YUN GAO SCHOOL WORK. T E A 150 huntington ave. apt. sg9 boston ma, Program Illustration

Similar documents
Parcel 5. Level 1 Application March 12, Design Submittal POST ROAD RESIDENTIAL

The Interlace. Winner Urban Habitat Award. Singapore

PINE CURVE REZONING. Property does not meet criteria for open space preservation and is not a candidate for a park

Policies and Code Intent Sections Related to Town Center

La Veranda Summary Notes from DRAC meeting 4/05/16

PINE CURVE REZONING. BACKGROUND Purchased as two parcels in 2001 and 2002

Downtown Dubuque...it s a great time.

Bridgeport Comprehensive Waterfront Plan 2 nd Launch Neighborhood Meeting 3/9/16

DOWNTOWN RESIDENTIAL DISTRICT DEVELOPMENT OPPORTUNITES

DRAFT ROOSEVELT ROAD. District Recommendations. Figure 5.23 The Roosevelt Road Corridor

SIMPLOT OFFICE BUILDING

The Lincoln Neighborhood Corridor Plan. The LiNC

RA1.01. Project Description:

ACSA/AIA Housing Design Education Award

Challenge 2017 St. Peters Place and Innovation

KENDALL SQUARE INITIATIVE. Planned Unit Development Special Permit Application - SoMa September 8, 2015

PLAN ELEMENTS WORKSHOP. April 5, 2016

PIKE PINE RENAISSANCE: ACT ONE. October 19, 2017

This Review Is Divided Into Two Phases:

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2.

[PLANNING RATIONALE] For Site Plan Control and Lifting of Holding Zone By-Law 101 Champagne Avenue. May 23, 2014

Highland Village Green Design Guidelines

Town Center (part of the Comprehensive Plan)

Planning Board Hearing October 20th, 2016

Arapahoe Square Zoning Task Force Summary Meeting 9 January 27, 2016

The Master Plan Framework

(DC1) Direct Development Control Provision DC1 Area 4

Elderberry, Pioneer, Junction

Bethesda Downtown Plan

The West College Avenue Corridor Redevelopment Plan

ARLINGTON COUNTY, VIRGINIA

Sheridan Boulevard S TAT I O N A R E A P L A N S H E R I D A N B O U L E VA R D S TAT I O N A R E A P L A N

Comprehensive Plan & Station Area Zoning

PORT OF VANCOUVER WATERFRONT DEVELOPMENT. Concept Development Plan City Center Redevelopment Authority April 20, 2017

Sierra Springs Regional Commercial Master Site Plan Airdrie, Alberta Hopewell Development Corporation Project No May 26, 2010

6 May 14, 2014 Public Hearing

Description. Summary. MCPB Item No. Date: 01/17/13. Bethesda Crescent, Limited Site Plan Amendment, A, A

EcoVerde MADISON TO DOWNTOWN TO BEACH. Legend Highway Major Connection Major Street Local Street Proposed Access. Response to Tropicana Field RFP

CPD Rules and Regulations. Arapahoe Square Zoning and Design Standards/Guidelines

RIVERSIDE, Newton MA June 9, 2011

SPRC PRESENTATION #3 JUNE 22, 2015

urban design Introduction

Taming the Bus: Strategies for Urbanizing Suburban Transit. Seth Riseman, Utile, Inc. Architecture + Planning

McDonald s Restaurant - Purcellville Town of Purcellville Special Use Permit Statement of Justification July 24, 2014

SPRC PRESENTATION MAY 13, 2015

Property Name & Address [ Property Name ] - [ Property Address ]

Meeting Display Boards for Public Hearing on the Wilson Transfer Station Project held Tuesday, February 18, 2014.

PUBLIC PARKS AND FACILITIES, SERVING NEIGHBORHOOD RECREATIONAL AND COMMUNITY EVENTS BUILDINGS BUILT TO THE LINE AND ORIENTED TOWARD THE STREET

INTRODUCTION TO THE CONCEPTUAL SITE PLANS

KENDALL SQUARE INITIATIVE. Planned Unit Development Special Permit Application - SoMa September 8, 2015

Charles P. Johnson and Associates. Annapolis Landscape Architects

Welcome! to Keller Town Hall

Planning Board Briefing

SAN FRANCISCO URBAN DESIGN GUIDELINES

Lehigh Acres Land Development Regulations Community Planning Project

TUSTIN RED HILL DEVELOPMENT TUSTIN CITY COUNCIL WORKSHOP

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

Examples of Good Practice Highland Public Engagement in Highland Council Planning Craig Baxter: Planner, Highland Council Lerwick, Shetland Housing

4.9 Mendocino Avenue Corridor Plan Design Guidelines

To ensure human scale design, the towers step back from the facade of the building after four stories.

Project Overview. Washington s Most Exciting New Destination for Office and Retail PROPERTY GROUP PARTNERS

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of April 21, 2018 SUPPLEMENTAL REPORT

MEMORANDUM. This memo deals with proposed amendments to previously issued Development Permit No for Park Royal North.

Atlanta BeltLine Subarea 3 Master Plan Update

Neighborhood Districts

New Orleans East District 9, 10 & 11. St. Martin Brown & Associates

A larger version of this map is located on the last page of this PDF.

NEIGHBORHOOD 7: FEE LANE AREA. Aerial View of Briscoe and McNutt Dormitories

M E M O R A N D U M. Principal Planner. HEARING DATE: March 13, 2018 CASE NUMBER: PC

Sidewalks Street Lights

CITY OF MERCER ISLAND DESIGN COMMISSION STAFF REPORT

Project Overview. Washington s Exciting Destination for Office & Retail. For More Information, Visit CapitolCrossingDC.com PROPERTY GROUP PARTNERS

WORLD CLASS CITY. WORLD CLASS ASSET. WORLD CLASS TENANTS.

MEMORANDUM. Planning and Zoning Division Department of Community Development TO: FROM: DATE: July 23, SUBJECT: PLNSUB : Salt City Plaza

N Watt Avenue Corridor Plan. STOREFRONT WORKSHOP May 15-17, 2007

Manhattanville Development Proposal: Project Description

DANIEL RODRIGUEZ SELECTED WORKS

Wadsworth Boulevard S TAT I O N A R E A P L A N

A L F O N S O A R C H I T E C T S

Part 2 Common Elements

ITEM #8. Regional Smart Growth Program. Regional Smart Growth Program. Presentation Overview. Coast Highway Vision and Stategic Plan.

DOWNTOWN NORFOLK COUNCIL ACTION PLAN. Strategic Initiatives Focus Area Objectives. Departmental Focus Area Key Objectives

THE GAS PLANT DISTRICT MASTER PLAN SCENARIO 2. COMMUNITY MEETING August 6, 2018

ARCHITECTURAL DESIGN BRIEF

PLANNED UNIT DEVELOPMENT Date: May 4, 2017

Nagle Place Extension Workshop August 3, 2010

Route 7/15 Norwalk. Route 7/15 Norwalk Project Project Advisory Committee Meeting #5. Wednesday, November 14 th, Norwalk City Hall

EXISTING COMPREHENSIVE PLAN

TRANSIT ORIENTED DEVELOPMENT PINELLAS COUNTY MPO LIVABLE COMMUNITIES INITIATIVE PINELLAS COUNTY COMPREHENSIVE PLAN AMENDMENTS

WEST LOOP DESIGN GUIDELINES CHECKLIST

Rocky Mountain Public Media

Figure 3-1: Public Realm Plan

Waterfront Development Master Plan

V. Gateways GATEWAYS / V-1

Rapid Transit Implementation Working Group Transit Oriented Development and Transit Villages January 12, 2017

Goals and Objectives. Garfield Blvd. Washngton Park

CITY OF DUNEDIN, FLORIDA DEVELOPMENT REVIEW COMMITTEE MEETING Regular Meeting of December 12, :30 a.m. 11:00 a.m. AGENDA

Town of Westport. Design Guidelines Development Committee Public Informational Presentation

PROJECT OVERVIEW Project type: Project name: Phase One, $21.5M, completed May 2013 Location: Completion date: responsibility of the architect

Gateway commercial MIXED USE MASTER SITE PLAN. CITILAND AIrDRIE GATEWAY VENTURE INC. airdrie GATEWAY COMMERCE CENTRE. airdrie, ALBERTA FEBRUARY 2012

Transcription:

High Rise Studio, Graduate School Spring 2016 Instructor: Seth Riseman & Blake Middleton The project WINTHROP SQUARED is a mixed-use high-rise project located in downtown Boston. The bundled tower design allows the independence of each major program, yet remains the interaction in between, through public/semi public programs taking place at the optimal height. The ground floor design complex indicates the respect for the pedestrians and the city by offering various acessible route from different direction. The ground flexibility is intended to reactive the surrounding neighborhood. Program Illustration STRUCTURAL SYSTEM FACADE SYSTEM 2 4 Building Section 8 6 5 WEST SOUTH EAST NORTH 6 2 4 12 9 WEST Ground Floor Plan with Program Highlight 3 SOUTH Structure and Facade Strategies

Comprehensive Studio Spring 2015 Instructor: Ryan Salvas The BROADWAY BRIDGE project is an application of our previously developed comprehensive building system. The system enables a low energy consuming building that provides high quality indoor comfort. The site design also involves sustainable approaches on stormwater reuse, and by reconnecting the break points Boston Harbor Walk, which encourages pedestrians to join the urban scale recreation route as the same time as interacting with the building. Site Model @ scale 1/16 = 1-0 Building Components & Sustainability Illustration Section Model @ scale 1/4 =1-0 Section Model @ scale 1/4 =1-0 Wall Peel Away Section Structure Model @ scale 1/2 =1-0

Urbanism Studio Spring 2014 Instructor: Dan Adams The ASSEMBLY SQUARE project is an urban planning assignment. The design intention is to elevate the residential towers while to allow ground floor openness and the fluidity that encouraging people travelling from the site to the water front on the other side train track. Few node elements are anchored in the ground, and become the connector and medium outdoor spaces and the entrances indoor tower lobbies. Wall Peel Away Section View Direction: Direction: View The Direction Direction major major occupiable occupiable spaces spaces The should be be facing facing to. to. should Master Plan. Level 3 Architecture connects connects the the site site to to the the city. city. Architecture Involves multi-user. multi-user. Most Most accessible accessible zone. zone. Involves Physically and and logically logically connected connected with with Physically the rest rest of the world. world. the Roads can used by by auto-mobiles, auto-mobiles, Roads bikes and and pedestrian. pedestrian. bikes Wraps the the site, site, be be able able to to support support enough enough Wraps amount of of traffic. traffic. amount Residents Residents Convenient paths paths for for residents residents to to get get Convenient around. Comfortable Comfortable to to used used in in both both around. winter and and summer. summer. winter Public Public Recreation loop loop connect connect programs programs Recreation used for for general general public. public. can Provides Pedestrian Pedestrian Walk Walk and and Bike Bike Provides Traffic Traffic Profile Profile Edge Edge of the block. block. Accommodate Accommodate the the programs programs that that need need to to be be advertised. advertised. Roads can used by by auto-mobiles, auto-mobiles, Roads bikes and and pedestrian. pedestrian. bikes Wraps the the site, site, be be able able to to support support enough enough Wraps amount of of traffic. traffic. amount Organizer Organizer and and connector connector inside inside of the site. site. Seperate Seperate traffic. traffic. Bring Bring together together people. people. Provide Provide public public indoor indoor space. space. Connects ourdoor spaces. Connects ourdoor spaces. Recreation loop loop connect connect programs programs Recreation used for for general general public. public. can Provides Pedestrian Pedestrian Walk Walk and and Bike Bike Provides Traffic Traffic View Direction: Direction: View Architecture Architecture connects connects the the site site to to the the city. city. Involves Involves multi-user. multi-user. Most Most accessible accessible zone. zone. Physically and and logically logically connected connected with with Physically the rest rest of the world. world. the Public Public Profile Edge Edge of the block. block. Profile Accommodate the the programs programs that that need need to to Accommodate be advertised. advertised. be Organizer and and connector connector inside inside of the site. site. Organizer Seperate traffic. traffic. Bring Bring together together people. people. Seperate Provide public public indoor indoor space. space. Provide Connects ourdoor ourdoor spaces. spaces. Connects Convenient paths paths for for residents residents to to get get Convenient around. Comfortable Comfortable to to used used in in both both around. winter and and summer. summer. winter The Direction Direction major major occupiable occupiable spaces spaces The should be be facing facing to. to. should Residents Residents Connection Connection between between train train station station and and architecture architecture in in a a distance. distance. Connection between between train train station station and and Connection architecture in in aa distance. distance. architecture

HANDEL ARCHITECTS LLP Millennium Tower Supervisor/ Project manager: Stephen Matkovits The Millennium Tower project is a residential tower with an attached historical building renovated as office and retail spaces, located in downtown Boston. I joined the team when the CA phase started. My primary responsibilities included providing assistance on finishing construction drawings; receiving, distributing and help returning submittals and RFIs; and providing visual material for design decisions making. I have also attended coordination meetings between Owner, Architects and Contractors. Amenity Pool RCP 3D Models(base+pluggable tower) Rendering shown only for reference purpose Lobby and Salon Floor Plan Storefront Canopy Details

HANDEL ARCHITECTS LLP Cornell Tech Residences Supervisor: Deborah Moelis I joined this 26-story, 350 units residential tower project for its DDs through CDs. My responsibility was to create and draft construction sheets with drawings provided by consultants. Through this process, I studied the NYC building codes, ADA standards, and MEP and fire protection documentation rules. Rendering shown only for reference purpose 44 43 44 IONTYPETYPE- ION 43 4 42 IONTYPETYPE- ION CEILING CEILINGHEIGHT HEIGHT 41 33 ION TYPE- 3 ION TYPE- 3 31 Bathroom Elevations 33 Bond Street Apartments IONTYPETYPE- ION 32 IONTYPETYPE- ION 33 Floor Plan and RCP B Supervisor: David Margolis 21 During internship at Handel Architects, I was assigned rendering and model making tasked ION TYPE- 2 ION TYPE- 2 for few residential teams. By providing interior renderings for 33 Bond Street, I got basic knowledge on interior furnishing, rendering and adjusting process. For similar purposes, I also produced physical models and 3D print models to represent spaces. ION TYPE- 2 A-760 14 ION TYPE- 2 22 13 21 11 Interior Renderings 14 13 12