Physical Connectivity Do not have structures that physically divide the community more than it is divided today

Similar documents
Note: Red text denotes additions/ changes from Dec 23, 2009 draft Page 1 of 12

The Role of Cities in Planning Transportation Megaprojects

Subject: Menlo Park Residents Deserve A Much Better Grade Separation Option

III. Design Principles

6.11 Land Use Introduction Regulatory Setting Regional Plans and Policies. Santa Clara Valley Transportation Authority

Diridon Station Area: Framework for Implementation

HILLSDALE STATION AREA PLAN COMMUNITY WORKSHOP 2 City of San Mateo

Railyard Alternatives and I-280 Boulevard Feasibility Study. MTA Board Meeting May 6, 2014

San Mateo County Storm Water Resource Plan

5.9 LAND USE INTRODUCTION METHODOLOGY

EXECUTIVE SUMMARY. Introduction

CHAPTER 7: Transportation, Mobility and Circulation

Dumbarton Rail Corridor. Project Scoping Meeting Nov 15, :15 PM City of Newark Nov 16, :15 PM City of Menlo Park

The University District envisions, in its neighborhood

Welcome to the San Francisquito Creek Flood Protection, Ecosystem Restoration, and Recreation Project Upstream of Highway 101

Dumbarton Transportation Corridor Study. Stakeholder/Public Meetings August 16, 2017

City of Meriden Harbor Brook Flood Control Project Overview

New land uses or changes to existing land uses in the Phase 1 area since certification of the FEIR and SEIR-1 are discussed below for each city.

Shift Rapid Transit Public Participation Meeting May 3, 2017

HIGH-SPEED RAIL PROGRAM UPDATE. Gilroy Unified School District & Gilroy City Council September 24, 2018 Gilroy City Council Chambers, Gilroy, CA

Isabel Neighborhood Plan: Alternatives

Page

THE PLANNING AREA 2.1 PLANNING AREA LOCATION

Corridor-Level Approaches to Creating Transit-Oriented Districts

A. WHAT IS A GENERAL PLAN?

Chapter 4. Linking Land Use with Transportation. Chapter 4

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

THE GREEN VISION WORKSHOP Friday, November 6, 2009

4.11 Land Use Introduction Environmental and Regulatory Setting Environmental Setting

Community Meeting #1: Project Kick Off

920 BAYSWATER AVENUE PROJECT

1.0 Circulation Element

Community Working Group Workshops - Workshop Summary September TOD Corridor Strategy and Access Planning Study. Workshop Introduction

Bay Meadows Specific Plan Amendment - Phase II Overview. I. Phase II Overview. November 7, 2005 I - 1

Dumbarton Transportation Corridor Study. JPB Board of Directors September 7, 2017

Dumbarton Transportation Corridor Study

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Transportation. Strategies for Action

SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW

TRANSIT-ORIENTED DEVELOPMENT POLICY DRAFT. City Planning and Development Department Kansas City, Missouri

WEST OAKLAND SPECIFIC PLAN Final Plan. 2. Vision & Goals. 2.1 Community-Based Goals and Objectives

4.16 Visual Quality and Aesthetics

10 San Jose Light Rail

Horizon 2035 Land Use and Transportation Element

Future Conditions Report - DRAFT

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

March 21, Mayor Gillmor and Santa Clara City Council members City of Santa Clara 1500 Warburton Avenue Santa Clara, CA 95050

Key Concepts of the General Plan

Chapter 1: Introduction

Transportation Working Team Duane Diggs, Co-Chair (VOICE Buffalo) Kelly Dixon, Co-Chair (GBNRTC) Paul Ray, Facilitator (UB Regional Institute)

DRAFT Civic Center Station Area Plan. Executive Summary

Study Area. Capitol Way. Greening America s Capitals 11/13/2014. A Greening America s Capitals Project

New Partners for Smart Growth Conference February 5, 2010

Visioning Statement and Guiding Principles

City of San Mateo General Plan Circulation Element. Adopted October 18, 2010

WEST LOOP DESIGN GUIDELINES CHECKLIST

4 LAND USE DESIGNATIONS

VISUAL QUALITY POLICIES

SOUTH NATOMAS COMMUNITY PLAN

Making Transit Oriented Development Work For Boonton, NJ

Knoxville Area Transit (KAT) Transit Development Plan Corridor Analysis

NOTICE OF PREPARATION OF ENVIRONMENTAL IMPACT REPORT

This Review Is Divided Into Two Phases:

Midtown Corridor Alternatives Analysis. Appendix A - Initially Considered Alternatives Screening

Corridor Vision. 1Pursue Minnehaha-Hiawatha Community Works Project. Mission of Hennepin County Community Works Program

PLAN ELEMENTS WORKSHOP. April 5, 2016

Union Station Master Plan Task 3 Update

A Context-Based Design Code for Pedestrian & Transit-Oriented Development RAIL~VOLUTION NOVEMBER 2006

WELCOME and introduction

Planning for TOD Implementation at a Corridor Scale

Partnerships in Transportation Transit-oriented Development The Return on Investment

City of Hermosa Beach Administrative Policy #

Affordability & Equity

Stockton Waterfront Master Plan. Waterfront Master Plan

Urban Planning and Land Use

Planning for TOD Implementation at a Corridor Scale

4 CIRCULATION AND TRANSPORTATION

2. Form and Character. 2.1 Introduction. 2.2 The Downtown Addition Plan. 2.1 Introduction

TRANSPORTATION ELEMENT

4.17 VISUAL QUALITY AND AESTHETICS

City of Villages Parking Strategies. William Anderson, FAICP City Planning & Community Investment San Diego Parking Symposium July 14, 2006

April 21, 2007 CCRP Workshop Summary

Station Area Plan Introduction & Draft Alternatives Review

Alaskan Way, Promenade, and Overlook Walk Final EIS Appendix D - Supplemental Draft EIS Comments and Responses October 2016.

Millbrae TOD #2 Project Analysis

1. Vision and Guiding Principles

Atlanta BeltLine Corridor Environmental Study. Scoping Meeting August 2008

East Corridor Final Environmental Impact Statement

4.14 SECURITY AND SYSTEM SAFETY

ECR. el camino real master plan. settings and opportunities. The City of San Mateo SMWM. Adopted by the San Mateo City Council September 18, 2001

WALTER RAND TRANSPORTATION CENTER

Windsor Locks Transit-Oriented Development Planning Grant Request. Project Background

Mariposa Lakes. Planned Community. Project Overview. Stockton, CA

[FWS R8 R 2015 N087; FXRS282108E8PD0 156 F ] South Bay Salt Pond Restoration Project, Phase 2; Don Edwards National Wildlife

Northwest Corridor LRT Line to Irving/DFW Public Meeting No. 1 Project Overview

Ashland BRT Environmental Assessment: logos of CTA, CDOT, Chicago Department of Housing and Economic Development

6.14 Visual Quality and Aesthetics

Michigan City Alternative Analysis Realignment Study. Progress Status Update Report Presentation to City Council February 1, 2012

CHAPTER 3 VISION, GOALS, & PLANNING PRINCIPLES. City of Greensburg Comprehensive Plan. Introduction. Vision Statement. Growth Management Goals.

MINUTES OF OCTOBER 16, P. Bendix, J. Berk, B. Jenkins, A. Levin, A. Sweet, C. Tucker, K. Gardiner

Transcription:

SECTION 0 & 1 SAN FRANCISCO ISSUES Caltrain & High Speed Rail service/stations Location of SF terminus (TTC and/or 4 th & King) and alignment must make sense from user perspective/greater ridership, and also provide greatest benefit to City, redevelopment opportunities, and other strategic investments) Provide better connections to transit/ for pedestrians and bicycles, minimize/reduce commuter travel time (door-to-door) Physical Connectivity Do not have structures that physically divide the community more than it is divided today Visual Impacts Do not have structures that visually divide the community more than it is today (i.e. is the railroad an imposing structure in the landscape that I can see from x distance away, or that reduces one s ability to see just beyond the railroad.) Do not block scenic views or vistas Do not have structures that are of a significantly larger scale when compared to the immediate environment Noise/Vibration Do not create train noise that is greater than it is today (whistles/horns, diesel engines, train wheels/brakes). Do not create train-related vibrations that are greater than they are today Urban Design & Community Character Alignment/infrastructure must be compatible with urban design and planning Natural Environment Minimize impacts to nearby parks Preserve drainage channels of creeks no reduction or obstruction to natural (daylighted) creeks, keep the same volume/flow of water and water quality San Francisquito Creek and Atherton Channel Traffic & Parking Minimize long-term traffic impacts associated with HSR station (passenger drop-off/pick-up, parking, etc.) Minimize construction-related traffic (i.e. reductions in access and street/parking capacity, truck traffic, shoofly limiting access, poor, road conditions) Economic health Overall project cost should be kept reasonable, mitigation costs implication that local jurisdictions will pay for cost over current construction estimates Housing/Neighborhood Minimize loss of housing, minimize residential property takes through eminent domain, otherwise provide compensation for taking severance damages. Minimize reductions in adjacent property values Need representation from Fair Oaks neighborhood to consider alternatives for vertical alignment Ref Doc: CSS3_003_Nov2009WorkshopSummary Page 1 of 16

SECTION 0 & 1 SAN FRANCISCO Environmental/Social Justice Safety & Security Freight Service Minimized constraints (to vertical alternatives) due to maintaining freight service on the corridor Utilities/drainage (public works) Opportunities Leverage Existing Developments and Investments Improve freight rail access to port Improve access to Mission Bay Development Improve East/West Access Improve pedestrian and vehicle safety Reduce commuter time to central business district Partnership with Local Transit agencies Improve residential areas Station retail opportunities Open Space and parks Promote new development Ref Doc: CSS3_003_Nov2009WorkshopSummary Page 2 of 16

SECTION 2 BRISBANE, S. SAN FRANCISCO, SAN BRUNO, MILLBRAE ISSUES Caltrain & High Speed Rail service/stations Improve South San Francisco Station, including location Consider relocation of Bayshore Station to improve regional connectivity Provide connectivity with region and compatibility with SFO Physical Connectivity Do not have structures that physically divide the community more than it is divided today Visual Impacts Do not have structures that visually divide the community more than it is today (i.e. is the railroad an imposing structure in the landscape that I can see from x distance away, or that reduces one s ability to see just beyond the railroad.) Do not block scenic views or vistas Do not have structures that are of a significantly larger scale when compared to the immediate environment Noise/Vibration Do not create train noise that is greater than it is today (whistles/horns, diesel engines, train wheels/brakes). Do not create train-related vibrations that are greater than they are today Urban Design & Community Character Minimize land use impact (impact = limit to future development opportunities) Ensure integration with Downtown San Bruno transit planning efforts Natural Environment Minimize impacts to nearby parks Maintain access to bay front Traffic & Parking Minimize long-term traffic impacts associated with HSR station (passenger drop-off/pick-up, parking, etc.) Minimize construction-related traffic (i.e. reductions in access and street/parking capacity, truck traffic, shoofly limiting access, poor, road conditions) Economic health Overall project cost should be kept reasonable, mitigation costs implication that local jurisdictions will pay for cost over current construction estimates Housing/Neighborhood Minimize loss of housing, minimize residential property takes through eminent domain, otherwise provide compensation for taking severance damages. Minimize reductions in adjacent property values Environmental/Social Justice Minimize impacts of HSR on Brownfield redevelopment Ref Doc: CSS3_003_Nov2009WorkshopSummary Page 3 of 16

SECTION 2 BRISBANE, S. SAN FRANCISCO, SAN BRUNO, MILLBRAE Safety & Security Freight Service Maintain access to rail yard in Brisbane Bay lands Minimized constraints (to vertical alternatives) due to maintaining freight service on the corridor Utilities/drainage (public works) Opportunities Eliminate Kinder Morgan tank farm Relocate Bayshore station southerly Provide connectivity to DT Brisbane Brownfield remediation Geneva Avenue extension Enhance connectivity to bay (pedestrian access) Utility extensions Provide seamless SFO connection Move SSF train station Colma creek improvements Extend people-mover to San Bruno HSR station High-density TOD around new HSR station Further mitigate existing impacts on communities (noise, visual, etc.) Off-site mitigations Habitat restoration west-of-bayshore (SFO) Ref Doc: CSS3_003_Nov2009WorkshopSummary Page 4 of 16

SECTION 3 BURLINGAME & SAN MATEO ISSUES Caltrain & High Speed Rail service/stations Minimize changes to historic Burlingame Caltrain station buildings, trees, provide same amount of parking as today Provide better connections to transit/ for pedestrians and bicycles, minimize/reduce commuter travel time (door-to-door) Physical Connectivity Do not have structures that physically divide the community more than it is divided today Visual Impacts Do not have structures that visually divide the community more than it is today (i.e. is the railroad an imposing structure in the landscape that I can see from x distance away, or that reduces one s ability to see just beyond the railroad.) Do not block scenic views or vistas Do not have structures that are of a significantly larger scale when compared to the immediate environment Noise/Vibration Do not create train noise that is greater than it is today (whistles/horns, diesel engines, train wheels/brakes). Do not create train-related vibrations that are greater than they are today Urban Design & Community Character Minimize land use impact (impact = limit to future development opportunities) Natural Environment Minimize impacts to nearby parks Preserve drainage channels of creeks no reduction or obstruction to natural (daylighted) creeks, keep the same volume/flow of water and water quality Mills Creek Culvert and Sanchez Creek Preserve historic trees Traffic & Parking Minimize long-term traffic impacts associated with HSR station (passenger drop-off/pick-up, parking, etc.) Minimize construction-related traffic (i.e. reductions in access and street/parking capacity, truck traffic, shoofly limiting access, poor, road conditions) Economic health Overall project cost should be kept reasonable, mitigation costs implication that local jurisdictions will pay for cost over current construction estimates Maintain access to downtowns Housing/Neighborhood Minimize loss of housing, minimize residential property takes through eminent domain, otherwise provide compensation for taking severance damages. Minimize reductions in adjacent property values Ref Doc: CSS3_003_Nov2009WorkshopSummary Page 5 of 16

SECTION 3 BURLINGAME & SAN MATEO Environmental/Social Justice Safety & Security Freight Service Minimized constraints (to vertical alternatives) due to maintaining freight service on the corridor Utilities/drainage (public works) Opportunities Connectivity eliminate at-grade crossings Increase number of crossings Final mile gap E-W connections Open space Public private partnerships Safer and more efficient rail crossings Establish public transportation system in L.A. Mixed use, public space, housing, TOD Millbrae station square Connectivity airport to HSR, HSR to airport,, from/to Millbrae BART Open design for elevated alignment bike and pedestrian access below Funding of underground alignment through sale of air rights BART extension around the bay Grade separations Integration of east and west side of rail Affordable housing from more location and more remote locations Improve safety of BHS Elimination of at-grade crossings in downtown San Mateo, Burlingame and Millbrae Improve infrastructure Better Caltrain service Improve drainage system along and across tracks Linear park along rail alignment Communication trunk/wifi in rail row Better landscaping Improved bike capacity on trains Improve aesthetics along rail alignment Electrification Caltrain and HSR on same grade HSR in tunnel with Caltrain on top (except in downtown San Mateo) Improved station amenities Improved business districts, San Mateo, Burlingame and Millbrae Transit hub at train stations Improved feeder lines Increased tourists and opportunities Cities/county green policies enactment for construction/deconstruction processes Ref Doc: CSS3_003_Nov2009WorkshopSummary Page 6 of 16

SECTION 4 BELMONT, SAN CARLOS & REDWOOD CITY ISSUES Caltrain & High Speed Rail service/stations Minimize changes to historic San Carlos Caltrain station buildings, trees, provide same amount of parking as today Provide better connections to transit/ for pedestrians and bicycles, minimize/reduce commuter travel time (door-to-door) Physical Connectivity Do not have structures that physically divide the community more than it is divided today Improve east/west connectivity Visual Impacts Do not have structures that visually divide the community more than it is today (i.e. is the railroad an imposing structure in the landscape that I can see from x distance away, or that reduces one s ability to see just beyond the railroad.) Do not block scenic views or vistas Do not have structures that are of a significantly larger scale when compared to the immediate environment Noise/Vibration Do not create train noise that is greater than it is today (whistles/horns, diesel engines, train wheels/brakes). Do not create train-related vibrations that are greater than they are today Urban Design & Community Character Minimize land use impact (impact = limit to future development opportunities) Coordinate with the San Carlos Transit Village Natural Environment Minimize impacts to nearby parks Preserve drainage channels of creeks no reduction or obstruction to natural (daylighted) creeks, keep the same volume/flow of water and water quality Fiesta Creek, Pulgas Creek, Cordilleras Creek Traffic & Parking Minimize long-term traffic impacts associated with HSR station (passenger drop-off/pick-up, parking, etc.) Minimize construction-related traffic (i.e. reductions in access and street/parking capacity, truck traffic, shoofly limiting access, poor, road conditions) Economic health Overall project cost should be kept reasonable, mitigation costs implication that local jurisdictions will pay for cost over current construction estimates Housing/Neighborhood Minimize loss of housing, minimize residential property takes through eminent domain, otherwise provide compensation for taking severance damages. Minimize reductions in adjacent property values Ref Doc: CSS3_003_Nov2009WorkshopSummary Page 7 of 16

SECTION 4 BELMONT, SAN CARLOS & REDWOOD CITY Environmental/Social Justice Safety & Security Freight Service Minimized constraints (to vertical alternatives) due to maintaining freight service on the corridor Utilities/drainage (public works) Opportunities Green space/parks/urban forest Solar power Smart grid/networks/underground cabling Land/air rights Creek enhancements/flood control Storm water quality basins Improving divided communities Increase bike and pedestrian trails/access Go underground Convert Berm to viaduct Caltrain schedule enhancements Commuting alternatives Tourism additional business Airport connectivity Crossing enhancements Improving rail safety Do away with Caltrain and make it one system? Ref Doc: CSS3_003_Nov2009WorkshopSummary Page 8 of 16

SECTION 5 ATHERTON & MENLO PARK ISSUES Caltrain & High Speed Rail service/stations Minimize changes to historic Menlo Park Caltrain station buildings, trees, provide same amount of parking as today Physical Connectivity Do not have structures that physically divide the community more than it is divided today Visual Impacts Do not have structures that visually divide the community more than it is today (i.e. is the railroad an imposing structure in the landscape that I can see from x distance away, or that reduces one s ability to see just beyond the railroad.) Do not block scenic views or vistas Do not have structures that are of a significantly larger scale when compared to the immediate environment Noise/Vibration Do not create train noise that is greater than it is today (whistles/horns, diesel engines, train wheels/brakes). Do not create train-related vibrations that are greater than they are today Urban Design & Community Character Minimize land use impact (impact = limit to future development opportunities) Natural Environment Minimize impacts to nearby parks Preserve drainage channels of creeks no reduction or obstruction to natural (daylighted) creeks, keep the same volume/flow of water and water quality San Francisquito Creek and Atherton Channel Traffic & Parking Minimize long-term traffic impacts associated with HSR station (passenger drop-off/pick-up, parking, etc.) Minimize construction-related traffic (i.e. reductions in access and street/parking capacity, truck traffic, shoofly limiting access, poor, road conditions) Economic health Overall project cost should be kept reasonable, mitigation costs implication that local jurisdictions will pay for cost over current construction estimates Housing/Neighborhood Minimize loss of housing, minimize residential property takes through eminent domain, otherwise provide compensation for taking severance damages. Minimize reductions in adjacent property values Need representation from Fair Oaks neighborhood to consider alternatives for vertical alignment Environmental/Social Justice Ref Doc: CSS3_003_Nov2009WorkshopSummary Page 9 of 16

SECTION 5 ATHERTON & MENLO PARK Safety & Security Freight Service Minimized constraints (to vertical alternatives) due to maintaining freight service on the corridor Utilities/drainage (public works) Opportunities Use land recaptured from underground solutions Use rail corridor to connect neighborhoods with bike/walking paths Reduces congestion with Grade Separations Improve traffic circulation in downtown Menlo Park Include quality of Life with reduced noise Improve Caltrain service with frequent local stops Efficiently bring more visitors to downtown Menlo Park Improve east/west connectivity for bikes/peds Stack systems to recapture land area Ref Doc: CSS3_003_Nov2009WorkshopSummary Page 10 of 16

SECTION 6 PALO ALTO ISSUES Caltrain & High Speed Rail service/stations Maintain Caltrain service 2009 peak hour levels of service during reconstruction Preserve (location and character of) historic Palo Alto Caltrain station Improve pedestrian/vehicular/transit/bicycle access to/from station Physical Connectivity Maintain current number of bicycle /pedestrian/ street connections between either side of the railroad Do not have structures that physically divide the community more than it is divided today Visual Impacts Do not have structures that visually divide the community more than it is today (i.e. is the railroad an imposing structure in the landscape that I can see from x distance away, or that reduces one s ability to see just beyond the railroad.) Do not block scenic views or vistas Do not have structures that are of a significantly larger scale when compared to the immediate environment Noise/Vibration Do not create train noise that is greater than it is today (whistles/horns, diesel engines, train wheels/brakes). Do not create train-related vibrations that are greater than they are today Natural Environment Protect historic trees (Palo Alto Tree Preservation Ordinance), particularly El Palo Alto Protect urban canopy and preserve the identity of Palo Alto (opportunity to create or add to the canopy) No net loss of park area in the city Preserve drainage channels of creeks no reduction or obstruction to natural (daylighted) creeks, keep the same volume/flow of water and water quality Traffic & Parking Minimize traffic impacts associated with HSR station (passenger drop-off/pick-up, parking, etc.) Minimize construction-related traffic (i.e. reductions in access and street/parking capacity) Palo Alto Alma Street Economic health Maintain existing level of parking and access to downtown businesses Palo Alto California Ave and University Ave business districts Housing/Neighborhood No loss of housing, no residential property takes. Minimize reductions in adjacent property values Minimize adverse impacts (incompatible aesthetics, out-of-scale structures, noise, traffic congestion, construction) to historic neighborhoods (Palo Alto Green Meadow Neighborhood) Environmental/Social Justice Do not disproportionately impact lower-income neighborhoods and locally-owned businesses Ref Doc: CSS3_003_Nov2009WorkshopSummary Page 11 of 16

SECTION 6 PALO ALTO Safety & Security Improve railroad safety (safe means to cross, discourage trespassing) Freight Service Maintain freight rail service to major metropolitan centers / industries that exist on the Peninsula Utilities/drainage (public works) During construction, minimize disruption of utilities During construction, minimize exceeding point storm drain capacity At grade separations, road under rail does not flood Opportunities Double-decking HSR on top Slow down, stay on two tracks, temporal separation, leverage baby bullet More Connectivity restore connectivity Elimination of grade crossings suicide prevention HSR stations Economic development Real-estate development on ROW, near ROW Improve intersection @ University Ave, El Camino Real Electrification eliminate diesel Horn Blowing (though still @ stations) Better commuter service on Caltrain Bike Paths Increased Parklands, Playing fields Reconnect Alma? Improve Margueritte shuttle Improve events access to Stanford events Improve access to Town & Country Improve Palo Alto and Cal ave stations Opportunities of air rights development with private businesses Take train to Airport. Ref Doc: CSS3_003_Nov2009WorkshopSummary Page 12 of 16

SECTION 7 MOUNTAIN VIEW ISSUES Caltrain & High Speed Rail service/stations San Antonio station maintain current Caltrain service levels Mountain View Transit Center maintain current levels of service and access to the transit center Physical Connectivity Maintain current number of bicycle /pedestrian/ street connections between either side of the railroad Do not have structures that physically divide the community more than it is divided today Visual Impacts Do not have structures that visually divide the community more than it is today (i.e. is the railroad an imposing structure in the landscape that I can see from x distance away, or that reduces one s ability to see just beyond the railroad.) Do not block scenic views or vistas Noise/Vibration Do not create train noise that is greater than it is today (whistles/horns, diesel engines, train wheels/brakes). Do not create train-related vibrations that are greater than they are today Natural Environment Preserve drainage channels of creeks no reduction or obstruction to natural (daylighted) creeks, keep the same volume/flow of water and water quality Traffic & Parking Minimize traffic impacts associated with HSR station (passenger drop-off/pick-up, parking, etc.) Minimize construction-related traffic (i.e. reductions in access and street/parking capacity) Economic health Maintain existing level of parking and access to downtown businesses Mountain View Castro Street Housing/Neighborhood Environmental/Social Justice Safety & Security Freight Service Utilities/drainage (public works) Ref Doc: CSS3_003_Nov2009WorkshopSummary Page 13 of 16

SECTION 7 MOUNTAIN VIEW Opportunities East West Access for pedestrians and bikes Create a Bike/Ped corridor along tracks Create a safe crossing for the school, parks, and community Unifying residential neighborhoods across tracks Integrate multi-modal transit in the train station Develop more commercial opportunities along the rail and green space Ref Doc: CSS3_003_Nov2009WorkshopSummary Page 14 of 16

SECTION 8 & 9 SANTA CLARA & SAN JOSE ISSUES Caltrain & High Speed Rail service/stations Improve system connectivity (HSR, Caltrain, ACE, Amtrak, BART, VTA LRT, Capitol Corridor, Buses, people mover to San Jose Airport) Improve/maintain station connectivity and pedestrian access Integration of planned ATN (?) at Diridon System must have thoughtful/functional interface with Caltrain stations: Santa Clara, College Park, Lawrence Station Provide HST service connection to city of Santa Clara Interface with CEMOF Improve/maintain same level of Station security Issues with southbound alignments from Diridon south to Merced Physical Connectivity Visual Impacts Incorporate aesthetics into design of Diridon station and elevated tracks that enhance visual experience Noise/Vibration Do not create train noise that is greater than it is today (whistles/horns, diesel engines, train wheels/brakes), especially as they impact residential neighborhoods: city of Santa Clara, College Park, Garden Alameda, Diridon/Georgetown. Do not create train-related vibrations that are greater than they are today Natural Environment Traffic & Parking Provide adequate parking (with a balanced approach to station access, i.e. pedestrians, bicycles, transit) Economic health Housing/Neighborhood See comment under Noise/Vibration Environmental/Social Justice Safety & Security Improve sec Freight Service Utilities/drainage (public works) Ref Doc: CSS3_003_Nov2009WorkshopSummary Page 15 of 16

SECTION 8 & 9 SANTA CLARA & SAN JOSE Opportunities Diridon Station Iconic Station Commercial/Retail/Housing Place Making center of Activity Expanded Downtown Increased Densities Move Downtown towards the West Connection to Housing West of Diridon Santa Clara Station Area Plan BART Connection People Movers Housing Commercial Ref Doc: CSS3_003_Nov2009WorkshopSummary Page 16 of 16