D ESIGN REVIEW COMMITTEE

Similar documents
A PPEARANCE REVIEW BOARD

Creative Village Design Review Committee

Appearance Review Board Staff Report

CREATIVE VILLAGE DEVELOPMENT, LLC

A PPEARANCE REVIEW BOARD

Creative Village Design Review Committee

ARLINGTON COUNTY, VIRGINIA

Maplewood Avenue Downtown Complete Street Project

BUSINESS DISTRICT DESIGN GUIDELINES

Lambeth Main Street Streetscape Improvements

A PPEARANCE REVIEW BOARD

Jewel. Platte. of the. Plattsmouth Main Street Landscape Architecture by HDR

Appearance Review Board Staff Report

Appearance Review Board Staff Report

Transportation. Strategies for Action

APPEARANCE REVIEW BOARD

STAFF BRIEF. Project: 2016-COA-356 Meeting: September 8, th Street Oxford Hotel

Appearance Review Board Staff Report

GREENING THE BOULEVARD Master Plan Concepts for Venice Boulevard between Lincoln and Sawtelle

SOUTH UNIVERSITY Street Design Setting a Direction for Schematic Design

ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA

The Project. In 2013, construction was completed between 100 Street and 102 Street.

MIDTOWN MIXED-USE VILLAGE. TECHNICAL DATA SHEET COMPONENT C-1 FOR PUBLIC HEARING - PETITION NUMBER Project No RZ1.1. Issued.

Mayor Leon Skip Beeler and Members of the City Commission. Anthony Caravella, AICP, Director of Development Services

Project phasing plan (if applicable) 12 copies of site plan

Central Avenue Landscape Architect Record of significant community service Worked with the Heart of Naples Committee to create streetscape plans

Broadway Avenue Streetscape Project City of Albert Lea. Streetscape Design Committee Meeting October 29, 2012

REQUIRED CHECKLIST FOR Better Streets Plan Section 138.1(c)(2)

I-70/71 Innerbelt Project

MASTER PLAN QUEEN ST. WEST BIA

West Dennis Center: Bass River to Old Main Street. West Dennis Business District: Old Main Street to Dennis Commons

A PPEARANCE REVIEW BOARD

VILLAGE OF CLEMMONS PLANNING BOARD DRAFT STAFF REPORT

ARLINGTON COUNTY, VIRGINIA

FROM DUPONT CIRCLE NORTH TO CALIFORNIA STREET, NW. Welcome!

FLORIN ROAD CORRIDOR Site Plan and Design Review Guidelines Checklist

4.9 Mendocino Avenue Corridor Plan Design Guidelines

GYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado. Schematic Design January 2015

Corporate Report. Further, that Legal Services be directed to prepare the necessary amendments to the City s Delegation By-law.

Wadsworth Boulevard S TAT I O N A R E A P L A N

SDOT DPD. SDOT Director s Rule DPD Director s Rule DCLU DR SED DR of 7 CITY OF SEATTLE

Rezoning Transportation Analysis Petition Number: General Location Identifier:

Johnson Street Bridge Public Realm Update

STREETSCAPE MANUAL ONLINE TRAINING SESSION 1: Background

BUSINESS OF THE CITY COUNCIL CITY OF MERCER ISLAND, WA

CITY OF ZEELAND PLANNING COMMISSION

ROCKTON DOWNTOWN STREETSCAPE MASTER PLAN. Plan Commission Presentation April 10, 2018 Teska Associates Christopher Burke Engineering

Sheridan Boulevard S TAT I O N A R E A P L A N S H E R I D A N B O U L E VA R D S TAT I O N A R E A P L A N

Commissioners Road West Realignment Environmental Assessment

COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING

PLANNED DEVELOPMENT (MASTER PLAN & UNIT PLAN)

Carson Street Streetscape Improvements. Request for Proposals

Staff Report to the North Ogden City Planning Commission

Architectural Review Board Report

BUSINESS DISTRICT DESIGN GUIDELINES

#8) T-1409 CENTENNIAL & LAMB TENTATIVE MAP

Design Guidelines and Standards for Sight Triangles. Sight Triangle MANUAL

Pine Avenue Improvement Project

CREATIVE VILLAGE. Mobility Plan. May 11, 2017

The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape..

A P P E A R A N C E R E V I E W B OA R D

The George Washington University Streetscape Concept Plan. May 6 th 2009 Public Presentation for Discussion EHRENKRANTZ ECKSTUT & KUHN ARCHITECTS

CITY OF VACAVILLE PLANNING COMMISSION Agenda Item No. G. 1 STAFF REPORT August 4, Staff Contact: Tricia Shortridge (707)

Main Street Reconstruction From Ninth Line to Stouffer Street. Town of Whitchurch-Stouffville. Public Information Centre

STAFF REPORT TO COUNCIL PLANNING AND DEVELOPMENT

THE CORPORATION OF DELTA ADVISORY DESIGN PANEL. Laura Ryan, Planner Yvette Luke, Senior Planner Candice Dannhauer, Recording Clerk

ARLINGTON COUNTY, VIRGINIA

Eastcreek Farm. Planned Development Standards September, 2014

who we are how we got here why is this corridor important? Goals

City of New Bedford STAFF REPORT

O Dell Parkway PUD Association, Inc. PO Box 1335

Lehigh Acres Land Development Regulations Community Planning Project

City of Burlington Downtown Street Design & Construction Standards

Public Art Plan. We have elected to submit Public Art Plans before or concurrently with the CSP Submittal per the FDP Manual

ARB AGENDA APPEARANCE REVIEW BOARD. AGENDA January 17, Location. Time. Board Members

Sewanee Village + Request for Builder/Developer Proposals

APPEARANCE REVIEW BOARD

STAFF REPORT. April 30, 2018 May 9, 2018

Note: Staff reports can be accessed at Special Exception Application No. SE Tier:

#16 ) FDP THE HABIT BURGER GRILL FINAL DEVELOPMENT PLAN

Project Profile BAR HARBOR

Rezoning Petition Zoning Committee Recommendation August 1, 2017

D E S I G N R E V I E W B OA R D

McCowan Precinct Plan Study Background & Deliverables

County of Loudoun. Department of Planning MEMORANDUM. SUBJECT: ZMOD , Dulles North Business Park Comprehensive Sign Plan, 2 nd Referral

open house 3 CITY OF SALEM Downtown Streetscape Plan

Sec Development design approval and procedures.

Honorable Mayor and Members of the City Council. Submitted by: Eric Angstadt, Director, Planning and Development

VEHICULAR AND PEDESTRIAN CIRCULATION

TEMPLE MEDICAL & EDUCATION DISTRICT

providing proof of liability insurance, indemnifying the City from any claims or liabilities arising from use of City property.

PARKLET PROPOSAL PACKAGE & PROCESS

COLERAIN TOWNSHIP ZONING COMMISSION Regular Meeting Tuesday, October 18, :00 p.m.

Streets Vision

ARLINGTON COUNTY, VIRGINIA

DESIGN SERVICES FOR BALLSTON- MU METRO STATION AREA IMPROVEMENTS 90% PLAN PRESENTATION: DECEMBER 2015

Official Community Plan Bylaw No. 4360, 2004, Amendment Bylaw No. 4897, 2016 (Sewell s Landing)

Conceptual Design. Main Street Enhancement and Extension Project. Bothell, Washington. June 11, 2009

ROCKTON DOWNTOWN STREETSCAPE MASTER PLAN. Village Board Presentation May 8, 2018 Teska Associates Christopher Burke Engineering

Transcription:

CVDRC STAFF REPORT C REATIVE VILLAGE D ESIGN REVIEW COMMITTEE March 14, 2017 Case Number LDC2017-00035 Applicant AGENDA ITEM 1 CREATIVE VILLAGE STREETSCAPE DESIGN GUIDELINES AMENDMENT Craig Ustler, Manager Creative Village, LLC Owner City of Orlando Requested Action Request for approval of modifications and updates to the previously approved Creative Village Streetscape Design Guidelines. Street Network Recommendation Approval, based on the conditions in the staff report Project Planner Doug Metzger, AICP, LMT S UMMARY Project Description The Creative Village PD is located west of I-4, east of N. Parramore Avenue, south of W. Colonial Drive and north of the CSX rail corridor. This amendment to the Creative Village Streetscape Design Guidelines will effect the design, construction and appearance of every street in the project. Project Background ARB2012-00010 Appearance Review Board approval of the original streetscape design guidelines. ARB2013-00007 - The streetscape design guidelines were updated to include final material and furnishings specifications. ARB2015-00034 The streetscape design guidelines were amended in 2015 to reflect the streetscape conditions constructed with the Parramore BRT route, known as The Creative Village Minimum Streetscape. The minimum streetscape includes installing only half the street trees, half the street furnishings and 5-feet of the required 10-foot pedestrian clear zone. The developer of parcels adjacent to minimum streetscape areas will be required to complete the streetscape adjacent to their development parcels. Updated: March 8, 2017

Page 2 P ROJECT OVERVIEW The Creative Village Streetscape Design Guidelines are intended to ensure superior streetscape and infrastructure design within the PD boundaries; to create a visual identity to the project as a whole; and to foster civic pride and professionalism by improving the overall quality of life for Creative Village s residents and visitors. Each street is identified as a Primary, Secondary, or Tertiary corridor. The Standards include landscaping (street trees, planting, groundcover) and streetscape (street furniture, bike racks, tree grates, light fixtures) and hardscape (paver block, and pavement materials) details and selections. Where the project borders existing streets, the City Downtown Streetscape Standard treatments will be required, except on the Creative Village corners such as at the intersections of Amelia at Parramore and Hughey, and Livingston at Parramore and Hughey. The Creative Village Streetscape Design Guidelines should be used for design guidance on all infrastructure and site development. Close coordination with the City during design development shall occur to address site specific conditions that may arise, and that may require slight deviations of the landscaping, streetscape, hardscape, or utilities within each project. Such deviations should be mentioned during the final SPMP review, or project review by the CVDRC. All reviews shall be made prior to a permit being issued. CVDRC STAFF OVERVIEW The Creative Village Streetscape Design Guidelines were originally approved by the Downtown Appearance Review Board [ARB] in 2012 and were amended in 2013 and 2015. This 2017 amendment is intended to update the streetscape guidelines to be consistent with the recently amended Creative Village PD Plan, the revised roadway network and with the streetscape that has already been constructed as part of the Lime Lymmo route. A Minimum Streetscape treatment was installed with the Lymmo Line. The 2015 design guidelines amendment defined what that Minimum Streetscape includes and what the developers of the parcels adjacent to a Minimum Streetscape installation will be required to install. Staff continues to support the streetscape design guidelines as submitted and has only minor conditions and comments on the latest version. CVDRC CONDITIONS OF APPROVAL CVDRC Staff has reviewed the Applicant s submittal documents and has the following conditions of approval: 1. Page 3, last line Add ARB2015-00034 to the last line. 2. Page 31, Typical Planter Pot Detail Add a 3/4 irrigation sleeve with irrigation emitter to the drawing. 3. Page 31, Deviation from Standards Per The conditions of approval for ARB 2015-00034 please add the following language regarding the Creative Village Minimum Streetscape: In such case that a new street is constructed adjacent to property within the Creative Village PD boundary that has not yet received Master Plan approval as described within the Planned Development Ordinance, the Creative Village Minimum Streetscape (curb to property line) may be applied as approved by the City and the Master Developer, then documented through an ARB Minor Certificate of Appearance Review. When development occurs on any street with the Minimum Streetscape or any other treatment (such as edge streets), each adjacent development is responsible for meeting the full streetscape guidelines for its parcel(s), compliant with the Creative Village Streetscape Guidelines, prior to a Certificate of Occupancy. Where the Creative Village Minimum Streetscape has been previously installed, each adjacent development is responsible for meeting the full streetscape treatment, including but not limited to remaining structural soils, pedestrian concrete sidewalk, sidewalk corner treatments, lighting, street trees, tree grates, and furnishings.

Page 3 CVDRC CONDITIONS OF APPROVAL [CONT.] The Creative Village Minimum Streetscape installation must meet all of the Creative Village Streetscape Guidelines, with allowable deviations as follows: All tree wells must be installed with structural soil and irrigation as specified, at 30 feet on center, as required. Every other tree must be installed along with the appropriate tree grates. Remaining tree wells must include structural soil and irrigation, as specified, but shall be planted with low-maintenance ground cover as an alternative. Pedestrian concrete sidewalk may be reduced to a minimum of 5 feet wide and must be installed adjacent to the furniture zone. The area beyond the 5 foot wide sidewalk, up to the property line, shall be sodded or planted with a low-maintenance ground cover if full sidewalk is not installed. Structural soils are not required to be installed as part of the minimum treatment within the area beyond the 5 foot sidewalk up to the property line. Not less than one-half the number of trash receptacles and bike racks (one of each per street corner) shall be installed as part of the Minimum Streetscape. Benches and planter pots may be eliminated entirely in the Minimum Streetscape installation, although irrigation to the planter locations must be installed and stubbed into a valve box at the proper locations. 4. Final Document File The Creative Village Streetscape Design Guidelines document should be modified based on the conditions of approval. Once modified the applicant must provide CVDRC Staff with 2 hard copies and one PDF file of the approved document. The dates on the cover and interior pages should be changed to March 16, 2017 in the final document. 5. Modifications Minor modifications to the approved Creative Village Streetscape Design Guidelines may be approved by the Planning Official and/or CVDRC Staff. Substantial modifications may require a return to the CVDRC for review and approval. 6. Permit Approvals CVDRC approval does not grant permission to construct or install. All necessary permits must be obtained prior to commencement of construction activities.

Page 4 S TREETSCAPE PHOTOS

Page 5 S TREETSCAPE PHOTOS

Page 6 S TREETSCAPE PHOTOS