PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT. Joint Planning and Zoning Meeting

Similar documents
PRELIMINARY CONDITIONAL USE SUBMITTAL CHECKLIST REQUIREMENTS

DEPARTMENT OF PLANNING JEFFERSON PARISH, LOUISIANA

STATUS OF REVIEW: ENGINEER WILL COMPLY

Drexel, Barrell & Co.

12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH

Sanford/Lee County Technical Review Committee (TRC) DEADLINES & MEETING DATES

DEPARTMENT OF PLANNING JEFFERSON PARISH, LOUISIANA

MOBILE CITY PLANNING COMMISSION LETTER OF DECISION. October 22, 2010

SITE PLAN REVIEW APPLICATION AND CHECKLIST

Application Number: SD Project Name: Walton Farms Preliminary Subdivision (acting as Master Plan)

Urban Planning and Land Use

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST

14 October 10, 2012 Public Hearing APPLICANT: MPB, INC

SUBMITTAL REQUIREMENTS

SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST

Design Review Application *Please call prior to submittal meeting to determine applicable fees*

Huntington Stormwater Utility

CASE NUMBER: 16SN0701 APPLICANT: Hanky, LLC

SUBDIVISION, REZONING, PLANNING APPROVAL, PUD & SIDEWALK WAIVER STAFF REPORT Date: May 3, 2007

March 15, 2017 Project:

CHECKLIST FOR PHASE II DRAINAGE REPORT

KNOXVILLE/KNOX COUNTY METROPOLITAN PLANNING COMMISSION

DESIGN CRITERIA PACKAGE

Rezoning Transportation Analysis Petition Number: General Location Identifier: , ,

S o u t h C e n t r a l O u t l i n e P l a n. Leduc Business Park. North Leduc Industrial Area Structure Plan C it y of Led u c.

Drexel, Barrell & Co.

R E S O L U T I O N. Single-Family Residence/ Church. 2,488 sq. ft. 2,488 sq. ft. Area Parking Required: Church

CITY PLANNING COMMISSION AGENDA. ITEM NO: 6.a 6.b STAFF: LONNA THELEN

AGENDA ITEM: IOWA. west] that were not FISCAL IMPACT. the City of Clive. STAFF REVIEW. Resolution II. Amendment PREPARED BY: REVIEWED BY:

Asbury Chapel Subdivision Sketch Plan

CONSENT CALENDAR CITY PLANNING COMMISSION AGENDA ITEM NO: A.1, A.2 STAFF: LARRY LARSEN

ROLL CALL Member Anthony, Member Avdoulos, Member Greco, Member Lynch, Member Maday, Chair Pehrson

5. FINAL DEVELOPMENT PLAN APPROVAL MENORAH MEDICAL CENTER OFFICE BUILDING Vicinity of the southwest corner of 119 th Street and Nall Avenue

CHARTER TOWNSHIP OF VAN BUREN PLANNING COMMISSION November 12, 2014 MINUTES

CITY OF ZEELAND PLANNING COMMISSION

Planning & Zoning Commission Meeting Date: June 18, 2012

Ref: March 21, Ms. Jody Kablack Director of Planning and Community Development Town of Sudbury 278 Old Sudbury Road Sudbury, MA 01776

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE

Project Name: MELWOOD HOTEL. Date Accepted: 1/12/04. Waived. Planning Board Action Limit: Plan Acreage: 1.7 Zone: Dwelling Units:

Prado Ranch North Common Open Space Tentative Map. Washoe County Planning Commission July 3, 2018

Re: Thorncreek Commons Commercial Response to Pre-Application Meeting held September 24, 2014 Comments

Town of Windham. Planning Department 8 School Road Windham, ME voice fax

Master Land Use Plan Application

Application for Site Plan Review

MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS

CASE NUMBER: 15SN0594 APPLICANT: Racetrack Petroleum, Inc.

Appendix I. Checklists

Rezoning Transportation Analysis Petition Number: General Location Identifier:

PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT

Approved: CITY OF ARDEN HILLS, MINNESOTA PLANNING COMMISSION WEDNESDAY, AUGUST 5, :30 P.M. - ARDEN HILLS CITY HALL

SUBDIVISION, PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL, REZONING & SIDEWALK WAIVER STAFF REPORT Date: February 7, 2013

THE CITY OF MOBILE, ALABAMA

City of Fort Lupton Site Plan Process

C. WATER. 1. Surface Water Runoff. See Section C.3, Flood Hazard/Mudflow Hazard, page Ground Water

Note: Staff reports can be accessed at Zone: I-3. Tier:

Town of West Point Plan of Development

13. PRELIMINARY PLAT NO MILLS FARM - Vicinity of the southeast corner of 159 th Street and Quivira Road

PLANNED UNIT DEVELOPMENT Date: April 5, 2018

FLOODPLAIN USE PERMIT APPLICATION COMMUNITY DEVELOPMENT DEPARTMENT W. Ten Mile Road Novi, MI (248)

York L. Phillips, AICP, Planning & Zoning Division Manager. APPLICANT: Carter Engineering Consultants, agent for Cordell Enterprises, owner.

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: March 15, 2012

Michael D, Harvey, Current Planning Supervisor. This project was originally approved in 2012 by the BOCC and is summarized as follows:

Preliminary Development Plan 07/ /2

Community Development Rezoning Report REZ14-006

CONCEPT PLAN APPLICATION

RESIDENTIAL PLANNED UNIT DEVELOPMENT / SUBDIVISION AND REZONING CONCEPT AND DEVELOPMENT STAGE PLAN SUBMITTAL NARRATIVE

MEMORANDUM AGENDA ITEM #6c

Tucson Koi & Water Gardens

CITY OF INVER GROVE HEIGHTS 8150 Barbara Avenue Inver Grove Heights, MN (651) Fax: (651)

City of Mt. Juliet Planning & Zoning Department. Site Plan Checklist. Site plan cklist v1.18

2 January 13, 2010 Public Hearing APPLICANT: AUTOBELL CAR WASH, INC

PART 1: PROJECT SUMMARY. Proposed Land Use: 120 single-family lots. The application is Attachment A. The site plan is Attachment B.

Planning & Zoning Commission Meeting Date: June 04, 2012

ARTICLE 17 SITE PLAN REVIEW

SPECIFIC PLAN Requirements

D1 September 11, 2013 Public Hearing APPLICANT:

Planning Commission Staff Report June 5, 2008

COMMUNITY DEVELOPMENT SERVICES PLANNING AND BUILDING DEPARTMENT PLACERVILLE OFFICE:

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

Watertown City Council

Camden County Development Regulations. Updated February 2017

CASE NUMBER: 16SN0565 (AMENDED) APPLICANT: C.A.H. Investments, LLC

Overall Drainage Report

ZONING AMENDMENT, PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: March 20, 2008

P: Site Plan Approval

Baumgarten MPUD. Exhibit 3 Evaluation Criteria

OP Council Resolution June 16, Planning and Development Services

Major Development Plan

that the Town Board of the Town of East Greenbush will hold a public hearing on April 11,

City Development Department 9500 Civic Center Drive Thornton, Colorado FAX

Planning & Zoning Commission Planning & Development Department February 17, 2014

Princess Anne Road. Phase VII (CIP 2-195) Citizens Information Meeting

City of Fort Lupton Administrative Site Plan Process

CITY OF DAYTON Meeting Date: PLANNING COMMISSION

DRIVEWAY REGULATIONS

DEPARTMENT OF PLANNING JEFFERSON PARISH, LOUISIANA

Florence County Small Commercial Land Disturbance Permit Application

Level 1 Downstream Analysis

REPORT TO PLANNING COMMISSION

4 January 11, 2012 Public Hearing APPLICANT:

Transcription:

1. Call To Order 2. Roll Call of Members 3. Chairman's Comments PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Joint Planning and Zoning Meeting January 11, 2017 6:00 PM Courthouse Annex - 828 Irma Blvd Council Meeting Room 2nd Floor (Following the Planning Commission Meeting) AGENDA 4. Public Hearing to Recommend Approval or Denial to the Parish Council to Consider the following: (A) 5. Adjourn Zoning Review ID PZ-1171.17 Lot 1 1.706 Acre Tract and Former Lottie Henderson Road Right of Way Containing 1.706 Acre for C.A.P./ Ritter Maher Located on the west side of LA Highway 73 approximately 400 north of Longwood Avenue to amend the Ascension Parish Zoning Map from Mixed Use 2 (MU2) and Medium Intensity Residential (RM) to Small Planned Unit Development (SPUD)

Description: Zoning Review ID PZ-1171.17 Lot 1 1.706 Acre Tract and Former Lottie Henderson Road Right of Way Containing 1.706 Acre for C.A.P./ Ritter Maher Located on the west side of LA Highway 73 approximately 400 north of Longwood Avenue to amend the Ascension Parish Zoning Map from Mixed Use 2 (MU2) and Medium Intensity Residential (RM) to Small Planned Unit Development (SPUD) ATTACHMENTS: Description Upload Date Type Final Review Letter 1/4/2017 Cover Memo Information Sheet 1/4/2017 Cover Memo Landscape Plan 1/4/2017 Cover Memo Survey 1/4/2017 Cover Memo

January 4, 2016 Mr. Jerome Fournier Ascension Parish Planning Commission P.O. Box 1659 Gonzales, La 70707 CSRS, INC. 6767 Perkins Road, Suite 200 Baton Rouge, Louisiana 70808 Phone. (225) 769-0546 Fax. (225) 767-0060 RE: C.A.P. SPUD Development Plan Review Mr. Fournier: As the Engineering Review Agency for the Ascension Parish Planning Commission, we have reviewed the Development Plan, Drainage Impact Study, and Traffic Impact Study submitted for the above referenced development for compliance with the Ascension Parish Subdivision Regulations and the Ascension Parish Development Code. Shown below are the comments made to the Consulting Engineer for the project as a result of our review of their submittals, as well as a description of their correction or response made to our comments (shown in bold print). Preliminary Plat 1. The Northern property line abuts a residential zoning/use and is therefore required to have a buffer yard with 7 Class A trees or equivalent. The buffer yard needs to be labeled as such along the northern and western property lines and the label stating a buffer yard is not required needs to be removed. Consultant appears to have addressed buffer yard requirements, however, this will be further reviewed during the building permit review process. 2. Label trees as Class A Trees on Landscape Plan. This has been added to the development plan. 3. Trees along relocated bayou should be shown in islands adjacent to driveway as DPW will not want trees too close along the edge of the relocated waterway. Also, it looks like there will be catch basins near the currently shown tree locations. Consultant added labels to indicate existing characteristics. 4. Parking lot tree count appears to be 10 and not the required 12. 5. Label fence on the Landscape Plan. This has been added to the development plan. 6. Show anticipated trail section on Landscape Plan. Ensure the trail material is noted. This has been added to the development plan. 7. Parking spaces are required to be a minimum of 200 sq. ft. except where they are adjacent to outer perimeter or interior landscaped areas. In these areas the depth may be reduced by two feet making WWW.CSRSONLINE.COM

the minimum required area of each parking spot 180 sq. ft. This has been updated on the development plan. 8. Toward is misspelled under PROJECT DESCRIPTION on Sheet. A 1.0. This has been corrected on the development plan. 9. Applicant shall coordinate with Ascension Parish Utilities Department on final location of Sewer Treatment Plant. The plant should also have perimeter fence. This has been added to the development plan. 10. Show all existing and proposed drainage servitudes. Ensure any servitudes that are to be revoked are labeled as such. This has been added to the development plan. 11. Depict and note the proposed drainage servitude of Bayou Goudine. Ensure adequate widths are provided from the top banks of the ditch per Section 17-4045 of the Ascension Parish Subdivision Regulations. In addition, it appears that a portion of the parking lot will fall within the drainage servitude. A Hold Harmless agreement will be required from DPW to allow parking within the drainage servitude after a detailed design is completed. This has been added to the development plan. The consultant stated a Hold Harmless agreement will be submitted upon design approval. 12. Note the existing land characteristics on the survey map. This has been added to the development plan. 13. The SPUD Development Checklist requires an aerial photograph to a scale of 1 = 200 taken within 2 years of the application. Please include this within the plans. This has been added to the development plan. 14. Provide a note stating, There are no existing curves on public streets within one-fourth (1/4) mile of the proposed entrance. This has been added to the development plan. 15. Depict the two proposed 5 x7 box culverts under the SPUD entrance on sheet A 1.0. This has been added to the development plan. 16. Note that this site is subject to traffic impact fees and confirm whether or not this site is subject to sewer development fees. Coordinate with Carl Ladmirault from Ascension Parish to determine sewer development fee requirements. This has been added to the development plan. 17. Under Buffer yard Requirements on the landscaping plan, add line for 422 north property line calculating required number of Class A trees (7). This has been added to the development plan. 18. Label the 55 drainage servitude of Bayou Goudine with arrows pointing to the specific lines. This has been added to the development plan. WWW.CSRSONLINE.COM

19. Label or otherwise more clearly delineate the top bank lines of Bayou Goudine. This has been added to the development plan. 20. Provide arrows pointing to the 25 front building line. This has been added to the development plan. 21. The parking space count seems to be incorrect. Please recount and revise circled numbers and update parking total note as necessary. This has been updated on the development plan. 22. The most recent submission did not include the previous version of the Boundary and Topo Survey map, and a comment response suggested this was revised to the Area to be Rezoned map. The General Notes section on the previous survey map needs to be included with the submittal as it contained required information per the Ascension Parish SPUD Development Plan Checklist. Please confirm whether the Boundary and Topo Survey map is to be a separate document or if this has been revised and replaced with the Area to be Rezoned map. If it is intended to replace the previous survey map, the General Notes section needs to be re-added. This has been updated on the development plan. Drainage Study 1. The HEC-RAS models show Longwood Avenue is overtopped at ~16.5. The topographic survey suggests this roadway is higher than this elevation. Provide evidence from the Longwood HOA or DPW showing this road gets overtopped with water in 10-year events, otherwise extend the HEC-RAS models to show water is contained within the banks of the Bayou and adjust road elevations to more accurately reflect the survey map elevations. Additionally, if the roadway is not overtopped during a 10-year event, add ineffective areas to the upstream and downstream areas around the two 5 x7 box culverts. Consultant noted Longwood Avenue elevation as 18.5 and revised HEC-RAS model accordingly. 2. Label station numbers on the HEC-RAS model graphs. This has been added to the DIS. 3. The existing and proposed conditions show offsite water from Longwood Subdivision to the North drains across this property. Although this is a conceptual design, only one inlet is shown along the northern property line which may be inadequate. This design will need to be further reviewed when more detailed plans are submitted. Consultant acknowledged the design will be further reviewed when detailed construction plans are submitted. 4. Both pre and post HEC-RAS models show Lottie Henderson Rd. at a lower elevation than is suggested by the survey map. Revise the deck/roadway height to more accurately reflect the survey map elevations and extend the HEC-RAS models to show water is contained within the banks of the Bayou. In addition, update the Pond Pack model as necessary. Resubmit an electronic copy of the revised HEC- RAS model for our review. Consultant revised roadway height and updated DIS accordingly. Traffic Study No Comments WWW.CSRSONLINE.COM

Drainage Impact Study Summary: Consulting Engineer: Jeff Cook, P.E., Louisiana Land Engineering, LLC Date of Study: December 2016 Size of Development: 3.6 acres Existing Land Use: Existing single family house & undeveloped grassy lot Receiving Basin: Bayou Goudine FEMA Flood Zone: X & A 100-year Flood Elevation: 18.0 ft Offsite Drainage Area: 160 acres upstream Fill Mitigation: Fill mitigation is being addressed with the proposed pond. Storm Water Mitigation: Retention pond proposed The Drainage Impact Study substantially conforms to the requirements of the Drainage Impact Study Policy included in the Subdivision Regulations. The Engineering Review Agency has performed a review of the input parameters and results of the submitted drainage calculations for compliance with the Subdivision Regulations and generally accepted practices for storm water hydrologic design. The Engineering Review Agency has not performed a detailed numerical check of the analysis submitted. Upon approval of the preliminary plat, the applicant can proceed with final drainage design in accordance with the concepts submitted in the impact study. Traffic Impact Study Summary: Consulting Engineer: Sheelagh Brin Ferlito, P.E., PTOE, Vectura Consulting Services, LLC Date of Study: December 2016 Date of Movement Counts: December 1, 2016 Number of Proposed Lots: 2 Buildings - 18,316 sq. ft. Health/Fitness, 2,500 sq. ft. gross Medical-Dental Peak Hour A.M. Trips: 32 Peak Hour P.M. Trips: 74 Study Threshold Level: 1 Conclusion: No roadway improvements are recommended by the consultant. Sight Distance Evaluation: Sight distance was evaluated at the current condition and concluded that sight distance will cause no traffic operational problems for this proposed development. The following intersections were studied with the following conclusions: LA 73 at Site Drive #1 (Right In/Right Out): The eastbound approach is anticipated to operate at a level of service (LOS) of B during both AM and PM peak periods. A right-turn lane was not warranted during the AM or PM peak hours. No roadway improvements are recommended by the consultant. LA 73 at Site Drive #2 (Full Access - Longwood Avenue Connection): The southbound and eastbound approaches are anticipated to operate at a level of service (LOS) of A during both AM and PM peak periods. No roadway improvements are recommended by the consultant. Longwood Avenue at LA 73: The level of services for the exit left turn from Longwood Ave. onto LA 73 remains at a C for the AM peak hour and goes from an E to and F for the PM peak hour. The level of services for the exit WWW.CSRSONLINE.COM

right turn from Longwood Ave. onto LA 73 remains at a B for both the AM and PM peak hours. The level of services for the La 73 left turn onto Longwood Avenue remains at an A for both the AM and PM peak hours. No roadway improvements are recommended by the consultant. The following items should be considered by the Planning Commission in their analysis of the case and addressed in the final motion: No Comments Should you have any questions or comments, please do not hesitate to contact me at (225) 769-0546. Sincerely, Engineer Review Agency for the Ascension Parish Planning Commission Shaun Sherrow, P.E. CC: Blayne McCrae, AIA, Ritter Maher Architects WWW.CSRSONLINE.COM