Rosslyn Plaza PDSP (SP #422) SPRC Staff Presentation

Similar documents
GOODY CLANCY WITH KITTELSON & ASSOCIATES RHODESIDE & HARWELL FARR ASSOCIATES W-ZHA

Adoption of the Rosslyn Sector Plan Site Plan Review Committee (SPRC) Meeting October 26, 2015

WEST LOOP DESIGN GUIDELINES CHECKLIST

Policies and Code Intent Sections Related to Town Center

Courthouse Square Planning & Urban Design Study. Courthouse Square Working Group #13 October 15, 2014

Urban Design Manual PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction. Station Study Areas

The West Vaughan Employment Area Secondary Plan Policies

W i l s o n B o u l e v a r d & K e y B o u l e v a r d

S I T E P L A N R E V I E W C O M M I T T E E M E E T I N G A G E N D A

appendix and street interface guidelines

DRAFT. October Wheaton. Design Guidelines

VILLAGE OF SKOKIE Design Guidelines for Mixed-Use Districts NX Neighborhood Mixed-Use TX Transit Mixed-Use CX Core Mixed-Use

Lehigh Acres Land Development Regulations Community Planning Project

Pentagon Centre (SP#297) Phase I Site Plan Amendments SPRC #3

DRAFT. 10% Common Open Space

URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018

EXISTING COMPREHENSIVE PLAN

INSTITUTIONAL USE DESIGN COMPATIBILITY TECHNIQUES

VICTORIA DOWNTOWN DEVELOPMENT PLANNING

4.0 Design Guidelines For The Village Centre. South fields Community Architectural Design Guidelines Town of Caledon

Planning Board Briefing

Community Design Guidelines. Port Wallace DRAFT

4. INDUSTRIAL 53 CASTLE ROCK DESIGN

THE NEIGHBORHOOD TODAY

ROSSLYN GATEWAY URBAN DESIGN MANUAL JULY 15, 2011 REVISED JANUARY 30, KOHN PEDERSEN FOX ASSOCIATES PC. All rights reserved.

Community Design Plan

FLORIN ROAD CORRIDOR Site Plan and Design Review Guidelines Checklist

Town Center (part of the Comprehensive Plan)

PUBLIC RIGHT-OF-WAY IN THIS CHAPTER PUBLIC REALM

Future Five. Design/ Development Guidelines. January 2008 Amended June 08 per City Council motion

6. DOWNTOWN. The Downtown Element focuses on supporting and expanding the vitality and enhancement of Downtown Chico as the City s central core.

Seneca Meadows. Block 4 Locate office, technology, and medical development adjacent to I Screen views of garage structures from I-270.

Millbrae TOD #2 Project Analysis

Appendix I ARLINGTON COUNTY SECTOR PLANS SUMMARY RECOMMENDATIONS RELATED TO PUBLIC SPACES

Rio/29 Small Area Plan. Design Plan & Implementation Framework Open House - January 25, 2018

ARLINGTON COUNTY, VIRGINIA

ZONING. 300 Attachment 1. City of Oneonta. Design Guidelines ( )

4.9 Mendocino Avenue Corridor Plan Design Guidelines

URBAN DESIGN BRIEF. 2136&2148 Trafalgar Road. Town of Oakville

Bayshore Boulevard Home Improvement District Design Guidelines

Buildings may be set back to create small plazas provided that these setbacks do not substantially disrupt the street wall s continuity.

Town Center. Block 5 Existing multifamily residential units are expected to remain.

Transportation. Strategies for Action

Hockessin Community Redevelopment Plan

HIGHLAND VILLAGE GREEN URBAN DESIGN PRINCIPLES/GUIDELINES

(DC1) Direct Development Control Provision DC1 Area 4

North Downtown Specific Plan MEMORANDUM

The Master Plan Framework

ARLINGTON COUNTY, VIRGINIA

CAMPUS MASTER PLAN DRAFT PLAN UPDATE JANUARY

DESIGN GUIDELINES CITY OF OTTAWA

Urban Design Brief December 23, 2015 Southside Construction Group Official Plan & Zoning By-Law Amendment

URBAN DESIGN BRIEF Gordon Street City of Guelph. Prepared on behalf of Ontario Inc. March 25, Project No. 1507

Derry Green Corporate Business Park

NORTH SAN JOSÉ AREA DESIGN GUIDELINES

Courthouse Square Planning & Urban Design Study. Clarendon / Courthouse Civic Association October 21, 2014

COMMUNITY DESIGN. GOAL: Create livable and attractive communities. Intent

PLAN ELEMENTS WORKSHOP. April 5, 2016

Realizing Rosslyn: a new era of opportunity GOODY CLANCY WITH KITTELSON & ASSOCIATES RHODESIDE & HARWELL FARR ASSOCIATES W-ZHA

Complete Neighbourhood Guidelines Review Tool

CONTENTS 8.0 LAND USE 8.1 GENERAL LAND USE 8.2 RESIDENTIAL 8.3 MIXED USE 8.4 COMMERCIAL 8.5 EMPLOYMENT LANDS

City of Long Beach. creating vibrant and exciting places

Cit of Kitchener Ur 6 an Design Manual PARTA. Desi n for _--::

A. Background Summary of Existing Challenges and Potential Possibilities. 1. Summary of Existing Assets and Potential Opportunities

8.0 Built Form Framework

The Five Components of the McLoughlin Area Plan

SITE PLAN AREA. Met Park 6 Site Area (122,368 sf) Met Park 4/5 The Bartlett. Met Park 3 The Acadia. Met Park 2 The Millennium.

Mixed Use Centres Development Permit Guidelines

Pickering City Centre

AN ORDINANCE THE COUNCIL OF THE CITY OF PHILADELPHIA HEREBY ORDAINS:

Site Planning. 1.0 Site Context. 2.0 Pedestrian Circulation Systems. Pag e 2-23

New-Cast Mixed-use Development Proposal King Street West, Newcastle, Ontario

Courthouse Square Planning & Urban Design Study

Willamette Falls Downtown District Policies and Design Guidelines

Small Area Plan. South Gateway

IMAGINE CLEARWATER. Community Workshop 3. November 2016

ELK GROVE TOWN CENTER DESIGN GUIDELINES

Response to the London Bridge Area Vision and Site Allocations within the New Southwark Plan

ATTACHMENT A. SILVERDALE DESIGN STANDARDS Amendments to the Waaga Way Town Center Chapter

Cha p t e r 2: Ge n e r a l De s i g n Gu i d e l i n e s

Introduction Plan Overview Performance and Development Standards Design Guidelines

FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN. Official Plan Amendment XX to the Official Plan for the City of Ottawa

Commercial Node Plan Devine Street/Jackson Blvd. COLUMBIA, SC

SP #94, AREP Rosslyn City Center

PINE CURVE REZONING. BACKGROUND Purchased as two parcels in 2001 and 2002

DRAFT ROOSEVELT ROAD. District Recommendations. Figure 5.23 The Roosevelt Road Corridor

Wheaton CBD & Vicinity Sector Plan D E S I G N G U I D E L I N E S

NEIGHBORHOOD 3: UNIVERSITY EDGE

FUTURE LAND USE ELEMENT

Revitalization Guidelines for Corridors, Villages and Town Centres

Mark-up of the effect of the proposed Bronte Village Growth Area OPA No.18 on the text of section 24, Bronte Village, of the Livable Oakville Plan

CHAPTER FIVE COMMUNITY DESIGN

Highland Village Green Design Guidelines

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

chapter DESIGN GUIDELINES NEW RIVER MASTER PLAN REPORT

FRAMEWORK OF DESIGN REVIEW:

DRAFT Northeast Quadrant of Kipling Avenue and Highway 7 DRAFT AUGUST 29, Goals Land Use. The goals of this Plan are to:

PORT OF VANCOUVER WATERFRONT DEVELOPMENT. Concept Development Plan City Center Redevelopment Authority April 20, 2017

Walnut Creek Transit Village Design Guidelines. Part Three III - 25

Arlington County Retail Plan

Transcription:

Rosslyn Plaza PDSP (SP #422) SPRC Staff Presentation ote Guiding Principles included in this document are taken from the latest working draft of the Guiding Principles dated. The illustrations included on slides 3-10 are intended to assist with the discussion of applying the principles to the site. 1

Evaluating the ew Alternatives Issues Street connectivity is achieved Does not propose solutions to topography challenges which minimize blank walls and increase site access Many streetscapes lack pedestrian-friendly elements ew Option 1 Retail lacks continuity and some is located without direct street frontage Open space is dispersed and has low visibility and accessibility ew Option 2 ew Option 3 2

Evaluating the ew Alternatives Issues Does not connect to and expand Rosslyn s street grid Retail is not concentrated on the street Much of the open space is dispersed with low visibility and accessibility The proposed esplanade does not provide river or monument views and will have noise issues A street grid and esplanade are not mutually exclusive ew Option 4 (Esplanade) 3

Circulation 1. Development should enhance Rosslyn s street network and provide multimodal, complete streets which improve pedestrian, bicycle, transit and vehicular access to, through, and around the site. M 2. A street grid that organizes open space, defines building placement, and distributes loading, parking, and emergency access points throughout the site should be phased into the development to break up the existing superblock. Potential Improved Multimodal Street Connections Potential Bike/Pedestrian Connection Key Entry Point 3. Development should include pedestrian connections through the site which link to surrounding developments, public open spaces, and routes to and from transit nodes. 4. Improved pedestrian and bicycle access from Rosslyn to the Mount Vernon Trail and Potomac Riverfront should be considered as part of the development plan, subject to collaboration with Virginia Department of Transportation and the ational Park Service. 5. Streetscapes should maximize pedestrian-friendly features, including widened sidewalks, shortened crossing distances, accessibility improvements, and street trees. 6. Creative and functional design solutions to topography challenges which improve site access should be used. 7. Special treatment should be used to distinguish key intersections or focal points of the site. 4

Parking and Loading 1. Parking should be provided below grade as much as possible. Visibility of above grade parking structures should be minimized by wrapping parking with other uses and incorporating facades consistent with high-quality architecture on the site. M 2. Flexibility for below grade parking under new streets should be considered if it improves garage functionality without adversely impacting streetscapes or utilities. 3. Loading and parking areas should be located so as to minimize conflicts with pedestrians and to distribute access points. 4. On-site and on-street public parking should be provided to accommodate short-term visitors and retail customers. Potential Improved Street Connections Potential Bike/Ped Connection Key Entry Point Opportunities for On-Street Parking 5

Compatibility and Placemaking 1. Development should complement surrounding existing and envisioned uses and create a distinct sense of place. M 2. Development should contribute to the rebuilding of Rosslyn in a more urban form with a functional street grid, mixed uses, pedestrian-friendly streetscapes, easy access to transit, buildings that relate well to one another and to the street, and connected open spaces. 3. Development should help define a gateway into Rosslyn. Gateway Cultural Existing Cultural Use Artisphere Potential Cultural Use Location Key Entry Point Edge Condition Cultural View from waterfront and monumental core 4. Development should contribute to the distinctive image of Arlington from the waterfront and monumental core. 5. The site design should seek to improve the site s edge condition adjacent to Interstate 66, both visually and physically. 6. Development should include certain placemaking features, such as cultural facilities, public spaces for park uses and flexible programming, and retail to enhance the site s sense of place. 6

M Central Place Plaza Open Space 1. Public open space should expand and diversify Rosslyn s open space resources by providing new types of spaces which attract a broad range of residents, workers, and visitors and encourage evening and weekend use. 2. Well-designed public open space should be highly visible, have direct street frontage, and be at grade with major pedestrian, bicycle and vehicular circulation around and through the site. Existing / Planned Open Space Potential Open Space Location Open Space Connection / Visual Corridor Central Open Space 3. A significantly sized public open space should be provided on a prominent street and should be designed to accommodate multiple park uses and provide flexibility for multipurpose programming. 4. Public open space should respond to the site s unique opportunities such as its proximity to the waterfront, Theodore Roosevelt Island, and nearby recreational trails. 5. Public open space should be designed and located so as to minimize the negative impacts from the site s adjacency to Interstate 66. 6. Streetscapes should be designed as useable public space with enhanced pedestrian elements such as widened sidewalks, seating, and multipurpose green spaces. 7. Public art should be incorporated into the site s open spaces in order to activate them, improve wayfinding, complement cultural uses, and contribute to a sense of place for the site. 7

Uses 1. Development should create a live-work-shop environment, encourage vitality throughout the day and evening, provide diverse housing and retail opportunities, and contribute to a more balanced use mix in Rosslyn. 2. Development should include a mix of uses, such as office, residential, hotel, cultural, retail and service businesses, community facilities, and civic spaces. 3. Retail should be clustered, have direct street frontage, and have strong visible connections to central Rosslyn to encourage its success. 4. Ground floor uses should complement adjoining public open spaces and activate streetscapes. 5. Ground floor spaces should be attractive and flexible enough to accommodate a wide range of tenants, including small retail and service businesses. Potential Retail Concentration eighborhood Connection 8

Building Form and Heights 1. Design techniques such as tapering, step backs, orientation of building footprints (base and tower), and distinctive top elements should be used to enhance Rosslyn s skyline, maximize key view corridors to, from, and through the site, and improve the pedestrian environment. 2. Views from the Central Place observation deck should be protected and other public view corridors should be provided. 3. Building heights should be noticeably varied and generally taper down from Central Place. Tapered Heights from Central Place 4. Buildings should be located and designed to create a consistent, pedestrian-scaled streetwall with visual interest, variety, and transparency. Visual Corridor Potential Building Locations Potential Open Space Location Varied Skyline 5. Building placement and form should be sensitive to shade impacts and the seasonal needs for both sunlit and shaded public space. 6. Creative and functional design solutions to topography challenges which prevent blank walls should be used. 9

Enhance Rosslyn s street grid and strengthen multimodal connections (Principle C.1) Break up the superblock and use streets to organize the site (Principle C.2) M Diversify Rosslyn s open space resources and make them visible and accessible (Principles E.1,E.2) Provide a significantly sized open space on a prominent street (Principle E.3) Complement surrounding uses and create a distinct sense of place (Principle A.1) Tapered Heights from Central Place Include placemaking features and uses (Principle A.6) Enhance Rosslyn s skyline, preserve view corridors, and improve the pedestrian environment (Principle F.1) Potential Improved Street Connections Potential Bike/Ped Connection Existing Open Space Potential Open Space Location Existing Cultural Use Potential Cultural Use Location Key Entry Point Varied Skyline Concentrate retail in highly visible locations (Principle B.3) Strengthen the pedestrian experience and create active streetscapes (Principles B.4, C.3, F.4) Potential Building Locations Potential Retail Concentration Illustration is for discussion purposes only. Principles language is simplified on this slide; related principle numbers are noted in parenthesis. 10

Sustainability 1. Development should incorporate best practices and County policies for green buildings and stormwater management. 2. Development should seek to achieve applicable County energy goals to ensure efficient building design, operation, and energy infrastructure. 3. Development should increase the tree canopy of the site and include green, landscaped elements throughout outdoor areas where feasible, including the use of roof gardens. Phasing 1. Key public infrastructure and community benefits should be achieved at each phase and detailed with approval of the PDSP. 2. Phasing should ensure short-term functionality of the site and accommodate existing uses and their garage and street access in the interim. 3. Development of early phases should preserve connectivity through the site and to transit access points. 4. Retail uses should be located so that a critical mass is maintained throughout phasing. Interim uses, such as temporary retail vendors or structures, should be considered to achieve this principle. 5. The phasing plan should allow for the replacement of the existing theater on site during the same phase in which it is demolished. 6. The PDSP should include urban design guidelines to facilitate the long-term development of the site and ensure consistent, high-quality urban design and architecture in future site plans. 11