Electrical Services Before connecting the power supply to the AC power line, make sure that all power supply power switches are OFF. Model Ø Voltage Nominal Current Maximum TDG/TCU 1Ø 110/220V 2A OPA 800C N/A N/A N/A Topas 1Ø 110/220V 2A Empower 15/30/45 1Ø 110/220V 15A/10A High Capacity Chiller 1Ø 110/220V 20A/15A Mai tai 1Ø 110/220V 15A/10A 2.4 General Specifications Up to date specifications for any Spectra Physics laser system are always available from the Newport web site: WWW.Newport.com. Enter the model as a keyword to be taken to the newest Specification Sheets. You can also contact your Newport Spectra Physics Sales Engineer or Spectra Physics Service Support to answer any questions regarding your system by calling 1-800-456-2552. We are here from 7:30am to 4:30

Pre-installation Considerations 7 pm Pacific time. You can send an e-mail at any time to Service@Spectra-Physics.com and we will get back to you the next business day. 2.5 Useful SP part numbers for Ultrafast systems 1607-0456 Nalco solution 1 US gal 1607-0547 Nalco cleaner 1 US gal 2604-0493 Empower Chiller filter 90019175 MaiTai / Tsunami floor chiller filter 2604-0490 MaiTai rack mounted chiller filter 90029851 5M hose assy laser out M-M 90029853 10M hose assy laser out M-M 90029852 5M hose assy laser in M-F This can be used as an extension 90029854 10M hose assy laser in M-F This can be used as an extension 90035539 MaiTai Purge Filter 0135-1923S TCU Purge filter 90048754 Activated Charcoal 12 pack The chiller filters and fluids must be changed on an annual basis. The purge filters on an as needed basis.

Pre-Installation Checklist 8 Before the arrival of your Spectra-Physics Service Engineer please review the following pre- installation requirements. When all the requirements have been met, initial the boxes and fax a signed copy to the Spectra-Physics Service department at (408) 980-6921. Physical Location: A location with adequate clearance around system to conduct service and accessible by Spectra- Physics personnel. A temperature controlled room. Utility services have been installed. Local building and safety codes are in compliance and have been verified. When Your System Arrives: Check crates for damage. (If damaged, file a claim with the carrier and notify Spectra-Physics.) Uncrate and place the system on your work surface. (Two or more people may be required to lift some equipment.) Compare the packing list with your quotation. Call your Spectra-Physics office about any discrepancies. Check that all manuals were received. Save all packing and shipping material until the installation has been completed. Obtain the correct safety glasses, oscilloscope and a power meter. Customer Signature Date Phone Number Fax Number E-Mail Sales Order Number