SF REC & PARK STANYAN STREET IMPROVEMENT. Supervisor London Breed District 5. Project Manager Dan Mauer Recreation and Parks Department

Similar documents
SF REC & PARK STANYAN STREET IMPROVEMENT. Supervisor London Breed District 5. Project Manager Dan Mauer Recreation and Parks Department

Philip A. Ginsburg, General Manager Toks Ajike, Acting Planning and Capital Program Director

SF REC & PARK MOSCONE RECREATION CENTER: EAST SITE. Supervisor Mark Farrell District 2. Project Manager Dan Mauer Recreation and Parks Department

SAN FRANCISCO RECREATION + PARKS DEPARTMENT HYDE & TURK MINI PARK COMMUNITY PRESENTATION #2 WEDNESDAY,

RPD GEORGE CHRISTOPHER PLAYGROUND COMMUNITY MEETING 1 SEPTEMBER 24, Duncan St

A 2012 Clean and Safe Neighborhood Parks Bond Project. Katy Tang, District Supervisor. Jasmine Kaw, Landscape Architect Will Kwan, Architect

SAN FRANCISCO RECREATION + PARKS DEPARTMENT MARGARET HAYWARD PLAYGROUND COMMUNITY WORKSHOP #1 WEDNESDAY, JANUARY 27, 2016

Charles P. Johnson and Associates. Annapolis Landscape Architects

LELAND & VISITACION PARK COMMUNITY MEETING

GOODY CLANCY WITH KITTELSON & ASSOCIATES RHODESIDE & HARWELL FARR ASSOCIATES W-ZHA

WLAC Facilities Committee Meeting. September 18, 2017

CITY COUNCIL STAFF REPORT

Juri Commons Design Review

4/8/2015 Item #10D Page 1

City of San Juan Capistrano PROJECT PRESENTATION NORTHWEST OPEN SPACE COMMUNITY PARK (CIP 09209) March 22, 2016 FOR THE PROJECT PRESENTATION

Port of San Diego Sea Level Rise Ad Hoc Committee Meeting 1 of 3.. September 18, 2018

Long Branch-Wayne Local Park Renovation Project

Historic Yonge Street HCD Plan Community Consultation October 14, 2015

Rt 29 Solutions Hydraulic Planning Advisory Panel. September 14, 2017

Efficient Irrigation, Smart Controllers and Climate Appropriate Shade Trees. Clovis Community College Center Clovis, CA

Rt 29 Solutions Hydraulic Planning Advisory Panel. September 28, 2017

SF RECREATION & PARK DEPARTMENT URBAN TRAILS PROGRAM

CIVIC CENTER PUBLIC REALM PLAN OVERVIEW

2016/17 Drought-Tolerant Education Project Work Plan February 10, 2017

CITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA

Tysons-Old Meadow Road Bike/Ped Improvements

AvalonBay Communities + BRIDGE Housing. Mission Housing Habitat for Humanity Pacific Union Development Corporation

Community Engagement Committee Meeting #1 December 10, :30pm-8:30pm

REPORT TO COUNCIL City of Sacramento

TOWN COUNCIL / PLANNING COMMISSION

New Westminster Downtown Parking Strategy Public Open House #1 September 13, 2012

Welcome to the. Open House

SFMTA PHELAN LOOP AND PUBLIC PLAZA PHELAN OCEAN AVENUE

WLAC Facilities Committee Meeting. May 15, 2017

Boulder County Comprehensive Drilling Plan Surface Owner Meeting. Thursday, Nov. 2, 2017

LINCOLN COUNTY COMMONS - REVISED MASTER PLAN. Lincoln County Public Meetings June 26-27, 2018, 6pm

26/Old Dominion Task Force

Stadium District Masterplan

In partnership with: Harbor Corridor Plan Bali Hi Mobile Home Park July 24, 2013

ANCHORAGE PARK REPORT CARD Assessing A Park s Appearance, Function, & Condition

Architectural Review Board Report

SOUTH UNIVERSITY Street Design Alternatives in Progress

Facilities Planning & Construction Report nd Quarter Ending December 31, 2016

Boulder County Comprehensive Drilling Plan Surface Owner Meeting. Thursday, Oct. 19, 2017

UCSF Parnassus Heights Re-Envisioning Process

Terrace View Park. Master Plan

Michigan State University Barrier-Free/Accessibility Project Status Summary March 2017

Main Street Conversion Site

URBAN DESIGN LONDON TRAINING PROGRAMME UDL are pleased to present our programme for April 2013 to March 2014.

Village of Glenview Appearance Commission

BENJAMIN BANNEKER PARK FRAMEWORK PLAN (PLAN ADOPTION)

MASTER PLAN KICK-OFF Open House #1A, April 28, 2015

BEST-IN-CLASS PERFORMANCE 2015 Q3 SAME-STORE

PLANNING COMMISSION STAFF REPORT

Access. Chapel Parking & Entry Loop Snowbridge Square Skier/Visitor Parking. Dumpster Access. 3 Entry Monument Future Chapel Park

Analogue to Digital Telecare. Technical Advisory Board. 21 st June 2017 Work Stream 3 Procurement

edmonton.ca/ribbonofgreen #ribbonofgreen

Pomegranate Center and Tully s Coffee Gathering Grounds program partnership Butterfly Park Gathering Place Project Preliminary Design I.

Sustainability, Health, Safety, Recreation & Open Space Working Group August 3, 2017

PHASE I BUDGET FOR THE GREATER DES MOINES BOTANICAL GARDEN IMPROVEMENTS

Rocky Mountain Public Media

Georgeson Botanical Garden Master Plan

Fair Oaks Ranch Homeowners Association Parks and Trails Master Plan & 2019 Budget Planning

Fisherman s Wharf Public Realm Plan

Elm Street Business District: Streetscape and Signage Plan

1999 Approval to replace World War I monument and relocate plaques Approval to rehabilitate the Chase Mill building and surrounding site

Bow to Bluff Public Realm Plan Design Update

announcements 4/10/08

CRA Five Year Capital Improvement Plan. September 2, 2015

SUBJECT: PREDEVELOPMENT PLAN REVIEW OF PROJECT LOCATED AT 2632 EAST WASHINGTON BOULEVARD ('ST. LUKE MEDICAL CENTER')

LMS A NORTH BEACH BRANCH LIBRARY SCHEMATIC DESIGN IMAGES SAN FRANCISCO PUBLIC LIBRARY

EUREKA VALLEY / HARVEY MILK MEMORIAL BRANCH LIBRARY COMMUNITY MEETING 3 WEDNESDAY, APRIL 5, 2017

ROCKTON DOWNTOWN STREETSCAPE MASTER PLAN. Plan Commission Presentation April 10, 2018 Teska Associates Christopher Burke Engineering

ST. MARY OF THE MOUNT PARISH PROPOSED PARISH CENTER GRANDVIEW & BERTHA. Community Meeting March 16, 2015

UNCW CAMPUS MASTER PLAN

A /19/2017 GAGAN RESIDENCE 1043 CENTINELA AVE. SANTA MONICA, CA CENTINELA AVE

Village of Glenview Appearance Commission

GREEN INFRASTRUCTURE SIGNAGE VILLAGE OF GLENVIEW

Agenda Parks Committee CITY of ROELAND PARK Wednesday, February 13th, 2019; 6:00pm-8:00pm Roeland Park City Hall

Littleton Fields Master Plan

El Cerrito High School Community Meeting Minutes El Cerrito High School Cafeteria, May 26 th, 2015

South Lyon Fire Department 2012 Annual Report

Plymouth Transportation & Visitor s Services Center May 6, 2014 Town of Plymouth Board of Selectmen Project Update - Schematic Design

PARDI MARKET PLAZA MASTER PLAN

Minneapolis Sculpture Garden Reconstruction and Cowles Conservatory Renovation. 6:00 p.m.

Design Considerations

Community Meeting #2. Cabrillo Playground Renovation A 2008 Clean and Safe Neighborhood Parks Bond Project

East Midtown Greenway East 53 rd 61 st Street. Community Board 8 Project Introduction November 16, 2017

TOWN OF NEW CASTLE - Master Plan Update

MEMORANDUM OF UNDERSTANDING REGARDING MANAGEMENT OF THE LAKE MERCED TRACT

M E M O R A N D U M February 21, 2018

PROJECT DESCRIPTION. Providing a mix of housing options supporting a diversity of needs (800-1,600 sf 1-3 bd flats and Townhomes).

Identification of Aberrant Railroad Wayside WILD and THD Detectors: Using Industry-wide Railroad Data. June 10, 2014

Montana Rail Link Park

Discussion and possible action to approve a conceptual improvement plan for the renovation of Cayuga Playground and Clubhouse

DESIGN REVIEW COMMITTEE AGENDA ITEM

Jordan Harrison, Planner III, San Francisco Recreation and Park Department

Appearance Review Board Staff Report

ROCKAWAY BOARDWALK Community Board 14 Parks Committee Meeting June 4, 2014

Don t Flood The Rodeo! Preparing for Fort Worth s New Arena

Transcription:

SF REC & PARK STANYAN STREET IMPROVEMENT COMMUNITY MEETING #3 THURSDAY, JANUARY 25 TH, 2018 Supervisor London Breed District 5 Project Manager Dan Mauer Recreation and Parks Department Design Team William Bulkley, Landscape Architect Mayton Xu, Landscape Architectural Intern San Francisco Public Works Building Design & Construction

AGENDA Welcome & Introductions 1. Background Information 2012 Bond Overview Community Engagement Process Budget and Schedule 2. Stanyan Street Frontage Improvement Overview Review Second Meeting Results Proposed Improvement Areas: Preferred Option 3. Questions 4. Next Steps Agenda 2

Background Information Community Engagement Process Budget and Schedule Review Meeting #2 Feedback Introduction 3

Community Involvement Neighbors have been organized and volunteering for more than 10 years Numerous neighborhood meetings to discuss these improvements Formal engagement with RPD and other city agencies Thank you! Community Engagement Process Meeting # Intent When? Meeting 1 Confirm Project Priorities & Program Direction October 2016 Meeting 2 Review Design Refinement Options June 2017 Meeting 3 Final Concept Approval January 2018 Stanyan Street Improvement: Community Process Building Design & Construction Stanyan Street Improvement Planning Presentation 01.25.18 4

Current Project Budget Approx. Construction Budget Approx. Project Control Costs $5.5 MILLION $4 MILLION $1.5 MILLION Includes: Project management Architectural and engineering design services Construction management Permits Testing and regulatory agencies review fees Project Schedule 2017 JAN FEB MAR APR MAY JUN JUL AUG PLANNING (14 MO) SEP OCT NOV DEC 2018 JAN FEB MAR APR MAY JUN JUL DESIGN (6 MO) AUG SEP OCT NOV BID (4 MO) DEC 2019 JAN FEB MAR APR MAY JUN CONSTRUCTION (6 MO) JUL AUG SEP OCT NOV OPEN TO PUBLIC DEC Stanyan Street Improvement: Budget, Schedule, & Goals 5

Meeting #2 Summary Information Examined four key areas and asked community to review 2 options at each area and share feedback/preference. Focus Areas Kiosk Visitor Station & Bocce Courts Stanyan Street Frontage Stanyan/Haight Plaza Improvements Oak Woodlands & Staircase Replacement Feedback Kiosk with plaza, bocce, and petanque New sidewalk with post & chain barrier Hybrid between large and small plazas Minimize paths and increase planting areas Meeting #2 Summary 6

Design Considerations/Intent 1. Public Safety 2. Positive Programming 3. Respect Historical Landscape 4. Aesthetics/Beautiful Materials/Plant Palette 7

2 3 1 Improvement Areas Kiosk Visitor Station and Bocce Courts 1 4 2 Stanyan Street Sidewalk and Fence 3 Stanyan/Haight Plaza Improvements 5 4 Oak Woodlands and Staircase Modifications 5 Exploratorium Collaboration (separate project) NTS Areas of Interest Diagram 8

Project Area 1 Kiosk Visitor Station & Bocce/Petanque Courts Project Area 1 9

Proposed Modifications 1. Renovate existing restroom into visitor kiosk/concession space 2. Maintain one all-gender restroom 3. Provide plaza space adjacent to visitor kiosk 4. Install recreation activity such as bocce/petanque court Project Area 1: Kiosk Visitor Station & Bocce Courts 10

4 6 P R EFERRED O PTION KIOSK PLAZA PETANQUE KIOSK 27 33 7 1 BOCCE Kiosk: Landscape Site Plan Building Design & Construction Stanyan Street Improvement Planning Presentation 01.25.18 11

bocce & petanque cafe seating Kiosk: Materials 12

N A2.03 BUILDING DESIGN AND CONSTRUCTION DIVISION 2 A2.03 5 1 18' - 2" 29 3/8" A GOLDE GATE PARK 4 26' - 5 1/2" 57" 144 1/2" 36" 133 1/2" 8" 5' - 0 1/2" 4' - 10 1/2" SALES/FOOD PREP 3 60" 3' - 0" 3' - 0" 47" 12' - 0 1/2" 26" 30" 55" 5 1/2" 5 1/2" 2 57" 37 1/2" A2.03 3' - 1 1/4" 3' - 7 3/8" 5' - 2" 10' - 0" 202" 37 1/2" 49 5/8" B 29 1/2" 37 1/4" 37 1/4" 29" 3 DEMOLITION LEGEND EXISTING WALL TO REMAIN DEMOLISH WALL REMOVE WINDOW/LOUVER REMOVE AND GATE/DOOR A2.03 PROJECT NORTH TRUE NORTH N STANYAN STREET Short History Built in 1930 s Removed in late 1990 s 440 SF structure 30 Van Ness Avenue San Francisco, CA 94102-6028 Project Consultant Edgar Lopez - City Architect Julia Laue - Principal Architect / Division Manager Suite 4100 Fax (415)557-4701 (415)557-4700 STANYAN STREET IMPROVEMENTS PROJECT GOLDEN GATE PARK,SAN FRANCISCO,CA STANYAN STREET & PAGE STREET 1 EXISTING/DEMOLITION PLAN 1/4" = 1'-0" A B 1 2 No. Date Revisions TOP OF WALL 8' - 6" TOP OF WALL 8' - 6" 13 1/2" C:\Users\mmarkari\Documents\Stanyan Street Improvements Building - CENTRAL_melinaboa.rvt 1/5/2017 3:21:36 PM 102" B 4 2 (E) EAST 1/4" = 1'-0" (E) WEST 1/4" = 1'-0" A TOP OF SLAB 0' - 0" TOP OF WALL 8' - 6" TOP OF SLAB 0' - 0" 2 3 5 (E) NORTH 1/4" = 1'-0" (E) SOUTH 1/4" = 1'-0" 1 8' - 6" TOP OF SLAB 0' - 0" TOP OF WALL 8' - 6" TOP OF SLAB 0' - 0" Original Sheet Size: 22"x34" Mark Dorian - Architecture Services Manager Section Head WILL KWAN Proj. Mgr. DAN MAUER Proj. Arch. JANE CHAN Drawn Author Date 12/28/16 Phase Drawing Title Sheet No. Job No. Scale: NOT FOR CONSTRUCTION EXISTING - DEMOLITION PLAN & ELEVATIONS A2.03 As indicated 3293V Kiosk: Existing Conditions 13

N 2 A GOLDE GATE PARK 26' 02 4 B AREA USE MAIN AREA RESTROOM UTILITIES BUILDING DESIGN AND CONSTRUCTION DIVISION SERVICE COUNTER 02 5 18' ROLL UP DOOR ABOVE FOOD PREP 2' FOOD PREP MOP SINK ELEC WH 3 WALL LEGEND EXISTING TO REMAIN 02 PROJECT NORTH NEW WALL MAIN AREA 279 SF UTILITIES 48 SF RESTROOM 77 SF Edgar Lopez - City Architect Julia Laue - Principal Architect / Division Manager 30 Van Ness Avenue Suite 4100 San Francisco, CA Fax (415)557-4701 94102-6028 (415)557-4700 Project STANYAN STREET IMPROVEMENTS PROJECT CONCEPT PLAN & FINISHES 1 TRUE NORTH N GOLDEN GATE PARK,SAN FRANCISCO,CA STANYAN STREET & PAGE STREET ADA SERVICE COUNTER 2 STANYAN STREET Consultant 1 PROPOSED FLOOR PLAN 1/4" = 1'-0" 02 7 CONCEPT AREA USE 1/4" = 1'-0" 6 CONCEPT AREA USE A B 1 2 No. Date Revisions V:\3293V_Stanyan_Street_Improvement_Project\1_Planning\Prelim_Drawings\BDC\Revit\Archieved\20171030\Stanyan Street Improv-Bldg - CENTRAL_R15.rvt 10/30/2017 2:14:08 PM 2 4 B 34" 83" EAST ELEVATION 1/4" = 1'-0" WEST ELEVATION 1/4" = 1'-0" ADA SERVICE COUNTER BUILT IN DUTCH DOOR A TOP OF WALL 8' - 6" TOP OF SLAB 0' - 0" TOP OF WALL 8' - 6" TOP OF SLAB 0' - 0" 3 42" NORTH ELEVATION 1/4" = 1'-0" 2 5 ROLL UP DOOR SERVICE COUNTER SOUTH ELEVATION 1/4" = 1'-0" 1 TOP OF WALL 8' - 6" TOP OF SLAB 0' - 0" TOP OF WALL 8' - 6" TOP OF SLAB 0' - 0" Concession Section Head WILL KWAN Proj. Mgr. Proj. Arch. Restroom DAN MAUER JANE CHAN Drawn MELINA MARKARIAN Date Phase Utility Room Drawing Title Original Sheet Size: 22"x34" Space Allocation Mark Dorian - Architecture Services Manager Sheet No. Job No. PROPOSED PLAN & ELEVATIONS Scale: NOT FOR CONSTRUCTION 02 As indicated 3293V 229 SF 57 SF 40 SF Kiosk: Proposed Use Plan 14

Project Area 2 Stanyan Street Sidewalk and Fence Project Area 2 15

Proposed Modifications 1. Construct new concrete sidewalk from plaza to John F. Kennedy Drive 2. Add new barrier edge to discourage dumping 3. Prune existing trees to improve sight lines 4. Improve Page Street Entry Point John F. Kennedy Dr Stanyan St Stanyan Street Sidewalk: Existing Conditions 16

PREFERRED OPTION STANYAN ST STANYAN STREET FRONTAGE ENTRANCE PLAZA ENTRANCE 20 32 J O H N F. K E N N E D Y 46 Stanyan Street Sidewalk: Landscape Site Plan 17

chain & bollard options Stanyan Street Sidewalk: Materials 18

Project Area 3 Stanyan/Haight Plaza Improvements Project Area 3 19

Proposed Modifications 1. Remove center planter and railings 2. Simplify plaza space for easy circulation 3. Add directional/informational signage 4. Remove or reduce pilasters 5. Explore bike vendor operation/staging areas to the south 6. Minimize plaza perimeter planting scheme A B B Stanyan St C A D Regrade existing paths as necessary for accessibility C D Stanyan/Haight Plaza: Existing Conditions 20

P R EFERRED O PTION ENTRANCE PLAZA 32 CENTRAL LAWN Haight Street Plaza: Landscape Site Plan Building Design & Construction Stanyan Street Improvement Planning Presentation 01.25.18 21

paving options chain & bollard options planting Haight Street Plaza: Materials 22

Project Area 4 Oak Woodland and Staircase Replacement Project Area 4 23

Proposed Modifications Stanyan St 1. Remove steps and handrails 2. Remove trees in area adjacent to steps 3. Replant shrub area with lawn 4. Open up sight lines 5. Add new pathways among oaks 6. Construct new rustic fencing around oak woodland zones 7. Increase planting and irrigation 8. Improve area and path lighting 9. Install erosion control on slopes as required Oak Woodland and Staircase: Existing Conditions 24

PREFERRED BIKE RENTAL OPTION OAK WOODLAND Oak Woodlands: Landscape Site Plan 25

california meadow palnting rustic wood fencing paving Oak Woodlands: Materials 26

Questions? 27

Next Steps... Design Team: Take Concept Plan to Recreation & Park Commission for approval Start Construction Documents Please send comments to the Project Manager by Friday, February 2, 2018: Email: Dan.Mauer@sfgov.org Fax: (415) 581-2542 Thank you!!! Moving Forward 28