This image shows a conceptual green space connection(s) throughout the project area. Linear green space elements are shown along the entire length of

Similar documents
I-90 ALLSTON INTERCHANGE A MULTIMODAL TRANSPORTATION PROJECT PUBLIC INFORMATION MEETING SEPTEMBER 18, 2014 JACKSON MANN COMMUNITY CENTER

RE: Comments on the Environmental Notification Form (ENF) for the I 90 Allston Interchange Project MEPA #15278

Citizen Concerns I-16/I-75 Interchange Design

Chapter 8. Visualizations

TRANSPORTATION & STREET DESIGN

Anderson Memorial Bridge Rehabilitation Project Boston/Cambridge

I-66 EASTBOUND WIDENING INSIDE THE BELTWAY PARDON OUR DUST MEETING

Derby-Shelton Bridge Pedestrian and Bicyclist Enhancements [1]

A VISION For ALLSTON LANDING...From the RIVER S POINT of VIEW...

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives).

MassDOT Highway ACEC State Markets Conference April 4, Jonathan Gulliver, Highway Administrator

Moving The Metro. A special construction update for the metro Omaha area.

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Conceptual Design Meeting. River Street and Western Avenue Bridge Rehabilitation Project

Downingtown Station Relocation Plan Site Selection Memo June 12, 2012

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM Transportation Authorities Project Descriptions

FDOT/FTBA Construction Conference Work Plan

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Ringsend & Irishtown Local Environmental Improvement Plan

7.5 Impacts on the Section 4(f) Properties

16E. 24 th Street Corridor. A. Background

Alta Vista Transportation Corridor Environmental Study Report November 2005

Welcome to the. Open House

Table of Contents Programmatic 4(f) Evaluation. Programmatic 4(f) Evaluation 77

(blank page) WestConnex New M Roads and Maritime Services Environmental impact statement

Chapter 7 Route window W20 Dover Road and Leigh Road bridges. Transport for London

Town of Weston Guardrail Overview Report

6 BRIDGES. 6.1 Design philosophy. Proposed bridges

I-70 Corridor Enhancement Plan

Corridor Enhancements

Section4 Design Vision & Implementation Plan

Project Status. Construction is underway for Phase 3. Overall Project Area and Schedule. Schedule of Current Construction Phases.

SAINT CHARLES COUNTY ROAD BOARD Minutes of June 15, 2016

BACKGROUND INFORMATION DOCUMENT

Phase I Redevelopment Plan. First Community Meeting

NEWSLETTER #03 BEAUDESERT ROAD LOGAN MOTORWAY

PARKLET PROPOSAL PACKAGE & PROCESS

The DCR Neponset River Trail Central Avenue to Mattapan Square

Silver Line Gateway. Extension of Silver Line Bus Rapid Transit (BRT) to Chelsea and East Boston. Public Informational Meeting Chelsea, MA

PLACEMAKING & MOBILITY WORKSHOP. January 27, 2016

7.4 Maintenance and Storage Facility

New Stanton Project Update July 3, 2012

Rethinking the MIT Campus Transportation System

Chesterfield County Project Update

WELCOME TO OPEN HOUSE TWO November 28, 2018

FY 2005 TRANSPORTATION CAPITAL PROGRAM

Route Planning and Environmental Assessment Study Highway 17 Four-Laning from Sudbury to Markstay GWP

Berkshire Regional Planning Commission Clearinghouse Review Report

From local initiatives to some of the largest and most complex projects, KOA leads the field in:

Capital Projects impacting Odenton Town Center

Port of Seattle Street Vacations Summary April, 2016

Project Overview. Fairfax County Parkway Widening Fairfax County. Get Involved. Public Information Meeting. Contact Information

2014 PSPE Philadelphia Chapter Outstanding Engineering Achievement Award Nomination

PUTTING THE HEART INTO BATTERSEA. A vision

Artists impression of the Park Promenade and plot H4 with café and restaurant uses that is still subject to change

Design Public Hearing. River Street and Western Avenue Bridge Rehabilitation Project

4.1 Build Alternative 1 Construction Phasing

CITY PLANNING COMMISSION. March 19, 2014/Calendar No. 6

I-75/I-475 Interchange Upgrade Project Informational Meeting Tuesday, July 27, 2010

III - design standards

14. NEWHAM ROUTE SECTION - ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS... 20

Capital Projects in and near Odenton Town Center

PURPOSE AND NEED FOR THE VROOMAN ROAD BRIDGE and ROADWAY IMPROVEMENT PROJECT

Eastern Terminus TECHNICAL MEMORANDUM CENTRAL BROWARD EAST-WEST TRANSIT ANALYSIS BROWARD COUNTY, FLORIDA

RIVERSIDE, Newton MA June 9, 2011

Northern Branch Corridor SDEIS March 2017

Part G: Assessment of Effects on the Environment. 11 Environmental Effects Assessment

RZC Public View Corridors and Gateways

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016

Appendix SPAIN Madrid M30-Río-TUNNEL

Public Works and Infrastructure Committee

Visitor's Guide to Historic Bridge Park

I-95 Girard Avenue Interchange Near Neighbors Meeting. Project Status

The Executive Chairperson Date: 14/09/2018 Planning Authority ERA Ref: EA 00050/18 St. Francis Ravelin, Floriana

BACKGROUND, GOALS, STUDY AREA, EVALUATION CRITERIA, ORGANIZATION

2290+ STADIUM VILLAGE STATION ABOVE FIELD) (T.O "

I-4 Beyond the Ultimate. Florida Transportation Builders Association February 9, 2018

Proposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

Public Open House. Welcome! Presentation at 5:15 p.m. Please sign-in at the registration table

Guiding Principles for the SR 520 Replacement Project

Places29: List of Implementation Projects

NORTH-SOUTH CORRIDOR STUDY EXECUTIVE SUMMARY. Executive Summary

PROPOSED CAPACITY IMPROVEMENTS TO NA- TIONAL ROUTE 2 (N2) AND NATIONAL ROUTE 3 (N3) WITHIN ETHEKWINI METROPOLITAN MUNICIPALITY

ULI St. Louis Technical Assistance Panel

Ball Square Station Design Meeting BALL SQUARE STATION JUNE 3, 2013

PLAN: Mattapan Preserve. Enhance. Grow.

Transportation. Strategies for Action

STREETSCAPE MANUAL ONLINE TRAINING SESSION 1: Background

5.4.6 Cumulative Operational Impacts

February 17, Sara Ullman Planner I. Sincerley,

SCARBOROUGH RAPID TRANSIT ENVIRONMENTAL PROJECT REPORT CHAPTER 2 PROJECT DESCRIPTION. Table 2-4: North Segment Alignment Analysis 2-21

Bloor Street East Potential Ravine Portal Overlook and Access Passage to the Rosedale Valley and Don River Valley Ravine, Toronto, Canada

This is the East Carolina University Comprehensive Facilities Master Plan Final Draft Plan Review. This workbook reviews the campus draft master plan

112th Avenue Light Rail Options Concept Design Report JUNE 2010 PREPARED FOR PREPARED BY TBG PGH

Project Introduction Visioning. Next Steps. Slide 1

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS

US-69 McAlester. Anthony Echelle, P.E. ODOT Division II Engineer

PROPOSED REDEVELOPMENT OF THE GLEN ABBEY GOLF CLUB. STREETSCAPE DESIGN STUDY (excerpt from the Urban Design Brief) TOWN OF OAKVILLE.

1 st now. Design Elements. iii STREET TREES PATTERNED CROSSWALKS SPECIAL SIDEWALK PAVING. First Street ELEMENTS TRANSIT SHELTER / LANTERN

Transcription:

This image shows a conceptual green space connection(s) throughout the project area. Linear green space elements are shown along the entire length of Cambridge Street South connecting to the Paul Dudley White Path and Stadium Way. Arrows illustrating pedestrian connections are shown from Seattle Street, through West Station, and down to Malvern Street. Additional connections are shown from Stadium Way, through West Station down Babcock Street and Harry Agganis way.

This image shows the I-90 Allston MassDOT 3K-1 concept. The key features include the I-90 viaduct from just west of the Boston University Bridge returning to an at-grade configuration perpendicular to Babcock Street. West Station is elevated as well as the Seattle Street and Stadium Way connectors as they reach West Station. Four north-south connectors are included between Cambridge Street and the I-90 collector road: West Connector, Seattle Street, Stadium Way, and the East Drive Connector. An elevated pedestrian bridge connects the East Drive Connector to the Paul Dudley White Path. Linear green space elements are included along Cambridge Street and the East Drive Connector.

This image shows the I-90 Allston MassDOT 3K-2 concept. The key features include the I-90 viaduct from just west of the Boston University Bridge returning to an at-grade configuration perpendicular to Babcock Street. West Station is elevated as well as the Seattle Street and Stadium Way connectors as they reach West Station. Four north-south connectors are included between Cambridge Street and the I-90 collector road: West Connector, Seattle Street, Stadium Way, and the East Drive Connector. This concept includes the addition of Cambridge Street South, which connects Cambridge Street at Lincoln Street to Soldiers Field Road between Cambridge Street and I-90. Cambridge Street is narrowed from the 3K-1 concept. An elevated pedestrian bridge connects the East Drive Connector to the Paul Dudley White Path. Linear green space elements are included along the northern sides of Cambridge Street, Cambridge Street South, and the middle of the East Drive Connector.

This image shows the I-90 Allston MassDOT 3K-3 concept. The key features include the I-90 viaduct from just west of the Boston University Bridge returning to an at-grade configuration perpendicular to Babcock Street. West Station is elevated as well as the Seattle Street and Stadium Way connectors as they reach West Station. Four north-south connectors are included between Cambridge Street and the I-90 collector road: West Connector, Seattle Street, Stadium Way, and the East Drive Connector. This concept includes the addition of Cambridge Street South, which connects Cambridge Street at Lincoln Street to Soldiers Field Road between Cambridge Street and I-90. An elevated pedestrian bridge connects the East Drive Connector to the Paul Dudley White Path. In this concept, Cambridge Street and Cambridge Street South are widened and include linear green space elements on both sides, in the middle of the median, and along the north side of Cambridge Street South. Green space elements are also included in the middle of the East Drive Connector.

This image shows the I-90 Allston MassDOT 3K-4 concept. The key features include the I-90 viaduct from just west of the Boston University Bridge returning to an at-grade configuration perpendicular to Babcock Street. West Station is elevated as well as the Seattle Street and Stadium Way connectors as they reach West Station. Four north-south connectors are included between Cambridge Street and the I-90 collector road: West Connector, Seattle Street, Stadium Way, and the East Drive Connector. Linear green space elements are included along both sides and in the middle of Cambridge Street. Green space elements are also included along the middle and northern edge of Cambridge Street South as well as the middle of the East Drive Connector.

This image shows a cross section for the concept advanced by A Better City. Starting from the left, section B-B shows the Paul Dudley White Path (10 feet) next to two lanes in each direction on Soldiers Field Road (44 feet). Raised 10 feet are four lanes in each direction on I-90 (101 feet). On the right, the Grand Junction and Worcester Lines are back down at grade (61 feet). Starting from the left, Section A-A shows a 5 foot shoulders, two off-ramp lanes from I-90 westbound (24 feet), four lanes of traffic in each direction on I-90 (48 feet for each direction with 5.5 feet between directions), and a single on-ramp to I-90 eastbound (12 feet with a 4 foot shoulder). Depressed 21 feet from I-90 are the Houghton Chemical Line and two Grand Junction tracks.

This image shows the concept advanced by A Better City. Similar to 3K-4, the plan includes Cambridge Street South, following the curving of I- 90, and connecting Cambridge Street from Lincoln Street to Soldiers Field Road at the elevated pedestrian bridge to the Paul Dudley White Path. Cambridge Street and Cambridge Street South include green space elements. Seattle Street and Stadium Way are both elevated as they reach West Station. The Paul Dudley White Path extends over the Charles River west of the Boston University Bridge. An access road connections Cambridge Street South west of Stadium Way to the rail yard.

This image shows the cross section for the concept advanced by the Amateur Planner. Starting from the left section of A-A, the image shows the Paul Dudley White Path (14 feet), a 7 foot buffer, followed by two lanes in each direction on Soldiers Field Road (22 feet for each direction with a 4 foot separation). I-90 westbound has four lanes at-grade (50.5 feet). I-90 eastbound is at-grade with the Grand Junction Line and a shared-use path elevated above (50.5 feet). The Worcester Line is slightly depressed at 8 feet below grade (30 feet). Section B-B is identical to section A-A expect that the Paul Dudley White Path is narrowed by 10 feet and the buffer to Soldiers Field Road is compressed to 3 feet.

This image shows the concept advanced by the Amateur Planner. Similar to 3K-4, the plan includes Cambridge Street South, following the curve of I-90 and connection Cambridge Street at Lincoln Street to Soldiers Field Road at the elevated pedestrian bridge to the Paul Dudley White path. Cambridge Street and Cambridge Street South both include green space elements. Seattle Street and Stadium Way are both elevated as the reach West Station. The Worcester Line platforms are extended west, providing more room for the elevation changes of the Worcester Line, which is slightly depressed to pass under the elevated Grand Junction Line.