Instaation Guide 1RUPTB Mounting Base This guide expains how to attah the ase of the aera doe (Figure 1) to a hard eiing or to an optiona ounting struture. Note: For an expanation of how to assee a ounting struture, see instrutions suppied with the struture. Figure 1. Mounting ase for aera doe Warnings and Cautions Pease review the foowing warnings and autions efore you insta the ounting ase. For additiona warnings and autions, see the aera doe instaation guide. WARNING ALWAYS USE: Proper safety equipent for the oation and type of instaation. Proper ift equipent to reah the instaation. Safety features of the ift equipent. BE SURE: Eetria power is not onneted to the doe when onneting wires. Doe wi ove when power is appied. Eetria power is not onneted to neary fixtures that you ight touh during instaation. WARNING DO NOT insta this aera doe in hazardous areas where highy oustie or exposive produts are stored or used. WARNING This doe runs on 24Va. DO NOT onnet ine votage to this doe. North Aeria power requireents: In North Aeria, this devie is intended to e suppied fro a Cass 2 power suppy. For outdoor instaations, use Cass 3 wiring tehniques, iquid-tight onduit, or iquidtight pipe. This instaation shoud e ade y a quaified servie person and shoud onfor to a oa odes. WARNING EU power requireents: This produt runs on 24Va. In the EU, it is intended to e powered fro a Liited Power Soure. A iited power soure is a ertified soure of SELV, and if inherenty iited, with 8 aps axiu output urrent, and a axiu of 100VA avaiae; or if not inherenty iited, fused with a axiu vaue of 3.3 Aps, eeting setion 2.11 of IEC950, and a axiu of 250VA avaiae. The power suppy an e otained through Aerian Dynais or through another soure where the provider an furnish the verifiation. This is required to assure eetria safety in the produt. Stroanforderungen in der EU: Dieses Produkt wird it 24 V Wehsestro etrieen. In der EU ist es für den Betrie durh eine egrenzte Stroquee vorgesehen. Eine egrenzte Stroquee ist eine zertifizierte SELV-Quee (Shutzkeinspannung), ei inhärenter Begrenzung it eine axiaen Ausgangsstro von 8 A und 100 VA axiaer Verfügarkeit, ei niht inhärenter Begrenzung it einer axiaen Siherung von 3,3 A geäß Ashnitt 2.11 der IEC950 und 250 VA axiaer Verfügarkeit. Das Netztei kann üer Aerian Dynais oder eine andere Quee ezogen werden, woei der Anieter den Nahweis der Konforität ereitsteen sote. Dies ist zur Gewähreistung der eektrishen Siherheit des Produktes erforderih. (5 pages) SpeedDoe Utra Caera Does 1
Cautions The axiu ength of power ae aowed etween the Cass 2 LPS (ow votage) a soure, suh as a J-ox, and the doe is 250 (820'). Do not run data and power aes adjaent to or in the sae onduit as ine votage ains power. SensorNet 485 networks require 22 AWG unshieded ae. Do not exeed 32 devies per ae run. RS422 networks require 22 AWG shieded ae. Do not exeed 10 devies per ae run. Manhester networks require 18 AWG shieded ae. Do not exeed 3 devies per ae run. Aways terinate the aera doe onneted at the end of a ae run. Before You Begin Pease read the foowing to ensure a sooth and suessfu instaation. You ust: Have eetria work opy with atest nationa eetria ode, nationa fire ode, and a appiae oa odes and ordinanes. Coordinate work with other trades to avoid interferene. Verify existing site onditions and oordinate with the owner s representative and appropriate utiities as required. Otain opies of a reated pans, speifiations, shop drawings and addenda to shedue and oordinate reated work. Thoroughy review the projet to ensure that a work eets or exeeds the aove requireents. Bring aeged disrepanies to the attention of the CCTV Projet Coordinator. Instaation Proedures This setion expains how to: 1. Attah the ase indoors to a: - Tie Ceiing (see RHIUTBAR instrutions) - Hard eiing (page 3) - Mounting struture (page 3). 2. Prepare aes for attahent to the housing and eyea assey (page 5). You shoud have on hand the foowing equipent: Phiips-head srewdriver Power dri with 1/8, 1/4, and 3/8 dri its Haer Soket wrenh with 6-inh extension, and 5.5 and 10 sokets Vauu and roo Insta kit 0351-1630-01. Note: In the foowing proedures, etters in rakets [ ] and in figures refer to ites in kit, whih inudes: a) Base, SpeedDoe Utra 1 0400-1146-01 ) Cip, Lanyard 1 0500-8046-01 ) Lanyard 1 0500-8019-01 d) Anhor, Togge 2 2880-0073-01 e) Washer, Fat, M4 2 5842-0300-020 f) Srew, STAP, 4.2x32 PH 2 5810-4091-120 g) Pug, 9-Pin 1 2109-0572-09 h) Pug, 4-Pin 1 2109-0572-04 i) Video Cae 1 6003-0131-01 j) Nut, Loking, M3 2 5826-0200-020 k) Srew, M3x10 Fathead 1 5801-1062-111 ) Srew, M3x6, PHP 1 5108-1041-111 ) Dust over 1 3100-0066-01 2 INSTALLATION GUIDE
Attahing to a Tie Ceiing Requires RHIUTBAR T-ar kit (optiona). Attahing to a Hard Ceiing Foow this proedure to attah the ase to sheet rok or wood eas (Figure 2). Figure 2. Surfae ounting to sheet rok and wood eas f d e k 1. Mark and dri hoes. Pae ase [a] against eiing and ark and dri hoes for two ounting srews. If ounting to sheet rok, aso ark and dri hoe for ae aess. SHEET ROCK: Dri two 9.5 (3/8") hoes for pasti anhors. Dri one 19.5 (3/4") hoe over ae aess area for ae aess. WOOD: Dri two 3.2 (1/8") hoes for ounting srews. If wood overs ae aess area, dri one 19.5 (3/4") hoe for ae aess. 2. Press dust over [] into arge hoe in ap of aera doe to keep deris out of doe. 3. Lanyard [] prevents strain on aes when detahing doe fro ase. As shown in Figure 2, attah anyard ip [] to ase where shown using M3x10 fat head srew [k] and M3 nut [j]. Attah other end of anyard to ap of doe using M3x6 pan head srew []. 4. Attah ase to eiing. SHEET ROCK: Insta pasti anhors [d]. Then pae washers [e] onto srews [f] and insert the into anhors. WOOD: Pae washers [e] onto srews [f] and insert the into the wood. 5. See Preparing Caes, page 5. Cae Aess Area a j INSTALLATION GUIDE 3
Attahing to a Mounting Struture Figure 3. Attahing ase to ounting struture To attah the ase to a ounting struture (Figure 3): 1. Press dust over [] into arge hoe in ap of aera doe to keep deris out of doe during this proedure. 2. Lanyard [] prevents strain on aes when detahing doe fro ase. As shown in Figure 2, attah anyard ip [] to ounting stud where shown using two nuts suppied with struture. Attah other end of anyard to ap of doe using M3x6 srew []. 3. See Preparing Caes, page 5. Use M3 nuts fro ounting struture RHIULWM or RHIUPND Use M3 nuts fro ounting struture RHIUWM Use M3 nuts fro ounting struture RHIUCM 4 INSTALLATION GUIDE
Preparing Caes The foowing steps refer to Figure 4. 1. Feed data, power, and aar aes through ae aess hoe in ase. 2. Connet data and power to 9-pin pug [g]. Manhester data and power (Utra IV ony). Order data ae 88760 (penu) or 8760 (non-penu) fro Beden y aing 1-800-235-3361. 1 White Manhester ( ) 2 Bak Manhester (+) 3 Bak 24Va 5 White 24va 6-9 N/A Not used. 4. Connet aar input ae wires, if used, to 4- pin pug [h]. 1 N/A +12Vd 2 N/A Aar Out 3 N/A Aar in 4 N/A Coon 5. Connet video ae [i] to video ae fro oposite ae. Figure 4. Preparing aes RS-422 data and power 1-2 N/A Not used. 3 Bak 24Va 5 White 24va 6 Orange RS-422 Data In High (+) 7 Green RS-422 Data In Low ( ) 8 Yeow RS-422 Data Out High (+) 9 Brown RS-422 Data Out Low ( ) Pin 1 Pin 1 SensorNet data and power 1 Orange SensorNet (unshieded) 2 Yeow SensorNet (unshieded) 3 Bak 24Va 5 White 24va 6-9 N/A Not used. i g h INSTALLATION GUIDE 5