Promoting Economic Development Through Upfront SEPA Review: Lessons from South Downtown Tacoma

Similar documents
Welcome! Agenda. South Downtown

City of Tacoma Planning and Development Services

ROBBINSDALE LRT STATION CDI DEVELOPMENT GUIDELINES

Robbinsdale LRT Station. CDI Development Guidelines. August Overview

Study Area. Capitol Way. Greening America s Capitals 11/13/2014. A Greening America s Capitals Project

City of Tacoma Planning and Development Services

Northwest commuter rail station US 36 BRT. Westminster Station

LEED-ND 101: Practical Strategies for Achieving Sustainability Goals. Travis Parker Lakewood Planning Director

CITY OF PUYALLUP. Background. Development Services

FUNDING CORRIDOR REVITALIZATION

CHAPTER 7: Transportation, Mobility and Circulation

CALL TO ARTISTS REQUEST FOR QUALIFICATIONS STart PUBLIC ART PROGRAM

TOD 101 CREATING LIVABLE COMMUNITIES WITH TRANSIT

Concord Community Reuse Project Goals and Guiding Principles. Overarching Goals (OG)

SIX YEAR COMPREHENSIVE TRANSPORTATION IMPROVEMENT PROGRAM AMENDED 2012 &

LPC Goals and Strategies. Transportation and Connectivity Employment Opportunities Food Access Waterfront Access Livable Communities

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

Silverdale Regional Center

BeltLine Corridor Environmental Study

Chapter 1.0 Introduction

REGIONAL ACTIVITY CENTER

Ann Arbor Downtown Street Design Manual. Ann Arbor DDA IDA 2015 Awards Planning Category

Planning Commission March 14, Presented by: City of Bellingham Port of Bellingham

Draft Bergamot Area Plan

CENTRAL ESTUARY PLAN AVISION FOR OAKLAND S WATERFRONT

Parks Master Plan Implementation: Phase I Waterfront Use and Design REPORT #: September 7, 2016 File #

PLAN ELEMENTS WORKSHOP. April 5, 2016

Windsor Locks Transit-Oriented Development Planning Grant Request. Project Background

Atlanta BeltLine Corridor Environmental Study. Scoping Meeting August 2008

Southwest Light Rail Transit (LRT) A corridor of opportunity

Public input has been an important part of the plan development process.

Atlanta BeltLine, Inc. Pathways to Urban Sustainability

Cumberland Region Tomorrow is a private, non-profit, citizen based regional organization working with Greater Nashville Regional Council

Route 1 Corridor Study

CHAPTER ONE INTRODUCTION

CITY OF UNION CITY MINUTES GENERAL PLAN ADVISORY COMMITTEE

New Partners for Smart Growth Conference February 5, 2010

Lesson 6. Corridor Planning

Planning for TOD Implementation at a Corridor Scale

A larger version of this map is located on the last page of this PDF.

Public Open House. Overview of the Downtown Plan Official Plan Amendment April 23, 2018

Sherri Ferguson. President/CEO Portland Chamber of Commerce. Tennessee Certified Economic Developer Capstone Project

Transportation. Strategies for Action

Downtown Dubuque...it s a great time.

SOUTHWEST TRANSITWAY (STAGE 2) PUBLIC OPEN HOUSE

DRAFT City of Titusville 2040 Comprehensive Plan Future Land Use, Housing, and Transportation Elements April 16, 2018

The University District envisions, in its neighborhood

JANUARY 19, 2011 CENTRAL AVENUE-METRO BLUE LINE TRANSIT-ORIENTED DEVELOPMENT IMPLEMENTATION PROJECT COMMUNITY FORUM

Letter to the Community

CITY OF BELLINGHAM PLANNING DEPARTMENT STAFF REPORT

Shift Rapid Transit Public Participation Meeting May 3, 2017

Ivywild On The Creek PRELIMINARY CREEK DISTRICT MASTER PLAN

Midtown Greenway Land Use and Development Plan Executive Summary

FOR SALE Roosevelt Way Seattle, WA Features. Michael Todd

A BLUEPRINT FOR BROCKTON A CITY-WIDE COMPREHENSIVE PLAN

Chapter 1: Introduction

Design Fort Ord. welcome why we are here what happened this week design guidelines: ideas so far 2/12/2015. Regional Urban Design Guidelines (RUDG)

Public may provide comments on the GDP within the next two weeks (December 24)

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Corridor Vision. 1Pursue Minnehaha-Hiawatha Community Works Project. Mission of Hennepin County Community Works Program

Making Transit Oriented Development Work For Boonton, NJ

Introduction. Chapter 1. Purpose of the Comprehensive Plan Plan Organization Planning Process & Community Input 1-1

Sacramento Area Council of Governments (SACOG)

FDOT D4 Complete Streets

ARISE: The Rock Renaissance Area Redevelopment & Implementation Strategy

NORTH CLAYMONT AREA MASTER PLAN COMMUNITY WORKSHOP #1 FEBRUARY 3, 2016

Welcome to the Oakridge Centre Open House

City of Nogales General Plan

Town of Oakville Streetscape Strategy

2040 LUP is a part of the Comprehensive Plan and carries the same legal authority. Economic Challenges

Northwest LRT Downtown to. Northwest Edmonton Study. Public Workshops

ANC 2A Presentation. November 9, 2006

Comprehensive Plan ADOPTED APRIL 2014

Downtown Area. Draft Vision and Strategies. February 24, 2015 Public Meeting

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

Tony Garcia, City-County Planning Commission & Beth Alden, Hillsborough MPO

DRAFT ROOSEVELT ROAD. District Recommendations. Figure 5.23 The Roosevelt Road Corridor

Chapter 4. Linking Land Use with Transportation. Chapter 4

No revisions to the Downtown Element are proposed as part of the 2015 Comprehensive Plan Update. The Downtown Element may be viewed at this link:

Equitable Growth Through TOD Planning

Visioning Statement and Guiding Principles

Port Credit Local Advisory Panel October 20 th Meeting

NASSAU COUNTY TOWN HALL NEW YORK & CONNECTICUT SUSTAINABLE COMMUNITIES. A Unique Bi-State Partnership to Improve Jobs, Housing and Transportation

MAIN STREET ECONOMIC DEVELOPMENT STRATEGY

Phase I Redevelopment Plan. First Community Meeting

2030 Comprehensive Plan VISION STATEMENT

Courthouse Square Planning & Urban Design Study Working Group Meeting #11 September 2, 2014

Urban Form Case Studies

The Five Components of the McLoughlin Area Plan

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

Ann Arbor Intermodal Station Environmental Review

The Allen District. Community Consultation Meeting #1. Presented for Local Advisory Committee Monday, May 2, 2016

VILLAGE OF ROMEOVILLE

DOMINION BOULEVARD CORRIDOR STUDY AND ECONOMIC DEVELOPMENT STRATEGIC PLAN A MODEL FOR CHESAPEAKE S FUTURE

THE GAS PLANT DISTRICT MASTER PLAN SCENARIO 2. COMMUNITY MEETING August 6, 2018

Draft MLK Subarea Plan

Midtown Greenway PROJECT REPORT CARD

COMMUNITY OPEN HOUSE. March 28, 2012

The Village of Shirlington

38 Queen s University Campus Master Plan Part 1

Transcription:

Promoting Economic Development Through Upfront SEPA Review: Lessons from South Downtown Tacoma 1

This session will focus on the City of Tacoma s South Downtown Subarea Plan and associated Non-Project SEPA Environmental Impact Statement (EIS). Looking northwest across the Thea Foss Waterway to the Glass Museum, marina, and waterfront promenade 2

Background UWT Campus Regional Growth Center PSRC Growing Transit Communities HUD Grant One of 3 Subareas in Downtown Tacoma South Downtown Subarea and its districts 3

University of Washington Tacoma Current Student Population: 4,000 Staff: 900 Projected 2030 Student Population: 14,000 Looking east toward the Foss on the Grand Staircase of the UWT campus 4

Regional Growth Center 2030 City-wide Targets: 60,000 new jobs 70,000 new people Based on growth allocations from PSRC and Pierce County 5

PSRC Growing Transit Communities The Growing Transit Communities Partnership was funded by a three-year grant from the Federal Partnership for Sustainable Communities LINK riders headed to the Dome Station Three main goals: Attract more of the region s residential and employment growth near high-capacity transit Provide housing choices affordable to a full range of incomes near high-capacity transit UWT campus Increase access to opportunity for existing and future community members in transit communities The South Downtown Plan and EIS are one of three demonstration projects 6 Chihuly Bridge of Glass

Station Typology West end of Freighthouse Square Busy LINK at Tacoma Dome Station LINK passing through the UWT campus Pierce Transit Park and Ride across from Freighthouse Square The four Sound Transit LINK station areas located in South Downtown are all designated as the Stimulate Demand type The high priority strategy categories associated with the Stimulate Demand type are: Promote economic development to retain and expand job base Long-Range capital facilities plan with phased infrastructure and public realm investments Affordable housing assessment and preservation Community needs assessment and targeted investments 7

HUD Grant U.S. Department of Housing and Urban Development (HUD) Sustainable Communities Regional Planning Grant Program Supports locally-led collaborative efforts to determine how best to target housing, economic and workforce development, and infrastructure investments to create more jobs and regional economic activity Looking north on Pacific Ave. at the UWT campus Six livability principles Historic Union Station (now a Federal Courthouse) To date HUD has awarded over $165 million to 74 regional grantees in 44 states and helping to improve the lives of approximately 112 million people. 8 Thea s Landing on the Foss Waterway

3 Downtown Tacoma Subareas North Downtown South Downtown Hilltop (MLK) 9

Previous Planning Efforts 10

About the Project Subarea Plan and Environmental Impact Statement (EIS) Planning Target: 30 million sq. ft. of new development 11

About the Plan Identify Necessary Utility Improvements Water, sewer, stormwater, telecommunications, etc. Plan for Open Space Prairie Line Trail, potential pocket & destination parks, Foss Waterway Park, etc. Prioritize Transportation Investments Light rail, bus, train, parking, pedestrian, bike, roadway improvements, etc. View of Pacific Ave. from S. 21 st St. The Harmon Brewery with office/loft space above. 12

Project Goals Alfred s Café in the Dome District The back side of the WA State History Museum Thea s Landing on the Foss Waterway Keystone building on UWT campus Maintain basic eligibility for federal, state, and regional transportation funding Accelerate public investment in downtown through a series of coordinated actions, e.g. utility/multi-model street upgrades and Freighthouse Square-area upgrades Gain a competitive advantage for new private and public sector investment through a streamlined project approval process, more flexible zoning, and public/private partnerships 13

Stakeholder Input & Review September 2011 Spring 2013 Data Collection & Existing Conditions Review Establish Draft Goals and Policy Framework Draft Subarea Plan & EIS Council Approval December 2013 Spring - Winter 2011 Spring 2011 - Fall 2012 Spring 2012- Fall 2013 14

Upfront SEPA LINK on Pacific Ave. Artwork and the Glass Museum Bicyclists, cars, and buses sharing the road Transit-Infill Review Upfront SEPA Looking south of the Foss at the SR-509 Bridge The City proceeded under the Planned Action and Infill Exemption Upfront SEPA forms recognizing that RCW 43.21C.420(5)(a) and (b) ( Transit-Infill Review ) include a sunset provision. 15

Non-Project EIS Not subject to SEPA-based appeals at project level Jointly sponsored by the City of Tacoma and the University of Washington Tacoma (UWT) with the City of Tacoma acting as Lead Agency A non-project document as it addresses a 600- acre area of South Downtown Tacoma and presents a cumulative impact analysis for the entire subarea Transit Infill Review No project/eis consistency test Provides certainty and predictability to developers and investors Streamlines permit review process Grand Staircase on UWT campus 16

Extensive EIS Notice Provision and Community Outreach Transit-infill review requires extensive mailed notice and upfront public participation provisions. The outreach efforts included providing project updates and overviews of the Plan and EIS to neighborhood councils, interested parties, monthly meetings with the Steering Committee, quarterly meetings with a Council-resolutionformed Working Group, periodic stakeholder meetings, and business group outreach Participants were encouraged to voice concerns, provide suggestions, and discuss particular issues throughout the entire process Reverie at Marcato Condominiums on Tacoma Ave. The Swiss Pub on Jefferson Ave. Adaptive-reuse building: UWT s Carlton Center 17

Catalyst Projects UWT Campus Master Plan Approval Amtrak Station Relocation Pierce Transit Site Redevelopment Prairie Line Trail The Henry 18

University of Washington Tacoma Master Plan The City pre-approved the entire UWT Campus Master Plan UWT campus was established in 1990 and the UWT campus has undergone an extraordinary transformation earning numerous awards for the adaptive reuse of several century-old, brick railroad-era structures into modern classroom facilities Looking west on the UWT campus UWT UWT s plans for continued expansion will be a major economic driver for the area. UWT Science Building 19

Amtrak Station Relocation Amtrak station is being relocated to Freighthouse Square from its current location on Puyallup Avenue The relocation is part of the Point Defiance Bypass Project which will reroute passenger trains to an existing rail line along the west side of Interstate 5 through south Tacoma, Lakewood, and DuPont The Project will allow two more runs from Tacoma to Portland, create a faster route and more reliable service, as well as free up the Point Defiance tracks for freight-only traffic Current location of the Amtrak station on Puyallup Ave. A Citizen Advisory Group was formed in February 2013 to help with the planning process of the relocation of Amtrak Station Freighthouse Square in the Dome District The Citizen Advisory Group recommended that the Amtrak station relocation be sited at the east end of Freighthouse Square 20

Pierce Transit Site Redevelopment Site owned by Pierce Transit across from Freighthouse Square on East 25 th St. A market study done by Kidder Mathews found that that there is a market for housing in this area, there is currently virtually no housing in the Dome District The proposed building would have 78-88 dwelling units, 7500 sq. ft. of street-level retail, 4,000 sq. ft. of amenities, and 7,000 sq. ft. of open space 6 modes of transportation available for residents and visitors Design concepts for the new Dome District apartment building 21

Map of the Pierce Transit Site 22

Prairie Line Trail Located ½ block from 6.4 acre catalyst site at 21 st Street and Jefferson Avenue The project would connect the Foss Waterway, downtown destinations and regional bicycle and pedestrian networks via a safe, comfortable and accessible multi-use pathway. Trail corridor and linear park will act as economic catalyst and important community resource UWT to complete portion running through the campus 23

Prairie Line Trail Design Concept Design concepts for the Prairie Line Trail through the UWT Campus 24

The Henry Located between Dock St. and the Thea Foss Waterway on the north side of the S. 21 st St Bridge 161-unit mixed-use building Rooftop dining, private dog park, views of Mt. Rainier and the Foss, retail space, and public park space. $32 million building 3 Design illustrations of The Henry Developed by the same group that built the first major building on the Foss: Thea s Landing 25

South Downtown Subarea 26

Thank you Contact Us: www.cityoftacoma.org/planning Ian Munce (253)573-2478 imunce@cityoftacoma.org 27