Architectural Drawings

Similar documents
PURPOSE OF THE PRESENTATION

CITY CLERK. Consolidated Clause in North York Community Council Report 8, which was considered by City Council on October 26, 27 and 28, 2004.

Binghamton University Construction SUMMER 2012 HIGHLIGHTS

PUBLIC REALM STRATEGY

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

BOULEVARD AND PARKWAY STANDARDS

Subject: Expo Light Rail - Revision of the Terminus Station North Entrance Design

The McCoppin Hub. Boor Bridges Architecture

City of La Palma Agenda Item No. 5

Blackfriars Heritage Conservation District Plan

STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS

City of New Bedford STAFF REPORT

Memo. B R A Y H e r i t a g e

- Document 2 - Algonquin Interpretation and The Continuing Conversation toward a Vision for a Revitalized Lansdowne

lot flankage Y street 16m 6m landscape strip for large site 3m landscape strip for small medium site

WINDSOR GLEN DESIGN GUIDELINES

Landscape and Streetscape Design 2.5

A. INTRODUCTION B. PROJECT LOCATION

#16 ) FDP THE HABIT BURGER GRILL FINAL DEVELOPMENT PLAN

STAFF BRIEF. Project: 2016-COA-356 Meeting: September 8, th Street Oxford Hotel

MAIN STREET RECONSTRUCTION PROJECT PRE-CONSTRUCTION PUBLIC INFORMATION SESSION AGENDA

DEVELOPMENT DESIGN GUIDELINES

Bylaw A Bylaw to amend Bylaw 12800, as amended, The Edmonton Zoning Bylaw Amendment No. 2239

Carleton University. Nicol Building New Sprott School of Business. Design Brief and Planning Rationale. Carleton University

URBAN DESIGN BRIEF REPORT

MOMENTUM. Design Brief. Site Plan Control and Minor Variance Applications. 59 Russell Avenue

1. General Purpose. 3. Uses

Architectural Review Board Report

BETTER PUBLIC TRANSPORT PROJECT WATERBEACH TO SCIENCE PARK AND EAST CAMBRIDGE CORRIDORS

F. Driveways. Driveways which provide access to off-street parking or loading from public streets shall comply with the following:

built form design guidelines

THE CORPORATION OF THE CITY OF VAUGHAN MAJOR MACKENZIE STREETSCAPE STUDY

Summary of Heritage Input

400 West Georgia Street Urban Design Panel. Public Realm

MEMORANDUM. I2 District Downtown Parking Overlay District 24,000 square feet /.55 acres. Industrial Employment District North Loop Small Area Plan

HALF MOON BAY CATHOLIC ELEMENTARY SCHOOL SITE PLAN CONTROL DESIGN BRIEF

D. Landscape Design. 1. Coverage Intent: To provide adequate landscaping materials that enhance the appearance of development projects.

South th E ast Communit ity Centre (SECC)

McDonald s Restaurant - Purcellville Town of Purcellville Special Use Permit Statement of Justification July 24, 2014

ELK GROVE TOWN CENTER DESIGN GUIDELINES

Yonge Eglinton Centre Urban Design Guidelines

ROCKAWAY BOARDWALK Community Board 14 Parks Committee Meeting June 4, 2014

Exterior Façade Lighting Design

8.0 Built Form Framework

GROUND LEVEL ENLARGEMENT / STREETSCAPE AT PIER AVENUE STRAND & PIER HOTEL HERMOSA BEACH HARDSCAPE MATERIAL KEY MAP PIER AVENUE

The Van Ness Campus. Weekly Construction Bulletin #259

CITY COUNCIL STAFF REPORT

30% 70% International. Domestic

VAUGHAN METROPOLITAN CENTRE STATION

Re: Coastal Manor Addition, Conceptual Site Plan Submittal Orey Gadway, Owner/ Administrator Coastal Manor 20 West Main St Yarmouth, ME 04096

4 Semi-Private & Private Open Spaces

University of Saskatchewan CAMPUS MASTER PLAN. Senate Meeting Preliminary Presentation. April 21, 2018 DIALOG ECS DA WATT

Middlebury RS 0174(8)


14825 Fruitvale Ave.

CONTEXT + PROGRAM. CONTEXT - Site Photos RIALTO THEATRE STATION DEPOT HOTEL CONGRESS GREYHOUND SITE 4TH AVENUE BROADWAY BOULEVARD

MEMORANDUM. This memo deals with proposed amendments to previously issued Development Permit No for Park Royal North.

TRAFALGAR PLACE LONDON

URBAN DESIGN PEER REVIEW PANEL MINUTES

1999 Approval to replace World War I monument and relocate plaques Approval to rehabilitate the Chase Mill building and surrounding site

The Brian Perry Charitable Trust Applicant

PLANNING APPROVAL & PLANNED UNIT DEVELOPMENT Date: April 6, 2017

Gateway commercial MIXED USE MASTER SITE PLAN. CITILAND AIrDRIE GATEWAY VENTURE INC. airdrie GATEWAY COMMERCE CENTRE. airdrie, ALBERTA FEBRUARY 2012

The following concept plans and illustrations are the result of this 10 month study of the alley connections from CSU to the River District.

FRAMEWORK OF DESIGN REVIEW:

/05 Architectural Response

St. Laurent Transit Improvements Innes / Industrial to Smyth. Public Information Session December 2, 2015

New Park / Entry Court & Plaza Concept Design

Humber Bay Shores Precinct Plan Final Report

Te c h S p e c 3. Edge Restraints for Interlocking Concrete Pavements

A/E REVIEW CHECKLIST SITE & LANDSCAPE

ROYAL ARSENAL Buildings 10, 11 and Royal Carriage Square Landscape and Public Realm Statement Addendum - December 2016

ARLINGTON COUNTY, VIRGINIA

Nepean Point CONSULTATION REPORT JUNE 2014

Conceptual Design. Main Street Enhancement and Extension Project. Bothell, Washington. June 11, 2009

Othello Neighborhood Design Guidelines

Landscaping Conceptual Design of 94 Northcliffe Boulevard, Toronto

Guidelines. Building. The minimum setback of an attached garage from the lot line shall be 6m. 4. Zoning Provision

New Library Building Proposal

Tampa Palms CDD. Board Of Directors September, 2017

Coxwell Station Easier Access

Urban Design Manual 2.0 DRIVE-THROUGH FACILITIES. Background. Urban Design Challenges

ARLINGTON COUNTY, VIRGINIA

SUBJECT: PREDEVELOPMENT PLAN REVIEW OF PROJECT LOCATED AT 2632 EAST WASHINGTON BOULEVARD ('ST. LUKE MEDICAL CENTER')

CHÂTEAU LAURIER URBAN DESIGN GUIDANCE

DVASE 2018 Excellence in Structural Engineering Awards Program

Cultural heritage impact statement - addendum

Master Plan Presentation August 12, 2015

Harmony Technology Park Third Filing, Second Replat Custom Blending, Project Development Plan/Final Development Plan - FDP #130021

ARCHITECTURAL GUIDELINES

Retail Signage Options. Planning Commission Special Meeting February 19, 2015

ARLINGTON COUNTY, VIRGINIA

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT AND ENGINEERING SERVICES DEPARTMENT

Division VI Community Mixed Use (CMU) Architectural Guidelines and Standards

3.13. Development Guidelines

Schematic Design Presentation December 15, 2006 David Smith

#8) T-1409 CENTENNIAL & LAMB TENTATIVE MAP

WILMINGTON WATERFRONT Approved Project

SF REC & PARK STANYAN STREET IMPROVEMENT. Supervisor London Breed District 5. Project Manager Dan Mauer Recreation and Parks Department

The Auburn Plan Designing the Future of Auburn February 28, 2005

Transcription:

10 Architectural Drawings

TABLE OF CONTENTS 2 1. Introduction 2. Board of Director Landscape Concept comments Sept 2015 3. Entrances and Tour Route 4. Exterior Landscape 5. Demonstration Current Design does not preclude 2009 Node Study 6. Exterior Lighting 7. MAJOR Project Milestones

1. INTRODUCTION / PROJECT UPDATE 3 Seeking final Board of Directors approval for Landscape Previous BoD Approval dates: Concept Design Approval January 2014 FLUDA 2A Approval July 2014 FLUDA 2B Approval February 2015 Landscape Concept Approval September 2015 FLUDA 3 Final Design June 2016 Final Landscape Design Current

2. Board of Director Landscape Concept comments Sept 2015 4 Landscape Concept Approval and Conditions: 1. That landscape proposals should not preclude, but rather enable future implementation of any of the proposed at grade plaza schemes of the 2009 Node Study As previously demonstrated the current landscape design does not preclude the Node Study options (upcoming slides) 2. That NCC staff continue to work with Public Works and Government Services Canada (PWGSC) in the next phase of the project to advance the detailed design, focusing on the proposed interior public space interventions, the landscape, and on the east façade Continued work, presentations and submissions have been made to ACPDR and NCC Board of Directors 3. That clear identifying elements be considered on both approaches south and north, and that an accessible sidewalk be re-examined on the east perimeter The accessible sidewalk on the NCC property will be modified to align with the east stair reconstruction. The City of Ottawa portion of the accessible sidewalk is not in PSPC project scope

3. ENTRANCES & TOUR ROUTE 5 PUBLIC ENTRANCE SENATOR ENTRANCE

3. ENTRANCES & TOUR ROUTE 6 MAIN ENTRANCE BLOCK (MEB) GENERAL WAITING ROOM (GWR) TICKETING BLOCK (TB) CONCOURSE SOUTH ADDITION PUBLIC ENTRY AND EXIT PARLIAMENTARY ENTRY AND EXIT

5. INTERIM LANDSCAPE CONCEPT 7 EXTERIOR LANDSCAPE

4. EXTERIOR LANDSCAPE LANDSCAPE PLAN 8

4. EXTERIOR LANDSCAPE AERIAL VIEW 9

4. EXTERIOR LANDSCAPE NORTH WEST VIEW 10

5. EXTERIOR LANDSCAPE SECURITY HUT OPERATION & VIEW STUDY Queuing for 30 visitors to be pre-screened (visual) before entering building SLIDE FOR INFORMATION ONLY NOT TO BE TRANSLATED 11 Queuing space for 100 visitors to purchase tickets and wait for tour times Queuing set up should work with plaza art displays

4. EXTERIOR LANDSCAPE SECURITY HUT DESIGN 12 Additional security hut cladding may be stone or zinc; to be determined with manufacturer

4. EXTERIOR LANDSCAPE SOUTH WEST VIEW 13

4. EXTERIOR LANDSCAPE SOUTH EAST VIEW 14

4. EXTERIOR LANDSCAPE NORTH EAST VIEW 15

4. EXTERIOR LANDSCAPE SOUTH COURTYARD 16

4. EXTERIOR LANDSCAPE SOUTH COURTYARD VIEW 17

4. EXTERIOR LANDSCAPE FENCE 18 Fence Galvanised Steel; brush blast, epoxy primer; poly urethane top coat egg shell finish colour to match Pratt & Lambert Graphite 2224 as per exterior colour used on all metal elements of building

4. EXTERIOR LANDSCAPE LANDSCAPE PLAN MATERIALS 19 1 *Reinstated concrete paving to match existing *Precast concrete bollards to match existing 2 2 *Concrete paving *Reinstated Confederation Blvd precast concrete unit pavers 1 3 3 *Concrete paving units to match NCC canal pavers at driveway *Concrete paving units *Salvaged stone pavers at entryway 4 4 *Reinstated concrete paving

5. INTERIM LANDSCAPE CONCEPT 20 DEMONSTRATION THE CURRENT DESIGN does not preclude, but rather enable future implementation of any of the proposed at grade plaza schemes of the 2009 Node Study

5. CONFEDERATION BOULEVARD : SUSSEX / RIDEAU / COLONEL BY NODE URBAN DESIGN STRATEGY 2009 Peter J. Smith & Company Inc. 21

5. LONG TERM LANDSCAPE CONCEPT NCC 2009 URBAN DESIGN STRATEGY (SCENARIO 3) 22

5. LONG TERM LANDSCAPE CONCEPT NCC 2009 URBAN DESIGN STRATEGY (SCENARIO 4) 23

5. INTERIM LANDSCAPE CONCEPT 24 EXTERIOR LIGHTING

6. EXTERIOR LIGHTING PARLIAMENTARY PRECINCT EXTERIOR LIGHTING MASTERPLAN 25 Legend: Jewel in the Night Hierarchy Level 1 Jewel in the Night Hierarchy Level 2 Jewel in the Night Hierarchy Level 3 Jewel in the Night Hierarchy Level 4 Jewel in the Night Hierarchy Level 2 - Commercial Jewel in the Night Dynamic Lighting Study Area Limits

6. EXTERIOR LIGHTING BUILDING LIGHTING - WEST ELEVATION 26

6. EXTERIOR LIGHTING BUILDING LIGHTING - DUSK VIEW 27

8. MAJOR PROJECT MILESTONES 28 Major Upcoming Project Milestones: September 2017 East Addition Structural components complete June 2018 Substantial completion September 2018 Building occupied