ROCKAWAY BOARDWALK Community Board 14 Parks Committee Meeting June 4, 2014
Introduction 2
Agenda Design Update Construction Update Local Hiring Update 3
Community Input 7 Meeting Date September 17, 2013 CB14 Parks Committee Presentation: Background and Constraints September 23/24/25, 2013 Neighborhood Listening Sessions: Access, Surface, Recreation and Boardwalk Design October 8, 2013 Full CB14 Meeting: Update and General Design Principles October 23, 2013 Community Listening Session: Access, Surface and Amenities November 6, 2013 Conceptual Plan Workshop: Recreation, Access, Natural Resources and Resiliency November 18, 2013 CB14 Parks Committee Presentation: Preliminary Architectural Concepts November 25, 2013 Conceptual Plan Workshop: Recreation, Access, Natural Resources and Resiliency December 5, 2013 Conceptual Plan Workshop: Opportunity Sites December 17, 2013 Full CB14 Meeting: Engineering and Pile Update and Phasing Overview January 14, 2014 CB14 Meeting: Design Presentation and Construction Management Overview February 6, 2014 Conceptual Plan Public Meeting February 13, 2014 Employment Opportunities Outreach Meeting #1 February 27, 2014 Phase 3 Design Meeting with Local Stakeholders March 5, 2014 Employment Opportunities Outreach Meeting #2 March 19, 2014 Construction Logistics Meeting #1 March 24, 2014 CB14 Parks Committee Presentation: Conceptual Plan March 26, 2014 Employment Opportunities Outreach Meeting #3 June 4, 2014 CB14 Parks Committee Presentation: Design and Construction Update 4
Agenda Design Update Precast Finishes R-O-C-K-A-W-A-Y Letters Dune Planting Beach and Land Side Access a. Special Entrances b. Typical Land Side Access c. Beach Side ADA Ramps d. Ramp at B102/103 Custom Furniture a. Chaise Seating b. Tanning Tables Design Look Ahead 5
Precast Finishes 6
R-O-C-K-A-W-A-Y Letters 7
R-O-C-K-A-W-A-Y Letters 8
R-O-C-K-A-W-A-Y Letters 9
R-O-C-K-A-W-A-Y Letters 10
R-O-C-K-A-W-A-Y Letters 11
Dune Planting 12
Dune Planting 13
Dune Planting 14
Beach and Landside Access Beach and Landside Access Update to Phase 1 Plaza Entrances Typical Landside Access Beach Side ADA Ramps 15
Update to Phase 1 Plaza Entrances 16
Special Entrances 17
Special Entrances B 94 th 95 th : Access as multipurpose public space B 90 th 91 st : Access as a support for upland recreation uses 18
Typical Landside Access 19
Typical Landside Access 20
Typical Beach Side Access 21
ADA Beach Side Ramp 22
Landside Ramp B102/103 23
Landside Ramp B102/103 24
Furniture Custom Furniture Elements Chaise Seating Tanning Tables 25
Chaise Seating 26
Tanning Tables 27
Design Look Ahead Moving the Boardwalk further south in phase 3 Proposed Boardwalk widening to 33.5 (3.5 wider than before) *Both items currently pending State Dept. of Environmental Conservation approval 28
Agenda Construction Update Overall Target Schedule Current and Ongoing Work Future Summer Work Monthly Updates 29
Target Construction Schedule Phase: Phase 1 (B86-B97) Phase 2 (B98-B108): Phase 3 (B108-B126): Phase 4a (B73-B86): Phase 4b (B60-B73) Phase 5a (B39-B60): Phase 5b (B19-B39) : Target Start (Actual): Spring 2014 (April 21) Summer 2014 (June) Fall 2014 Spring 2015 Late 2014* Fall 2015* Fall 2016* *Piping Plover Moratorium (Apr Sept) Target End: Memorial Day 2015 July 4 th 2015 Memorial Day 2016 Memorial Day 2016 Memorial Day 2016* Memorial Day 2016* Memorial Day 2017* 30
Site Fencing 31
Site Fencing 32
Site Fencing 33
Demolition 34
Demolition 35
Demolition 36
Demolition 37
Demolition 38
Future Summer Work Upcoming Work Phase 1 Pile Driving H piles for the Sand Retaining Wall Pipe Piles for the Boardwalk Will establish baseline parameters Will implement a full vibration monitoring program during duration of driving activities Will provide notice in advance of driving Pile Caps Sand Retaining Wall Utilities 39
Future Summer Work Upcoming Work Phase 2 Fence Installation Removals 40
Monthly Updates Monthly updates (2-3 page PDFs) are posted at: http://www.nycgovparks.org/facility/beaches/beach-recovery and can be downloaded via a link located in the Updates section. Sign up for monthly email distribution list. 41
Employment Outreach Meetings February 13, 2014 March 5, 2014 March 26, 2014 Storefront 92-08 Rockaway Beach Boulevard, opened March 28, 2014 Applications Stats 1,054 total applicants 4 new hires 3/4 local hires 4/4 Section 3 hires 42
Employment Moving Forward Coordination with Dept. Small Business Services Workforce1 Centers will reach out to initial applicant pool Specific job openings will be posted as they become available moving forward. Applicants already in the pool will not need to reapply. Job seekers not in the pool will need to apply to these opening to be considered. 43
Wrap Up Questions? 44