VISUALIZATION TOOLS FOR COMMUNICATION & DECISION MAKING REAL MINNESOTA EXAMPLES

Similar documents
WHAT IS THE PURPOSE OF THE OPEN HOUSE?

Grand Rounds History

Blue Line LRT Extension

Corridor Vision. 1Pursue Minnehaha-Hiawatha Community Works Project. Mission of Hennepin County Community Works Program

Mississippi Skyway Preliminary Engineering Report

I-494 Rehabilitation Project SP (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination

A PROPOSAL FOR THE Small Area Corridor Plan

Missing Link Study Grand Rounds Parkway Planning and Design Introduction

Bassett Creek Valley Working Group. October 4, 2017

Long Lost Allies? Walking Advocates & Business District Organizations. Matt Kazinka Lake Street Council. Shaina Brassard Seward Redesign

St. Louis Park Wooddale LRT Station Site development guidelines

Welcome. Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals:

Infrastructure Engineering Planning Construction Suite 300 Minneapolis, MN Tel: Fax:

Midtown Greenway to lake street

Highway 100 / The Grandview Green Feasibility Study

SELMON GREENWAY FEASIBILITY STUDY. For: Hillsborough County Metropolitan Planning Organization By: Renaissance Planning

Transportation Committee

Corridor Background. Defining the Corridor Study Area. Lake Street. 38th Street. 46th Street

Community Engagement Committee Meeting #1 December 10, :30pm-8:30pm

OPEN HOUSE #3. Project Manager Kristi Sebastian, PE, PTOE

#27. Timing: Short term. Costs: $$

the west loop HOME TO 5,000 NEW DOGS

Dayton Transportation Plan 2016 Update

MAY 2012 CITY OF ST. LOUIS PARK, MINNESOTA SAINT LOUIS PARK BELTLINE AREA FRAMEWORK & DESIGN GUIDELINES

Place and Opportunity: An Equity Assessment of the Twin Cities Region (

Embrace Green Urban Space:

Corridor Management Committee. September 29, 2017

Proposal for Brainerd Housing and Redevelopment Authority (HRA) Mississippi River Partnership Plan Implementation. September 30, 2015

4 Park Planning and Design

STREETSCAPE MANUAL ONLINE TRAINING SESSION 1: Background

Tracking the Blue Line Extension

Albert Lea. Redevelopment Plan. 701 Xenia Avenue South, Suite 300 Minneapolis, MN Tel: (763) Fax: (763) wsbeng.

ROBBINSDALE LRT STATION CDI DEVELOPMENT GUIDELINES

Designing Walkable Urban Thoroughfares: A Context Sensitive Approach

7.0 SECTION 4(F) EVALUATION

METRO Gold Line BRT CBAC Meeting. August 23, 2018

Gratigny Parkway East Extension Project Development & Environment (PD&E) Study

Reconnecting to a Forgotten River St. Cloud MN. Aaron Hanson Design Design Thesis LA 572, Thesis, Spring 2012

June 14, 2017 for the June 20, 2017 Parks and Trails Commission Meeting

State Highway 121 Southwest Parkway. Fort Worth s Transportation Success Story in Design and Cooperation

Technical Report Land Use Plan Compatibility

Chapter V-Transportation

Construction Projects

FDOT D4 Complete Streets

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

CHAPTER 3: LAND USE. 3.1 Purpose. 3.2 Influencing Factors

METRO Gold Line BRT CMC Meeting

DEVELOPMENT FRAMEWORK POST 2030 LAND USE PLAN INTRODUCTION

Mavis Road Class Environmental Assessment

I-90 Mississippi River Bridge & Interchange Project

Chapter 1: Introduction

Great Rivers Greenway CLEAN GREEN CONNEC TED T RAILS

West Broadway Transit Study Initial Screening of Alternatives Memo

PACE CENTRAL HARLEM AVENUE CORRIDOR STUDY. Steering Committee Meeting #1 January 18, 2018

MINNEHAHA. Hiawatha. Strategic. Framework. Community Works. Investment

This chapter describes the purpose of the Plan, introduces how the Plan is organized and provides contextual background for the Plan.

ARGENTA TRAIL (CSAH 28/63) REALIGNMENT SOUTH PROJECT (CP 63-25)

12/9/2013. HOLLYWOOD/PINES CORRIDOR PROJECT AMPO 2013 Annual Conference October 24, Our Perspective. Broward.

Exhibit A. SH 161 RTC Work Program of New Projects. Collin County

Potential Green Infrastructure Strategies May 6, 2015 Workshop

include playgrounds, sports fields, community gardens and picnic areas.

Quality Façade Restorations on a Budget Preservation and Adaptive Re-Use

Downtown Elkton Station Area Plan, Elkton, MD. Difficult enough to get support for new starts challenge to fund Houston transit

Pedestrian Annual Count Report

FINAL MITIGATION PLAN to address

GAINING LEVERAGE through

The Trust for Public Land. in Minnesota

BROOKLYN PARK / 85TH AVE LRT STATION CDI DEVELOPMENT GUIDELINES DRAFT

2040 Long Range Transportation Plan

Welcome. Green Line LRT. Beltline Alignment Options. Stay engaged! Follow the Green Line story at calgary.ca/greenline

Evaluation Criteria. Detailed Evaluation Criteria

Subject: City of Richfield Cedar Avenue Corridor Plan Comprehensive Plan Amendment, Review File No

OFFICIAL CONTROLS IMPLEMENTATION LEGAL REQUIREMENTS

elm creek Watershed Management Commission

PARK & PORTLAND: VISION FOR DEVELOPMENT

KCATA Transit Oriented Development Initiatives

Eglinton West LRT Update

AGENCY: Federal Emergency Management Agency, DHS. SUMMARY: Flood hazard determinations, which may include additions or

River to River Greenway Robert Street Pedestrian Crossing Feasibility Study

Mendota Heights 2040 Comprehensive Plan Draft Vers

PUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN

DOWNLOAD OR READ : PERENNIALS FOR MINNESOTA AND WISCONSIN PDF EBOOK EPUB MOBI

Blue Line Extension Corridor Management Committee

Knoxville Area Transit (KAT) Transit Development Plan Corridor Analysis

Agenda. Introductions and Overview Study Purpose Study Approach Key Analysis Components Study Context Development Activity ( )

124 Subarea Visions. Vision Plan. A. Nelessen Associates, INC I Visioning I Planning I Urban Design

Land Use and Economic Development 2015 New Starts Executive Summary

2030 Comprehensive Plan VISION STATEMENT

Midtown Greenway Land Use and Development Plan Executive Summary

Planning for TOD Implementation at a Corridor Scale

International Blvd. TOD Plan Public Workshop #1

CALDER PLAZA A PLAZA FULL OF OPTIONS GRAND RAPIDS HAS THE ICON... IT S TIME TO CREATE ICONIC EXPERIENCES!

50TH AND FRANCE DISTRICT STREETSCAPE IMPROVEMENTS

Information for File # MVP MMJ; Elim Care

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Findings of Fact and Conclusion

CONTEXT: the Highway, the River + the Railroads run through us.

Urban Design Review Panel Submission. The Ottawa Train Yards - Office Development. 405 Terminal Avenue. 17 April Table of Contents.

PLANNING COORDINATING COMMITTEE

Isabel Neighborhood Plan: Alternatives

Transcription:

REAL MINNESOTA EXAMPLES 23rd Annual CTS Transportation Research Conference Leif Garnass, P.E., PTOE Senior Engineer lgarnass@srfconsulting.com Sean Jergens, ASLA, LEED AP Senior Landscape Architect sjergens@srfconsulting.com MAY 23, 2012

Visualization is the visual representation of proposed project alternatives and improvements and their associated impacts on the surroundings. - NCHRP 361 PRESENTATION OUTLINE Types of visualization tools Real Minnesota Examples - Graphic methodology - Benefit to project - Approximate level of effort Potential applications

WHY USE THESE VISUALIZATION TOOLS? Enables stakeholders and the public to understand transportation concepts and proposed solutions Allows complex information to be simplified Can highlight or reveal hidden infrastructure that is not easily portrayed in traditional graphic methods Technology is rapidly making it more efficient to create powerful visualization graphics A picture is worth a thousand words! An animation is worth millions!

ANALYSIS, DIAGRAMS, AND SECTIONS TRANSPORTATION INFRASTRUCTURE STREETSCAPE PLANNING AND DESIGN BEFORE AND AFTER PHOTO ILLUSTRATIVE PERSPECTIVES TRAFFIC SIMULATION

ANALYSIS, DIAGRAMS, AND SECTIONS TRANSPORTATION INFRASTRUCTURE STREETSCAPE PLANNING AND DESIGN BEFORE AND AFTER PHOTO ILLUSTRATIVE PERSPECTIVES TRAFFIC SIMULATION

CEDAR RIVERSIDE STREET SECTION Minneapolis, MN

MANUAL FOR STREET TREE & BOULEVARD DESIGN Minneapolis, MN

MIXED USE ZONING Moorhead, MN

ANALYSIS, DIAGRAMS, AND SECTIONS TRANSPORTATION INFRASTRUCTURE STREETSCAPE PLANNING AND DESIGN BEFORE AND AFTER ILLUSTRATIVE PERSPECTIVES TRAFFIC SIMULATION

BELTLINE BOULEVARD & WOODDALE AVENUE STATION AREA STUDIES St. Louis Park, MN

CENTRAL AVENUE PEDESTRIAN BRIDGE Columbia Heights, MN

CENTRAL AVENUE PEDESTRIAN BRIDGE Columbia Heights, MN

ROBERT STREET PEDESTRIAN BRIDGE FEASIBILITY West St. Paul, MN

ROBERT STREET PEDESTRIAN BRIDGE FEASIBILITY West St. Paul, MN

TH101 FLYOVER Rogers, MN

TH 41 RIVER CROSSING PHOTO VISUALIZATION STUDY Chaska, MN

TH 41 RIVER CROSSING PHOTO VISUALIZATION STUDY Chaska, MN

LAFAYETTE BRIDGE St. Paul, MN

LAFAYETTE BRIDGE St. Paul, MN

TH 610/ZACHARY LANE BIRD S EYE GRAPHIC Maple Grove, MN

DRESBACH INTERCHANGE I-90 Crossing over the Mississippi River MnDOT & WisDOT

DRESBACH INTERCHANGE I-90 Crossing over the Mississippi River MnDOT & WisDOT

ANALYSIS, DIAGRAMS, AND SECTIONS TRANSPORTATION INFRASTRUCTURE STREETSCAPE PLANNING AND DESIGN BEFORE AND AFTER ILLUSTRATIVE PERSPECTIVES TRAFFIC SIMULATION

BRAINERD DOWNTOWN STREETSCAPE Brainerd, MN

13TH STREET PEDESTRIAN IMPROVEMENTS Minneapolis, MN

ARTERIAL RAPID BUS TRANSIT Metropolitan Council

BROADWAY AVENUE Forest Lake, MN

ANALYSIS, DIAGRAMS, AND SECTIONS TRANSPORTATION INFRASTRUCTURE STREETSCAPE PLANNING AND DESIGN BEFORE AND AFTER PHOTO ILLUSTRATIVE PERSPECTIVES TRAFFIC SIMULATION

BROADWAY AVENUE Forest Lake, MN BEFORE

BROADWAY AVENUE Forest Lake, MN AFTER

84TH ST. CORRIDOR Bloomington, MN BEFORE AFTER

84TH ST. CORRIDOR Bloomington, MN AFTER

CSAH 9 Chisago County BEFORE

CSAH 9 Chisago County AFTER

ANALYSIS, DIAGRAMS, AND SECTIONS TRANSPORTATION INFRASTRUCTURE STREETSCAPE PLANNING AND DESIGN BEFORE AND AFTER PHOTO ILLUSTRATIVE PERSPECTIVES TRAFFIC SIMULATION

SHINGLE CREEK LAND USE STUDY Brooklyn Center, MN

SHINGLE CREEK LAND USE STUDY Brooklyn Center, MN

63RD AVENUE/ BOTTINEAU BOULEVARD LAND USE & TOD PLAN Hennepin County

DRESBACH INTERCHANGE I-90 Crossing over the Mississippi River MnDOT & WisDOT

DRESBACH INTERCHANGE I-90 Crossing over the Mississippi River MnDOT & WisDOT

FARGO-MOORHEAD AREA DIVERSION RECREATION AND USE MASTER PLAN

FARGO-MOORHEAD AREA DIVERSION RECREATION AND USE MASTER PLAN

ANALYSIS, DIAGRAMS, AND SECTIONS TRANSPORTATION INFRASTRUCTURE STREETSCAPE PLANNING AND DESIGN BEFORE AND AFTER PHOTO ILLUSTRATIVE PERSPECTIVES TRAFFIC SIMULATION

TH 610/ ZACHARY LANE Maple Grove, MN

LAKE ST./ SUPERIOR BLVD. Wayzata, MN

CSAH 2 (BROADWAY AVE.) Forest Lake, MN

POTENTIAL APPLICATIONS Project management meetings During the design process City council meetings County board meetings Public open houses Project newsletters, project website YouTube channel

REAL MINNESOTA EXAMPLES THANK YOU! Leif Garnass, P.E., PTOE Senior Engineer lgarnass@srfconsulting.com Sean Jergens, ASLA, LEED AP Senior Landscape Architect sjergens@srfconsulting.com MAY 23, 2012