YOUR FUTURE RIDE. Lynnwood. 200th St SW. Lynnwood. Transit Center. 52nd Ave W. 220th St SW. Transit Center. 236th St SW. 244th St SW.

Similar documents
Lynnwood Link Extension

Blue Line LRT Extension

The University District envisions, in its neighborhood

Transportation. Strategies for Action

ATTACHMENT A. Definition of Activity Centers

SYSTEM EXPANSION. Sound Transit system expansion will:

WELCOME TACOMA TRESTLE TRACK & SIGNAL PROJECT OPEN HOUSE REVIEW AND COMMENT ON TRESTLE AND PLATFORM PRELIMINARY STRUCTURAL DESIGN

This Review Is Divided Into Two Phases:

PIKE PINE RENAISSANCE: ACT ONE. October 19, 2017

ALTERNATIVE STATION AREA -

EcoVerde MADISON TO DOWNTOWN TO BEACH. Legend Highway Major Connection Major Street Local Street Proposed Access. Response to Tropicana Field RFP

DESIGN AND CONSTRUCTION OPEN HOUSE

East Corridor Final Environmental Impact Statement

Century Park to Ellerslie Road Preliminary Engineering

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

East Link Extension. June 28, South Bellevue Final Design Open House Public Involvement Summary

ROCHESTER INSTITUTE OF TECHNOLOGY Active Transportation Improvements 2010

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

Mary Hills Nature Area. Roadway Lighting. The Minneapolis Clinic of Neurology Courage Kenny Rehabilitation Institute

VEHICULAR AND PEDESTRIAN CIRCULATION

DRAFT Civic Center Station Area Plan. Executive Summary

Public Consultation Summary: Lakeview Place Making Workshop January 30, 2008.

Pattern 3: Parking. Parking in great amounts is not a characteristic of great streets. Allan Jacobs. Community Form and Mobility Principles

3.1 community vision. 3.3 required plan elements

OVERLAKE VILLAGE STATION

FRUITVALE TRANSIT VILLAGE (Phase 2) Residential Project

WEST LOOP DESIGN GUIDELINES CHECKLIST

4.9 Mendocino Avenue Corridor Plan Design Guidelines

DOWNTOWN RESIDENTIAL DISTRICT DEVELOPMENT OPPORTUNITES

JULIA M. CARSON TRANSIT CENTER

Michigan State University Barrier-Free/Accessibility Project Status Summary March 2017

City of Plattsburgh DRI: Downtown Streetscapes & Riverfront Access. Downtown Streetscape and Riverfront Access Design

CITY OF MERCER ISLAND DESIGN COMMISSION STAFF REPORT

Introduction. Community Outreach Approach. Sacramento Valley Station Master Plan. Online Questionnaire Summary of Feedback.

MEMORANDUM. I2 District Downtown Parking Overlay District 24,000 square feet /.55 acres. Industrial Employment District North Loop Small Area Plan

COMPLETE GREEN STREET CHECKLIST

Design Guidelines for the Route 30 Corridor Master Plan: Subdivision and Land Development Elements

VAUGHAN METROPOLITAN CENTRE STATION

Jenifer Street Reconstruction Neighborhood Engagement Meeting November 4, 2015

Reconnecting to a Forgotten River St. Cloud MN. Aaron Hanson Design Design Thesis LA 572, Thesis, Spring 2012

Town Center (part of the Comprehensive Plan)

GAMMAGE SQUARE - RECOMMENDATIONS

THE NEIGHBORHOOD TODAY

PROJECTS AND THE PUBLIC ART MASTER PLAN

Public may provide comments on the GDP within the next two weeks (December 24)

Cleveland Park Streetscape and Drainage Improvement Project 1

JACKsON STREET PIER CONCEPTUAL DESIGN PACKAGE SEPTEMBER 21, 2017

DOWNTOWN REDMOND LINK EXTENSION SEPA Addendum to the East Link Project Final Environmental Impact Statement

STREETSCAPE IMPROVEMENTS - RECOMMENDATIONS

Millbrae TOD #2 Project Analysis

Urban Design & Placemaking

Northwest commuter rail station US 36 BRT. Westminster Station

1.1 WATERFRONT SEATTLE

WATERFRONT DISTRICT DESIGN STANDARDS

Description of Preferred Alternative

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2.

Regency Developments. Urban Design Brief. Holyrood DC2 Rezoning

PHASE 3-4 PARKS SOUTH PARK AND CHANNEL PARK

PLAN ELEMENTS WORKSHOP. April 5, 2016

South 200 th Link Extension Open House April 3, 2013

South Davis County COMMUNITY SPOTLIGHT

The Village. Chapter 3. Mixed Use Development Plan SPECIFIC PLAN

NEIGHBORHOOD 3: UNIVERSITY EDGE

Key Themes and Responses May 2016

THE CIVIC DISTRICT DEVELOPMENT OPPORTUNITIES

SFMTA PHELAN LOOP AND PUBLIC PLAZA PHELAN OCEAN AVENUE

Metro 2010 Pedestrian Symposium Walking into the Future City

Goals AND Guiding principles

Forest Hills Improvement Initiative A Partnership for Building a Better Community. Use & Design Guidelines September 23, 2008

Welcome. Community Consultation Meeting November 28, Review and discuss the Bathurst Quay Neighbourhood Plan Framework

PUBLIC RIGHT-OF-WAY IN THIS CHAPTER PUBLIC REALM

PROPOSED WATERFRONT DISTRICT DESIGN STANDARDS

QUESTION 8: What are your Public Realm priorities for implementation? What would you like to see happen first? TELL US WHAT YOU THINK

PORT OF VANCOUVER WATERFRONT DEVELOPMENT. Concept Development Plan City Center Redevelopment Authority April 20, 2017

Dogpatch/22nd Street Greening

BUILDING SCALE AND SETBACKS 5 ELEMENTS:... 5 FAÇADES (COMMERCIAL/RESIDENTIAL) 5

CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS

CONTEXT + PROGRAM. CONTEXT - Site Photos RIALTO THEATRE STATION DEPOT HOTEL CONGRESS GREYHOUND SITE 4TH AVENUE BROADWAY BOULEVARD

BROOKHILL NEIGHBORHOOD MODEL ZONING MAP AMENDMENT PREFACE TO APPLICATION

FREEWAY/TOURIST DISTRICT

Planning Board Briefing

The Vision. Photo provided by The Minervini Group. 46 Vision, Objectives & Strategies

DRAFT MAJOR CORRIDORS 48 EAST BENCH MASTER PLAN

ANCHOR TO ANCHOR. Rescale the street to create an iconic boulevard.

Today Land & People. Northeast Nampa Gateway District. Employment. Land Use Characteristics. Demographics. Current Zoning

Welcome. Green Line LRT. Beltline Alignment Options. Stay engaged! Follow the Green Line story at calgary.ca/greenline

9/19/2018 TODAY S WEBINAR AGENDA CONTINUING EDUCATION UPCOMING TRAINING FROM APBP

ROME WATERFRONT VILLAGE PROJECT NARRATIVE January 25, 2018

Planning Board Hearing October 20th, 2016

The Trinity River Corridor Project Update

38 Queen s University Campus Master Plan Part 1

Queensborough Eastern Neighbourhood Node. Community Open House

Northgate Link (University District to Northgate)

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

Sheridan Boulevard S TAT I O N A R E A P L A N S H E R I D A N B O U L E VA R D S TAT I O N A R E A P L A N

A Vibrant Downtown. Chapter 5 Cary Public Art Opportunities 31

MONTGOMERY COUNTY METRO STATION AREA DESIGN CHARRETTE

03 HIGH PRIORITY SITES

TREASURE ISLAND PHASE ONE PROJECTS PUBLIC ART PROJECT OUTLINE

SUBCHAPTER 4-B GUIDELINES FOR THE B-3 COMMERCIAL CHARACTER AREA

Transcription:

.17 YOUR FUTURE RIDE Lynnwood Lynnwood Transit Center 200th St SW P 44th Ave W 220th St SW Includes accommodations for a future station 2nd Ave W Mountlake Terrace Edmonds Lake Ballinger Mountlake Terrace Transit Center P 26th St SW 244th St SW King-Snohomish County Line Shoreline Conference Center NE 18th P NE 18th St Shoreline N 14th St N 10th St P th Ave NE NE 14th Jackson Park Golf Course Includes accommodations for a future station Seattle Lake Washington North Seattle Community College Northgate Mall P Northgate Transit Center P Stations: at NE 14th, NE 18th, Mountlake Terrace Transit Center and Lynnwood Transit Center Park & Rides: at NE 14th, NE 18th, Mountlake Terrace Transit Center and Lynnwood Transit Center Accommodation for potential future stations at NE 10th and 220th St SW, should future funding become available Light rail under construction Elevated routes Surface route

.17 BENEFITS OF YOUR FUTURE RIDE How long will my trip from Lynnwood take? LYNNWOOD 4 MINUTES MOUNTLAKE TERRACE MINUTES NE 14TH MINUTES NE 18TH MINUTES NORTHGATE MINUTES U DISTRICT 8 MINUTES DOWNTOWN SEATTLE 7 MINUTES 24 MINUTES STADIUM DOWNTOWN BELLEVUE 27 MINUTES 9 MINUTES SEA-TAC AIRPORT OVERLAKE TRANSIT CENTER Ride Link and save 14-16 minutes on peak morning commutes That s 6 HOURS per year In that time you could watch 2 movies EACH LINK CAR CAN HOLD... 4 bicycles 4 wheelchairs 200 riders Multiple suitcases One train every 4MINUTES during peak weekday commutes

.17 PROJECT SCHEDULE 2010-2012 EVALUATED POTENTIAL ROUTE AND MODE ALTERNATIVES 201-201 ENVIRONMENTAL REVIEW 2016-2018 FINAL DESIGN AND PERMITTING Develop and then finalize project design through 0%, 60% and 90% milestones Obtain permits Pre-construction activities WE ARE HERE 1. Utility relocation 2. Clearing. Field work investigations 2018-202 CONSTRUCTION LATE 202 SAFETY AND SYSTEMS TESTING OPEN FOR SERVICE Subject to change

NE 14TH STATION SITE PLAN

NE 14TH STATION AERIAL VIEW NE 14TH ST 2 1 8 4 6 4 7 1 Bike racks 2 Parking garage Bus drop-off 4 Station entrance Elevator 6 Elevated platform 7 Noise wall 8 Drop-off/Public gathering

NE 14TH STATION EXTERIOR VIEWS 4 2 NE 14th Station street view (looking north) 1 2 NE 14th Station street view (looking south) 1 Parking garage 2 Bus drop-off Station entrance 4 Elevator Elevated platform

NE 14TH STATION INTERIOR AND PLATFORM VIEWS 4 2 1 NE 14th Station concourse view 1 Elevator 2 Escalator Ticket vending machine & information 4 Stairs Public restrooms NE 14th Station platform view

NE 14TH STATION PLAZA AND PLATFORM LEVEL PLANS LEGEND PUBLIC SPACE VERTICAL CIRCULATION EGRESS STAIRS ANCILLARY SPACE

Sound Transit Art Program NE 14th Station Artwork Buster Simpson Local luminary Buster Simpson is developing two sculptures which he is calling Helical Sine Wave Trusses. Simpson s projects for the station are a continuation of his long practice of exposing and celebrating institutional infrastructure. He is particularly drawn to the way water is controlled and used in urban places. Related artwork can be in Seattle along Vine Street in the Belltown neighborhood, at the Brightwater Treatment Plant in Snohomish County and, within the next few years, along Seattle s Central Waterfront. Simpson writes the Helical Sine Wave Truss is a metaphoric sculptural conveyance storm water coming off the station garage s roof into a mitigating bog and moss landscape. The form s curving rivulets suggest the dynamics of the water s meander, making transparent, legible and instructive the respectful journey of water at this, one of the sources of Thornton Creek. Concept sketch showing the movement of storm water from the station garage. View of the west garage façade looking towards southeast. View of the west and south garage façades looking NE. Water Glass (2001) Seattle, Washington Whole Flow (2009) Pasadena, California Beckoning Cistern (200) Seattle, Washington Examples of the artist s past work related to this project at the NE 14th Station garage.

NE 18TH STATION SITE PLAN NEW TRAFFIC SIGNAL AT INTERSECTION RETAINING WALL, TYPICAL TH AVE NE GARAGE ENTRANCE/EXIT FIRE LANE PARKING GARAGE BIORETENTION PLANTING NE 18TH ST COVERED WALKWAY IMPROVED BRIDGE CONNECTION I- SB EDGE OF GUIDEWAY BELOW SEAT WALL STATION ENTRANCE, TYPICAL BIKE LOCKERS () BIKE CAGE BIKE RACKS () I- NB BENCH, TYPICAL TREE IN GRATE, TYPICAL RETAINING WALL PLATFORM BELOW STATION EDGE OF GUIDEWAY BELOW BIKE RACKS () BUS LIVE ZONE ENHANCED CONCRETE PAVING PARATRANSIT TH AVE NE BUS LIVE ZONE BUS LIVE ZONE BUS SHELTER & BENCH BIKE LOCKERS (2) BUS LIVE ZONE BUS LIVE ZONE NEW TRAFFIC SIGNAL AT INTERSECTION BUS LAYOVER BUS ONLY ENTRANCE & EXIT NE 18TH ST BUS LAYOVER BUS LAYOVER PASSENGER DROP-OFF ADA RAMP BUFFER PLANTING NE 189TH ST FUTURE DEVELOPMENT BIORETENTION PLANTING STREETSCAPE PLANTING LAWN 8TH AVE NE

NE 18TH STATION AERIAL VIEW 6 NE 18TH ST 9 2 8 7 6 4 1 1 Bike racks 2 Parking Drop-off 4 ADA parking Bus drop-off 6 Station entrance 7 Platform 8 Noise wall 9 Covered pedestrian walkway

NE 18TH STATION EXTERIOR VIEWS 2 1 NE 18th Station street view (looking north) 2 4 NE 18th Station street view (looking south) 1 Bus drop-off 2 Station entrance Ticket vending machines 4 Bike racks

NE 18TH STATION INTERIOR AND PLATFORM VIEWS 1 4 2 NE 18th Station concourse view 1 Elevator 2 Escalator Stairs 4 Bike racks NE 18th Station platform view (looking north)

NE 18TH STATION PLAZA AND PLATFORM LEVEL PLANS

Sound Transit Art Program NE 18th Station Artwork Mary Lucking Arizona-based artist Mary Lucking is working on a series of murals and cut metal screens populated with images of imagined birds and plants. She thinks of the birds as stand-ins for the station s neighbors and writes in some places, the birds are hanging out in a group, like people waiting for a train. Their postures and gazes suggest that they are talkative, bored, shy, sleepy, curious or wistful the emotions of the daily commute. Like real birds, they share our physical space, but experience it in a different way. Lucking s inspiration comes from a variety of sources, including her exploration of local neighborhoods set amid tall trees, the forests of folktales and the notion of nests as a metaphor for home. Concept sketch of mosaic technique on ticketing wall in south entrance. Cut metal plant forms concept on south entrance building. Detail of mosaic fabrication technique. Concept sketch showing cut metal bird and plant forms on north entrance building.

MOUNTLAKE TERRACE SITE PLAN

MOUNTLAKE TERRACE STATION AERIAL VIEW 6 4 7 6 2 1 8 1 Bike racks 2 Bike storage Existing parking garage 4 Bus drop-off Station entrance 6 Elevator 7 Platform 8 Drop-off

MOUNTLAKE TERRACE STATION EXTERIOR VIEWS 1 4 2 2 Mountlake Terrace Station street view (looking north) 4 7 6 Mountlake Terrace Station street view (south entrance looking west) 1 Existing parking garage 2 Bike storage Bus drop-off 4 Station entrance Platform 6 Bike racks 7 Elevators

MOUNTLAKE TERRACE STATION LOBBY VIEWS 2 4 6 1 Mountlake Terrace Station north lobby 4 2 6 1 Mountlake Terrace Station south lobby 1 Elevator 2 Escalator Stairs 4 Ticket vending machine & information Public restrooms 6 Bus drop-off

Mountlake Terrace Station platform view MOUNTLAKE TERRACE STATION PLATFORM VIEW

MOUNTLAKE TERRACE STATION PLAZA AND PLATFORM LEVEL PLANS SPACE

Sound Transit Art Program Mountlake Terrace Station Artist: Kipp Kobayashi ABOUT THE ARTIST As an artist and urban designer, Kipp Kobayashi has a keen interest in the nature of human interaction in our public environments and is in constant search for ways to initiate dialogue and to promote sociability within these spaces. His combinations that are unique to each project. By focusing on these intersections of the human, cultural and natural factors, he aims to create artwork that can continue to change, grow and evolve along with the world around it; forever changing how we perceive a particular place or thing. EXAMPLES OF THE ARTIST S PAST WORK Fluid Dynamics, Alondra Park, California, 2012 project in Southern California. Here, Kobayashi photographed local skaters, turning those images into silhouettes. Rendered life-size onto the park s surfaces, the silhouettes create the impression that the entire deck is like the surface of a pool of water full of blue rippling waves. At the entrance to a multi story mixed-use project in Pasadena, Kobayashi chose to explore different types of social connectivity abstractly through a project winding up through an outdoor courtyard. Connecting Flights, Pasadena, California, 2016 Imagining what future activities and dialogue might occur here, hundreds of folded aerogami shapes were envisioned swirling whimsically above the plaza. Natural Flow, Long Beach, California, 2016 In 2016, Kobayashi was invited to create 6 unique street crossings as part of the Southern California Vision Zero street safety improvements. The initial process involved the tracing of the actual movement of people as they crossed the street. The artwork also refers to natural systems of migration and breakwater, serving as an analogy to the rejuvenation of this redeveloping downtown area. Story Lines, Station 14, Castaic, California, 2016 Containing the layers of stories that ultimately form each company s unique identity, the objects and tools collected by hallways provided inspiration for this suspended sculptural composition. Over 200 scanned and printed objects were arranged in sequential strands. Reminiscent of hoses hanging within traditional drying towers, they serve as an archive of past events while implying multiple combinations of narratives in a lyrical and playful way.

.17 UNDERSTANDING NOISE WALLS AND NOISE MITIGATION Below are types of noise mitigation that Sound Transit can use to help reduce noise along Link light rail alignments. Elevated sound walls Installed close to the track Made of stainless steel or aluminum Inside surface absorbs sound Wall heights range from four feet to 10 feet over the elevated deck Provide noise reduction up to 1 decibels Audible emergency messages at platform Elevated sound barriers Thick plastic/rubber sheets used on elevated guideway Used when less than 10 decibels noise reduction is needed At-grade sound walls Typical sound walls seen along freeways Made of concrete or engineered composites Wall heights can range from eight feet to 26 feet Provide noise reduction up to 1 decibels

TREE MITIGATION Trees removed for construction and future operations Construction of the guideway and stations requires removal of trees along the corridor. Trees will be planted to mitigate those being removed. Sound Transit continues to work with local jurisdictions to maximize planting opportunities and will plant more trees than those being affected. Tree placement strategies Sound Transit continues to work with local jurisdictions to determine where new trees will be planted. Plans may include strategic replacement plantings and community engagement opportunities. The Roadside Master Plan also outlines the future restoration and vegetation landscaping along Interstate where light rail will be constructed. Jurisdiction Number of trees to be removed Required replacement plantings Seattle properties 66 67 91 Proposed plantings Shoreline properties 2 67 9,474 Mountlake Terrace properties 2 462 1,690 Lynnwood properties 42 426 1,761 WSDOT property corridor wide 4,21,07,07 *Projected numbers as of May 1, 2017

TREE SAFETY ASSESSMENT Maintaining a clear area around the Link light rail guideway ensures a safe and reliable space for trains to travel. Removing trees and vegetation minimizes the chance for branches to fall onto the tracks and disrupt service. Secondary clearing and grading limits Primary clearing and grading limits Clearing and Grading Limits Secondary clearing and grading limits Peripheral limits LEGEND Primary clearing and grading limits All trees and vegetation in this area are removed for construction access and guideway operations. Secondary clearing and grading limits Trees that could fall into the primary area are removed. Branches that reach into the primary area are pruned. Vegetation and trees could be removed for construction or guideway access. Peripheral limits Trees and vegetation are monitored for potential future safety risks and are pruned accordingly.

RONALD BOG MITIGATION PROJECT The Lynnwood Link Extension project will permanently impact approximately 0.42 acres of wetlands along I- in the City of Shoreline. Sound Transit will mitigate these impacts by reestablishing approximately one acre of wetlands at Ronald Bog Park, which will increase ecological functions and values. Outside of the wetland mitigation areas, new and improved trails will enhance pedestrian access. 1st Ave NE 1st Pl NE NE 1th St 2nd Ave NE Area of wetland impacts 4th Ave NE NE 1rd St NE 12nd St NE 11st St Wetland impacts are mitigated through reestablishment of wetlands at Ronald Bog Park.