Falkland Islands Demining Programme

Similar documents
WLAC Facilities Committee Meeting. May 15, 2017

MASTER PLAN KICK-OFF Open House #1A, April 28, 2015

Westinghouse UK AP1000 GENERIC DESIGN ASSESSMENT Resolution Plan for GI-AP1000-IH-01 Internal Fire Safety Case Substantiation.

LEASEHOLD YEARLY PROPERTY SCHEDULE

WLAC Facilities Committee Meeting. September 18, 2017

THE ALBANIAN MINE ACTION PROGRAMME

Securing Your World. Who we are. What we do

Safety Information and Emergency Instructions

IMAS nd Edition Director, United Nations Mine Action Service (UNMAS), DC2 0650, United Nations, New York, NY 10017, USA

CROWN YEARLY PROPERTY SCHEDULE

Our Community Safety Information and Emergency Instructions

Welcome to the. Open House

Grangegorman Update. College of Engineering & Built Environment 29 November 2013

Geneva. International Centre. for Humanitarian. Demining

I would do the project 100 times over with the company. I would recommend them to anybody else. They were very professional.

SOUTHEND CARELINE ANNUAL REPORT

Analogue to Digital Telecare. Technical Advisory Board. 21 st June 2017 Work Stream 3 Procurement

Transfer Station Recycling Update SWANA Technical Session-Waste Diversion 4 2/24/2017 2/28/2017

Long-term protection. against Chafer grubs. Merit Turf Long lasting treatment of Chafer grubs and Leatherjackets

DEMINERS CV CV do Sapador

Lake Nokomis Shoreline Enhancement Project

2010 Fire Log Fire Log. Annual Fire Safety Report

Our Wetland Restoration Plan

Standardization Programme ( ) Building & Construction Standards Committee

Don t Flood The Rodeo! Preparing for Fort Worth s New Arena

Equipment ATA 12 April 2016

Goals and Strategies. Goals. Strategies. Long-term Beach and Shoreline Management Program

The Remodeling Market

Monthly Report for July 2015

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

Improving Service Sustainability of Electric Pump Systems in Rural Timor-Leste

LAKE JOHANNA FIRE DEPARTMENT

IMAS Marking mine and ERW hazards

NULL Virginia Beach, VA NULL (845)

Advances in Multisensor Mine Detectors. A presentation for the UN Workshop, GICHD Geneva, February 2006

Good Practice Guide GPG

Food Control Plans or National Programmes Cold Hold Records 2019

INTERNATIONAL MARINA AND WATERFRONT CONSULTANTS MDLCONSULTANCY.COM

Boulder County Comprehensive Drilling Plan Surface Owner Meeting. Thursday, Oct. 19, 2017

Engineers and Contractors - Innovative Technologies to Achieve Highest GeoExchange System Efficiencies for Commercial Projects

Type 5 Certifications:

Water Heater Innovations Marathon Water Heater Limited Warranty Policies & Procedures

4/8/2015 Item #10D Page 1

Elm Street Business District: Streetscape and Signage Plan

Welcome. Green Line LRT. Beltline Alignment Options. Stay engaged! Follow the Green Line story at calgary.ca/greenline

Boulder County Comprehensive Drilling Plan Surface Owner Meeting. Thursday, Nov. 2, 2017

How To Win Friends & Influence People / How To Stop Worrying And Start Living By Dale Carnegie

Kingfisher AGM. 17 June 2010

CANADIAN GUIDE FOR GREENER ROADS AND SUSTAINABILITY CONSIDERATIONS FOR BRIDGES GUIDE 2016 CANADIAN CONSULTING ENGINEERING AWARDS

FRANCE PARIS REGION OFFICES

Agenda Parks Committee CITY of ROELAND PARK Wednesday September 12th, 2018; 6:00pm-8:00pm Roeland Park City Hall

The RPII s radon road shows. Hugh Synnott Scientific Officer Radon Advice Section

SIMS Discover and SIMS FFT Estimates. Chris Sherwood

1.0 INTRODUCTION 1.1 TH 14 WEST STUDY AREA Project Description Functional Classification Purpose of the Project

The Macro Quallty Assurance System for Fire Safety Engineering

Asparagus Response to Water and Nitrogen

Monthly Report for October 2015

Regional Open Space Conservation Plan. Regional Staff Committee January 18, 2018

ORCGA Geographic Council Niagara Hamilton (Burlington) Meeting Minutes October 28, 2015

Heat Pumps and Public Swimming Pools, a Perfect Match

SOIL SURVEY FOR PROPOSED WET ASH DISPOSAL FACILITY, HENDRINA POWER STATION, MPUMALANGA PROVINCE

Coast Protection, Development and Coastal Biodiversity. Brian Caton Member CEMAC, AMLR NRM Former Chair & Member, Coast Protection Board

DRAFT: NOT FINAL DESIGN

Update from the United Nations Inter-Agency Coordination Group - Mine Action

The workers that they had were the best I had in ages! I was most satisfied with the work and workmanship the crew did.

PROFILE. Background Our Customer Organisation Why Greenmax Lighting? Guaranteed Saving 2 Years Warranty Appendices: Brochure Catalogue

TOWN OF MIDLAND TERMS OF REFERENCE AND REQUEST FOR PROPOSALS

Remodeling Market. Kermit Baker. Remodeling Futures Conference November 9, Harvard University JOINT CENTER FOR HOUSING STUDIES

100 Mill Plain Road Danbury, CT (475)

Foothills Solar and Substation

TYPE APPROVAL CERTIFICATE

Downtown Development Specialist 2017 Year in Review

ProMoss TM Plant-Based Water Treatment Solves Problems in Tobacco Manufacturing Plant Air Washer Systems

How increased prices in bananas show people will move store for produce January Kantar Worldpanel

Identification of Aberrant Railroad Wayside WILD and THD Detectors: Using Industry-wide Railroad Data. June 10, 2014

Lifestyle Electric Thermal Radiator

Lifestyle Electric Thermal Radiator

TOWN OF BEDFORD CONSERVATION COMMISSION

Agenda Parks Committee CITY of ROELAND PARK Wednesday, February 13th, 2019; 6:00pm-8:00pm Roeland Park City Hall

In partnership with: Harbor Corridor Plan Bali Hi Mobile Home Park July 24, 2013

LOW IMPACT DEVELOPMENT GUIDANCE MANUAL AND LID WORKING GROUP ACTIVITIES. Powerpoint Templates. MS4 Statewide Stormwater Summit June 18, 2013

Fisher Slough Tidal Marsh Restoration Project Scaling Down the Restoration Planning & Analysis Framework to Evaluate Project Alternatives

Monthly Report for October 2015

Heating and Hot Water

KELLYVILLE LIONS CALENDAR 2016 to 2017

Enabling Works Fox Primary School, Kensignton, London. Presentation for Drop-in Session for Fox Primary School Staff & Parents

A GUIDE TO THE REGULATORY REFORM ORDER (FIRE SAFETY) 2005 (RRO)

Meeting Minutes March 21, 2018 / 5:30 p.m. at City Hall Council Chambers

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

WATER HEATING PAGETTE

They were just terrific in working thru what proved to be a complicated design and renovation project.

Health and Safety Committee

14 Shaft Fire. Jacey Kruger

A global view of integrated closure and legacy planning

A guide to the changes between BS 8418:2010 and BS 8418:2015

Third Party Certification:

The project manager Chris Darity was excellent throughout the entire process.

B&M European Value Retail SA Interim Results Presentation 26 weeks to 23 rd September 2017

Customer Feedback Summary

City Council Staff Report

Transcription:

Falkland Islands De-mining Programme; the Challenges of Clearance Presented by Robin Swanson Programme Manager Falkland Islands Demining Programme 1

Roles and Personalities Falkland Islands De-mining Programme Office (FIDPO). Contract awarded to C King Associates Ltd. Colin King (CKA Ltd)); MD and provision of Technical Sp Services based in UK David Hewitson (RitherdonConsulting Ltd); Quality & Ops Adviser based in UK Henry Thompson (OxaniaLtd); Environmental Adviser based in UK Robin Swanson (Biron Associates Ltd); Programme Manager in FI Guy Marot; Technical Adviser in FI Roles and Personalities (Continued) De-mining Contractor. Contract awarded to BACTEC International Ltd Guy Lucas; MD based in UK Roger Gagen; Project Manager in FI Kevin Bryant; Ops Manager in FI 2

De-mining Contract; Key Deliverables Clear 2 known minefields + BAC tasks Clear 2 SHAs in the Camps Contract depth 200mm; in dunes 300mm below surrounding sand Clear between mine rows and 400mm beyond panel edges The Scope of the Threat Location Category Area Threat Remarks Surf Bay Minefield 3.34 Ha SB 33, SB 81 > 1000 mines Surf Bay BAC 3.44 Ha M67 Wet Area Sapper Hill Minefield 0.77 Ha P4B <200 mines Sapper Hill BAC 6.29 Ha BL 755 Cluster Strike Goose Green SHA 2.41 Ha C3B, No4, BL 755 Cluster Strike Fox Bay SHA 2.30 Ha BL 755 Cluster Strike Fox Bay BAC 1.99 Ha BL 755 Cluster Strike 3

Surf Bay Map Surf Bay Minefield 4

Surf Bay Documents Surf Bay Documents (Continued) 5

Mine Laying Chord Template Moon no 1 2 3 6 5 4 0.65m 0.6m 3.8m 4.1m 3.5m 3.7m 3.9m 3.5m 3.7m 0.6m 0.6m Sapper Hill Minefield 6

Sapper Hill Documents Goose Green SHA 7

Potential Threat at Goose Green Goose Green Accident 31 Jul 82 8

Fox Bay SHA Quality Management Accreditation Quality Assurance Quality Control 9

Results SHA/MF AP Mines AV Mines UXO Area Cleared Surf Bay MF 488 SB 33 568 SB 81 1 M67 + SA Ammo 3.34 Ha Surf Bay BAC - - 4 M67 + SA Ammo 3.44 Ha Sapper Hill MF 190 P4B - - 0.77 Ha Sapper Hill BAC - - 2 BL755 + Rifle Gren 6.29 Ha Goose Green SHA - - SA Ammo 2.41 Ha Fox Bay SHA - - - 2.3 Ha Fox Bay BAC - - - 1.99 Ha Total 678 568 8 UXO + SA Ammo 20.54 Ha Detailed RTK Survey Maps 10

Outline Timescale FIDPO PM & Tech Adviser deployed to FI; 1 Oct 09 BACTEC PM deployed to FI; 29 Oct De-miners arrive; 7 Nov In country training; 10 30 Nov Partial Accreditation granted; 2/3 Dec 09 Surf Bay MF; 146 days (4 Dec 09 2 Jun 10) Sapper Hill MF; 77 days(4 Dec 09 22 Mar 10) Goose Green SHA; 21 days (8 Mar 15 Apr 10) Fox Bay SHA; 10 days (7 19 Apr 10) Programme Complete; 4 Jun 10 The Challenges of Clearance Principles Detection Physical Mechanical Environmental Local Government & Public Confidence 11

Principles Two fundamental principles to ensuring quality of cleared land: Can you find the threat? Have you covered all the ground? Accreditation. Detection Challenges (P4B/C3B) Spanish P4B, C3B Lowest metal content Lead Alloy Foil Test Piece with spring Deployed detectors unable to detect to contract depth For P4B/C3B threat, used full manual excavation 12

Detection Challenges(SB33/SB81) Italian SB 33/SB 81 Steel spring and strikers Rugged design with 20 year guarantee Deployed detectors unable to detect to contract depth For SB33/SB81 threat, used layered manual excavation Physical Challenges (Ground) 13

Physical Challenges (Weather) Worst on record Unpredictable Days lost to weather Physical Challenges (Mine Movement) 14

Physical Challenges (Logistics) Mechanical Challenges (Surf Bay) 15

Mechanical Challenges (RTK Survey) Mechanical Challenges (Sand Dunes) 16

Environmental Challenges (Vegetation) Planning Permission Requirements of Consent Broad Plan worked in conjunction with planners De-miners collected cut vegetation Environmental Challenges (Sand Dunes) 17

Environmental Challenges (Replanting) Local Government & Public Confidence Perception on Arrival Winning the hearts and minds FI Land Release Committee Residual Liability Public Confidence Demonstrations 18

Concluding Remarks Phase 1 Clearance considered a huge success Project longer than expected: Inability to detect to contract depth Hostile environment (weather/terrain/logistics) Accurate survey capability essential Big emphasis on environmental issues Most mines examined were functional Questions 19