Forest Hills Improvement Initiative A Partnership for Building a Better Community. Use & Design Guidelines September 23, 2008

Similar documents
Policies and Code Intent Sections Related to Town Center

WEST LOOP DESIGN GUIDELINES CHECKLIST

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

PLAN ELEMENTS WORKSHOP. April 5, 2016

Town Center (part of the Comprehensive Plan)

Courthouse Square Planning & Urban Design Study. Courthouse Square Working Group #13 October 15, 2014

PUBLIC RIGHT-OF-WAY IN THIS CHAPTER PUBLIC REALM

EXISTING COMPREHENSIVE PLAN

Civic Center District

FRUITVALE TRANSIT VILLAGE (Phase 2) Residential Project

Buildings may be set back to create small plazas provided that these setbacks do not substantially disrupt the street wall s continuity.

VILLAGE OF SKOKIE Design Guidelines for Mixed-Use Districts NX Neighborhood Mixed-Use TX Transit Mixed-Use CX Core Mixed-Use

SECTION TWO: Urban Design Concepts

Chapter 1: Introduction

McDonald s Restaurant - Purcellville Town of Purcellville Special Use Permit Statement of Justification July 24, 2014

Transportation. Strategies for Action

The University District envisions, in its neighborhood

Metro. Activity Center Design Guidelines. Recommendations For Developing Focused, Mixed-Use Commercial/Residential Centers

AMITY STATION Revised Concept Plan Review West Rosemary Street Chapel Hill, NC September 27, 2016

4.0 Design Guidelines For The Village Centre. South fields Community Architectural Design Guidelines Town of Caledon

Establish a network of streetscaped vehicle and pedestrian routes that connect within and outside the Plan area.

Mark-up of the effect of the proposed Bronte Village Growth Area OPA No.18 on the text of section 24, Bronte Village, of the Livable Oakville Plan

3.1 community vision. 3.3 required plan elements

PINE CURVE REZONING. BACKGROUND Purchased as two parcels in 2001 and 2002

Planning Board Briefing

The transportation system in a community is an

LOW DENSITY RESIDENTIAL

(DC1) Direct Development Control Provision DC1 Area 4

CHAPTER 5: GUIDING PRINCIPLES

PINE CURVE REZONING. Property does not meet criteria for open space preservation and is not a candidate for a park

CRYSTAL CITY BLOCK PLAN # CCBP- G 1

Standards (R-3) Figure B-11: R-3 Residential Standards Exhibit

C. Westerly Creek Village & The Montview Corridor

Highland Village Green Design Guidelines

This Review Is Divided Into Two Phases:

The West Vaughan Employment Area Secondary Plan Policies

VISION AND GUIDING DESIGN PRINCIPLES

FUTURE LAND USE ELEMENT

Clairtrell Area Context Plan

Future Five. Design/ Development Guidelines. January 2008 Amended June 08 per City Council motion

II. SINGLE FAMILY RESIDENTIAL

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

Rosslyn Plaza PDSP (SP #422) SPRC Staff Presentation

Lehigh Acres Land Development Regulations Community Planning Project

The Village. Chapter 3. Mixed Use Development Plan SPECIFIC PLAN

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

DRAFT. October Wheaton. Design Guidelines

SUBCHAPTER 4-B GUIDELINES FOR THE B-3 COMMERCIAL CHARACTER AREA

BUILDING SCALE AND SETBACKS 5 ELEMENTS:... 5 FAÇADES (COMMERCIAL/RESIDENTIAL) 5

B L A C K D I A M O N D D E S I G N G U I D E L I N E S for Multi-family Development

The Vision. Photo provided by The Minervini Group. 46 Vision, Objectives & Strategies

V. Vision and Guiding Principles

FLORIN ROAD CORRIDOR Site Plan and Design Review Guidelines Checklist

CRYSTAL CITY BLOCK PLAN # CCBP- G 1 DRAFT

Be it enacted by the Town Board of the Town of Guilderland that the following new A (Transit Oriented Development (TOD) District) is adopted:

Urban Design Manual PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction. Station Study Areas

East Bayshore Road Neighbourhood

Study Area. Capitol Way. Greening America s Capitals 11/13/2014. A Greening America s Capitals Project

The principal elements of the NTC Strategic Vision plan are as follows.

ATTACHMENT A. SILVERDALE DESIGN STANDARDS Amendments to the Waaga Way Town Center Chapter

PIKE PINE RENAISSANCE: ACT ONE. October 19, 2017

3.0 URBAN DESIGN. December 6, OVERVIEW

Millbrae TOD #2 Project Analysis

FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN. Official Plan Amendment XX to the Official Plan for the City of Ottawa

4. INDUSTRIAL 53 CASTLE ROCK DESIGN

Carlsbad Village Redevelopment Concept Summary of Features

URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2.

Institutional Master Plan The Arnold Arboretum of Harvard University

DRAFT. 10% Common Open Space

Phase I Redevelopment Plan. First Community Meeting

3. VISION AND GOALS. Vision Statement. Goals, Objectives and Policies

chapter DESIGN GUIDELINES NEW RIVER MASTER PLAN REPORT

11 GUIDING PRINCIPLES:

Design Guidelines. Roosevelt. Mike Podowski DPD Design Guidelines Ordinance ATT 13 August 13, 2012 Version #1

Concept Evaluations 2 May 2009

Commercial Development Permit Area

Create Policy Options Draft Plan Plan Approval. Public Consultation Events. Phase 2

2.0 THE PLATINUM TRIANGLE VISION

SECTION TWO: Overall Design Guidelines

R STREET CORRIDOR NEIGHBORHOOD Site Plan and Design Review Supplemental Guidelines Checklist

Derry Green Corporate Business Park

Tonight s Agenda. Summary Presentation Open House. Group Discussion Next Steps: online community wide survey

Residential Commons at Barry s Corner. Boston civic design commission February 5, 2013

4.9 Mendocino Avenue Corridor Plan Design Guidelines

Silverdale Regional Center

YONGE STEELES CORRIDOR SECONDARY PLAN. Young + Wright / IBI Group Architects Dillon Consulting Ltd. GHK International (Canada) Ltd.

Plan-It Greenville (2009) Comprehensive Plan 5-Year Update

Appendix I ARLINGTON COUNTY SECTOR PLANS SUMMARY RECOMMENDATIONS RELATED TO PUBLIC SPACES

Seneca Meadows. Block 4 Locate office, technology, and medical development adjacent to I Screen views of garage structures from I-270.

Pedestrian and Bike Bridge LOGO

A BLUEPRINT FOR BROCKTON A CITY-WIDE COMPREHENSIVE PLAN

CENTERS AND CORRIDORS

Urban Design Brief December 23, 2015 Southside Construction Group Official Plan & Zoning By-Law Amendment

MIXED-USE VILLAGE OVERLAY FLOATING DISTRICT

lot flankage Y street 16m 6m landscape strip for large site 3m landscape strip for small medium site

NEIGHBORHOOD 3: UNIVERSITY EDGE

4.1.3 LAND USE CATEGORIES

CHAPTER 2: FUTURE LAND USE CONCEPTS

Figure 3-1: Public Realm Plan

Transcription:

Forest Hills Improvement Initiative A Partnership for Building a Better Community City of Boston Thomas M. Menino, Mayor Emerging Community Vision p. 2 Site Use & Design Guidelines p. 3 to 21 Arborway Yard p. 3 Fitzgerald Private Parking Lot p. 7 MBTA Commuter Parking Lot p. 11 MBTA Parcel U p. 15 Use & Design Guidelines September 23, 2008 Boston Redevelopment Authority MBTA Parcels V & W p. 19 District Wide Sustainable Development & Green Buildings p. 22 District Wide Housing & Affordability p. 23 District Wide Vehicle Parking & Service Access p. 25 District Wide Bicycle Storage p. 26 District Wide Transportation & Streetscape Improvements - p. 27 Arborway Yard Surplus Parcel Gateway Commercial Core / Residential Office over Retail and Residential with Family / Affordable Housing. Commercial district anchor, active uses connecting to Forest Hills Station and new uses at the Fitzgerald lot. MBTA Parcel W Residential / Local Convenience Residential /Commercial over Retail including Family / Affordable Housing. Residential cluster at edge of district center with local retail and active street edges. MBTA Parcel V Local Service / Convenience / OS Small Residential over Retail including Family / Affordable Housing. Residential cluster at edge of district with local / small commercial and active street edges. Private Parking Lot (Fitzgerald) Gateway Commercial Core Residential / Commercial with ground floor Retail. Commercial district center with active uses connecting to Arborway Yard site. MBTA Station Parking Lot Commercial Core Residential / Commercial over Retail with Structured Parking. Commercial district center and public space with active pedestrian uses, access, water feature & landscape features. MBTA Parcel U Residential / Local Convenience Mix of Residential including Family / Affordable Housing and some Retail. Residential cluster at edge of district with local retail and services supporting with area housing.

Community Vision September 23, 2008 District Wide Emerging Community Vision Statement of Intent Emerging Principles While a consensus vision continues to emerge, community meetings and surveys to date have brought forth shared principles and examples of ideal development for the community. This statement is an attempt to provide a shared basis for ongoing conversations, and should be treated as a living document to be refined based on additional community input. Based on community input to date, the Forest Hills Improvement Initiative envisions growth that supports the neighborhood in five key ways Principles Improved Traffic Patterns Vibrant Mixed Use District Community Orientation Green / Sustainable Development Green Space Assets Improvements will reduce car dependency; minimize any additional automobile traffic to and through Forest Hills and result in smoother, safer flow for cars, pedestrians, and bicycles. All new buildings and uses should promote pedestrian, bicycle, and public transit use, with only the minimum parking necessary to allow retail stores and residential uses to flourish. Better pedestrian and bicycle connections throughout Forest Hills--especially north-south connections--are a priority. Improvements will increase the number and range of local retail and service businesses and community uses for area residents while recognizing area commuters also contribute to local businesses. New residential development should add to the existing mix of rental and ownership housing in the area. Affordable rental and ownership housing, services and programs for the elderly, and facilities and programs for youth are particularly important. Improvements should provide opportunity for community ownership and interaction by creating spaces for public gatherings and markets, artist exhibits, and locally owned retail and service businesses. The Forest Hills community values its diversity (age, socioeconomic, and race and ethnicity); all new growth and uses including retail, commercial, and housing should support and continue that diversity. Forest Hills should be a model for green / sustainable development including healthy, energy efficient buildings and transit-oriented, neighborhood-scaled development that reduces building and transportation based pollution and carbon emissions. Access to Forest Hill s numerous green space assets including the Arboretum, Southwest Corridor, Franklin Park, Forest Hills Cemetery and Station area should be increased by better connections and improved with new landscaping. Page 2 of 27

Forest Hill Improvement Initiative Arborway Yard Parcel A Partnership for Building a Better Community Site Plan 1 =100 10/3/07 Focus Gateway Commercial / Residential at northern end, family housing over community / service; at interior, family housing and office over retail; at southern end. BU RN ET ST W AS HI NG TO N ST T MBTA Bus Facility LRV Reserve Page 3 of 27 N

Arborway Yard Parcel September 23, 2008 Site Arborway Yard 277,323 SF / 6.37 Acres (includes LRV Reserve 44,251 SF) Disposition Status Transferred to City upon completion of new bus facility; RFP in 3 to 6 years. Inclusion of LRV Reserve is dependent upon the restoration of the Arborway Trolley Line. Focus Gateway Commercial / Residential Residential with some community uses at northern end; residential at adjacent interior; and, office over retail at southern end. Use Guidelines Residential Uses Commercial Office Uses Provide a mix of unit types including family housing; provide Studios, 1, 2, 3 and 4 bedroom units. Consider some artist focus with live / work spaces and or lofts. Ownership & Affordability: See District Wide Housing & Affordability Guidelines. Note: The District Wide Housing & Affordability Guideline does not apply to the Arborway Yard site, since a prior agreement between the City, the MBTA, and the CPCAY states that any housing developed on the site will be affordable. Provide upper story commercial / office space as anchor use for district; locate at southern end of site including LRV Reserve if available. Retail Uses Provide space for active ground floor retail and service businesses with youth orientation and usable outdoor space to support area community needs. Include a grocery store or other mini-anchor business. Focus active uses at southern end to reinforce connections under Casey Overpass. Community Uses Illustrated Build Out Potential (assuming a housing focus) Provide for community service needs including on-site childcare, youth and senior service centers. Open Space: 62,000 SF / 23% of Site plus connector Housing: 160 Units Retail: 45,000 SF Office / Commercial: 120,000 SF Community: 8,000 SF (childcare & services) Vehicular Parking: 120 Res. / 155 Comm. SP Bicycle Storage: 160 Res./ 16 Comm./ 32 Visitor SP Design Guidelines Street & Block Pattern Reduce the overall scale of the site with multi-building approach. Provide new interior drives and / or roads to allow through site access and reduce scale of site; align new roadway with Burnett St. and connect with Stonley Rd. at the rear of the site. Page 4 of 27

Arborway Yard Parcel September 23, 2008 Area Circulation & Connections Provide strong pedestrian connections and active uses at southern end oriented to the station area and connecting through the site. Provide fire lane and circulation and access for MBTA Bus Yard at the rear of buildings. Streetscape Improve existing streetscape conditions with new / realigned curbing, wide landscaped sidewalks, street lighting, street furniture and enhanced paving. Improvements are to be coordinated and implemented with the district wide streetscape plan. Preservation of existing street trees is a top priority. Building Height & Massing Low rise mix of 4 stories with 5 stories at the southern corner. Vary building heights, arrange massing into multiple structures, and step massing to reduce site size and provide breaks for light, air and views. Orientation Front new buildings on Washington St. Emphasize massing and height at corner near Casey Overpass (southern end) with taller 5 story massing and features to reinforce connections under Casey Overpass and pedestrian open space to support active ground floor retail and uses. Orient interior buildings to front on new streets. Edges & Street Wall Building Character & Materials Site Open Space & Landscaping Enhance existing street wall conditions, provide set-backs: Residential: 12-15 set-back to provide buffer from street. Retail: no or minimum set -back, recess ground floor 8 to 12 for continuous pedestrian arcade. At side streets 8 to 12 set-back to provide landscaped plaza areas and opportunities for outdoor seating. Ensure frequent entrances, transparent facades, tall store and display windows, canopies and attractive building materials. Modulate façade to break up building length and massing. Vary character between different building types and provide for high quality construction, materials & detailing. Washington Street: Commercial / retail building typology of brick / masonry construction. Provide tall ground floor retail spaces with large display windows and entries. Side / Interior: Row house and multi-family flat typology of wood or masonry construction consistent with the existing character of neighborhood. Provide a mix of usable semi-private open space at each building and defensible semi-public neighborhood open space for each site. Include outdoor passive and active open spaces with play structures for children. Provide high quality landscaping and screening of building mechanical equipment and ventilation openings. Include plantings and ornamental fencing along edges. Preservation of existing trees and planting of new trees are top priorities. Page 5 of 27

Arborway Yard Parcel September 23, 2008 Transportation, Access & Parking Requirements Pedestrian Promote a high quality and accessible pedestrian environment in and around the building(s) that promotes walking to nearby uses, activities and public transit. Bicycle Parking Vehicular Parking Vehicular and Service Access See District Wide Bicycle Guidelines. See District Wide Vehicular Parking & Access Guidelines. See District Wide Vehicular Parking & Access Guidelines. Site access should be from side streets with limited access via 1 or 2 shared driveways on Washington St. Building service access should be out of common view and from the rear of the buildings via private driveways and parking lots. Sustainable Development and Green Buildings See District Wide Sustainable Development & Green Buildings Guidelines Page 6 of 27

Forest Hill Improvement Initiative Fitzgerald Parking Lot A Partnership for Building a Better Community Site Plan 1 =100 10/3/07 ARBORWAY HY DE PA R KA VE FOREST HILLS MBTA STATION Focus Gateway Commercial / Residential Residential over retail and office; mixed income housing. Page 7 of 27 N

Fitzgerald Parking Lot September 23, 2008 Site Fitzgerald Parking Lot 100,477 SF / 2.31 Acres (Private) Disposition Status Available as determined by private owner; open ended redevelopment possibilities; active commercial parking lot. Use Guidelines Design Guidelines Focus Gateway Commercial / Residential Residential and / or office over street level retail at the Hyde Park Ave / Arborway corner; option for anchor retail. Residential Uses Commercial Office Uses Provide a mix of unit types including family housing; provide Studios, 1, 2, 3 and 4 bedroom units. Ownership & Affordability: See District Wide Housing & Affordability Guidelines. Provide upper story commercial / office space above street level retail uses along Hyde Park edge. Retail Uses Provide space for active ground floor retail and service businesses along Hyde Park Ave. with usable outdoor space to support area community needs, including locally based neighborhood serving retail uses and mini-anchor businesses. Focus active uses at corner to reinforce connections under Casey Overpass. Allow option for anchor retail on interior of site. Community Uses Illustrated Potential Build Out (assuming a housing focus) Street & Block Pattern Area Circulation & Connections Provide for community service needs and uses including onsite childcare, youth and senior oriented businesses. Open Space: 36,000 SF / 37% of Site Housing Option: 135 Units Retail Option: 15,000 SF Office / Commercial Option: 40,000 SF Vehicular Parking Options: 120 SP (Resident) / 40 SP (Commercial) / 15 SP (Retail) Bicycle Storage: 150 Res. / 4 Comm./ 19 Visitor SP Reduce the overall scale of the site with multi-building approach; use open space to organize site and private drives to access interior buildings. Provide an open space pedestrian connection through site from Hyde Park Ave. to Orchard Hill Road. Provide active pedestrian uses to strengthen connection under Casey Overpass. Streetscape Improve existing streetscape conditions with new / realigned curbing, wide landscaped sidewalks, street lighting, street furniture and enhanced paving. Improvements are to be coordinated and implemented with the district wide streetscape plan. Page 8 of 27

Fitzgerald Parking Lot September 23, 2008 Views & Topography Building Height & Massing Reinforce Emerald Necklace connection along Arborway with large landscaped pathway. Preservation of existing street trees and planting new trees are top priorities. Preserve existing view corridors from adjacent residences by stepping down building heights and setting taller massing at the street edge away from Court House hill. Low rise mix 4 stories with 5 stories at the corner. Vary building height and step massing into multiple structures to reduce scale of site and preserve views. Orientation Front of new buildings on Hyde Park Ave. Emphasize the corner near Casey Overpass with taller 5 story massing and features to reinforce connections under Casey Overpass. Edges & Street Wall Building Character & Materials Site Landscaping & Open Space Enhance existing street wall conditions, provide set-backs: Residential: 12-15 set-back to provide buffer from street. Retail: no or minimum set back, use existing sidewalk are for outdoor seating. At Arborway 8 to 12 set-back to provide buffer from street. Ensure frequent entrances, transparent facades, tall store and display windows, canopies and attractive building materials. Modulate façade to break up building length and massing. Adjacent Residential Edges: Provide wide landscaped buffers (20 min.) from adjacent residential uses. Apartment building typology of brick / masonry construction consistent with character of neighborhood. Provide tall ground floor retail spaces with large display windows. Vary character between different buildings and provide for high quality materials & detailing. Building mechanical and ventilation equipment is to be located away from adjacent residential uses and screened to eliminate noise and visual impacts. Provide a mix of usable semi-private open space at each building and defensible semi-public neighborhood open space connector through the site. Include outdoor passive and active open spaces with play structures for children. Provide high quality landscaping and screening of building mechanical equipment and ventilation openings. Include plantings and ornamental fencing along open edges and wide landscaped buffers with trees at the adjoining parcel edges at Tower Street and Orchard Hill Road. Preservation of existing trees and planting of new trees are top priorities. Transportation Access & Parking Requirements Pedestrian Promote a high quality and accessible pedestrian environment in and around the building(s) that promotes walking to nearby uses, activities and public transit. Page 9 of 27

Fitzgerald Parking Lot September 23, 2008 Bicycle Parking Vehicular Parking Vehicular and Service Access Sustainable Development & Green Buildings See District Wide Bicycle Guidelines. See District Wide Vehicular Parking & Access Guidelines. May use interior, southern portion of site for surface parking to support anchor retail and or office uses only. Any surface parking should incorporate state-of-the-art sustainable design strategies to reduce storm water run-off and heat island effects See District Wide Vehicular Parking & Access Guidelines. Site access should be from a private driveway off Hyde Park Ave. with limited or no access off of Arborway. Building service access should be out of common view and from the rear of the buildings via private driveways and parking lots. See District Wide Sustainable Development & Green Buildings Guidelines. Page 10 of 27

Forest Hills Improvement Initative A Partnership for Building a Better Community MBTA Parcel S (Parking Lot) Site Plan 1 =100 9/23/08 FOREST HILLS MBTA STATION WASHINGTON STREET HYDE PARK AVE UKRAIN WAY

MBTA Parcel S (Parking Lot) September 23, 2008 Site MBTA Parcel S (Parking Lot) 137,662 SF / 3.16 Acres Disposition Status Focus Available Immediately, MBTA to issue Invitation to Bid in Spring of 2008 Feasibility requires no cost to T or to commuters, replace all commuter parking spaces. Commercial Core / Office Office / Institutional over retail at northern end; structured parking over retail at southern end. Include Village Center plaza and pedestrian pathway connecting Hyde Park Avenue to Arnold Arboretum. Must replace existing commuter parking inventory. Use Guidelines Commercial Office / Institutional Uses Provide active commercial / office / institutional space (education, office, health services, movie theater) at Washington Street ground level (2 nd floor on Hyde Park Ave.). Provide upper story commercial office / institutional space as anchor uses for district; locate at northern end of site adjacent to the MBTA Station. Retail Uses Provide space for active ground floor retail and service businesses along Hyde Park Ave. with usable outdoor space to support area community needs. Include locally based neighborhood serving retail uses. Community Uses Commuter Parking Illustrated Build Out Potential (assuming a housing focus) Provide for community service needs including on-site childcare, youth and senior service centers. Replace existing MBTA Commuter and station employee parking in new structure; total 240 spaces. Provide up to 120 additional Commuter parking spaces as funding allows. Open Space: 22,000 SF / 16% of Site Retail: 42,000 SF Commercial / Office: 163,000 SF Community: 6,000 SF (childcare & services) Vehicular Parking: 411 SP (Commercial / Retail) Commuter Parking: 240 min. SP Bicycle Storage: 17 Comm./ 24 Visitor SP Design Guidelines Street & Block Pattern Area Circulation & Connections Reduce the overall scale of the site with a multi-building approach. Provide a major public open space, Village Center with pedestrian through connection. Use Open Space feature as organizing element for buildings and site. Provide pedestrian connection / open space from Hyde Park Ave. to Washington Street linking to the Arnold Arboretum. Provide active pedestrian uses along Hyde Park Ave. Page 12 of 27

MBTA Parcel S (Parking Lot) September 23, 2008 Streetscape Improve existing streetscape conditions with new / realigned curbing, wide landscaped sidewalks, street lighting, street furniture and enhanced paving. Improvements are to be coordinated and implemented with the district wide streetscape plan. Preservation of existing street trees is a top priority. Views & Topography Building Height & Massing Preserve view corridors across Station area. Use grade change for better building access on both Washington Street and Hyde Park Ave. 5 / 6 stories (Wash. St. / Hyde Park Ave.). Building height is a concern for many in the community; proposals should employ multiple strategies to reduce actual and apparent building heights including setbacks and step-backs at the upper levels to reduce massing, shadow and light impacts. On northern portion of site, building heights should not obstruct views of Station Clock Tower. Orientation Front new buildings Hyde Park Ave. Emphasize the corner at Ukraine Way with building features and taller massing. Accentuate architectural elements at open space / pedestrian connection through site. Edges & Street Wall Building Character & Materials Site Landscaping & Open Space Enhance existing street wall conditions with 8-12 setbacks. Provide frequent entrances, transparent facades, and attractive building materials to reinforce pedestrian environment. At open space provide landscaped plaza area and opportunities for outdoor seating. Modulate façade to break up length. Commercial or apartment building typology of masonry construction consistent with character of area neighborhood. Provide tall ground floor retail spaces with large display windows and entries. Screen parking garage elements and cars from public view. Garage design should emphasize interior visibility, illumination, and other safety features for users. Vary character between different buildings and uses; provide for high quality materials & detailing throughout. Incorporate active open space features (public stairs, plaza, water element) into Village Center pedestrian plaza and pedestrian connection between Hyde Park Ave. and Washington Street. Design and program plaza as a defensible public space with active uses including farmers market, artists booths, and similar activities. Provide a mix of usable semi-private open space at each building. Include outdoor passive and active open spaces with play structures for children. Page 13 of 27

MBTA Parcel S (Parking Lot) September 23, 2008 Transportation Access & Parking Requirements Pedestrian Promote a high quality and accessible pedestrian environment in and around the building(s) that promotes walking to nearby uses, activities and public transit. Bicycle Parking Vehicular Parking Vehicular and Service Access See District Wide Bicycle Guidelines. See District Wide Vehicular Parking & Access Guidelines. See District Wide Vehicular Parking & Access Guidelines. Site access should be from both Washington St. & Hyde Park Ave. Building service access should be out of common view and from the building interior via the parking garage. Align garage entries with existing streets and to minimize conflicts with bus and vehicular traffic and movement. Sustainable Development and Green Buildings See District Wide Sustainable Development & Green Buildings Guidelines Page 14 of 27

Forest Hills Improvement Initiative A Partnership for Building a Better Community MBTA Parcels U, V & W Site Plan 1 =100 10/3/07 MBTA Parcel W MBTA Parcel V Page 15 of 27

MBTA Parcel U September 23, 2008 Site MBTA Parcel U 122,799 SF / 2.82 Acres Disposition Status Focus Available Immediately, MBTA to issue Invitation to Bid in Spring of 2008 Neighborhood Residential - Residential with some retail at the Ukraine Way corner and at Walk Hill Street. Use Guidelines Residential Uses Provide a mix of unit types with a focus on family housing; include Studios, 1, 2, 3 and 4 bedroom units. Ownership & Affordability: See District Wide Housing & Affordability Guidelines. Retail Uses Ground floor uses should support local neighborhood needs and should include such uses as a small grocery store, dry cleaners, hardware store, bookstore, and/or café. Community Uses Illustrated Potential Buildout (assuming a housing focus) Provide for community service needs including on-site childcare center. Open Space: 30,000 sq. ft. / 24% of site Housing: 120 units Retail: 5,000 sq. ft. Community: 4,000 sq. ft. (e.g. day care) Vehicular Parking: 120 Res. / 0 Comm. SP Bicycle Parking: 120 Res. / 2 Comm. / 16 Visitor SP Design Guidelines Street and Block Pattern Area Circulation & Connections Reduce the overall scale of the site with multi-building approach; align open space and site access with Walk Hill Street. Strengthen bicycle and pedestrian cross connections at Ukraine Way and along Hyde Park Ave. Explore ways to accommodate bicycle path extending from Walk Hill Street to Forest Hills Station. If feasible, relocate Toll Gate foot bridge to align with base of Walk Hill Street. Streetscape Improve existing streetscape conditions with new / realigned curbing, wide landscaped sidewalks, street lighting, street furniture and enhanced paving. Improvements are to be coordinated and implemented with the district wide streetscape plan. Preservation of existing street trees is a top priority. Views & Topography Position and space buildings to preserve key sight lines and views especially from Walk Hill Street. Use site topography to provide vehicle access to grade level parking (basement) at rear of site. Page 16 of 27

MBTA Parcel U September 23, 2008 Building Height & Massing 3 to 4 stories with 4 stories at the northern corner. Configure height, scale, and massing to be compatible with residential buildings on opposite side of Hyde Park Avenue. Arrange building massing into multiple structures and provide breaks for light, air, and views; and, to reflect traditional building massing. While of compatible design, multiple building structures should be of sufficiently distinct design to appear to be different developments. Orientation Front new buildings on Hyde Park Ave. Emphasize the corner at Ukraine Way with building features, taller 4 story massing and pedestrian space to support ground floor retail. Edges & Street Wall Building Character & Materials Site Open Space & Landscaping Enhance existing street wall conditions, provide set-backs: Residential: 12-15 set-back to provide buffer from street. Retail: 8-12 set-back to provide landscaped plaza areas with opportunities for outdoor seating. Ensure frequent entrances, transparent facades, tall store and display windows, canopies, and attractive building materials along Hyde Park Avenue to reinforce pedestrian scale and character. Modulate façades to break up building lengths. Row house and multi-family-flat typology focusing on wood frame construction consistent with character of neighborhood. Apartment building typology with wood frame or brick/masonry construction limited to northern end of site. For retail, include tall ground floor spaces with large display windows. Vary character between different buildings and provide for high quality construction, materials & detailing to address noise and vibration of adjacent train uses. Provide usable, semi-private open space for each building. At the intersection of Hyde Park Avenue and Walk Hill Street, provide defensible, semi-public open space for neighborhood use. Include outdoor passive and active open spaces with play structures for children. Provide high quality landscaping and screening of mechanical equipment and ventilation openings. Include plantings and ornamental fencing along edges. Preservation of existing trees and planting of new trees are top priorities. Transportation, Access & Parking Requirements Pedestrian Promote a high quality, accessible pedestrian environment in and around the building(s) that promotes walking to nearby uses, activities and public transit. Bicycle Parking Vehicular Parking See District Wide Bicycle Storage Guidelines. See District Wide Parking Guidelines. Page 17 of 27

MBTA Parcel U September 23, 2008 Vehicular and Service Access Sustainable Development and Green Building Should be from the side or rear of the building via private driveways. See District Wide Sustainable Development & Green Buildings Guidelines Page 18 of 27

MBTA Parcels V &W September 23, 2008 Site MBTA Parcel V and 22,975 SF / 0.53 Acres MBTA Parcel W 58,541 SF / 1.34 Acres Disposition Status Available Immediately, MBTA to issue Invitation to Bid in Spring of 2008 Focus Neighborhood Residential or Local Commercial Residential or commercial business with street level neighborhood retail. Focus should be on Parcel W with no or minimal new uses on Parcel V. Transfer all or remaining linear open spaces at southern end of Parcel V to DCR for continuation of Southwest corridor park. Use Guidelines Residential Uses Option Commercial Uses Option Retail Uses Option Community Uses Option Potential Buildout Provide a mix of unit types with a focus on family housing; include Studios, 1, 2, 3 and 4 bedroom units. Ownership & Affordability: See District Wide Housing & Affordability Guidelines. Provide space for local commercial businesses to support area community needs and as an anchor use for district. Retail uses on these parcels are second tier to primary retail area that is focused on Hyde Park Ave. If retail is included, provide space for locally based active ground floor retail and service businesses to support area community needs. Parcel V: provide for youth oriented uses and usable outdoor space to relate to adjacent linear park space. Parcel W: provide for a new mini-anchor business such as a grocery store, restaurant / café, dry cleaners, hardware store, bookstore, or commercial business. Parcel W: Provide for related community service needs including on-site childcare center. Parcel V: Open Space: 18,000 sq. ft. / 79% of site Housing Option: up to 6 units Commercial Option: up to 8,000 sq. ft. on 2 stories Retail Option: up to 4,000 sq. ft. Vehicular Parking: 6 Resident, or 8 Commercial / 4 Retail SP Bicycle Parking: 6 Resident or 8 Commercial SP Parcel W: Open Space: 23,000 sq. ft. / 40% of site Housing Option: up to 40 units Commercial Option: up to 32,000 sq. ft. on 2 stories Retail Option: up to 10,000 sq. ft. Community Option: 2,000 sq. ft. (e.g. day care) Vehicular Parking: 36 Resident, or 32 Commercial / 10 Retail SP Bicycle Parking: 40 Resident / 4 Visitor, or 4 Comm. / 4 Visitor SP Page 19 of 27

MBTA Parcels V &W September 23, 2008 Design Guidelines Area Circulation & Connections Strengthen bicycle and pedestrian connections across Ukraine Way and along Washington Street. Parcel V open space (narrow area at southern) to be improved and deed restricted for public use. Streetscape Improve existing streetscape conditions with new / realigned curbing, wide landscaped sidewalks, street lighting, street furniture and enhanced paving. Improvements are to be coordinated and implemented with the district wide streetscape plan. Preservation of existing street trees is a top priority. Views & Topography Building Height & Massing Position and space buildings to preserve key sight lines and views especially to the Arboretum. Parcel W: Use site topography to provide vehicle access to grade level (basement) parking and service access at the rear of site. Parcel V: 3 stories Parcel W: 3 stories at northern end; 4 stories at southern end where grade drops off. On both parcels, configure height, scale, and massing to be compatible with surrounding buildings and proposed development. Limit building to southern end of both sites where width allows for normal building depths. Orientation Front new buildings on Washington Street. Edges & Street Wall Building Character & Materials Site Open Space & Landscaping Enhance existing street wall conditions, provide set-backs: Residential: 12-15 set-back to provide buffer from street. Retail: 8-12 set-back to provide landscaped plaza areas with opportunities for outdoor seating. Ensure frequent entrances, transparent facades, tall store and display windows, canopies, and attractive building materials along Washington Street to create a more pedestrian scale and character to area. Modulate façades to break up building lengths. Apartment building, row house, multi-family-flat typology of brick / masonry and or wood frame construction consistent with character of the area neighborhood. Include tall ground floor retail spaces with large display windows. Vary character between different buildings and provide for high quality materials & detailing. Provide usable, semi-private open space for each building. Parcel V: All or remaining linear open space along Washington Street to be transferred to State Department of Conservation and Recreation (DCR). If parcel is developed, coordinate improve remaining open space with DCR as defensible public space for neighborhood use and include Page 20 of 27

MBTA Parcels V &W September 23, 2008 outdoor passive and active open spaces with play structures for children. Parcel W: At the intersection of Washington Street and Ukraine Way, provide defensible, semi-public open space for neighborhood use. Include outdoor passive and active open spaces with play structures for children. Provide high quality landscaping and screening of mechanical equipment and ventilation openings. Include plantings and ornamental fencing along edges. Preservation of existing trees and planting of new trees are top priorities. Surface parking should be landscaped and screened. Transportation Access & Parking Requirements Pedestrian Promote a high quality, accessible pedestrian environment in and around the building(s) that promotes walking to nearby uses, activities and public transit. Bicycle Parking Vehicular Parking Vehicular and Service Access See District Wide Bicycle Storage Guidelines. See District Wide Parking Guidelines. Should be from the side or rear of the building via private driveways. Service for retail spaces should be screened and from the rear of the building. Sustainable Development and Green Buildings See District Wide Sustainable Development & Green Buildings Guidelines Page 21 of 27

September 23, 2008 District Wide Sustainable Development and Green Buildings Community Expression The Community s Vision is that Forest Hills should be a model for sustainable development and green building including healthy, energy efficient buildings and transitoriented, neighborhood-scaled development that reduces building and transportation based pollution and carbon emissions. Guidelines Sustainable Development Green Buildings The redevelopment of these parcels should enhance the overall sustainability of the Forest Hills neighborhood through a careful mix of new uses and compact, low impact development strategies. Each project site must comply with the US Green Building Council (USGBC) Leadership in Energy & Environmental Design for Neighborhood Development (LEED - ND) standards. While projects must at minimum meet the certified level, the Community s vision is for model practices and a goal of LEED-ND Gold or better. All new buildings are to be Green Buildings and comply with City of Boston Green Building Zoning Article 37 and be designed and constructed to meet the most appropriate USGBC LEED standard at the Certified level or better and comply with DND Healthy Homes Standards. USGBC Certification is highly encouraged but not required. Projects Green Building strategies should include a focus on the following: On-site Renewable Energy Distributed Generation Energy Efficiency Stormwater Management Transportation Demand Management Sustainable Landscaping Page 22 of 27

Housing and Affordability September 23, 2008 District Wide Housing and Affordability Community Expression The community has expressed an interest in creating housing that serves a mix of incomes reflective of the existing community and includes both rental and ownership housing. Recommendations for affordable housing range from as little as 15% to as much as 75% with broad community support of a goal of 50% of new units. Guidelines Publicly Owned or Sold Land Privately Owned Land Affordability Range Ownership / Rental Mix The community s goal is that 50% of all new housing units built on publicly owned or sold land are to be deed restricted affordable homes. The City plans to seek State Chapter 40R funding for infrastructure improvements for Forest Hills; projects must comply with Chapter 40R requirements including that at least 20% of all new units be affordable. All projects must comply with the Boston Inclusionary Development Policy requirements including that at least 15% of all new housing units be affordable homes. Note: This guideline does not apply to the Arborway Yard site, since a prior agreement between the City, the MBTA, and the CPCAY states that any housing developed on the site will be affordable. The community s goal is that 30% of all new housing units built on privately owned land are to be deed restricted affordable homes. The City plans to seek State Chapter 40R funding for infrastructure improvements for Forest Hills; projects must comply with Chapter 40R requirements including that at least 20% of all new units be affordable. All projects must comply with the Boston Inclusionary Development Policy requirements including that at least 15% of all new housing units are affordable homes. New housing should be affordable to a broad range of income earners with household incomes between 60% - 100% Area Medium Income. Both rental and ownership housing is desired with a slight preference for ownership housing. On large development sites include a mix of both rental and ownership housing. Unit Type Provide a mix of unit types with a focus on family housing ; include Studios, 1, 2, 3 and 4 bedroom units in the mix. Units must conform to the BRA Minimum Neighborhood Unit Size as follows: Studio 500 SF, One Bedroom 750 SF, Two Bedroom 900 SF, and Three Bedroom 1200 SF. Open Space Each building and site should include dedicated out door open space for family and children and provide active play spaces and structures. Page 23 of 27

Housing and Affordability September 23, 2008 Quality Design Submission Information All new buildings, including housing, must be well designed and be of high quality materials and construction. Affordable units should be indistinguishable from market rate units. Respondents should provide detailed information on the number and percentages of affordable units, level of affordability and project financially feasible. Page 24 of 27

Vehicular Parking & Service Access September 23, 2008 District Wide Vehicle Parking & Service Access Community Expression The community has expressed an interest in reduced car dependency by requiring the minimum parking necessary to allow retail and residential uses to flourish and the provision of spaces for car sharing that are easily accessible to local area residents and commuters. The community also encourages shared parking strategies to maximize off-hours use of commuter parking spaces and to minimize the overall need and cost for off street parking. Guidelines Off Street Parking The following are use specific requirements; fewer parking spaces may be provided for unique uses with low car ownership such as senior residential development. Residential: Min. 0.75 to max. 1.0 spaces per dwelling unit and, for building with more than 10 units, 1 visitor space per 10 dwelling units. Retail / Services: Business spaces less than 5,000 Sq. Ft. curb side only; businesses spaces greater than 5,000 Sq. Ft. min. 0.75 spaces to max. 1.0 per 1,000 Sq. Ft. Commercial / Non-retail: Min. 0.75 to max. 1.0 spaces per 1,000 Sq. Ft. Car Sharing A set-aside for dedicated parking spaces for shared vehicles (such as Zipcar) accessible to the general public (including local residents and commuters) is required. Demand Management Loading & Service Access Develop programs to encourage tenant / owner use of public transit, bicycling and walking for transportation including free or subsidized T passes, unbundling of parking from housing sales/leases, bicycling or walking bonuses and other strategies that discourage use of personal vehicles. All service loading and unloading facilities should be located off-street and designed to prevent truck back-up maneuvers in the public right-of-way. 1 Page 25 of 27

September 23, 2008 District Wide Bicycle Storage Community Expression The community has expressed an interest that all new buildings and uses should promote pedestrian, bicycle, and public transit use. Better pedestrian and bicycle connections throughout Forest Hills--especially north-south connections-- are a priority. Guidelines Bicycle Racks and Storage The following are use specific requirements which may vary for unique uses. Residential: Minimum of one (1) accessible, indoor, secure bicycle storage space per dwelling unit. And on-site, secure visitor bike rack(s) with a minimum of one (1) bike space per 10 dwelling units but no less than four (4) bike spaces per site. Retail: At minimum, the greater of one (1) accessible, indoor, secure bicycle storage space per 10,000 SF of net building area, or fraction thereof, or one (1) bicycle storage space per 10 parking space. And on-site, secure visitor bike rack(s) with a minimum of one (1) bike space per 10,000 SF but no less than four (4) bike spaces per site. Commercial Non-retail: At minimum, the greater of one (1) accessible, indoor, secure bicycle storage space per 10,000 SF of net building area, or fraction thereof, or one (1) bicycle storage space per 10 parking space. And on-site, secure visitor bike rack(s) with a minimum of one (1) bike space per 10,000 SF but no less than four (4) bike spaces per building. Page 26 of 27

Transportation & Streetscape Improvements September 23, 2008 District Wide Transportation & Streetscape Improvements Coordinated Plan In order to achieve the Community Vision for an improved and sustainably developed Forest Hills and to mitigate the impacts of new uses and buildings, the Forest Hills Community and the City of Boston seek a district wide approach to improving Transportation & Streetscape conditions. To promote the best outcome and coordinate the actions of the many development projects (sites) within the Study Area, each project (site) will be required to contribute funding to a Second Phase district wide Transportation & Streetscape planning and engineering effort. The Second Phase Transportation & Streetscape Plan will: Build upon community recommendations from the Forest Hills Improvement Initiative. Work with the City, State, and Community to analyze the engineering and financial feasibility of the Med and Long Term Transportation & Streetscape Improvement Recommendations. Finalize improvement recommendations. Produce 25% Construction Documents for the agreed upon improvements. Guidelines Funding In addition to City and BRA funding, the development proponents of the six study sites (including those designated through either MBTA or City disposition processes) and other major development sites in the study area each contribute funding for the Second Phase Transportation & Streetscape Plan. Funding requirements will be proportioned according to development size. Construction In addition to City and State capital funding, the development proponents within the Forest Hills Study Area will contribute to district wide improvements and / or construction district wide improvements associated with each project. Page 27 of 27