A. INTRODUCTION B. DESCRIPTION OF PROPOSED PROJECT

Similar documents
A. INTRODUCTION B. DESCRIPTION OF PROPOSED ACTION

PROJECT SITE The Proposed Project includes the Allen and Pike Street malls between Delancey and South Streets (see Figure 2C-1).

VEHICULAR AND PEDESTRIAN CIRCULATION

SOUTH UNIVERSITY Street Design Setting a Direction for Schematic Design

The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape..

Johnson Street Bridge Public Realm Update

A. INTRODUCTION B. EXISTING CONDITIONS

COMPLETE GREEN STREET CHECKLIST

Maplewood Avenue Downtown Complete Street Project

GREENING THE BOULEVARD Master Plan Concepts for Venice Boulevard between Lincoln and Sawtelle

PUBLIC RIGHT-OF-WAY IN THIS CHAPTER PUBLIC REALM

BUSINESS DISTRICT DESIGN GUIDELINES

Jewel. Platte. of the. Plattsmouth Main Street Landscape Architecture by HDR

Chapter 2, Section C: Urban Design and Visual Resources A. INTRODUCTION

Chapter 8: Neighborhood Character A. INTRODUCTION

Conceptual Design. Main Street Enhancement and Extension Project. Bothell, Washington. June 11, 2009

Cleveland Park Streetscape and Drainage Improvement Project 1

3.13. Development Guidelines

West Dennis Center: Bass River to Old Main Street. West Dennis Business District: Old Main Street to Dennis Commons

MAIN STREET RECONSTRUCTION PROJECT PRE-CONSTRUCTION PUBLIC INFORMATION SESSION AGENDA

TREE GUARDS AND EDGING

Wayfinding. North Gateway: Integrate a vertical gateway marker on the west side of Ward Street at the south corner of Vernon Street.

open house 3 CITY OF SALEM Downtown Streetscape Plan

B. ROLE OF THE EIS IN THE APPROVALS PROCESS

The Vision. Photo provided by The Minervini Group. 46 Vision, Objectives & Strategies

Design Guidelines for the Route 30 Corridor Master Plan: Subdivision and Land Development Elements

Main Street Reconstruction From Ninth Line to Stouffer Street. Town of Whitchurch-Stouffville. Public Information Centre

Landscape and Streetscape Design 2.5

Community Mixed Use Zone Districts (CMU)

Lambeth Main Street Streetscape Improvements

CHAPTER 8. Mrs. Zimman s Class - Central Elementary

Design Guidelines and Standards for Sight Triangles. Sight Triangle MANUAL

A. INTRODUCTION B. PROJECT LOCATION

The Project. In 2013, construction was completed between 100 Street and 102 Street.

4.9 Mendocino Avenue Corridor Plan Design Guidelines

CHAPTER 3. Design Standards for Business, Commercial, Industrial, Recreational and Institutional Uses

FREEWAY/TOURIST DISTRICT

City of Burlington Downtown Street Design & Construction Standards

Pedestrian and Bike Bridge LOGO

Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates).

GYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado. Schematic Design January 2015

East Midtown Greenway East 53 rd 61 st Street. Community Board 8 Project Introduction November 16, 2017

SOUTH UNIVERSITY Street Design Alternatives in Progress

ROCKTON DOWNTOWN STREETSCAPE MASTER PLAN. Plan Commission Presentation April 10, 2018 Teska Associates Christopher Burke Engineering

LOCATION AND DESIGN DIVISION

DRAFT. 10% Common Open Space

Town Center Design Guidelines

ROME WATERFRONT VILLAGE PROJECT NARRATIVE January 25, 2018

E. Natural areas include habitats such as wetlands, tidal marshes, waterways, natural drainage-ways, woodlands and grassland meadows.

Broadway Avenue Streetscape Project City of Albert Lea. Streetscape Design Committee Meeting October 29, 2012

Project Status. Construction is underway for Phase 3. Overall Project Area and Schedule. Schedule of Current Construction Phases.

TURN TO THE RIVER CITY PLAZA LANDSCAPE DESIGN CONCEPT May 25, 2016

Dogpatch/22nd Street Greening

R STREET CORRIDOR NEIGHBORHOOD Site Plan and Design Review Supplemental Guidelines Checklist

Cottage Grove Road Reconstruction. City of Madison Engineering

VILLAGE OF SKOKIE Design Guidelines for Mixed-Use Districts NX Neighborhood Mixed-Use TX Transit Mixed-Use CX Core Mixed-Use

Figure Example of out door dining in the public right-of-way.

Learning Objectives. Introduction. Design at an Ecodistrict Scale can Change Washington, DC s Landscape

GPCID Mall Boulevard & Gwinnett Place Drive Complete Street: Sectional View of Concepts

Chapter 14 Streetscape Improvements

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

The Center Street Project

BEMIDJI CITY COUNCIL Work Session Agenda Monday July 9, 2012

July 12, Columbus City Council City Hall 90 West Broad Street Columbus, OH RE: I-70/71 Columbus Crossroads Project

Division VI Community Mixed Use (CMU) Architectural Guidelines and Standards

CHARLOTTESVILLE. Streetscape ENTRANCE CORRIDOR DESIGN GUIDELINES. Amendments adopted by City Council March 7, Design Principles...

FROM DUPONT CIRCLE NORTH TO CALIFORNIA STREET, NW. Welcome!

STAFF REPORT Agenda Item: J.4 To: Mayor and City Council Date:

VISION AND GUIDING DESIGN PRINCIPLES

A. INTRODUCTION B. NO ACTION ALTERNATIVE

Figure 3-1: Public Realm Plan

Chapter 4: Jordan Road Character District

A. INTRODUCTION B. EXISTING CONDITIONS

A. Background Summary of Existing Challenges and Potential Possibilities. 1. Summary of Existing Assets and Potential Opportunities

Effective September 1, 2015

Lockport Streetscape Plan Primary Streetscape Design 10th Street to 9th Street

AESTHETIC APPEARANCE. Design Guidelines for Grade-Separated Pedestrian, Cyclist and Equestrian Structures

PROJECT UPDATE BON AIR ROAD BRIDGE REPLACEMENT AND MAGNOLIA AVENUE WATER QUALITY FACILITIES

Fifth and Detroit Street Design May 2017 Capital Improvements Committee. DOWNTOWN Street Design

Toronto Complete Streets Guidelines

Property Owners Association. Annual Meeting Notice July 26, :00pm - 7:00pm Park City Marriott 1895 Sidewinder Drive Park City, Utah

Little Mountain UDP Presentation

MISSION STREETSCAPE PLAN. Neighborhood Commercial Streets handle continuous activity. Neighborhood Commercial STREET ROW: Main Design Treatments

FDOT D4 Complete Streets

SPRINGHILL LAKE TRANSIT VILLAGE

DRAFT. October Wheaton. Design Guidelines

East River Waterfront Esplanade and Piers New York, New York Draft Environmental Impact Statement

Spring 2018 Construction Update

Speedway Mall Project Frequently Asked Questions

STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS

Main Street Conversion Site

NARRATIVE: NORTH FERRY STREET PUMP HOUSE, OVERLOOK, AND RIVERWALK IMPROVEMENTS

City of Plattsburgh DRI: Downtown Streetscapes & Riverfront Access. Downtown Streetscape and Riverfront Access Design

Edenfield Avenue Green Street Demonstration Project Neighborhood Meeting

PARKLET PROPOSAL PACKAGE & PROCESS

MAIN STREET ECONOMIC DEVELOPMENT STRATEGY

AHBE Landscape Architects Revitalizes Southern California Streetscapes

Streets Vision

PIKE PINE RENAISSANCE: ACT ONE. October 19, 2017

Arterial Mainstreets ottawa.ca

Transcription:

Chapter 1: Project Description A. ITRODUCTIO The City of ew York (the City ) Department of Parks and Recreation (DPR) has requested funds from the Lower Manhattan Development Corporation (LMDC) for improvements involving reconstruction of six existing sections of the median malls on Allen Street between Delancey and Hester Streets and on Pike Street between Madison and South Streets (the Proposed Project). (See Figure 1-1 for a map of the proposed project site). These median sections are currently narrow and paved with some trees and benches. It is expected that DPR will design and reconstruct the remaining median sections on Allen and Pike Streets between Hester and Madison Streets in the future as a second phase of the project; however, DPR has not yet requested funding for those sections due to the continuing study of the complex double mall condition between Division Street and East Broadway. This Environmental Assessment describes the Proposed Project, as well as the reconstruction of the median sections between Hester and Madison Streets, and assesses its potential environmental effects. B. DESCRIPTIO OF PROPOSED PROJECT The Proposed Project aims to provide a unique pedestrian park promenade that would serve as a linear community park linking the adjacent Lower East Side, Two Bridges, and Chinatown neighborhoods to the East River. The Proposed Project would provide for public green space, recreational space, and amenities in an area that has a strong demand for open space south of Delancey Street. The design of the Proposed Project intends to bring a new sense of life and a heightened sense of place to the adjacent neighborhoods and would take its aesthetic cues from their history and diversity and connection to the East River waterfront. The specific goals of the Proposed Project are: Creation of connections between the upland and East River waterfront neighborhoods; Creation of a series of green, social, and neighborhood spaces, doubling the width of the existing center plots on Allen and Pike Streets; Provision of new seating and flexible community gathering spaces; Creation and enhancement of separated corridors for pedestrians and bicyclists; and Increased site sustainability through removal of excess paving, increased planting areas, and introduction of continuous tree pits. The reconstruction of the six median sections would begin in the fall of 2010 and be completed by 2012. The City would coordinate construction activities with the Lower Manhattan Construction Command Center (LMCCC). The City would also comply with the requirements of ew York City Local Law 77, the ew York City oise Control Code, and LMDC s Environmental Performance Commitments. 1-1

CATHERIE ST MARKET ST MARKET SLIP PIKE ST PIKE ST RUTGERS ST RUTGERS SLIP JEFFERSO ST 2.10.10 KEMARE ST RIVIGTO ST MOTT ST BROOME ST BOWERY LUDLOW ST ELIZABETH ST CAAL ST HESTER ST CHRYSTIE ST FORSYTH ST GRAD ST HESTER ST ALLE ST ELDRIDGE ST ALLE ST BROOME ST ORCHARD ST DELACEY ST ESSEX ST ORFOLK ST SUFFOLK ST FORSYTH ST DIVISIO ST MAHATTA BRIDGE APPROACH E BROADWAY HERY ST CLITO ST MADISO ST MECHAICS AL MOROE ST CHERRY ST CATHERIE SLIP CATHERIE SLIP WATER ST PIKE SLIP PIKE SLIP SOUTH ST MAHATTA BR MAHATTA BR F D R DR EAST RIVER Project Site 0 400 800 FEET SCALE Project Location Figure 1-1

The LMDC would provide a portion of the funding for the proposed reconstruction of the six median sections. Established in the aftermath of September 11, 2001, LMDC coordinates the rebuilding and revitalization efforts in Lower Manhattan. LMDC is a subsidiary of the ew York State Urban Development Corporation, doing business as the Empire State Development Corporation (ESDC), a political subdivision and public benefit corporation of the State of ew York. DPR DEMOSTRATIO MALL AD EW YORK CITY DEPARTMET OF TRASPORTATIO ITERIM PLA In 2008 and 2009, DPR and the ew York City Department of Transportation (YCDOT) implemented two projects on Allen and Pike Streets as part of the planning for the Proposed Project and upon which the Proposed Project would be built. DPR constructed a Demonstration Mall on the Allen Street median between Delancey and Broome Streets in 2008. The Demonstration Mall contains new pavements and curbs, fences, benches, plant materials, historic and cultural information, new street lighting, and a series of Chinese stones arranged by an artist. Plants and pavement materials in the Demonstration Mall will be used to guide the design of the Proposed Project. In the summer of 2009, YCDOT implemented an Interim Plan on Allen and Pike Streets from Houston Street to South Street. The Interim Plan consisted of the following improvements: Elimination of one north-bound lane of traffic and one south-bound lane of traffic immediately adjacent to the existing median malls on Allen and Pike Streets; Relocation of the existing bike lanes on Allen and Pikes Streets to immediately adjacent to each side of the existing median malls with a striped buffer zone separating them from traffic; Closure of four intersections to create plaza connectors at Stanton Street, Broome Street, Hester Street, and Monroe Street. These plaza connectors were implemented with color seal paint, temporary planters, and benches; Implementation of new traffic light phases and protected left turn lanes at Houston Street, Rivington Street, Grand Street, Canal Street, Division Street, East Broadway, Henry Street, Madison Street, and Cherry Street; Implementation of new traffic signals, protecting pedestrian and bike crossings with new pedestrian crosswalks between mall sections; and Provision of tables and chairs within the connector plazas. See Figures 1-2 through 1-7 for site plans of the Interim Plan between Delancey and Hester Streets and between Madison and South Streets. PROJECT DESIG COCEPT The Proposed Project would be superimposed on the YCDOT Interim Plan footprint on Allen Street between Delancey and Hester Streets and on Pike Street between Madison and South Streets. The width of the proposed median malls would be expanded by the YCDOT Interim Plan configuration, which presents an opportunity to provide additional public green space, including an integrated park bikeway and planted buffers, by doubling the width of the median malls by expanding into striped, excess streetbed outside the existing traffic lanes. In general, the reconstructed medians would consist of: a central, approximately eight-foot-wide minimum pedestrian path (the maximum width of which would vary); flanking landscaped areas with 1-2

2.9.10 Demonstration Mall Delancey Street See Figure 1-3 YCDOT Interim Plan Delancey Street to Broome Street Figure 1-2

2.8.10 Grand Street See Figure 1-2 See Figure 1-4 Broome Street YCDOT Interim Plan Broome Street to Grand Street Figure 1-3

2.8.10 Grand St. Hester St. See Figure 1-3 YCDOT Interim Plan Grand Street to Hester Street Figure 1-4

Madison St. Monroe St. See Figure 1-6 YCDOT Interim Plan Madison Street to Monroe Street Figure 1-5

See Figure 1-7 See Figure 1-5 YCDOT Interim Plan Monroe Street to Cherry Street Figure 1-6

South Street 3.15.10 Cherry Street See Figure 1-6 YCDOT Interim Plan Cherry Street to South Street Figure 1-7

Chapter 1: Project Description seating, each of which would be approximately six feet wide (with varying maximum widths); and a six-foot-wide bike path on each side of the landscaped pedestrian malls. Three-foot-wide planted buffers with street lights and curbs would separate the bike paths from the adjacent vehicular lanes. (See Figures 1-8 and 1-9 for representative sections of the Proposed Project and Figures 1-10 through 1-17 for site plans of the Proposed Project.) The Proposed Project would also reconstruct the YCDOT Interim Plan plaza connectors at Broome, Hester, and Monroe Streets. Each reconstructed connector would consist of a paved plaza area, a 14-foot-wide paved pedestrian way at one end through the project site, and a 20- foot-wide paved lane for emergency vehicle access through the project site. Landscaped areas with curbs would border each central plaza area between the pedestrian way and emergency vehicle access corridor. Seating and decorative paving would be located in each central plaza area. (See Figure 1-17 for the proposed site plan of the reconstructed plaza connector at Broome Street.) The proposed design would create a stronger connection between the upland neighborhoods and the East River. This city to river connection would be expressed in the progression of path geometries through the median sections from linear to angular to curved within the increased park width. This progression of path geometries would be accompanied by seating areas within the park that respond to the linear, angular, and curved paths. The pavement in the park would also make a progression from the existing 12-inch square blue/green precast concrete paver panels bordered by bluestone from the Demonstration Mall to panels that incorporate a single color, 12-inch square blue or green glass precast-concrete paver mixed with a grey precastconcrete paver. This progression would end at the last section between Cherry Street and South Street where a 14-foot-wide multi-use bike and pedestrian path would be asphalt. Plant design concepts include the retention of existing trees and the use of selected specimens from the Demonstration Mall, combined with new understory planting to provide vibrant colors and varied textures and heights inside the plots and in beds between the bike path and street curbs. All plantings would contribute to visual and sound buffering for visitors and provide seasonal variations for community enjoyment. Although DPR has not designed the potential reconstructed median sections between Hester and Madison Streets, it is expected that the proposed design of those future sections would follow the design concept described above. PROJECT SUSTAIABILITY OBJECTIVES Site sustainability is one of the prime goals of the Proposed Project, which would be met through the following objectives: Water. The expansion of planting areas in the median sections would decrease the area covered by impervious pavement, thereby allowing more storm water to be intercepted for plant use. The retention of storm water for use in the plant beds would decrease water usage for the project site. In addition, planting materials would be carefully chosen to be droughtadapted and drought-resistant species. Overall, the Proposed Project would have minimal water usage. Materials and Climate. The Proposed Project would increase areas of planting beds, provide much needed expansion space for existing tightly constricted and overgrown tree roots, include increased numbers of plant species, and establish continuous tree pits to increase the health of new tree plantings. Hardscape materials and furnishings would be chosen for long- 1-3

19-0 Traffi c Lane and Parking Lane 10-0 Traffi c Lane 9-0 Striping Zone 6-0 Bike Path 5-9 8-6 5-9 Pedestrian Path 6-0 Bike Path 9-0 10-0 19-0 Striping Zone Traffi c Lane Traffi c Lane and Parking Lane Demonstration Mall and YCDOT Interim Plan - Existing Section 8-6 Minimum, Width Varies 12-0 29-0 6-6 Minimum, 6-6 Minimum, 1-0 1-0 6-0 Width Varies Width Varies Curb 3-0 6-0 3-0 Curb 30-0 12-0 Pedestrian Sidewalk Traffic Lane & Parking Lane Planted Buffer Bike Path Pedestrian Path 53-0 Bike Path Planted Buffer Traffic Lane & Parking Lane Pedestrian Sidewalk Typical Proposed Section: Allen Street orth from Hester Street Schematic Sections Figure 1-8

19-0 Traffi c Lane and Parking Lane 10-0 Traffi c Lane 9-0 Striping Zone 6-0 Bike Path 5-9 8-6 5-9 Pedestrian Path 6-0 Bike Path 9-0 10-0 19-0 Striping Zone Traffi c Lane Traffi c Lane and Parking Lane Demonstration Mall and YCDOT Interim Plan - Existing Section 12-0 29-0 8-6 Minimum, Width Varies 1-0 7-6 Minimum, 7-6 Minimum, 1-0 3-0 6-0 6-0 3-0 Curb Width Varies Width Varies Curb 29-0 12-0 Pedestrian Traffic Lane & Parking Lane Planted Bike Pedestrian Bike Planted Traffic Lane & Parking Lane Pedestrian Sidewalk Buffer Path Path Path Buffer Sidewalk 57-0 Typical Proposed Section: Pike Street orth from Monroe Street Schematic Sections Figure 1-9

Delancey St. Broome St. Existing Mall Curb Line Bicycle Rack, Typ. Allen St. 6-foot Asphalt Bike Lane Existing Wicket Fence Existing Tree, Typ. 30 Steel Post and Chain Fence 18 Concrete Curb Moveable or Fixed Tables and Chairs, Typ. Granite Paving, Typ. Granite Paving, Typ. 3-foot Buffer Bench Seating, Typ. Recycled Glass/Concrete Pavers Bluestone Band Pedestrian Light, B-Pole,Typ. See Figure 1-11 Proposed Tree Existing Tree Understory Tree River Bench Recycled Glass/ Concrete Pavers 3-foot Buffer Moveable or Fixed Tables and Chairs Bike Rack Street Light, M-Pole Pedestrian Light, B-Pole Perennial and Shrub Proposed Site Plan Allen Street between Delancey Street and Broome Street Figure 1-10

Broome St. Grand St. Existing Mall Curb Line Allen St. 6-foot Asphalt Bike Lane ew Tree, Typ. ew Understory Tree Bench Seating, Typ. See Figure 1-10 Bluestone Band, Typ. Recycled Glass/Concrete Pavers Existing Tree, Typ. Allen St. See Figure 1-12 Proposed Tree Existing Tree Understory Tree River Bench Recycled Glass/ Concrete Pavers 3-foot Buffer Moveable or Fixed Tables and Chairs Bike Rack Street Light, M-Pole Pedestrian Light, B-Pole Perennial and Shrub Proposed Site Plan Allen Street between Broome Street and Grand Street Figure 1-11

Grand St. Allen St. Bicycle Rack 6-foot Asphalt Bike Lane Wicket Fence ew Understory Tree Existing Tree, Typ. 30 Steel Post and Chain Fence 18 Concrete Curb See Figure 1-11 Granite Paving, Typ. 3-foot Buffer Recycled Glass/Concrete Pavers Bluestone Band Bench Seating, Typ. Pedestrian Light, B-Pole,Typ. Allen St. See Figure 1-13 Proposed Tree Existing Tree Understory Tree River Bench Recycled Glass/ Concrete Pavers 3-foot Buffer Moveable or Fixed Tables and Chairs Bike Rack Street Light, M-Pole Pedestrian Light, B-Pole Perennial and Shrub Proposed Site Plan Allen Street between Grand Street and Hester Street Figure 1-12

Hester St. 3-foot Buffer 6-foot Asphalt Bike Lane Bench Seating, Typ. ew Canopy Tree, Typ. Granite Paving, Typ. Moveable or Fixed Tables and Chairs, Typ. Allen St. See Figure 1-12 Allen St. Existing Tree, Typ. Recycled Glass/Concrete Pavers Bluestone Band 30 Steel Post and Chain Fence Street Light, M-Pole, Typ. Proposed Tree Existing Tree Understory Tree River Bench Recycled Glass/ Concrete Pavers 3-foot Buffer Moveable or Fixed Tables and Chairs Bike Rack Street Light, M-Pole Pedestrian Light, B-Pole Perennial and Shrub Proposed Site Plan Allen Street between Grand Street and Hester Street Figure 1-13

Madison St. Monroe St. Bicycle Rack ew Understory Tree 6-foot Asphalt Bike Lane Wicket Fence Existing Tree, Typ. 30 Steel Post and Chain Fence 18 Concrete Curb Moveable or Fixed Tables and Chairs, Typ. 3-foot Buffer Recycled Glass/Concrete Pavers Bluestone Band Bench Seating, Typ. Proposed Tree, Typ. Pike St. Granite Paving, Typ. Pedestrian Light, B-Pole,Typ. See Figure 1-15 Proposed Tree Existing Tree Understory Tree River Bench Recycled Glass/ Concrete Pavers 3-foot Buffer Moveable or Fixed Tables and Chairs Bike Rack Street Light, M-Pole Pedestrian Light, B-Pole Perennial and Shrub Proposed Site Plan Pike Street between Madison Street and Monroe Street Figure 1-14

Monroe St. Cherry St. - Shurb & Perennials, Typ. 3-foot Buffer 6-foot Asphalt Bike Lane Wicket Fence ew Canopy Tree, Typ. ew Understory Tree 30 Steel Post and Chain Fence See Figure 1-14 Pike St. Existing Curb Line Pedestrian Light, B-Pole, Typ. Recycled Glass/Concrete Pavers Bluestone Band Street Light, M-Pole, Typ. Granite Paving, 18 Typ. Concrete Curb Existing Tree, Typ. See Figure 1-16 Proposed Tree Existing Tree Understory Tree River Bench Recycled Glass/ Concrete Pavers 3-foot Buffer Moveable or Fixed Tables and Chairs Bike Rack Street Light, M-Pole Pedestrian Light, B-Pole Perennial and Shrub Proposed Site Plan Pike Street between Monroe Street and Cherry Street Figure 1-15

South St. Pedestrian Light, B-Pole, Typ. Street Light, M-Pole, Typ. Existing Mall Curb line Pike St. 14 Asphalt Multi-use Path Manhattan Bridge See Figure 1-15 Proposed Tree Existing Tree Understory Tree River Bench Recycled Glass/ Concrete Pavers 3-foot Buffer Moveable or Fixed Tables and Chairs Bike Rack Street Light, M-Pole Pedestrian Light, B-Pole Perennial and Shrub Proposed Site Plan Pike Street between Cherry Street and South Street Figure 1-16

Bicycle Rack, Typ. - Shurb & Perennials 6-foot Asphalt Bike Lane 30 Steel Post and Chain Fence 18 Concrete Curb Bluestone Band, Typ. Moveable Cafe Tables & Chairs Wicket Fence Proposed Understory Tree 30 Post and Chain Fence Stone Banding Proposed Tree Existing Tree 3-foot Buffer Trash Receptacle, Typ. Existing Curb Line Emergency Vehicle Service Access Recycled Glass/Concrete Pavers Street Light, M-Pole, Typ. Cobble Bands 6 Granite Curb 4 2 0 4 8 Proposed Site Plan Broome Street Plaza Connector Enlargement Figure 1-17

The term durability and recycled content where appropriate. The paving materials and expanded planting areas would reduce heat retention on the project site. Community. The Proposed Project has been informed by extensive community outreach to Manhattan Community Board 3, the Lower East Side Business Improvement District, United eighbors to Revitalize Allen and Pike (a coalition of local community organizations). Operations. The Proposed Project would be developed to enable efficient and effective maintenance and operations through design and sustainable plant material and hardscape selections. The 35-year-old street lighting system must be replaced and the proposed design would use the new street lighting and pedestrian lighting fixtures as approved by the Public Design Commission and YCDOT. C. EVIROMETAL REVIEW LMDC is responsible, pursuant to federal statute 42 U.S.C. 5304(g) as the recipient of United States Department of Housing and Development (HUD) Community Development Block Grant program funds, for conducting environmental reviews of projects receiving HUD funds in accordance with 24 Code of Federal Regulations (CFR) Part 58, as well as other laws and regulations. LMDC is serving as lead agency for the environmental review of the Proposed Project under the ational Environmental Policy Act (EPA) and the ew York State Environmental Quality Review Act (SEQRA). ew York City Environmental Quality Review (CEQR) and its implementing regulations are referenced as appropriate. Because the Proposed Project is located in ew York City and will involve actions by the City, the CEQR Technical Manual (Mayor s Office of Environmental Coordination, 2001) generally serves as a guide with respect to methodologies and impact criteria for evaluating the Proposed Project. In addition to EPA and SEQRA, the review of the Proposed Project has been coordinated with review pursuant to other applicable laws and regulations, such as Section 106 of the ational Historic Preservation Act of 1966 (HPA). The City is serving as a cooperating/involved agency through relevant departments including DPR, YCDOT, and ew York City Department of Design and Construction. 1-4