VEHICULAR AND PEDESTRIAN CIRCULATION

SALEM FOREST RIVER PARK PRELIMINARY POOL AREA ASSESSMENT & MASTER PLAN STUDY. For the City of Salem

BRADENTON RIVERWALK EXPANSION MASTER PLAN

Y Sports Complex PROGRAMMING Capitol Improvement Plan. Anticipated/Suggested Improvements. Sedgwick County Park: Sports Complex:

Design Considerations

The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape..

JACKsON STREET PIER CONCEPTUAL DESIGN PACKAGE SEPTEMBER 21, 2017

Emerson Park Master Plan Update. Public Meeting III August 27, 2014

ROCKTON DOWNTOWN STREETSCAPE MASTER PLAN. Plan Commission Presentation April 10, 2018 Teska Associates Christopher Burke Engineering

PHASE 3-4 PARKS SOUTH PARK AND CHANNEL PARK

New Park / Entry Court & Plaza Concept Design

BEMIDJI CITY COUNCIL Work Session Agenda Monday July 9, 2012

1. Parks & Recreation Neighborhood Parks Community Parks Special Use Sites 2. Open Space 3. Trails

Preliminary Sketch Plan for Fort Hunter Park

Charles P. Johnson and Associates. Annapolis Landscape Architects

Appendix 1. Private Projects with Respective On Site PUS and Public Parks in the Silver Spring CBD

Chapter 14 Streetscape Improvements

City of Plattsburgh DRI: Downtown Streetscapes & Riverfront Access. Downtown Streetscape and Riverfront Access Design

Preferred Riverwalk Alternative Components August 17, 2017:

R STREET CORRIDOR NEIGHBORHOOD Site Plan and Design Review Supplemental Guidelines Checklist

Providence Waterfront Park

MASTER PLAN for the EARL NEWHOUSE WATERFRONT

Master Plan Presentation August 12, 2015

4 Semi-Private & Private Open Spaces

Highland Falls Waterfront Redevelopment Feasibility Study Village Board Meeting March 20, 2017

Carlsbad Village Redevelopment Concept Summary of Features

SFMTA PHELAN LOOP AND PUBLIC PLAZA PHELAN OCEAN AVENUE

January 11, New benches installed. Paving of parking lot adjacent to piers and the canoe put-in. Near complete with clean up remaining.

Reconnecting to a Forgotten River St. Cloud MN. Aaron Hanson Design Design Thesis LA 572, Thesis, Spring 2012

Preci nct P l ans Figure 56 Campus Aerial Photo, 2008 CAL STATE EAST BAY, HAYWARD CAMPUS MASTER PLAN

ACADEMY AREA CONCEPT PLAN

Popp s Ferry Causeway Park Back Bay Environmental Educational Center CASHIO COCHRAN LLC

GYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado. Schematic Design January 2015

Port of Camas-Washougal Waterfront Trail Master Plan

BURTON STATION STRATEGIC GROWTH AREA PLAN UPDATE PUBLIC MEETING 3/26/18

WINDSOR GLEN DESIGN GUIDELINES

Dowdy Park. Concept Plans TOWN OF NAGS HEAD NORTH CAROLINA. Developed by: Albemarle & Associates, Ltd VHB/ Vanasse Hangen Brustlin, Inc.

chapter DESIGN GUIDELINES NEW RIVER MASTER PLAN REPORT

FROM DUPONT CIRCLE NORTH TO CALIFORNIA STREET, NW. Welcome!

Public Workshop 2 December 11, 2014 OLIN

PRELIMINARY DESIGN + DEVELOPMENT PLAN

Activities for All Ages. Small Community Feel. Entertainment. Mix of Uses

preliminary master plan Cover Slide executive summary public presentation

VIRGINIA KEY CONSENSUS MASTER PLAN

OPPORTUNITIES AND CONSTRAINTS - OXBOW PARK ENTRANCE AND PUT-IN

Georgeson Botanical Garden Master Plan

ROME WATERFRONT VILLAGE PROJECT NARRATIVE January 25, 2018

lakeway mixed use tract open space plan

Chapter 6. Overall Vision RECOMMENDATIONS. More Trail and Trail. Connections. Equal Access to Park. Facilities and Programs. Water Access.

5.0 P A R K R E C O M M E N D A T I O N S

ANCHORAGE PARK REPORT CARD Assessing A Park s Appearance, Function, & Condition

The Village. Chapter 3. Mixed Use Development Plan SPECIFIC PLAN

Sub-committee on Harbour Plan Review of Harbour-front Enhancement Committee. Ninth Meeting

Forest Grove Park Master Plan

Welcome! HORSESHOE BAY PARK. Welcome!

A L F O N S O A R C H I T E C T S

Ohlone College Measure G Project Scope Revisions

Woods Chapel Park. Park Amenities: Playground, basketball court, single table shelter, small pond and multi-use trail.

Clairtrell Area Context Plan

ALTERNATIVE STATION AREA -

Millbrae TOD #2 Project Analysis

Lakefront Downtown Action Plan Phase I June 2008

Point Defiance Park. Master Plan Update. April 23 rd 2015

GREENING THE BOULEVARD Master Plan Concepts for Venice Boulevard between Lincoln and Sawtelle

CONTEXT + PROGRAM. CONTEXT - Site Photos RIALTO THEATRE STATION DEPOT HOTEL CONGRESS GREYHOUND SITE 4TH AVENUE BROADWAY BOULEVARD

Rotary Park / Railroad Lake

Design Guidelines for the Route 30 Corridor Master Plan: Subdivision and Land Development Elements

SOUTH UNIVERSITY Street Design Alternatives in Progress

3.1 Existing Land Use

Las Colonias Park Master Plan

M i s s i o n B a y W a t e r f r o n t

Long Branch-Wayne Local Park Renovation Project

Illustrative Development Plan

PROJECT SITE The Proposed Project includes the Allen and Pike Street malls between Delancey and South Streets (see Figure 2C-1).

Maplewood Avenue Downtown Complete Street Project

Notice of Preparation (NOP) of an Environmental Impact Report and Public Scoping Meeting for the Alameda Shipways Residential Project

Benedict Fountain Park Meeting Notes Wednesday, February 15, 2012

Figure 3-1: Public Realm Plan

Master Plan Implementation Committee Meeting

GROUND LEVEL ENLARGEMENT / STREETSCAPE AT PIER AVENUE STRAND & PIER HOTEL HERMOSA BEACH HARDSCAPE MATERIAL KEY MAP PIER AVENUE

TOWN COUNCIL / PLANNING COMMISSION

Though functionally a part of the Ocean Avenue Neighborhood Commercial

The Process. Phase 1: Detailed Assessment, Design Framework Phase 2: Conceptual Design. Phase 3: Master Plan Document

Capital Projects Update March 2017

Throughout. square. (Crystal City Vision Plan 2050)

TURN TO THE RIVER CITY PLAZA LANDSCAPE DESIGN CONCEPT May 25, 2016

Parks & Recreation. Michael Versen & Associates Landscape Architecture Land Planning

Official Community Plan Bylaw No. 4360, 2004, Amendment Bylaw No. 4897, 2016 (Sewell s Landing)

WEST BLACKHALL STREET PUBLIC REALM + TOWN CENTRE CONNECTIONS Public Exhibition 28 th June 2018

Welcome to. kzla. Codman Square Park

Wilbur Young Park. Park Land Established: Developed Acres: 15 acres Undeveloped Acres: 25 acres

5.15 AESTHETIC RESOURCES

Wentworth Point July Community Information Session Feedback Summary

Master Plan. of a new entry ramp as depicted on the Proposed First Floor Plan.

for Master Planned Development Framework Design Standards & Guidelines

4.9 Mendocino Avenue Corridor Plan Design Guidelines

IMAGINE CLEARWATER. Community Workshop 3. November 2016

MCCOYS CREEK RESTORATION 30% DESIGN

EXISTING VEHICULAR & PEDESTRIAN CIRCULATION

Current City Warehouse Facility. City Market Re-Use Concept. Indoor Market/ Maker s Incubator 1.06 acres +/- Open Air Market 1.

Transcription:

FORT MONROE WATERFRONT PARK February 09, 2016

THEMES: Series of Experiences Connectivity Cohesiveness Multi-functional Spaces Resiliency

THEME: SERIES OF EXPERIENCES History Water / Beaches Open Space Nature CONNECTIVITY Sidewalks Multi-use Trails Roads Water

THEME: COHESIVENESS Details Materials Repetition

THEME: MULTI-FUNCTIONAL SPACES Passive Use Active Use

THEME: RESILIENCY Sea-level Rise LID Techniques Brock Environmental Center, Virginia Beach Portland, OR Virginia Beach, VA Buckingham Co ES, Dillwyn, VA

OVERALL WATERFRONT PARK PLAN & 10 STUDY AREAS: 1 ENTRANCE 2 MARINA 3 CONTINENTAL PARK 4 ENGINEER WHARF (FISHING PIER) 5 BATTERY & OUTLOOK BEACH 6 GLACIS 7 WHERRY QUARTER 8 KAYAK LAUNCH 9 COMMUNITY CENTER 10 400-YEAR COMMEMORATION AREA

STUDY AREA 1: ENTRANCE

PROGRAM: ENHANCE SENSE OF ARRIVAL CONSIDER WALL CONFIGURATION (SERIES OF BARRIERS AS FEATURES) ENHANCE WAYFINDING CONSIDER VEHICULAR PULL-OFF REMOVE / RELOCATE KIOSK REMOVE GUARD BUILDING CONSIDER DECORATIVE PAVING (INGALLS RD HISTORICALLY ASPHALT PAVER BLOCKS) TROLLEY ROUTE ENHANCE & CREATE PEDESTRIAN & VEHICULAR CONNECTIONS PROVIDE NPS SIGN LOCATION CONSIDER AREA FOR PUBLIC ART STUDY AREA 1: ENTRANCE PROGRAM

Savannah, GA Youngstown, OH Kent, OH Hampton, VA STUDY AREA 1: ENTRANCE INSPIRATION

STUDY AREA 1: ENTRANCE EXISTING

1. Live Oaks for Framing View 2. Connecting Walkway 3. Keep Ex. Walls & Piers 4. Keep Portion of Ex. Wall 5. New Walkway & Bench 6. Shoreline Restoration 7. Linear Park 8. New Shelter 9. Ex. Osprey Nest 10. Remove Parking Lot & Basketball Court 11. Bleacher Set-up Area 12. Ex. Pump Station 13. Remove Portion of Wall 14. New Entry Sign 15. Keep Wall and Piers 16. New Pavers 17. Monument / Art 18. Remove Guardhouse, Kiosk & Pavement 19. Walkway Connection 20. New Kiosk & Pull-off 21. New Road Connection 22. Remove 2 Lanes & Add Green Space STUDY AREA 1: ENTRANCE OPTION 1

STUDY AREA 1: ENTRANCE OPTION 1

1. Live Oaks for Framing View 2. Annual Planting 3. Keep Ex. Walls & Piers 4. Keep Portion of Ex. Wall 5. New Walkway & Bench 6. Shoreline Restoration 7. Linear Park 8. New Shelter 9. Ex. Osprey Nest 10. Remove Parking Lot & Basketball Court 11. Bleacher Set-up Area 12. Ex. Pump Station 13. Remove Portion of Wall 14. New Roundabout 15. Tree-lined Walkway 16. New Pavers 17. Monument / Art 18. Remove Guardhouse, Kiosk & Pavement 19. Walkway Connection 20. Keep Ex. Sign 21. New Road Pull-off & Kiosk 22. Remove 2 Lanes & Add Green Space STUDY AREA 1: ENTRANCE OPTION 1a

STUDY AREA 1: ENTRANCE OPTION 1a

1. Live Oaks for Framing View 2. Historic Rail Line Walk 3. Keep Ex. Walls & Piers 4. Keep Ex. Wall 5. New Walkway & Bench 6. Shoreline Restoration 7. Linear Park 8. New Shelter 9. Ex. Osprey Nest 10. Remove Parking Lot & Basketball Court 11. Bleacher Set-up Area 12. Ex. Pump Station 13. Flowering Trees 14. New Entry Sign 15. Keep Ex. Wall and Piers 16. New Pavers & Public Art 17. Remove Guardhouse and Kiosk & Add Green Space 18. Walkway Connection 19. New Kiosk & Parking 20. New Road Connection 21. Remove 1 Lane & Add Bike Lane & Green Space STUDY AREA 1: ENTRANCE OPTION 2

STUDY AREA 1: ENTRANCE OPTION 2

STUDY AREA 2: MARINA / MCNAIR DRIVE

PROGRAM: CONSIDER EXPANDING MARINA MCNAIR DRIVE WIDTH REDUCTION EXPAND PEDESTRIAN WALK ENHANCE WATERFRONT CONNECTIONS RE-WORK PIER GATES CREATE FEATURES TO REFLECT HISTORIC RIDING GROUNDS CONSIDER PARKING FOR RESIDENTIAL VS. MARINA CONSIDER PARKING FOR MARINA VS. THEATER CONSIDER ADAPTIVE RE-USE OF BUILDINGS EDUCATION CENTER RESTAURANT W/ OUTDOOR SEATING RESTROOMS PROVIDE CONNECTIONS AROUND BUILDINGS PROVIDE ADDITIONAL SITE AMENITIES STUDY AREA 2: MARINA / MCNAIR DRIVE PROGRAM

Boston, MA Hong Kong, China San Francisco, CA Virginia Beach, VA Beaufort, SC STUDY AREA 2: MARINA / MCNAIR DRIVE INSPIRATION

STUDY AREA 2: MARINA / MCNAIR DRIVE EXISTING

1. Walkway around Seawall 2. Remove Paving & Create Green Space 3. Deck & Outdoor Seating 4. Reconfigure Parking 5. Mixed-Use Development & Parking Garage 6. Zero Mile Marker Plaza 7. Walkway Connection 8. Decking for Outdoor Seating 9. Boardwalk / Walkway 10. Reconfigure Parking 11. Roadway Connection STUDY AREA 2: MARINA / MCNAIR DRIVE PROPOSED

STUDY AREA 2: MARINA / MCNAIR DRIVE PROPOSED

STUDY AREA 3: CONTINENTAL PARK

PROGRAM: MAINTAIN PARK FOR PRIVATE EVENTS CONSIDER TIMING OF USE (NOTHING LATE-NIGHT ) CONSIDER RESTROOMS FOR SMALL EVENTS LOCATION NEEDED FOR PORTABLE RESTROOMS FOR LARGE EVENTS CONSIDER BANDSTAND ORIENTATION (MAINTAIN HISTORIC ORIENTATION ) CONSIDER WALKWAY ALIGNMENT (CURRENT ALIGNMENT NOT HISTORIC ) AREA NEEDED FOR PULL-OFF ENHANCE VEHICULAR ACCESS FOR LOADING / UNLOADING POTENTIAL TO PROVIDE STREET TREES (TREES WERE LOCATED HISTORICALLY ALONG FENWICK RD ) CONSIDER SHADOW CAST FROM CHAMBERLIN CONSIDER TYPES OF FESTIVALS / EVENTS PROVIDE OTHER STAGE AREAS PROVIDE STORAGE CONSIDER USE DURING NON-EVENTS CONSIDER INVISIBLE SOLUTIONS ENHANCE CROWD CONTROL AND SAFETY CHANGING ROOMS STUDY AREA 3: CONTINENTAL PARK PROGRAM

STUDY AREA 3: CONTINENTAL PARK INSPIRATION

STUDY AREA 3: CONTINENTAL PARK EXISTING

1. Pavers and Gathering Space 2. Add Green Space & Walkways 3. Grass Paver Parking 4. New Wharf 5. Stage Set-up Area 6. Paved Area for ADA 7. Paved Area for Stage Set-up 8. Drop-off & Walkway 9. Interpretive Signage & Plant Beds 10. New Walkways to Garden 11. Reinforced Walkway 12. Bus Stop 13. Bench 14. Restroom Building 15. Reconfigured Parking STUDY AREA 3: CONTINENTAL PARK PROPOSED

STUDY AREA 3: CONTINENTAL PARK PROPOSED

STUDY AREA 4: ENGINEER WHARF (FISHING PIER)

PROGRAM: ENHANCE PARKING FOR FISHING MAINTAIN ADA ACCESSIBILITY TO PIER MAINTAIN EMERGENCY ACCESS ENHANCE PEDESTRIAN SAFETY / CROSSING CONSIDER VEHICULAR SAFETY CONSIDER TRAFFIC CALMING CREATE SPACE FOR GATHERINGS AT 1619 MARKER CONSIDER PUBLIC ART CONSIDER PHOTOGRAPHY OPPORTUNITIES ENHANCE AND CREATE CONNECTIONS STUDY AREA 4: ENGINEER WHARF PROGRAM

Leonardtown, MD Richmond, VA Permeable Paving, Chesapeake, VA Mt. Vernon Beaufort, SC STUDY AREA 4: ENGINEER WHARF INSPIRATION

STUDY AREA 4: ENGINEER WHARF EXISTING

1. Reconfigured Parking 2. 1619 Plaza 3. One-way Parking 4. Drop-off 5. Paver Crosswalk 6. Plaza 7. Monuments or Piers 8. One-way Parking 9. New Walkways 10. Interpretive Signage & Photo Set-up Area 11. Alternative Circulation 12. Moat Walk 13. Restroom Building STUDY AREA 4: ENGINEER WHARF PROPOSED

STUDY AREA 4: ENGINEER WHARF PROPOSED

STUDY AREA 5: BATTERY & OUTLOOK BEACH

PROGRAM: OPPORTUNITY FOR PRIVATE EVENT SPACE BEHIND BATTERY BEACH / LAWN / PIER RENTAL SPACE CREATE OVERFLOW PARKING AREAS POTENTIAL FOR PEDESTRIAN BRIDGE TO INNER FORT PROVIDE ALTERNATE PATH FOR PRIVATE EVENT CLOSURE MAINTAIN & ENHANCE EXISTING PARKING LOTS FOR BUS & VEHICULAR PARKING MAINTAIN VEHICULAR ACCESS TO GULICK DRIVE / BOARDWALK REMOVE GUARDRAIL & CREATE MORE ACCESS POINTS TO BEACH PROVIDE SITE AMENITIES & FURNISHINGS CONSIDER ADAPTIVE RE-USE OF BUILDING 300 STUDY AREA 5: BATTERY & OUTLOOK BEACH PROGRAM

Lee Square Park, Bowling Green, KY Farmville, VA Playground, Toronto Myrtle Beach, SC STUDY AREA 5: BATTERY & OUTLOOK BEACH INSPIRATION

STUDY AREA 5: BATTERY & OUTLOOK BEACH EXISTING

1. Shelter Location & Walkway 2. ADA Ramp 3. Earthworks Management 4. Alternative Pathway 5. Vehicular & ADA Access 6. Reconfigured Parking Approx. 180 spaces 7. ADA Access 8. Walkway on Axis with Gate 9. Gateway & Amphitheater Steps 10. Building 300 Renovation 11. Deck & Outdoor Seating 12. New Playground 13. Shelters or Picnic Tables 14. New Decorative Guardrail 15. Beach Access (ADA) 16. Decorative Outdoor Furnishings 17. Pedestrian Bridge Connection to Fort STUDY AREA 5: BATTERY & OUTLOOK BEACH OPTION 1

STUDY AREA 5: BATTERY & OUTLOOK BEACH OPTION 1

1. Shelter Location & Walkway 2. ADA Ramp or Steps 3. Earthworks Management 4. Alternative Pathway 5. Vehicular & ADA Access 6. Reconfigured Parking Approx. 85 spaces 7. ADA Access 8. Walkway on Axis with Gate 9. Gateway 10. Building 300 Renovation 11. Deck & Outdoor Seating 12. Amphitheater-style Steps 13. Picnic Area 14. Large Shelter 15. Decorative Guardrail 16. Beach Access 17. Decorative Outdoor Furnishings 18. Pedestrian Bridge Connection STUDY AREA 5: BATTERY & OUTLOOK BEACH OPTION 2

STUDY AREA 5: BATTERY & OUTLOOK BEACH OPTION 2

1. Shelter Location & Walkway 2. ADA Ramp 3. Earthworks Management 4. Alternative Pathway 5. Vehicular & ADA Access 6. Reconfigured Parking Approx. 120 spaces 7. ADA Access 8. Walkway on Axis with Gate 9. Gateway Feature 10. Building 300 Renovation 11. Deck & Outdoor Seating 12. New Playground 13. Shelters or Picnic Tables 14. Large Shelter 15. Decorative Guardrail 16. Beach Access 17. Decorative Outdoor Furnishings 18. Pedestrian Bridge Connection STUDY AREA 5: BATTERY & OUTLOOK BEACH OPTION 3

STUDY AREA 5: BATTERY & OUTLOOK BEACH OPTION 3

Existing Building Proposed Rendering STUDY AREA 5: BUILDING 300 / BOARDWALK CAFÉ

Proposed Plan STUDY AREA 5: BUILDING 300 / BOARDWALK CAFÉ

STUDY AREA 6: GLACIS

PROGRAM: CONSIDER ADAPTIVE RE-USE OF BLDG 88 AND RANGE BUILDING MAINTAIN VIEWS TO FIREWORKS PROVIDE MORE PERMANENT PARKING CONSIDER A STAGE AREA FOR EVENTS PROVIDE SHADE MAINTAIN MOAT ACCESS STUDY AREA 6: GLACIS PROGRAM

Stage Example, Yorktown, VA Circa 1919 Crissy Field, San Francisco, CA Chattanooga, TN Norfolk, VA STUDY AREA 6: GLACIS INSPIRATION

STUDY AREA 6: GLACIS EXISTING

1. Walkway Connection 2. Interpretive Signage 3. Moat Access 4. Wetland Restoration or Infill 5. Secondary Stage 6. Walkway to Follow Outer Works 7. Earthworks Management 8. Keep Ex. Road 9. New Walkways & Plaza 10. Bench 11. New Roadway Connection 12. Building 88 Renovation 13. Reconfigured Parking 14. Navy Range Building Renovation 15. ADA Access 16. Deck or Patio 17. Beach Access 18. New Roadway Connection 19. New Roadway Connection STUDY AREA 6: GLACIS PROPOSED

STUDY AREA 6: GLACIS PROPOSED

Proposed Plan STUDY AREA 6: BUILDING 88 / COMMEMORATION PARK VENUE

Proposed Plan (1 st Floor) Proposed Plan (2 nd Floor) STUDY AREA 6: NAVY RANGE BUILDING

STUDY AREA 7: WHERRY QUARTER

PROGRAM: MAINTAIN AS RENTABLE OPEN SPACE CONSIDER ADA ACCESS ISSUES WITH REMAINING CURB CONSIDER LAYOUT FOR EVENTS (UTILITIES, PARKING, ETC.) CONSIDER MULTI-PURPOSE SOLUTIONS PROVIDE MORE ACCESS TO BOARDWALK CONNECTIONS TO NPS PROPERTY CONNECTION TO PARADISE OCEAN CLUB STUDY AREA 7: WHERRY QUARTER PROGRAM

STUDY AREA 7: WHERRY QUARTER EXISTING

1. Shelter 2. Soccer / Multi-purpose Fields 3. Ex. Steps 4. Shelter / Concession 5. ADA Access or Amphitheater Seating 6. Remove Parking & O/H Utilities 7. New Parking Lot 8. New Roadway Connection 9. New Roadway Connection 10. Jr. Soccer / Multi-purpose Fields 11. Create Grassed Slope for Seating STUDY AREA 7: WHERRY QUARTER PROPOSED

STUDY AREA 7: WHERRY QUARTER PROPOSED

STUDY AREA 8: KAYAK LAUNCH

PROGRAM: PROVIDE SITE AMENITIES (GAZEBO, BOARDWALK, SITE FURNITURE) PROVIDE RESTROOM BUILDINGS PROVIDE PEDESTRIAN CONNECTIONS CONSIDER PARKING (TRAILER / BOAT/VEHICULAR) CONSIDER EVENTS (SAILING, RACING, COMPETITIONS) POTENTIAL ONE-WAY VEHICULAR CIRCULATION CONSIDER NEW VEHICULAR CONNECTIONS PROVIDE TRAFFIC CALMING PROVIDE CONNECTION TO BEACH POTENTIAL LIVING SHORELINE STUDY AREA 8: KAYAK LAUNCH PROGRAM

Ljubljana, Slovenia Pavilion Example Hampton, VA Shoreline Restoration Path Example STUDY AREA 8: KAYAK LAUNCH INSPIRATION

STUDY AREA 8: KAYAK LAUNCH EXISTING

1. Shoreline Restoration 2. Beach Area 3. ADA Access to Beach 4. Wood Deck for Seating / Viewing 5. Re-pave Kayak Launch Access 6. Steps 7. Connect with 7-mile Trail 8. Pavers 9. Monument Piers 10. Car & Trailer Parking (one-way) 11. Ex. Utility Bldg 12. Restroom / Bike & Kayak Rental 13. Shelter 14. Multi-purpose Field 15. New Roads and Parallel Parking 16. Event Set-up Area STUDY AREA 8: KAYAK LAUNCH PROPOSED

STUDY AREA 8: KAYAK LAUNCH PROPOSED

STUDY AREA 9: COMMUNITY CENTER

PROGRAM: 200 PIER PROPOSED (CITY OF HAMPTON) POTENTIAL LIVING SHORELINE CONSIDER REMOVING BERM CONNECTION TO NPS LAND STUDY AREA 9: COMMUNITY CENTER PROGRAM

STUDY AREA 9: COMMUNITY CENTER EXISTING

1. 7-mile Trail Connection 2. 200-foot Pier (location pending) 3. Shoreline Restoration 4. Walkways / Plaza 5. Connection to Air Strip 6. Walkway to Parking 7. Tent Set-up Area STUDY AREA 9: COMMUNITY CENTER PROPOSED

STUDY AREA 9: COMMUNITY CENTER PROPOSED

STUDY AREA 10: 400-YEAR COMMEMORATION AREA

3 1 2 1. Building 138 Post Library 2. Building 42 Post Theatre 3. Cannon Park STUDY AREA 10: COMMEMORATION AREA EXISTING

INFORMATION: BUILT 1909 RENOVATED 1946 TWO STORIES 14,468 SF STUDY AREA 10: BUILDING 138 POST LIBRARY

STUDY AREA 10: REAR (EAST) ELEVATION

STUDY AREA 10: BUILDING SECTIONS

1. GLASS / STEEL / BRICK ADDITION 2. ELEVATOR / STAIR 3. ADA RESTROOM 4. BRIDGE 5. RESTROOM 6. VISITOR CENTER DESK 7. FILM / VIEWING ROOM (FMA + NPS) 8. ADA RAMP 9. EXISTING TRANSFORMERS STUDY AREA 10: FIRST FLOOR PROPOSED PLAN

1. GLASS / STEEL / BRICK ADDITION 2. ELEVATOR / STAIR (ACCESS TO ROOF GARDEN) 3. ADA RESTROOM 4. BRIDGE 5. RESTROOM 6. RESTORED READING ROOM 7. RESTORED ATRIUM 8. ROOF GARDEN SECONDARY ACCESS STUDY AREA 10: SECOND FLOOR PROPOSED PLAN

1. GLASS/STEEL/BRICK ADDITION 2. RESTORED BASEMENT WINDOWS 3. CONFERENCE ROOM 4. STAFF PANTRY 5. WORK ROOM 6. RESTROOM 7. SERVER ROOM 8. OFFICES STUDY AREA 10: BASEMENT (STAFF LEVEL) PROPOSED PLAN

SAMPLE CIRCULATION TOWER MAP IDEA FOR ROOF GARDEN/ PLAZA BIRMINGHAM, AL BIRMINGHAM, AL HOUSTON PERMITTING CENTER, HOUSTON, TX YALE UNIVERSITY ART GALLERY, NEW HAVEN, CT STUDY AREA 10: LIBRARY ARCHITECTURAL ELEMENTS FT. MONROE

INFORMATION: BUILT 1938 RENOVATED 1973, 1983, 1991 TWO STORIES 10,450 SF STUDY AREA 10: BUILDING 42 POST THEATRE

STUDY AREA 10: SIDE (EAST) ELEVATION

1. THREE SEASON ENCLOSED PORCH 2. EXPANDED LOBBY SPACE 3. NEW ADA TOILET ROOM STUDY AREA 10: LOBBY PROPOSED PLAN

1. DRESSING ROOM & TOILETS 2. LOADING DOCK & CONNECTION TO STAGE STUDY AREA 10: AUDITORIUM PROPOSED PLAN

STUDY AREA 10: THEATRE ARCHITECTURAL ELEMENTS

3 1 2 1. Building 138 Post Library 2. Building 42 Post Theatre 3. Cannon Park STUDY AREA 10: COMMEMORATION AREA EXISTING

STUDY AREA 10: COMMEMORATION AREA PRECEDENTS

US Navy Memorial, DC Lynchburg, VA Richmond, VA Charlottesville, VA STUDY AREA 10: COMMEMORATION AREA INSPIRATION

1. Plaza / Monument / Art 2. NPS Sign 3. Walkway Enhancement 4. Plaza & Drop-off 5. ADA Parking & Ramp 6. Reconfigured Parking 7. Addition, Loading & Service 8. New Curb Cut 9. Reconfigured Parking 10. New Roadway Connection 11. New Parking Lot 12. Mixed-use / Parking Garage 13. New Connections 14. Old Hotel Site 15. New Roadway Connection 16. Keep YMCA Drop-off 17. Reconfigured Parking 18. Observation Deck 19. Restored Housing 20. New Roadway Connection 21. Podium & Plaza 22. Building Addition 23. Reconfigured Parking 24. Commemoration Loop STUDY AREA 10: COMMEMORATION AREA PROPOSED

STUDY AREA 10: COMMEMORATION AREA PROPOSED

STUDY AREA 10: COMMEMORATION AREA PROPOSED

CONSIDERATIONS MOVING FORWARD Signage Package (in the works) Parking Plan (KHA) Design Guidelines (Buildings & Landscape) Transportation / Bicycle Plan Earthworks Management Plan Integrate Interpretive Plan with Waterfront Park NEXT STEPS Review and Integrate Stakeholder & Public Comments Final Plans

THANK YOU! Billy Almond (WPL) billy@wplsite.com Nicole Weisstanner (WPL) nicole@wplsite.com Emily Rothrock (WPL) emily@wplsite.com Ron Quinn (Q-Design) qdesignarchitecture@gmail.com Carrie Quinn (Q-Design) qdesignarchitecture@gmail.com Jamie Weist (KHA) jamie.weist@kimley-horn.com Rob McGinnis (OCULUS) rob@oculus.info