PROJECT: NITESH PALO Bangalore FIRE SAFETY MEASURES

Similar documents
Technical write-up on Fire safety services

Following are the systems proposed as per NBC & Local Fire Authority:

Enclosure 4- RISK ASSESSMENT

DISASTER MANAGEMENT PLAN 3.0 IDENTIFICATION OF MAJOR HAZARD POTENTIAL

RISK ASSESSMENT & EMERGENCY PREPAREDNESS PLAN

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT

CHAPTER 8: RISK ASSESSMENT & EMERGENCY PREPAREDNESS PLAN

DEPARTMENT OF FIRE & EMERGENCY SERVICES DNH.


Proposed Commercial Project at Plot No. C3A, Sector-16B, Greater Noida West (U.P)

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU STANDARD

UNIVERSITY OF MISSOURI Fire Protection System Design 2016 Q1

Fire Protection in High-rise Buildings

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT

Material Design for Central Chutes

A. This section includes design and performance information for fire protection and suppression systems.

ENGINEERING PROJECTS (INDIA) LTD. (A Govt. of India Enterprise) Signature of Bidder 1 of 11 EPI

School of Fire & Safety, GSFC University

Fire Sprinkler Plan Submittal Form

PRICE BID. UNIT QTY Rate in Figure Rate in words Amount DESCRIPTION OF ITEM D: FIRE PROTECTION SYSTEM

1.1.1 HAZARD IDENTIFICATION

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT

7.2 SAFETY CODE FOR BUILDING & FIRE FIGHTING SYSTEM

Explosion Protection Engineering Principles

DEPARTMENT OF FIRE & EMERGENCY SERVICES DNH.

Checklist For Life Safety

FIRE PROTECTION. 1. Vertical fire pumps shall not be used at the University.

Skilled Healthcare Documentation Requirements Life Safety and Fire Protection

FIRE INSPECTION CHECKLIST

TRIMAX ASIA ENGINEERING & CONSTRUCTION (PG U )

REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE RISK ASSESSMENT

Hiren Industrial Corporation

Winnipeg Fire Department Fire Prevention Branch

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU INSPECTION CHECKLIST

COGEN CONSULT. Page 1 of 23

SCHEDULE. Essential Safety Measures taken from Schedule 9 of the Building Regulations PART 1 BUILDING FIRE INTEGRITY

FUNDAMENTALS OF FIRE SAFETY

DRY POWDER FIRE EXTINGUISHER (Stored Pressure) ABC TYPE - PORTABLE


Delhi Metro System. Emergency and Fire Safety Measures in. - by Sanjeev Kumar & Kailash Chandra Joshi. Fire Protection & Safety

Govt. of West Bengal Online Clearance for Fire Safety Certificate and Renewal (Application for Fire Safety Recommendations)

PLAN REVIEW CHECKLIST

DIVISION 21 FIRE SUPPRESSION FIRE SUPRESSION

Aircraft Hangers. ft. (3,716 sq. m) per hangar construction type as defined by NFPA 409

EXHIBIT D ATTACHMENT G - UNIT PRICING DMS-14/15-039B - SIMPLEXGRINNELL, LP FIRE SPRINKLER SYSTEM INSPECTIONS YEARS 1-5

Proposed construction of National Institute of Homeopathy at Sec-A8, Narela Delhi by Ministry of Ayush. Risk Assessment

APPLICATION FOR FIRE CERTIFICATE / FIRE CLEARANCE UNDER THE MAURITIUS FIRE AND RESCUE SERVICE ACT 2013 OFFICE USE ONLY

CHAPTER 8 OCCUPATIONAL HEALTH AND SAFETY

DESIGN & SAFETY REQUIREMENTS OF FIRE HYDRANT IN CHEMICAL PLANT

HDPE PIPING SYSTEMS. FIRE FIGHTING APPLICATION by POLYETHYLENE PIPE.

Risk assessment is a term used to describe the overall process or method where you:

Fire Safety. Presenter, Kevin V Coleman September 14 th 2016

Black Diamond Fire Department Building Owner s Responsibilities for Fire Safety Equipment

HI-FOG for buildings. Technical introduction. Protecting people, property and business continuity. Jussi Tiainen

C. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers.

TECHNICAL AND USER REQUIREMENTS FOR PERSONAL ALERT SAFETY SYSTEMS

Property Protect Risk Questionnaire (To be completed for all risks containing high hazard activities / processes)

Western Michigan University Facilities Management Engineering Division

RISK ASSESSMENT AND DISASTER MANAGEMENT PLAN 1.1 RISK ASSESSMENT AND DISASTER MANAGEMENT PLAN

Fire Safety and Evacuation Plan

1.1 Refer to Section for General Mechanical Requirements. 1.3 Refer to Section for Pipe and Equipment Identification Requirements.

FIRE SAFETY INSPECTION REPORT

FIRE INSPECTORS GUIDELINES FOR PLAN REVIEWS AND INSPECTIONS OF NEW CONSTRUCTION / ADDITIONS AND CHANGE OF OCCUPANCY

Sprinkler Permit Applications

FIRE SAFETY INSPECTION REPORT

Port of St Helens SIA Aircraft Hanger Scappoose, OR

SECTION : FIRE PROTECTION SYSTEMS

Module 3. Water-Based Suppression Systems (WBSS) Part II: Highlights of Code Requirements

Ramp up. Ramp up. Ramp up 7,540 3,414 3,957 3,761 3,800. Fire Hose Reel. Fire. Lift Lobby Granito tiles DN DN 2,932 ENTRANCE GATE

DIVISION 21 FIRE SUPPRESSION

Reliance Fire Protection Systems

CHAPTER 61G15-32 RESPONSIBILITY RULES OF PROFESSIONAL ENGINEERS CONCERNING THE DESIGN OF FIRE PROTECTION SYSTEMS

Certification Assessment Instrument and Guidelines

Slight Harm Moderate Harm Extreme Harm Low Trivial Risk Tolerable Risk Moderate Risk Medium Tolerable Risk Moderate Risk Substantial Risk

Protecting Your Property: Well Do You Know Your Fire Fire Systems Systems. Joe Szewczyk, Risk Control Consultant

International Fire Code 2006 Requirements for Construction Plan Reviews of Commercial and Multi-Family Structures

Fire Protection Coffee Break Training May 2016

FIRE PROTECTION SYSTEMS IN BURJ KHALIFA. By NAFFCO Fire Protection

Paper Subject and Papers Examination. Duration Mark I

Osceola County Department of Fire Rescue and Emergency Medical Services

BOQ FOR FIRE HYDRANT & FIRE ALARM SYSTEM AT T.I.E

RULES 1978 UNDERGROUND COAL MINES FIRE PRECAUTIONS

THE MAURITIUS FIRE AND RESCUE SERVICE ACT. Regulations made by the Minister under sections 18, 19 and 27 of the Mauritius Fire and Rescue Service Act

Induction Course for new M&E Engineers

Our Ref: CD/FSSD/12/02/03/01 DID: FAX:

Newport City Council Bettws High School Fire Fighting Performance Specification CONTRACT C1

Service Requirements SEMI- ANNUAL ANNUALLY OTHER REF. REQUIREMENT

Distribution Restriction Statement

IMO INTERPRETATIONS OF FIRE PROTECTION-RELATED PROVISIONS OF THE HSC CODE

BALAJI FIRE PROTECTION SYSTEMS:

Life Safety Code NFPA 10 NFPA 13 NFPA 25 NFPA 72 NFPA 90A NFPA 110 NFPA 99 THE 2012 EDITION OF THE LIFE SAFETY CODE HOSPITAL EDITION SESSION #7

CITY OF MADISON FIRE DEPARTMENT (MFD) FIRE PROTECTION SYSTEM PLANS

PRINCIPLES OF DESIGN SPRINKLER INSTALLATION FOR FIRE FIGHTING IN THE UNDERGROUND GARAGES AND SUPPLEMENTARY LEGAL ACTS

RISK ASSESSMENT AND HAZARD MANAGEMENT

Fire protection on chemical manufacturing sites

Review Paper FIREWATER SYSTEM DESIGN AND SELECTION OF OPTIMIZED LOCATION FOR FIREWATER TANKS AND PUMPS IN GAS OIL SEPARATION FACILITY

ACTIVE FIRE PROTECTION SYSTEMS OVERVIEW. Fire Protection Systems

Transcription:

PROJECT: NITESH PALO ALTO @ Bangalore FIRE SAFETY MEASURES System Description 1 Firewater pumping system 2 Wet riser system and hose reel system. 3 Automatic sprinkler system 4 Yard hydrant system 5 Pressurization system 6 Potable fire aid fire extinguishers. 7 Fire safety plans. 8 Public address system. 1. Fire Water pumping system Fire water to the complete building fire protection system shall be catered through an RCC Underground (UG) storage sump of capacity 360 cum. Water to these tanks shall be fed by gravity from the nearby municipal/bore well water main pipe. The following are the motor driven and diesel driven firewater pumps that shall be located adjacent to the UG storage tanks. The level switches shall be provided in the underground tank and terrace tank. Breaching inlet shall be provided at the inlet of the storage tank for quick filling by fire brigade. 2. Wet riser and Hose reel system Wet riser shall be provided at all floor landings of the staircase of the buildings. Water supply to the wet risers shall be fed directly from the motor driven wet riser pump. This system shall consist of single/double headed hydrant outlet landing valves installed at a height of 1000 mm above finished floor level and a separate tap off for hose reel associated with hoses, branch pipe and nozzles for building at each floor on each riser. The system shall be designed hydraulically to meet the MAPLE Engg-Design Services (India)Pvt. Ltd. NITESH PALO ALTO @ Bangalore

flow and pressure requirements as per NBC. Hydrant accessories such as hose reel, branch pipe and nozzles etc. shall be provided in separate enclosures/cabinet with glass panels. Four ways breaching inlet with sluice check valve shall be installed and connected to each wet risers. The breaching inlets shall be located at 1000mm above the ground level. The pipe material for wet risers shall be Galvanized Iron (Gi) C class as per requirements of the local fire officer from pump house to discharge to wet riser and hose reel system topmost hydrant/ hose reel. In the event of fire, if the hydrant or hose reel are opened, the pressure in the wet riser main will drop due to the resulting flow, thereby the jockey pump comes in to operation at a preset low pressure. If the pressure drops further, at a preset low pressure in the wet riser, the wet riser pump shall start automatically by getting an impulse from a pressure switch provided on the main. I n case the wet riser pump fails to start, the pressure in the main will drop further and at a preset low pressure, the standby diesel pump shall come into operation by getting an impulse from a pressure switch provided. Stopping of the pump shall be manual. 3. Automatic Sprinkler System Sprinklers are provided at lower ground floor and all upper floors. The system consists of alarm check valve, Isolation valve, piping network. All sprinklers are 68 deg. Temperature rating. The Installation Control Valve(ICV) are located outside the pump room and each ICV caters to about 500 to 750 Sprinklers having a coverage area of 9-12m 2 and are networked through GI C Class Pipes. The spacing and the pipe diameters are designed as per the norms of NFPA-13, Low Hazard Classification Requirement. 4. Pressurization System The common pressurization system of wet riser system comprises of one Jockey pump operating automatically. In the event of minor system leakages in wet riser MAPLE Engg-Design Services (India)Pvt. Ltd. NITESH PALO ALTO @ Bangalore

system the Jockey pump will start automatically by getting an impulse from pressure switch provided on the discharge header of the jockey pump. The jockey pump shall stop automatically once the mains pressure is resorted to original set value. All pressure switches shall have two contacts- one for starting/ stopping the jockey pump and the other for jockey pump running annunciation in the panel. The control panel shall have all necessary control and interlock for operation and control of the pumps. Jockey pump shall not be running when main pump/booster pump are under operation. 5. Yard Hydrant System The yard hydrant shall be located at various places around the building. The water supply for yard hydrant shall be tapped off from wet riser system headers. Each single headed yard hydrant shall be provided with hoses, nozzles and accessories. All hydrant accessories shall be located in a Hose box adjacent to Hydrant valve. Brick masonry valve chambers with cast iron covers shall be provided wherever required for isolating the system to enable maintenance if any without affecting the complete system. The mode of operation of the hydrant system is as follows. In the event of fire, hydrant valves are opened, at the preset low pressure the wet riser pumps shall start as furnished in wet riser system. In case of failure of wet riser pump stand by common pump shall come into operation. 6. Portable First Aid Fire Extinguishers Portable First Aid fire extinguishers such as carbon-di-oxide extinguishers, ABC type extinguishers, Mechanical foam and Fire buckets etc. shall be provided in all areas of the buildings. The type of portable fire extinguishers and their numbers shall be as per NBC. Service tags shall be provided and attached on all extinguishers installed. MAPLE Engg-Design Services (India)Pvt. Ltd. NITESH PALO ALTO @ Bangalore

7. Fire Safety Plans Fire escape route printed in signal red color shall be fixed near fire exit staircases, which shall show directions to the inmates for escape in case of fire. Fire order as per NBC shall be fixed near lift/ lift lobby, which shall guide action to be taken in case of ire. 8. Public Address System Two ways talk back facility will be placed at ever floor near staircase and the public address control console will be placed at the ground floor reception/ security as required by the statutory authority and local by-laws for residential building, commercial building and club house. Addition to the above talk back facility entire floors public address system shall be provided and the control console shall be placed at the ground floor reception/security. MAPLE Engg-Design Services (India)Pvt. Ltd. NITESH PALO ALTO @ Bangalore

Annexure -4 : Site Location