Weston 2021 Design Charrette / may 2011 Part 1 of the Weston 2021 Initiative led by the City of Toronto

Similar documents
Urban Land Institute Toronto / January John Street Revitalization. Public Realm Improvement Plan

GUIDELINES WESTON LOCATION: URBAN DESIGN GUIDELINES

Urban Design Manual PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction. Station Study Areas

Lambeth Main Street Streetscape Improvements

Mark-up of the effect of the proposed Bronte Village Growth Area OPA No.18 on the text of section 24, Bronte Village, of the Livable Oakville Plan

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2.

This Review Is Divided Into Two Phases:

The Master Plan Framework

appendix and street interface guidelines

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference


Downtown Streetscape Manual & Built Form Standards

DOWNTOWN PARKS & PUBLIC REALM PLAN

Contact: Alex Taranu ( ) or Karl Walsh ( )

7Page 91 CLEMMONS COMMUNITY COMPASS 7 COMMUNITY CHARACTER

Elliot Park 2. Neighborhood Master Plan. Historical Perspective

Roanoke Rapids Streetscape Master Plan. City Council Presentation

Status Update (2006 vs. Now) Citizen s Advisory Committee February Plan for Prosperity

GOLDEN MILE SECONDARY PLAN. Community Consultation Meeting #3 June 26, 2018

38 Queen s University Campus Master Plan Part 1

A Vision Statement. In Progress

Study Area. Capitol Way. Greening America s Capitals 11/13/2014. A Greening America s Capitals Project

11.5 Kipling Avenue Corridor Secondary Plan

TOWN COUNCIL / PLANNING COMMISSION

STREETSCAPE MANUAL ONLINE TRAINING SESSION 1: Background

Clairtrell Area Context Plan

Introduction. Intent of the Plan. Urban Design and Land Use Approach

CHAPTER 5: GUIDING PRINCIPLES

McCowan Precinct Plan Study Background & Deliverables

South Yonge Street Corridor

St. Clair Avenue West Area Transportation Master Plan

Animating the Rideau Canal December 2013

WELCOME and introduction

Chairman and Members of the Planning and Development Committee. Thomas S. Mokrzycki, Commissioner of Planning and Building

The Project. In 2013, construction was completed between 100 Street and 102 Street.

PLAN ELEMENTS WORKSHOP. April 5, 2016

SECTION TWO: Urban Design Concepts

Town Center (part of the Comprehensive Plan)

Public Consultation Summary: Lakeview Place Making Workshop January 30, 2008.

Implementation Guide Comprehensive Plan City of Allen

open house 3 CITY OF SALEM Downtown Streetscape Plan

Derry Green Corporate Business Park

Workshop 3. City of Burlington Waterfront Hotel Planning Study. September 14, The Planning Partnership

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

Tonight s Agenda. 7:45 p.m. Next Steps 8:00 p.m. Close

C I T Y O F T O R O N T O L A W R E N C E A V E N U E E A S T S T U D Y. Northwest Corner of Birchmount Road and Lawrence Avenue East

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

Welcome. Community Consultation Meeting November 28, Review and discuss the Bathurst Quay Neighbourhood Plan Framework

February 7, 2012 WESTON Toronto ULI TECHNICAL ASSISTANCE PANEL REPORT

Welcome to the Oakridge Centre Open House

Elliot Park 4. Neighborhood Master Plan. The Master Plan

Planning Board Briefing

Dan Harris 74 Church Street Weston ON M9N 1N3

ARLINGTON COUNTY, VIRGINIA

A BLUEPRINT FOR BROCKTON A CITY-WIDE COMPREHENSIVE PLAN

1 October Dear Citizens of Charlotte and Mecklenburg County,

LAKEVIEW LOCAL ADVISORY PANEL. THE COPORATION OF THE CITY OF MISSISSAUGA THURSDAY, NOVEMBER 18, 2010

Hockessin Community Redevelopment Plan

PART 1. Background to the Study. Avenue Study. The Danforth

01 the vision NEW LYNN IS WAITING FOR THE GREAT LEAP FORWARD

Dyersville Downtown Plan. Open House October 24, 2017

About Momentum Midland

13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154

THE GARDEN CITY PLAN. City of St. Catharines Official Plan. City of St. Catharines

QUEEN-RIVER SECONDARY PLAN

Prosperity Hucks Area Plan. Transportation and Planning Committee May 11, 2015

Mount Dennis Mobility Hub Study Public Meeting December 12 th, :30pm 9:30pm York Memorial Collegiate, Cafeteria 2690 Eglinton Avenue West

URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018

hermitage town center

Old East Village Dundas Street Corridor Secondary Plan

THEMES, VISION, + PRINCIPLES

Shared Principles and Emerging Plan Directions

Lakeview and Port Credit District Policies Review Public Engagement Process

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions

East Bayshore Road Neighbourhood

Complete Street and the EA Process. Queen Street Corridor- Brampton Golden Mile

PROPOSED REDEVELOPMENT OF THE GLEN ABBEY GOLF CLUB. STREETSCAPE DESIGN STUDY (excerpt from the Urban Design Brief) TOWN OF OAKVILLE.

GO Station Mobility Hubs: Draft Precinct Plans. Committee of the Whole July 12, 2018

St. Lawrence Neighbourhood Focused Area - Official Plan Amendment Status Report

Agenda. 7 Wright Crescent Urban Design Study. Public Meeting and Urban Design Workshop. 1 INTRODUCTION AND BACKGROUND (City of Kingston)

Potential Green Infrastructure Strategies May 6, 2015 Workshop

Plan Framework Report. Attachment A

SLIDE TITLE TRANSIT-ORIENTED DEVELOPMENT PLAN RED-PURPLE BYPASS STUDY AREA PUBLIC MEETING #2 RED AND PURPLE MODERNIZATION. RPM TOD Plan Update

King-Spadina Secondary Plan Community Consultation Meeting. Michelle Knieriem, City Planner October 11, 2017

PIKE PINE RENAISSANCE: ACT ONE. October 19, 2017

burlington mobility hubs study Downtown Burlington Mobility Hub

Downtown Whitby Action Plan

The Lower SaLuda Greenway

Public Open House #1

Visioning Statement and Guiding Principles

Tauranga City Centre Spatial Framework

Courtice Main Street Study Community Vision Workshop PLANNING SERVICES DEPARTMENT

V. Vision and Guiding Principles

Corridor Transformation Strategy

Historic Yonge Street HCD Study Public Meeting #2

Robbinsdale LRT Station. CDI Development Guidelines. August Overview

LAND USE AMENDMENT DOWNTOWN COMMERCIAL CORE (WARD 7) MACLEOD TRAIL SE AND 5 AVENUE SE BYLAW 254D2017

Comprehensive Plan Advisory Panel Meeting #3

SPRINGHILL LAKE TRANSIT VILLAGE

Transcription:

ATTACHMENT 3: Weston 2021 Design Charrette Report Summary Weston 2021 Design Charrette / may 2011 Part 1 of the Weston 2021 Initiative led by the City of Toronto WESTON 2021 DESIGN CHARRETTE CITY OF TORONTO i

CONTENTS Overview............................................... page 02 Site Description......................................... page 04 Background............................................ page 05 Key Messages From the Public Workshop.................. page 06 Key Messages From the Focus Groups.................... page 07 Key Design Directions Overall Central Weston Community.................. page 08 Focus Area 1- Weston Town Centre.................. page 14 Focus Area 2- Metrolinx Station Area.................page 18 Focus Area 3- Tower Renewal Area................... page 22 Appendices............................................. page 27 1. Charrette Agenda and Invitation 2. Design Charrette Information Sheet 3. Weston 2021 - Design Initiative Overview 4. Participant Feedback Summary 5. Design Group Presentations WESTON 2021 DESIGN CHARRETTE CITY OF TORONTO 1

OVERVIEW Weston Design Initiative Purpose of the Charrette The Weston 2021 Design Initiative is a long-range, neighbourhood revitalization effort being coordinated by the City of Toronto with the participation of Metrolinx. The Weston 2021 Design Initiative consists of three parts: Design Charrette. A focused effort that allows a large number of ideas to be quickly explored and then distilled into a few key, practical short and long-term design objectives. The design charrette was a three day event, held between May 3rd to May 5th, 2011 at the Yorkwest Active Living Centre, 1901 Weston Road. Working sessions were open to public and involved the community, key stakeholders and City of Toronto staff. Urban Land Institute (ULI) Technical Assistance Panel (TAP). A review in detail of the development opportunities for one or more key neighbourhood sites by volunteer members of the Urban Land Institute. The TAP workshop was held between the May 16th to May 17th, 2011. The TAP Panel report is the subject of a separate report. Weston 2021 Action Plan. Both the Charrette and ULI TAP reports will serve as the background for a more intense and involved effort led by the City of Toronto. The intent of the Action Plan is to guide revitalization, redevelopment and capital improvements. 2 CITY OF TORONTO WESTON 2021 DESIGN CHARRETTE The aim of the charrette was to provide inspiration for how the village of Weston can position itself to grow and thrive over the next decade. The results for the Charrette will inform the ULI TAP and the Weston 2021 Action Plan. Partners The partners who contributed to the development and organization of this event included: Office of Councillor Frances Nunziata City of Toronto (Planning, Urban Design, Tower Renewal) Metrolinx Swerhun Facilitation & Decision Support Urban Land Institute (ULI Toronto) du Toit Allsopp Hillier Urban Strategies Fleisher Turner and E.R.A Architects Public workshop Design Charrette working session

Charrette Structure The charrette schedule was structured into the following 3 parts: A. Public meeting - Participants identified key issues that should be considered by the design teams, current strengths and weaknesses of Weston and ideas for the vision of Weston s future. B. Central Weston Community - Development of circulation plans, parks and open space and streetscaping plans. C. Detailed design concepts - design work focussed on the following three areas: 1. Weston Town Centre The area around Weston Road north of Lawrence Avenue West. 2. Weston Metrolinx Station Area The area of the new Go and Air Rail Link Stations southeast of Weston Road and Lawrence Avenue West. 3. Tower Renewal Area The apartment towers at 1765-1775 Weston Road. Weston 2021 Design Charrette focus areas WESTON 2021 DESIGN CHARRETTE CITY OF TORONTO 3

SITE DESCRIPTION The site is defined by: The Humber River to the west. Church Street to the North. Victoria Avenue to the South. Rosemount Avenue / Sam Frustaglio Drive to the East including Lawrence Business Park and CR Marchant Middle School. Church Street Humber River Rosemount Avenue Victoria Avenue Aerial photograph of the site 4 CITY OF TORONTO WESTON 2021 DESIGN CHARRETTE

BACKGROUND Weston is an area in Toronto with a rich history as a community. The community has grown and evolved since it was first settled in the 1800 s. The key background events leading up to this Design Initiative are: Weston was a thriving independent village with several local industries that formed the backbone of the local economy until the 1960 s-70 s when industrial uses began leaving the area. In 1967 Weston became part of the Borough of York and in 1998 it was amalgamated into the City of Toronto. Today Weston is recognized as a Priority Neighbourhood by the City of Toronto. It is an area in need of revitalization. Metrolinx is building an Air Rail Link between Pearson International Airport and Union Station with bi-directional transit service every 15 minutes. A stop at Weston Station is planned as part of the project. Resident concerns around the new transit services include road closures, frequent train traffic and the relocation of the existing GO Station to south of Lawrence Avenue. Present day Weston Road The Humber River Historic Main Street Weston. Image courtesy of the Weston Historical Society Main & Dufferin (Weston & Lawrence) 1907. Image courtesy of the Weston Historical Society WESTON 2021 DESIGN CHARRETTE CITY OF TORONTO 5

KEY MESSAGES FROM THE PUBLIC WORKSHOP Strengths Weston is a walkable neighbourhood. Historic low rise scale of Main Street gives Weston an unmistakable identity of a town. The Humber River Park and trail is an incredible neighbourhood and city wide asset. The Farmers Market, held at the Toronto Parking Authority surface parking lot (TPA lot) is a positive community event. There is a large community orientated residential base within the neighbourhood. The new GO Station will improve rail connections to downtown and the airport. Unique heritage. Challenges / Weaknesses Lack of connectivity, not only physical connections but also between forms of transit (i.e. TTC and GO). Lack of community cohesion (i.e. social, economic and cultural). Weston Road streetscape is in poor condition and is uninviting. Sidewalks are narrow and street furniture does not facilitate discussion. Concerns about safety and perception of crime. Lack of community space and underused community spaces. The business mix along Weston. Poor access to open spaces. The rail corridor is seen as a barrier. Poor pedestrian environment at the corner of Weston Road and Lawrence Avenue. Schools are overcrowded. Loss of vehicle connection along John Street resulting from depression of rail tracks. Vision More connectivity, not less. Improved access to parks and open spaces. Strengthen east/west connections. Improve community cohesion. Improve connections across the rail corridor. Institutional/ education facility that increases street activity in a positive way. Rejuvenate the businesses along Weston Road. Reinstate the pattern of blocks and streets to improve connectivity. Create a bicycle identity for the area (i.e. retail, bike transit, bike repair, bike museum, Bixi bikes, bike lockers). Transform the dark tunnel below the tracks at Lawrence Avenue into a positive space. 6 CITY OF TORONTO WESTON 2021 DESIGN CHARRETTE

KEY MESSAGES FROM THE FOCUS GROUPS Focus Groups During the Charrette focus groups where conducted with: Local businesses Development community Resident leaders Community services Heritage Local schools The Key Messages There is a need to revitalise Main Street. A need for catalyst development within the community. The Weston GO Station and the future development of the TPA site can act as catalyst for revitalization. There is a need for catalyst public spaces. New development should relate to the pedestrians through commercial/ retail uses at street level. Focus on markers that trigger investment. The markers typically start with social drivers such as artists, coffee culture etc. Provide investment certainty. Establish open space allocation and density targets as first steps. Quality urban environment and public spaces can be a catalyst for attracting investment. Public investment will need to be funded by the private sector. Community connections between Weston and the larger area. Crime Prevention though Environmental Design (CPTED). Community space is needed. I.e. youth, children, seniors etc. Restoration of the key heritage assets, including Weston Road would improve the identity of the community. View looking towards 31-35 King Street Little Avenue 1765-1775 Weston Road WESTON 2021 DESIGN CHARRETTE CITY OF TORONTO 7

OVERALL CENTRAL WESTON COMMUNITY KEY DESIGN DIRECTIONS The key issues identified for the Overall Central 1. Many Communities - ONE Main Street Weston Community are: The low rise scale and finer gain of frontages along improvements to create an attractive destination the Main Street were viewed as distinctive and and reinforce the identity of Weston Road as the characteristic of Weston Village. However, the central spine linking its surrounding communities. streetscape is in poor condition, development fronting the street has been uncoordinated and the Lack of connectivity between destinations and open spaces, particularly the Humber River. Location plan movement through and around the community. A lack of safe street routes in the neighbourhood and concerns about perception of safety. Lack of community cohesion. Enhance street links and pedestrian routes connecting with Weston Road to improve overall local business mix could be better. Weston Road Streetscape and shopfront New developments within the core section of Weston Road to be of a 2-3 story scale similar to the historic scale of Main Street. Either side of the core new developments should be encouraged to rise to 8 storeys (bookend the Main Street). The 4 key design directions identified for the redevelopment and regeneration of the Weston Community area are: Main Street revitalization - Many communities - ONE Main Street The Village - a finer grain of streets and lanes. Linking the Metrolinx Station to the Farmers Market. Network of open spaces - the Emerald Necklace Lawrence Avenue n to es W ad Ro 8 CITY OF TORONTO WESTON 2021 DESIGN CHARRETTE

2. The Village - A finer grain of streets and lanes 3. Link the Metrolinx Station to the Farmers Market 4. Network of Open Spaces - The Emerald Necklace Introduce a finer grain block pattern of intimate scaled lane-ways and mews that connect with Main Street, reinforce neighbourhood connections and unlock further development potential. Create a new retail/ cultural development at the TPA site (F). Active frontages on ground floor level. New open space in the form of a plaza, square or Market Street for the farmers market and community/ cultural events. There are opportunities for the Market to spill out onto John Street or down South Station Street. 4-6 storey building heights within the Village. Elsmere Avenue / King Street and the Metrolinx Station - taller buildings of up to 13 storeys adjacent to the Village. Transform South Station Street into a pedestrian priority street to link the Farmers Market/ TPA (F) site to the Metrolinx Station (M). Long term opportunities for live/work artists workshops along South Station Street or for the market to spill out down the Street (similar to Kensington Market, Toronto). Create an Emerald Necklace of heritage tree lined streets to connect a network of open spaces and the Humber River. Extend the Memorial Gardens to Main Street to create a new open space and gateway to the Humber River. (E) Create a link between the Metolinx Station and the Humber with a tree lined, pedestrian friendly street along Bellevue Crescent. Landscape over infrastructure (K) - New community/ schools green open space over the proposed lid of the depressed railway tracks. K F F E Lawrence Avenue M Weston Road Lawrence Avenue M Weston Road Lawrence Avenue Weston Road WESTON 2021 DESIGN CHARRETTE CITY OF TORONTO 9

Character Areas Main Street Future developments to be of a 2-3 storey in height with narrow blocks similar to existing. K The Village Future developments to be 4-6 storeys in height. Elsmere Avenue / King Street and the Metrolinx Station Taller buildings of up to 13 storeys adjacent to the village. A successful example of the how a taller building can contribute to the overall urban form without compromising the charm of a finer grained neighbourhood is the Distillery District in Toronto. E F Active frontages on the street level through the use a podium and set backs to create positive edges. Bookend the Main Street KEY Main Street The Village M Either side of the core blocks of 2-3 storey frontages along Weston Road, new developments should be encouraged to rise to 8 storeys. F M E K Elsmere Avenue / King Street and the Metrolinx Station Bookend the Main Street Farmers Market Metrolinx Station New open space linking the Humber to Main Street New open space on proposed lid of depressed railway tracks 10 CITY OF TORONTO WESTON 2021 DESIGN CHARRETTE

Streets Plan Streets are a major contributor to the urban public space system. A streetscape plan identified possible new streets, lanes and gateways. Direction To develop an accessible network of streets and public spaces that respond to and reinforce the neighbourhood s varied character. Streets plan WESTON 2021 DESIGN CHARRETTE CITY OF TORONTO 11

Streetscape Character Main Streets: Weston Road and Lawrence Avenue Parkway Streets Lanes Improve the quality and character of materials, details and furnishings on the pedestrian boulevards. Urban in character, primarily retail commercial uses at grade. Weston Road 2 Options 20 m public right-of-way: With Parking 2 bike friendly through travel lanes, 2 parking lanes, 4.0 m boulevards, suitable street tree soil volumes. Without Parking 2 bike friendly through travel lanes, a full time centre left turning lane, 4.5 m boulevards, suitable street tree soil volumes. Weston Road : No parking (King, Church, Wright/Hickory Tree, Bellevue Crescent). Streets that either cross or meet Weston Road and connect to the Humber River corridor parks and open space system. Improve the quality and character of materials, details and furnishings. Provide suitable street tree soil volumes for planting large canopy trees. Demarcate as being parkway streets through the use of street furniture, signs or some other visual means for directing pedestrians, cyclists or vehicles. 20 m public right of way using existing curb to curb dimensions. Allow for one parking lane and two bike friendly through travel lanes. Rear service lanes or pedestrian lanes. 5 to 6 m right-of-way. New and existing lanes already in use. Extend the lane network throughout the study area. Surface in a higher grade material than asphalt. Laneway lighting either in catenary or wall-pack forms. Opportunity to use laneways for stormwater management similar to Chicago Green Alleys initiative. Weston Road : With parking Parkway Streets Lanes 12 CITY OF TORONTO WESTON 2021 DESIGN CHARRETTE

Streetscape Character Precedents: The Best of Toronto The prescription for Weston is to learn from the best and most appropriate streets in Toronto: Keep it simple, use what works and what we know can be done. The Village streets can happen in advance of long-term redevelopment, and support the initial moves such as the Farmers Market and lower density infill. Weston Road and Lawrence Avenue = Dundas Avenue West in the Junction Clear footpaths. Uncluttered above grade, below grade utilities. Simple concrete curbs and pavement in pedestrian boulevards. Asphalt travelway. Elegant character street lighting at vehicular level. Street trees. Easy to maintain and replace. John Street + South station road = St. Nicholas Street in Yorkville Clear footpaths. Uncluttered above grade, below grade utilities. Simple concrete curbs and pavement in pedestrian boulevards. Interlocking unit paver/paleotec in travelway. Elegant character street lighting at pedestrian level. Street trees. Easy to maintain and replace. Lanes and Mews = St. Joseph Street in Yorkville No sidewalks - Curb and gutter or gutter alone. Interlocking unit paver/paleotec in travelway. Lighting either wall mounted or catenary overhead. Dundas Avenue West St. Nicholas Street St. Joseph Street WESTON 2021 DESIGN CHARRETTE CITY OF TORONTO 13

FOCUS AREA 1 - WESTON TOWN CENTRE KEY DESIGN DIRECTIONS The Village The introduction of a fine grain of intimate scaled lane-ways and mews that connect with Main Street and reinforce neighbourhood connections could unlock further opportunities for development and regeneration. Direction Flexible block pattern, plan of subdivision to provide a framework to direct growth in an overall cohesive manner. Location plan Block widths and height of new buildings respectful of the historic scale of buildings along Weston Road. A fine grain of intimate scaled lane-ways and mews that New building heights respectful of historic scale along Weston Road connect with Main Street and reinforce neighbourhood connections. Active frontages - ground floor retail / commercial. A new open space in the form of a plaza or square for F the Farmers Market located on axis with the Metrolinx Station. Transform South Station Street into a pedestrian priority street to link the Farmers Market/ TPA (F) site to the Metrolinx Station (M). M Making a new connection between the Metrolinx Station and the Farmers Market 14 CITY OF TORONTO WESTON 2021 DESIGN CHARRETTE

Built form Concepts Weston Road - existing 2-3 storeys, low scale fronting Weston Road New lane with active frontages and 3-4 storeys Larger floorplate retail on corners Potential - taller buildings set back from Main Street WESTON 2021 DESIGN CHARRETTE CITY OF TORONTO 15