EXPANDING THE NETWORK ALEXANDRIA, VIRGINIA

Similar documents
Lesson 6. Corridor Planning

Tysons Circulator Study: Process and Preliminary Results Summary. March 2012

Ashland BRT Environmental Assessment: logos of CTA, CDOT, Chicago Department of Housing and Economic Development

master plan of highways bus rapid transit amendment

SCARBOROUGH SUBWAY EXTENSION. Scarborough Subway Extension. Final Terms of Reference

Making TOD Work in the Heart of Suburban Sprawl

Connecting Key Activity Centers with High Quality Bus Service

Shift Rapid Transit Public Participation Meeting May 3, 2017

DRAFT. Urban Development Areas Fairfax County. UDA Needs Profile: Tysons Corner 13% Location Characteristics. Socio-Economic Characteristics

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

40 Years of Smart Growth Arlington County s Experience with Transit Oriented Development in the Rosslyn-Ballston Metro Corridor

Port Credit Local Advisory Panel October 20 th Meeting

40 Years of Smart Growth Arlington County s Experience with Transit Oriented Development in the Rosslyn-Ballston Metro Corridor

Chapter 1: Introduction

TOD 101 CREATING LIVABLE COMMUNITIES WITH TRANSIT

South Corridor Rapid Transit Project Public Kick-Off Meeting

This page left intentionally blank.

LEED-ND 101: Practical Strategies for Achieving Sustainability Goals. Travis Parker Lakewood Planning Director

Transportation. Strategies for Action

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT

Subregion 4 Central Avenue-Metro Blue Line Corridor Transit-Oriented Development (TOD) Implementation Project. Community Meeting April 27, 2011

South King County High Capacity Transit Corridor Report. Figure 1-1. Study Area

Eglinton West LRT Update

Ryoko Iizuka Finance, Economics and Urban Department

Executive Summary. NY 7 / NY 2 Corridor

MORRISVILLE TRANSPORTATION PLAN TOWN COUNCIL PRESENTATION AUGUST 22, 2017

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT-2

Point A Point B Point C Point D. City of Hapeville Public Meeting July 25, 2017

Midtown Corridor Alternatives Analysis. Appendix A - Initially Considered Alternatives Screening

FDOT D4 Complete Streets

Route 1 Corridor Study

A Connected Region for Our Future. Tampa Bay Regional Planning Council

Northwest commuter rail station US 36 BRT. Westminster Station

Urban Planning and Land Use

New Partners for Smart Growth Conference February 5, 2010

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

3. Endorse the LRT vision in transforming Surrey into Connected-Complete-Livable communities, and more specifically, the official vision statement:

Port Lavaca Future Land Use

Implementation Guide Comprehensive Plan City of Allen

Denver Moves: Transit Task Force

Issues Requiring Future Study

Economic Development & Housing Council Committee Comprehensive Plan Update September 20, 2005

3 MARKHAM NORTH-SOUTH LINK CORRIDOR PUBLIC TRANSIT IMPROVEMENTS ENVIRONMENTAL ASSESSMENT UPDATE

Bus Rapid Transit Backgrounder. December 2016

The Hartford Line Transit-Oriented Development (TOD) Action Plan. Maxwell L. Sokol, AICP WSP USA, Lead Planner New York, NY

PSRC REVIEW REPORT & CERTIFICATION RECOMMENDATION

TRANSIT SUPPORTIVE DEVELOPMENT ANALYSIS

12/9/2013. HOLLYWOOD/PINES CORRIDOR PROJECT AMPO 2013 Annual Conference October 24, Our Perspective. Broward.

Kenilworth Avenue and Town of Cheverly Industrial Study Briefing

History: a Grand Urban Boulevard

International Blvd. TOD Plan Public Workshop #1

Arlington, Virginia is a worldclass

THE GREEN VISION WORKSHOP Friday, November 6, 2009

BeltLine Corridor Environmental Study

Tier 1 Analysis August 21, North-South Corridor Study

9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED

Planning for TOD Implementation at a Corridor Scale

PLAN ELEMENTS WORKSHOP. April 5, 2016

Knoxville Area Transit (KAT) Transit Development Plan Corridor Analysis

Hurontario/Main Street Corridor Master Plan Mississauga and Brampton Building a new and integrated vision for the corridor

What s Up Next In The Seattle Squeeze. PSRC Transportation Policy Board April 11

Cambie Corridor Planning Program Phase Two Draft Plan. Standing Committee on City Services and Budgets May 5, 2011

DRAFT Subject to Modifications

3. VISION AND GOALS. Vision Statement. Goals, Objectives and Policies

Route 110 Alternatives Analysis

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

COUNCIL COMMUNICATION

COMMUNITY OPEN HOUSE. March 28, 2012

Coordinated Transit Planning in Toronto SmartTrack GO RER Scarborough Relief Line Waterfront Transit

Downtown Elkton Station Area Plan, Elkton, MD. Difficult enough to get support for new starts challenge to fund Houston transit

D-O LRT Zoning Discussion. Chapel Hill Boards & Commissions October 16, 2017

PUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN

Urban Development Area (UDA) Process in Virginia: History & Requirements

Reshaping The City: New Visions for Urban Transport. Trent Lethco, Associate Principal Allison Davis, Senior Planner Vicent Risica, Planner Arup

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

East Corridor Final Environmental Impact Statement

of ZONING OVERHAUL

MONTGOMERY COUNTY METRO STATION AREA DESIGN CHARRETTE

WELCOME! Town of Halton Hills Transit Service Strategy. Public Information Centre

Urban Design Manual PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction. Station Study Areas

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference

Welcome to the Oakridge Centre Open House

The Village of Shirlington

I. INTRODUCTION. Project Background and Study Area

St. Clair Avenue West Area Transportation Master Plan

8implementation. strategies

CHAPTER 7: Transportation, Mobility and Circulation

DRAFT FOR PUBLIC REVIEW. Game Plan for a Healthy City

METRO Gold Line BRT CBAC Meeting. August 23, 2018

Rio/29 Small Area Plan. Design Plan & Implementation Framework Open House - January 25, 2018

Cumberland Region Tomorrow is a private, non-profit, citizen based regional organization working with Greater Nashville Regional Council

Chapter 4. Linking Land Use with Transportation. Chapter 4

BeltLine Corridor Environmental Study

TOD 203 CORRIDOR PLANNING and TOD

Silver Line CPAM UPDATE. Transportation and Land Use Committee October 14, 2016

The Master Plan Framework

Planning for TOD Implementation at a Corridor Scale

Corridor Vision. 1Pursue Minnehaha-Hiawatha Community Works Project. Mission of Hennepin County Community Works Program

Economy Vision Statements: Social Wellbeing Vision Statements: Natural Environment Vision Statements:

ATTACHMENT A 09/12/2011. Attachment A - 1. A. Preliminary Future Transit Station Sub-area

Transcription:

EXPANDING THE NETWORK ALEXANDRIA, VIRGINIA David Whyte david.whyte@kimley-horn.com

Overview Project Context Corridors Land Use Coordination Concepts Outreach and Coordination Results

Core of the region Major road network heavily congested and impractical to improve for SOVs City focused on multimodal solutions City looking opportunistically toward transit to help move people and encourage high-quality urban development Context Physical Policy Need

Transit Captive people in this group do not have access to a car or are unable to drive. Reliant on transit for mobility. Services are typically designed to serve this group Choice people in this group may have access to a car, but instead choose to use transit to meet their mobility needs. Could be very large market if services were made attractive Auto Captive this group has little to no inclination to use transit trips do not lend themselves to transit or the trip maker does not want to use transit Targets Serving transit dependent Design to attract choice riders Generate financial support through patronage Plan for the ultimate system

Fast and efficient. Congestion free runningway, direct services, short headways Accommodating. High level of passenger amenities Permanent. Investment in permanent runningway and facilities Identifiable. Easy to recognize transit brand First class. High-quality design and implementation Attractive System Fast and efficient Accommodating Permanent Identifiable First class

C A B Corridors Common vision to have high-capacity transit in each corridor Connections to major regional transit (Metrorail) Tailored solutions o Context and physical conditions o Purpose of corridor o Interconnectivity with region/other jurisdictions A. East Side (US 1 & Old Town) B. Duke /Eisenhower C. Beauregard /Van Dorn

Land Use Coordination Connecting the urban ring Highest density areas Coordination with adopted and ongoing plans Columbia Pike (6 million sf planned development) Pentagon Pentagon City (19 million sf planned development) Crystal City More than 55 million square feet of mixed use development Transit critical to accommodating future development Transit critical to maintaining people s mobility Quality of life Bailey s Crossroads (5.5 million sf planned development) Skyline Beauregard (6.8million sf proposed development*) Landmark/Van Dorn (12 million sf planned development) NVCC Mark Center Shirlington Arlington Potomac Yard Potomac Yard North (7.5 million sf planned development) Potomac Yard South (4 million sf planned development) Braddock Metro (2 million sf planned development) Braddock East (1 million sf planned development) Eisenhower West (to be determined) Old Town Eisenhower East (6 million sf planned development**)

Significant coordination with planning along Beauregard Street and the adopted Landmark/Van Dorn Corridor Plan Serves key attractors and generators Supports regional connectivity Full Bus Rapid Transit Median running (~80% dedicated) Effective & flexible Minimal physical impacts Cost effective Convertible at a later time if desired Concept: Corridor C Alignment Runningway Mode technology

Highlights Physical Characteristics Low-floor BRT vehicles Dedicated lanes (~80% of corridor) Off-board fare collection Service specific branding and identity Substantial transit stations Level boarding Operational Characteristics Transit signal priority at intersections Real-time service information 15-minute peak period headways 20-minute off-peak headways 18 hours of service (Monday through Saturday) 12 hours of service on Sunday Planning-Level Cost Estimate 1 Capital: $48 million Fleet (25-year): $20 million ROW 2 : $33 million Operating (25-year): $60 million Notes 1. Planning level cost estimates are shown in year 2010 dollars and do not include additional contingency or escalation to a future year mid-point of construction. Totals listed do not include costs for major utility relocations/new service, or the capital costs for roadway/streetscape improvements that may be implemented concurrently, but are not required for the transit project. Alignments designated as optional or phased are not included in the cost. 2. Right of way costs do not include property along Eisenhower Avenue, within Northern Virginia Community College, or in locations where development contribution is expected.

Concept: Corridor C Median configuration Barrier separated Straight Phaseable

Barrier separated dedicated runningway Double median cross section Deliberately planned to provide space for future conversion to rail if financially feasible and/or needed Integrated complete street design Runningway Median configuration Barrier separated Straight Phaseable

Diverse views and backgrounds Iterative collaborative process Strong and comprehensive educational component of the outreach Open discussion with study work group and public Outreach & Coordination Corridor working group Public Elected & appointed officials Land owners/developers

(Rapid Bus) (BRT) (Mixed Mode) (Streetcar) Considerable discussion on local funding availability and City capacity to fund comprehensive system Significant discussions about potential partnership opportunities Developing action plan Results Preferred alternative Support from local appointed and elected bodies Potential for partnerships in implementation

THANK YOU David Whyte david.whyte@kimley-horn.com 703.674.1309