SWANA Northern Lights Chapter. EXTINGUISHING THE IQALUIT LANDFILL FIRE Winnipeg May 20, 2015

Similar documents
Essentials of Fire Fighting, Fourth Edition Transition Guide. Chapter 1: The History of the Fire Service (Essentials, Chapter 1)

Summary. firefighter training in Since that time the firefighter had attended semi-annual

2016 Annual Inspection Report

DEPARTMENTAL GUIDELINES CHAPTER 6 TACTICAL OPERATIONS

COMMON SENSE FIRE PREVENTION MEASURES FOR SOLID WASTE OPERATORS Presented by the Sacramento County LEA Program and Sacramento Fire Department

Compaction versus the value of airspace: Solid Waste Compaction in Sanitary Landfills

Fire Safety. Presenter, Kevin V Coleman September 14 th 2016

Wilson County Emergency Management Agency 110 Oak Street Lebanon, Tennessee 37087

Based on NFPA 1003: Standard for Airport Fire Fighter Professional Qualifications 2015 Edition

Cumru Township Fire Department 4/27/10 Standard Operating Guidelines Page: 1 of 6 Section 15.07

Chapter 17 Test. Directions: Write the correct letter on the blank before each question.

Truckee Meadows Fire Protection District Guide to Wildfire Terminology

FIRE PROTECTION BUREAU ACCREDITATION AND CERTIFICATION PO Box Olympia WA (360) FAX: (360) AIRPORT FIREFIGHTER

Fire Service Considerations A Primer for Building and System Designers. Society of Fire Protection Engineers Fire Service Committee

3.0 CARSON CITY FIRE HISTORY & FIRE RESOURCES

The Corporation of the District of North Cowichan Fire Protection Bylaw Bylaw 3340

Appendix J Framework Fire Prevention and Suppression Plan. Prepared by Idaho Power Company 1221 W Idaho Street Boise, ID 83702

Topic: Mechanical Ventilation Refresher Reference #: DG Level of Instruction: In service personnel Time Required: 3 hours

INSTRUCTOR GUIDE COURSE: FIREFIGHTER PRE-BASIC SESSION REFERENCE: 1 TOPIC: ORIENTATION AND FIRE BEHAVIOR LEVEL OF INSTRUCTION:

Fire Suppression Systems. Heavy Duty Mobile Plant Protecting Your Business. Head Office: 14 Baynes Place, Chelmsford, Essex, CM1 2QX

Elko County Human Resources Employment Opportunity Announcement

Serving you is our calling. Service Operations. Repairs Maintenance Upgrades Inspections Testing Trucks Apparatus Breathing Air Parts

I. It shall be the responsibility of the department officers to implement this operating guideline.

San Ramon Valley Fire Protection District GREEN SHEET

SPEARFISH FIRE DEPARTMENT POLICIES AND PROCEDURES

BP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 6

9S / 9E Inspection Worksheets. The fire department should complete the following sheets prior to inspection date

Angellala Creek ammonium nitrate explosion 5 September H Zuidersma, Principal DG Officer 25 August 2017

Guemes Island Fire Department

January 2018 Courses Hours Section # Fee Dates Times* February 2018 Courses Hours Section# Fee Dates Times* March 2018 Courses Hours

Wildfire in Travis County

IMPLEMENTING RECOMMENDATIONS FROM THE ANGELLALA CREEK AMMONIUM NITRATE VEHICLE EXPLOSION

U.S. Fire Administration/Technical Report Series 10 Million Dollar Marina Fire. Bohemia Bay, Maryland. USFA-TR-026/January 1989.

Fire prevention plans: environmental permits. The fire prevention measures in this guidance have been designed to meet these 3 objectives:

BUSHFIRE MANAGEMENT PLAN (BMP)

Composting: Don t Waste Your Waste!

Fixed plant and mobile equipment fires on surface coal mines

Fire Service Training Update

BYLAW 5542 *******************************************************************************

Management of a large scale pit wall failure at Ernest Henry Mine

Instructor Guide. Title: Tactical Approach to Chimney Fires. Time Required: 2 hours. Materials: PowerPoint presentation AV equipment

SYLLABUS. Departmental Syllabus. Fire Protection Equipment Alarm Systems. Departmental Syllabus. Departmental Syllabus. Departmental Syllabus

Tips for Maintaining and Enhancing Stormwater Management Areas

Objectives. NFPA Dust Specific Documents. Combustible Dust Process Hazard Safety Overview of NFPA Standards for Combustible Dusts

FIREFIGHTER II MANIPULATIVE SKILL OBJECTIVES

EM-3.1 SAFETY ALERT HEAVY EQUIPMENT VEHICLE FIRES AND SUPPRESSION SYSTEMS

Combustible Dust Hazard Recognition and Control NFPA Standards for Combustible Dusts

Mission. Vision. To set the standard for excellence and innovation in public safety. Department Description

Preventing and Controlling Fires at Compost and Mulch Sites

Triangle Land Conservancy Conservation Area Monitoring Report Carolina North

TRIPR FLAMMABLE LIQUID UNIT TRAINS

Glencoe Elementary School Parking Lot Retrofit 825 SE 51 st Street

January 2019 Courses Hours Section # Fee Dates Times* February 2019 Courses Hours Section # Fee Dates Times*

Fire Department Orientation / Organization

SOUTHERN AFRICAN EMERGENCY SERVICES INSTITUTE NPC Registration No. 2014/162285/08. Interior Industrial Fire Brigade Member- NFPA 1081, 2007

Scandinavian Shipyard / 2011 Vessel Fire whilst in Dry Dock. Major Incident Investigation

Table EXIT ACCESS TRAVEL DISTANCE a OCCUPANCY SYSTEM SYSTEM. A, E, F-1, I-1, M, b,d R, S-1. B c. F-2, S-2, U c

Recycling and Solid Waste Management Report

LA GRANGE FIRE DEPARTMENT JANUARY 2018

SCALES NW EMERGENCY ACTION PLAN

Solid Waste Management Department:

Exposed Geomembrane Cover Systems for Coal Ash Facilities

Fire Flow Requirements Standard

Unit 6: Fire Investigation

Rescues individuals in danger from fire, vehicle accidents, industrial accidents and other situation requiring extraction.

INCIDENT TYPE: Structure Fire Fire in mobile property used as a fixed structure

Hot Work Permit. Can this job be avoided? Is there a safer alternative? Permit No.:

PRINCE WILLIAM COUNTY FIRE AND RESCUE ASSOCIATION RESOLUTION LOG

ATTIC FIRES. Part 2 LIGHT SMOKE SHOWING

IFE Level 4 Certificate in Fire Science and Fire Safety

BROWNSVILLE VOLUNTEER FIRE DEPARTMENT

Countywide Recycling and Disposal Facility Weekly Progress Report 08/22/08

MASTER COURSE OUTLINE

NATIONAL FIRE PROTECTION ASSOCIATION Fourth Survey of the Needs of the U. S. Fire Service

Leak Location Geosynthetic Materials in Base Liner Systems. NY Federation SWANA. May, 2014

Centers for Regional Excellence. Downriver Fire Authority. Organization Committee Objective. Operations Committee Report 2007

Phumza Matitiba Assistant General Manager Eastern Cape

Self Expanding Foam Fire Suppression System SPECIFICATION SHEET Rev

Standardized Curriculum Form Ontario, Canada

Staff Report. Fire and Enforcement Services

AIRPORT FIRE FIGHTER ID#: STANDARD:

Emergency Response. Types of Emergencies

FIRE AND FIRE FITTING By Mr. Prashant Sansare

EASTERN ARIZONA COLLEGE Fire Department Operations II

Additional Materials: Instructor s PowerPoint, Question Files

NITOL INSURANCE COMPANY LIMITED

FIRE RANGER PREAMBLE. Crews specifically trained to attack and extinguish forest fires. Crew and necessary equipment normally transported by truck.

Safety Program. Eastern Electrical Testing Corporation 2 Skyline Drive Clarks Summit, PA (570)

1.1.0 Protocols for the response to fires involving MRI Machines

Watkins Glen Fire Department

Public Comment No. 3-NFPA [ Chapter 7 ]

Fire Flow Requirements Standard

Burned Dozer 230. I m just glad we get to do this the RLS process so others can learn something from it. Dozer Operator

WASTE REDUCTION AND RECYCLING PLAN FOR STOWE CELEBRATES SUMMER STOWE, VERMONT

FANERGY Far more than just a fan.

FRS 103. Firefighters Basic Skills II. 45 clock hours 3 credit hours

Hazardous Material Safety Program

Organic Residuals Collection Frequency and its Impact on Contamination Levels

International Safety Guide Chapter 30 for Inland Navigation Tank-barges and Terminals. Chapter 30 FIRE-FIGHTING

Chesapeake AIHA /ASSE Educational Seminar. Captain Stephen M. Hardesty Howard County Department Of Fire & Rescue Services Special Operations

Transcription:

SWANA Northern Lights Chapter EXTINGUISHING THE IQALUIT LANDFILL FIRE Winnipeg May 20, 2015 Prepared by: Dr. Tony Sperling, P.Eng. Landfill Fire Control Inc. Slide 1 of 26

Extinguishing the Iqaluit Landfill Fire AGENDA Site History Fire History Field Investigation Extinguishment Options Extinguishment Plan Implementation Risk Reduction

Satellite Photo Baffin Island and Frobisher Bay

June 19 Fire Spread across entire Old Phase, Day 31 Slide 4 of 50

2012 Aerial Photo 5 km Radius Slide 5 of 50

On most days smoke blowing north or south - June 28 Slide 6 of 50

Smoke Impacts at Airport Slide 7 of 50

Smoke from dump fire Drifting Into Town Day 31 June 19 Noticeable impacts in town (23 ug/m3 PM2.5) Slide 8 of 50

Site History Landfill established in 1995 Currently receives approx. 9,000 tonnes of MSW Operated by City of Iqaluit Little to no soil cover Footprint is limited, garbage is being placed with very steep side slopes Extreme risk of spontaneous combustion Slide 9 of 50

2010 Fire took 5 weeks to extinguish, overhaul used. Rough estimate that pile contained 10,000 m 3. Slide 10 of 50

Fire 6 Reported May 20, 2014 Day 1 Same Problem Corner as Fire 3, pile now contains 50,000 m 3 Slide 11 of 50

Day 2 Fire break completed, fire burning in Fireguard completed Day 2 Slide 12 of 50

Protecting Fireguard Day 4 Slide 13 of 50

Iqaluit FD Resources:20 full time, 15 volunteers, pumper, ladder, 3 EMS Slide 14 of 50

Iqaluit Fire Dept. Primary Mission Slide 15 of 50

Residents wanted the fire extinguished Slide 16 of 50

Air Photo for Hercules June 29 th, 2014 Old Phase Phase on Fire Fuel Tank Quanset Hut Active Face Fire Break Slide 17 of 50

Fire Time Line Six fires since 2010 Most Fires in same area problem corner 1. September, 2010 (5 weeks) 2. January, 2013 3. December, 2013 4. January, 2014 5. March, 2014 6. May 20, 2014 LFCI Mobilized June 28 th, 2014 August 25 th, 2014 LFCI Suppression Plan Completed July 1, 2014 Hellfire Mobilized to Site August 31 st, 2014 Fire Extinguished Sept. 16, 2014 Slide 18 of 50

The problem LFCI suspected that deep seated landfill fire has been burning since December, 2013. Extinguishment of deep seated landfill fires is very difficult. Fire Dept. resources are not set up and do not have the equipment or training to fight landfill fires. Multiple attacks are often required to fully extinguish a deep seated landfill fire. June 11, 2014 Council resolved that fire be extinguished as soon as possible with assistance of experts and help from Government of Nunavut. Slide 19 of 50

Particulate levels very high at landfill (downwind) Slide 20 of 50\

PM 10 in smoke 7500 ug/m 3 (42,000 ug/m3 highest) Slide 21 of 50

US EPA PM-2.5 Guidance Slide 22 of 50

VOCs PAHs PM 2.5 (nephelometer) NO2 O3 CO SO2 Slide 23 of 50

Airpointer data June 14 th -18 th All 24hr [X]averages below health standards Had a 2hr spike of 35 μg/m 3 Slide 24 of 50

Assessment of Smoke Impacts Prevailing wind directions usually keep smoke out of town. Strong winds usually provide a lot of dispersion, reducing concentrations. Available Environment Canada monitoring shows mostly no impact with few events of moderate impact. Airport site is downwind more often, requires additional monitoring. Air quality at landfill site is problematic. All staff at site to wear appropriate respiratory protection. Slide 25 of 50

LFCI Analysis of Fire History Operations and Fire history reviewed. Fire burning over previously combusted material Fire is deep seated Landfill operations do not use best practices Excessively steep slopes Inadequate cover to no cover No clean up and recompaction after fire extinguished Re-ignition of fire through spontaneous combustion very likely Slide 26 of 50

Composition lots of ash and inerts Slide 27 of 50

Sensitive Communications Repeater Slide 28 of 50

Strategies for extinguishing DUMPCANO Slide 29 of 50

Extinguishment Strategies Used in past and suggested Do nothing (not an option, too long) Bury with Dirt (possible collapse risk, steep slopes) Water Saturation (geometrically not possible) Inject Water (horizontal rig?? ) Overhaul Overhaul with Dirt Cover Carbon Dioxide/Nitrogen (not practical, logistics) Surface Foam Blanket (loss of blanket over time, costs) Inject Foam (Canadrill technology) Slide 30 of 50

More unconventional extinguishment strategies suggested by public Geomembrane Cover (melts, wont work) Geomembrane Welders Tarp (fire resistant tarp, placement impossible, seams not possible) Water Bombers (will not work fire deep, will run-off) Sea Ice / Ice Burial (environmental damage, slow) Accelerated Burn Accelerated Burn with Diesel (not acceptable) Blow up with Explosives (can t be controlled) Slide 31 of 50

Site Investigation June 29th Excavated 3 test pits to assess: Nature of waste Amount of Inert Temperature at depth Potential for accelerated burn Particulate release during work Slide 33 of 50

Excavated 3 test pits 3 4 m deep Slide 34 of 50

Cost of Overhaul and Quench Equipment (7 pieces) $24,500 / day Manpower (13 workers) $14,550 / day Supplies $ 17,733 / day Daily Cost: $56,783 / day Daily Production 1,000 m 3 Number of Days 60 Total Cost $3,407,000 Slide 35 of 50

Extinguishment Action Plan Secure funding for $2 to $3 million in fire suppression effort. Commence drafting health and safety plan for protecting fire fighters and contractors. Mobilize Hellfire Suppression and Tower Arctic Establish Water Supply and Quenching Pond Commence Overhaul Compact extinguished material and cover Demobilize Treat leachate Slide 36 of 50

Fire Fighting Resources Heavy Equipment 2 medium excavators 1 large excavator 1 Dozer (D7 or larger) 1 Loader ($24,500 @$400/unit on 10-12 hr days) Fire Suppression 3 monitors (500 to 1,000 GPM) 2 low head, high volume diesel pumps 2 high head pumps capable of 1,000 GPM 4 manifold system and hose 10 day supply of Class A foam at 1% Slide 37 of 50

Tower Arctic Contracting at work Slide 38 of 50

Required Resources Manpower Incident Command Team (3 people) 6 fire fighters from Hellfire 2 fire fighters from Iqaluit FD 4 Equipment operators (plus 2 spares) 2 Security Total 17 to 20 people Logistics Command Post radios common frequency Equipment storage Food supply Slide 39 of 50

Hellfire Quad Pod Monitor 1200 GPM Slide 40 of 50

Start-Up Health and Safety Orientation Establish Command Post Clear staging areas Establish water supply Construct Quenching Pond Prepare Extinguishment Laydown Area Prepare fire water system Prepare 4,500 m 3 lined drafting pond (1,500 GPM 2 days supply) Commence overhaul Slide 41 of 50

Nearest Creek 2 km away Slide 42 of 50

Lined Water Supply Pond Slide 43 of 50

Daily Operations Safety Briefing Overhaul Operations 15 minute break every two hours 30 minute lunch break 10 to 12 hours of productivity Target productivity 1,000 m 3 /day, but may be much slower if lots of heat and dry ash Volume roughly estimated at 50,000 m 3 Slide 44 of 50

Fire Fighter and Excavator working fire

Saturation in Quenching Trench

Actual Cost of Overhaul Hellfire Fire Fighters $1.0 million Arctic Tower Contracting $800K Project Managers $200K Public Works $300K Iqaluit Fire $115K Retention Ponds $750K Flights $600K Logistics $200K Total Cost $3.965 million LFCI Estimate $3.407 million Slide 47 of 50

Landfill not operated following best practice. Operations virtually guaranteed this problem would happen. In future you MUST reduce slopes to 3H:1V. In future you MUST build landfill in cells. In future you MUST cover cells with 300 mm of DIRT. In future you should divert cardboard and clean wood and periodically burn it or compost. In future you should recycle and ship plastics back. Avoiding Future Problems Slide 48 of 50

Lessons Learned Avoiding compaction and good soil cover is penny wise but pound foolish. Landfill fires overwhelm small town fire dept. resources, mutual aid critical. Landfill fires do not burn out on their own, they smoulder and smoulder. Air quality impacts near landfill will be severe, respiratory protection for all is critical. Extinguishment could cost millions, having a plan to secure funding is very important. Provincial and Federal Govt. provided only limited support. Slide 49 of 50

Decisions you make today will affect your kids tomorrow. Slide 50 of 50