Asheville Design Center March 2010

Similar documents
RIVER ARTS DISTRICT TRANSPORTATION PROJECT

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

Executive Summary. NY 7 / NY 2 Corridor

Small Area Plan. South Gateway

July 12, Columbus City Council City Hall 90 West Broad Street Columbus, OH RE: I-70/71 Columbus Crossroads Project

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT

MURRAY CENTRAL STATION MASTER PLAN Central Station Area of Influence and Site Analysis

PLAN ELEMENTS WORKSHOP. April 5, 2016

Southern Gateway Project and Public Green

Transportation. Strategies for Action

NORTH CLAYMONT AREA MASTER PLAN COMMUNITY WORKSHOP #1 FEBRUARY 3, 2016

Public input has been an important part of the plan development process.

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

Town Center (part of the Comprehensive Plan)

CHAPTER 7: VISION AND ACTION STATEMENTS. Noble 2025 Vision Statement

Isabel Neighborhood Plan: Alternatives

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT-2

TOWN COUNCIL / PLANNING COMMISSION

Date: April 10, 2017 City Council Work Session April 24, 2017: Status Report on the Comprehensive Plan Update and Transportation Master Plan

IMPLEMENTATION STRATEGIES. In This Chapter. Goals & Strategies 182 Project List 183 Future Land Use 186 CHAPTER 11 IMPLEMENTATION STRATEGIES

V. Vision and Guiding Principles

Potential Green Infrastructure Strategies May 6, 2015 Workshop

Issues Requiring Future Study

WELCOME TO OPEN HOUSE TWO November 28, 2018

Stakeholders Advisory Working Groups (SAWGs) Smart Growth and TOD Land Use (#11) SAWG Meeting

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

Tonight s Agenda. Summary Presentation Open House. Group Discussion Next Steps: online community wide survey

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives).

Bloor Street East Potential Ravine Portal Overlook and Access Passage to the Rosedale Valley and Don River Valley Ravine, Toronto, Canada

Complete Neighbourhood Guidelines Review Tool

Comprehensive Plan Advisory Panel Meeting #3

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose:

Memorandum CITY OF DALLAS

MAIN STREET ECONOMIC DEVELOPMENT STRATEGY

A. INTRODUCTION B. PROJECT LOCATION

hermitage town center

Secrest Short Cut and Monroe Expressway Small Area Plan AUGUST 29, 2018

The transportation system in a community is an

3. VISION AND GOALS. Vision Statement. Goals, Objectives and Policies

New Auburn Village Center Study Auburn, Maine

North Downtown Specific Plan MEMORANDUM

STAFF SUMMARY FOR S17-02 SPECIAL USE PERMIT APPLICATION

ARLINGTON COUNTY, VIRGINIA

Cobb County Design Guidelines Mableton Parkway & Veterans Memorial Highway Community Design Workshop January 12, 2017

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

PUBLIC ENGAGEMENT & SIX THEMES OF THE PLAN

CHAPTER 8 ISSUES, CONCERNS, CONSTRAINTS AND OPPORTUNITIES

DRAFT Civic Center Station Area Plan. Executive Summary

Route 347. New York State Department of Transportation Region 10, Long Island. THE GREENING of ROUTE 347

This Review Is Divided Into Two Phases:

Rosslyn Plaza PDSP (SP #422) SPRC Staff Presentation

North Fair Oaks Community Plan Summary and Information

DOMINION BOULEVARD CORRIDOR STUDY AND ECONOMIC DEVELOPMENT STRATEGIC PLAN A MODEL FOR CHESAPEAKE S FUTURE

DOWNTOWN GEORGETOWN PLANNING STUDY

Public may provide comments on the GDP within the next two weeks (December 24)

Urban Planning and Land Use

Broadway District Specific Plan. Community Workshop #2 February 23,2016

Corridor Vision. 1Pursue Minnehaha-Hiawatha Community Works Project. Mission of Hennepin County Community Works Program

Lambeth Main Street Streetscape Improvements

Route 1 Corridor Study

McCowan Precinct Plan Study Background & Deliverables

Draft Cary Community Plan Review Part 3: Shop, Engage, Serve, Special Area Plans, Other Updates. October 27, 2015 Police Department Training Room

REVIEW AND EVALUATION OF REGIONAL LAND USE

MEMORANDUM. DATE: March 15, Chairman and Members Community Redevelopment Agency. Leif J. Ahnell, C.P.A., C.G.F.O. Executive Director

New Partners for Smart Growth Conference February 5, 2010

Seneca Meadows. Block 4 Locate office, technology, and medical development adjacent to I Screen views of garage structures from I-270.

Section4 Design Vision & Implementation Plan

PIKE PINE RENAISSANCE: ACT ONE. October 19, 2017

OVERVIEW OF PLANS FOR THE JEFFERSON COUNTY COUNTRYSIDE FARM In the Context of Quality Place Characteristics

CHAPTER 7: Transportation, Mobility and Circulation

Citizen Comment Staff Response Staff Recommended Revision Planning Committee

Hockessin Community Redevelopment Plan

Former Rockcliffe Airbase Community Design Plan Guiding Design Vision and Principles December 4, 2013

PLACEMAKING & MOBILITY WORKSHOP. January 27, 2016

Policies and Code Intent Sections Related to Town Center

4/8/2015 Item #10D Page 1

Mavis Road Class Environmental Assessment

Access Management: An Overview

Implementation Guide Comprehensive Plan City of Allen

Local Growth Planning in North Central Green Line Communities

SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW

26/Old Dominion Task Force

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

Town Center. Block 5 Existing multifamily residential units are expected to remain.

TORONTO COMPLETE STREETS GUIDELINES

City of Toronto. Emery Village Transportation Master Plan

Chapter 1.0 Introduction

A larger version of this map is located on the last page of this PDF.

PINE CURVE REZONING. BACKGROUND Purchased as two parcels in 2001 and 2002

Better Cycling. The City will update the cycling master plan (London ON Bikes) based on the approved BRT network.

THE NEIGHBORHOOD TODAY

Mississippi Skyway Preliminary Engineering Report

Future Proposed Development

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

Goals for Tonight s Meeting

Welcome. Walk Around. Talk to Us. Write Down Your Comments

Honorable Members of the Mobility Solutions, Infrastructure and Sustainability Committee

Presentation of the Staff Draft. July 17, 2014 SSRVP Team, Area 3

Transcription:

Community-Based Design Update Asheville Design Center March 2010 www.ashevilledesigncenter.org

1 introduction contents 1. Introduction 2. Background 3. ovember Design Charrette 4. January Work Session 5. Recent Developments and ext Steps Since 2006, the Asheville Design Center (ADC) has continued to use its community-based design capacity to generate improvements to the 1-26 Connector that will better meet the Asheville community planning and development goals. This report provides a brief project overview, a summary of a series of related community workshops and recent important design developments from CDOT associated with Alternative 4B ote: The materials presented in these pages are conceptual and schematic renderings that have resulted in the emergence of concrete design ideas; they are not intended to be sophisticated final drawings. This document was collaboratively produced by the Asheville Design Center s I-26 Task Force. Get involved or provide feedback: www.ashevilledesigncenter.org Asheville Design Center I-26 Alternative 4B - Community-Based Design Update February 2010 2

2 background CDOT has been working on the proposed I-26 Connector since 1995. The overall project would include three sections, of which Section B is the most pertinent to this report. In Section B, I-26 would be built on a new alignment north of Patton Ave., with a new bridge over the French Broad River; it would connect to US 23/70 south of the Broadway interchange. There are currently three alternatives under consideration for this segment: Alternatives 3, 4, and 4B. In 2000 CDOT convened the Community Coordinating Committee (CCC) to develop consensus goals for the project. The Committee had broad representation from the community, including neighborhood, business, and environmental groups. The Committee adopted nine Key Project Design Goals (listed here). In 2006 the Asheville Design Center presented a proposal for a new alternative in Section B; this alternative is a modification of Alternative 4 that would reduce the right-ofway needed for the project by using the existing US 23/70 alignment for part of the project. Community Coordinating Committee (CCC) Adopted Key Project Design Goals, 2000 1. Separation of local and interstate traffic 2. Matching scale of project to character of community 3. Reunification and connectivity of community 4. Minimization of neighborhood and local business impacts 5. Use of updated traffic modeling software and data 6. Maintenance of compatibility with community s design vision and plans; incorporation of communityselected design features 7. Creation of full interstate movements between I-26 and I-40 8. Minimization of air quality and other environmental impacts 9. Emphasis on safety - during construction and in the design of the final product Asheville Design Center I-26 Alternative 4B - Community-Based Design Update February 2010 3

In 2007 the City of Asheville and Buncombe County funded an engineering study of the ADC alternative by Figg Engineers. This study was conducted in close cooperation with CDOT, and a modified version of the ADC Alternative was produced in June 2008, now referred to as Alternative 4B. In the summer of 2008 CDOT issued a Draft Environmental Impact Statement (DEIS) for the project, and conducted a public hearing in September 2008. The DEIS analyzed Alternatives 2, 3, and 4 in Section B. Alternative 4B was presented along with the others at the public hearing. CDOT subsequently agreed to add Alternative 4B as a full alternative. Alternative 2 has been dropped from consideration by CDOT. alternative 4 (blue) In an Oct. 2009 meeting between CDOT and the Technical Review Committee (City of Asheville, Buncombe County, and ADC) CDOT addressed one important design issue. The 2008 CDOT version of Alternative 4B showed I-26 crossing over I-26 in West Asheville. This would have a negative visual impact, and would detract from the urban boulevard that the community hopes to see for the future Patton Avenue. CDOT has now developed an alignment with I-26 passing under Patton Avenue; this would be less expensive than the over-patton option by about $13 million. DOT now plans to include the under-patton plan in the Supplemental DEIS. The ADC, in coordination with neighborhood groups, continued to press that CDOT study additional design changes for Alternative 4B. These include: reducing the length of elevated structure along the US 23/70 alignment west of Montford; reducing the impact on the Hill Street neighborhood; improving the aesthetics of the river crossing; and reducing noise and visual impacts. alternative 4B (yellow) alternatives 4 and 4B compared Asheville Design Center I-26 Alternative 4B - Community-Based Design Update February 2010 4

3 november 2009 design charrette The I-26 Task Force of the ADC conducted a Design Charrette on ovember 14th 2009 to explore potential improvements to CDOT s latest version of Alternative 4B. This one-day workshop included representatives of the Montford eighborhood, the City s Greenways Commission, members of the Patton Avenue Task Force, and several other interested community members. The Charrette focused on three key areas of Alternative 4B: 1. 2. 3. The bridge landing and the segment of highway between Montford and the river, A series of multimodal linkages to the French Broad River, and The network of freeway ramps at Patton and I-240 next to the Hillcrest Community Asheville Design Center I-26 Alternative 4B - Community-Based Design Update February 2010 5

segment 1.1 bridge landing at montford MOTFORD The impact of the bridge landing at the western edge of Montford was further mitigated by some minor, but potentially significant, highway alignment adjustments. The recommended adjustments involve reducing the amount of elevated highway and lowering the height of remaining elevation sections. These changes are intended to further reduce the noise and visual impacts to the neighborhood. HILLCREST DOWTOW WECA WESTWOOD Asheville Design Center I-26 Alternative 4B - Community-Based Design Update February 2010 6

ADC review and analysis of CDOT drawing (segment 1, 2009) roadway meets grade too far north potential bottleneck at upcoming Broadway interchange (5 lanes merge to 2 lanes) aerial structure causes visual impacts to historic neighborhood missed opportunity for access to river (future Wilma Dykeman Riverway) Asheville Design Center I-26 Alternative 4B - Community-Based Design Update February 2010 7

charrette response to CDOT drawing segment 1.1, 2009 Community members worked together with ADC Volunteer Designers to arrive at improved design updates to this segment. In February, CDOT presented to the City of Asheville I-26 Technical Review Committee (TRC) a similar plan. The TRC had asked CDOT to consider the feasibility of these potential revisions at our last meeting. CDOT reported that these changes are possible and their version could save about $20 million in construction costs. aerial structure brought down sooner montford neighborhood merger of 1923/26 shifted further south connection to river charrette concept drawing Asheville Design Center I-26 Alternative 4B - Community-Based Design Update February 2010 8

ADC segment 1.1 improvement concept elevated highway landing retaining wall bridge landing bike / pedestrian connection from Riverside Cemetery to River Asheville Design Center I-26 Alternative 4B - Community-Based Design Update February 2010 9

segment 1.2 green connections along east bank A B MOTFORD The reconfiguration of the I-26 Corridor should provide additional opportunities to reconnect Asheville residents to the French Broad River through pedestrian and bicycle connections, not result in additional barriers to these movements. In particular, this large-scale highway project provides an opportunity to begin realizing key elements of the Wilma Dykeman Riverway Plan. The ovember Charrette work group identified four potential pedestrian and bike connections along the East bank of I-26 Alternative 4B project area. These are referred to as Green Connections due to their inclusion of ecological elements such as streams and wildlife habitat along a natural, green landscape corridor. WESTWOOD C HILLCREST D WECA DOWTOW A. Potential greenway underpass from the heart of Montford (least feasible) B. Stream restoration and greenway from Riverside Cemetery to a proposed park C. Greenway and/or bike lane along Hill Street extending directly to the French Broad River D. Connection from Patton Avenue (to be reclaimed for local traffic and multimodal connections across the French Broad) Wilma Dykeman Riverway Plan, 2003 Asheville Design Center I-26 Alternative 4B - Community-Based Design Update February 2010 10

Option B involves an extension of the Riverside Cemetery path along a proposed greenway that would run beneath the freeway and across Riverside Drive to the future Wilma Dykeman Riverway. restored creek with greenway connecting Montford to Wilma Dykeman Riverway bike lanes and sidewalks along Hill Street possible connection to Hillcrest The greenway has an opportunity to restore and day-light an existing stream previously piped under the 19/23 highway to the river. The greenway would run beneath a raised portion of the freeway at a point, possibly allowing a sun-lit, open air pathway that runs along the stream. The path would lead to a riverside park with a programmed open space that might include something like a boathouse or BMX bike park. The idea is to promote safety while creating a convenient, usable recreation space for the community. The group found that this greenway could also feasibly connect to Courtland Place. Riverside Cemetery greenway passes beneath freeway ramps with programmed open space (not a tunnel) views of and along river proposed riverfront park (see Wilma Dykeman Riverway plan) intersection improvements facilitate direct pathway to river and park segment 1.2 connection concept Asheville Design Center I-26 Alternative 4B - Community-Based Design Update February 2010 11

segment 2 ramp network at patton, hillcrest, and hill street MOTFORD The portion of I-26 that meets downtown Asheville and Patton Avenue on the east side of the French Broad River is perhaps the most critical, especially since it will function as both a regional and local gateway. With Alternatives 4 or 4B, this critical area has the potential to be transformed from a confusing landscape of wasteful freeway infrastructure into a vibrant urban district that connects existing areas through a variety of transportation options, attracts investment in new development, and enhances the natural environment. HILLCREST WECA DOWTOW WESTWOOD Asheville Design Center I-26 Alternative 4B - Community-Based Design Update February 2010 12

ADC review and analysis of CDOT drawing (segment 2, 2009) severe impact; taking of homes at Hill Street circuitous access from Patton to Hillcrest poor intersection functionality does not provide access to river Asheville Design Center overall corridor has poor sidewalks and no bike lanes unsafe intersection for pedestrians (high speed traffic and extremely long crossing distance) I-26 Alternative 4B - Community-Based Design Update February 2010 13

charrette response to CDOT drawing segment 2, 2009 The design approach for this area was based largely on reducing the impact to the Hill Street area, a cluster of homes and civic buildings functioning as its own neighborhood. CDOT s plan for Alternatives 4 and 4B calls for shifting Hill Street, thus taking about five houses. The proposed modification involves shifting the westbound lanes of I-240 southward to meet the eastbound lanes. This reconfiguration would involve using a jersey barrier instead of a widely spaced median along this section of I-240, keeping with its arrangement along the northern edge of downtown. This can be considered a more urban-scaled configuration, as opposed to a suburban one. Other adjustments include decreasing the size of the intersection where highway ramps meet Patton Avenue. Such wide approaches as shown by CDOT impede the safe and comfortable movement of pedestrians along Patton Avenue. Consideration was also given to traffic movement from I-240 across Patton to Hilliard Street, thus facilitating traffic moving southward to the River Arts District and destinations south of downtown, such as Mission Hospital and AB Tech. more direct access for Hillcrest to Patton Ave. consolidate lane alignments to minimize Hill Street impacts Continue use of jersey barrier along I-240 walkable intersection spacing The charrette response also includes a pathway to the river from Patton Avenue and a less circuitous connection of Hillcrest to Patton Avenue. pedestrian / bike pathway to river facilitate traffic to south of downtown Asheville Design Center I-26 Alternative 4B - Community-Based Design Update February 2010 14

4 january 2010 work session Two key areas were identified for further study in a follow-up meeting to the ovember Charrette. These include the ramp network at Patton, Hillcrest and Hill Street, as well as the major interchange on the west side of the river. These remaining investigations and design interventions were conducted in an ADC Work Session with members of the Patton Avenue Task Force and other ADC Volunteers. HILLCREST MOTFORD DOWTOW WECA WESTWOOD study area 1 study area 2 Asheville Design Center I-26 Alternative 4B - Community-Based Design Update February 2010 15

study area 1 ramp network at Patton, Hillcrest, Hill Street study area 1 concept drawing, 2009 This exhibit shows one ADC architect s vision of how moderately dense urban development could be integrated along Patton Avenue, using land reclaimed from CDOT. This approach involves a reconfiguration of the area s roadway networks and freeway ramps to maximize connectivity and facilitate an extension of downtown to the Smoky Park Bridge (a multi-modal corridor to West Asheville). This plan also involves connecting Hillcrest to Patton Avenue using an urban grid. connection from Hill Street to Patton Ave. eastbound on-ramp moved further west enhance pedestrian bridge at church Key to this exhibit is a direct connection from Hill Street to Patton Avenue using the freeway ramps. However, a due to intersection spacing requirements, some configurations presented here may not be feasible and merited more investigation. connection of Hillcrest to Patton Ave. using a seamless network buildings line the street with parking in back eastbound off-ramp moved further east Asheville Design Center I-26 Alternative 4B - Community-Based Design Update February 2010 16

With further investigation, the Work Session group determined that a pedestrian-only connection from the I-240 ramps to Hill Street would eliminate the intersection spacing conflict found in the earlier exhibit. This plan also includes more regular intersection spacing along Patton Avenue. This version includes urban-scale density along Patton, a more efficient connection to the WECA neighborhood, and enhancements to the current pedestrian crossing over I-240. possible connections to Hillcrest and Hill Street pedestrian connection with signalized crossing study area 1 concept drawing, 2010 freeway ramps transition into rectangular block structure create a park-like approach to pedestrian bridge in place of current freeway entrance ramp tree lined boulevard with plazas and ground floor retail green space at bridgehead with pathway to river parking deck with active frontage to neighborhood neighborhood-scale mixed use at roundabout extnesion of Hilliard provides direct access to south side destinations continuous urban fabric from downtown to river Asheville Design Center I-26 Alternative 4B - Community-Based Design Update February 2010 17

study area 2 west side interchange smith mill creek greenway ecological infrastructure The western convergence of future I-26 and Patton Avenue is currently confusing, inefficient, and dominated by automobiles. The area marks a transition from the Smokey Park Bride to a high-traffic commercial corridor and a variety of neighborhoods in West Asheville. Businesses surrounding the current intersection have limited roadway access, resulting in missed opportunities for commerce. Most notable is the buried stream corridor, Smith Mill Creek, which flows through a culvert below the intersection. A wide variety of opportunities exist with the coming reconstruction of this intersection to enhance business vitality, promote additional urban development, increase pedestrian and bike infrastructure, and reconnect neighborhoods. HILLCREST MOTFORD WECA DOWTOW WESTWOOD Asheville Design Center I-26 Alternative 4B - Community-Based Design Update February 2010 18

ADC review and analysis of CDOT drawing (study area 2, 2009) Smith Mill Creek overall corridor does not allow for urban development Smith Mill Creek is further culverted, when it should be restored neighborhood and church impacted by 8-10 lane cross section poor connectivity from Patton to golf course and areas north ramp impact to neighborhood not needed Smith Mill Creek ramp footprint too large; too much taking of property overall corridor has poor sidewalks and no bike lanes Asheville Design Center I-26 Alternative 4B - Community-Based Design Update February 2010 19

An ADC landscape architect approached the intersection reconfiguration by considering how ecological infrastructure could be re-introduced (management of storm water with man-made wetlands, provision of wildlife habitat, creation of open space, etc.). This would facilitate a natural corridor at the base of the freeway interchange, restoring the Smith Mill Creek floodplain and having no negative effect on the efficient movement of automobiles at the roadway level. Running along Smith Mill Creek would be a greenway, enabling the safe and comfortable movement of pedestrians and cyclists by separating them from high-speed vehicular traffic. Also featured is a redevelopment concept for the Westgate Shopping Center as a mixed-use Urban Village. This strategy would combine housing, offices, retail and open space in an area close to downtown that s well connected to mass transit. ot to worry, there s still plenty of room for parking. allow Smith Mill Creek to flow naturally through floodplain stormwater management landscape westgate shopping center as a mixed-use urban village study area 2 concept drawing, 2010 Asheville Design Center I-26 Alternative 4B - Community-Based Design Update February 2010 20

The final drawing for this site provides an effective alternative solution to the intersection as its currently designed by CDOT. This plan features more urban development along Patton Avenue and better multimodal connections. A major feature is a greenway along Smith Mill Creek; the greenway and the day-lighted creek would pass through the interchange; this plan would also provide a storm water management area. add buffer between highway and neighborhood restore natural drainage course restore creek to fully daylit conditions increase number of bridge functions enable greenway connections from neighborhoods to river add stomwater filtration zones to West Asheville redefine Patton Avenue as a multimodal boulevard increase connections new building at urban setback to patton avenue tight radii at intersections for pedestrian safety relocate buried and open trench culvert reclaim open stormwater trench for parking enhance roadway function enhance and simplify entry and exit to hotel keep ramps tight to highway footprint, allowing neighborhood preservation and expansion greenway connection to river follows creek segment 1.2 concept drawing, 2010 to Downtown tighten ramp to allow urban development tight radii at intersections for pedestrian safety Asheville Design Center I-26 Alternative 4B - Community-Based Design Update February 2010 21

5 recent developments and next steps At a February 26, 2010 meeting with City Staff, County and ADC representatives, CDOT reported that they had investigated the design of the section west of Montford, and they have developed an alignment that reduces the length of elevated highway, similar to ADC s proposal. Due to this and other community efforts to improve the design of Alternative 4B, there is a construction cost savings of $30 Million for Alternative 4b, possibly more. Also, there is a possibility of a greenway connection from the Montford neighborhood to the Wilma Dykeman Riverway Master Plan if the City includes the connection in Greenway Master Plan. The 1-26 ROW area acquired for the bridge on the east side of the river can be used for the Riverside Park as shown on the Wilma Dykeman Riverway Master Plan. This can be done thru an existing process the City of Asheville and CDOT have in place to use CDOT ROW as City-maintained parks. And although, DDOT reported that they have not been able to develop an alignment that would save the five houses in the Hill Street area, they will study this area in more detail if Alternative 4 or 4B is selected as the Preferred Alternative. Many design refinements will be considered after the selection of the Preferred Alternative. These elements could include further consideration of a Patton Avenue connection to Hillcrest, the west side 1-26 / Patton interchange, mitigation to noise and visual impacts, a signature bridge and the number of lanes required. ext Steps for CDOT Design Process May 2010 Publish Supplemental DEIS Summer 2010 Hold Public Hearing Late Summer/ Select Preferred Alternative Early Fall 2010 Community support for a preferred alternative will be a key factor in the final selection. The ADC will continue to study community concerns and present specific proposals for these items during the DEIS comment period this summer. Asheville Design Center I-26 Alternative 4B - Community-Based Design Update February 2010 22