Welcome to the Jericho Reservoir Project Open House is responsible for supplying clean, safe drinking water to over 2.4 million residents in the region. Operating our vast drinking water system with a growing population requires constant upgrades, improvements, maintenance and expansion. To meet the growing demand for drinking water in communities south of the Fraser River, needs to construct a new, above-ground at 20400-73A Avenue in the Township of Langley. SERVICES AND SOLUTIONS FOR A LIVABLE REGION 1
How does water get to your home? and its local governments work together to supply clean, safe drinking water to the region. 1 Watershed Natural Reservoir is responsible for protecting and providing the region s water supply, including: protecting our watersheds, treating and ensuring the quality of our water, supplying water directly to our local governments, and planning for future supply and demand. Our local governments are responsible for providing water to residents and businesses, enforcing regulations, utility billing, and where used, water metering. 2 Raw Water Main Reservoir Dam Metro Vancouver Pump Station 5 6 Water Reservoir Water Main 7 8 Local Government Pump Station 3 Water Treatment Facility Water main connects to plumbing inside your home 4 11 9 10 Local Government Water Main Local Government Water Distribution Mains
Ensuring the reliable delivery of clean and safe drinking water to Township of Langley and City of Surrey residents and businesses. Project overview To meet the growing demand for drinking water, needs to construct a new, above ground at 20400-73A Avenue in the Township of Langley. Phase 1 of the Jericho Reservoir Project includes: An above-ground One above-ground valve chamber and three underground valve chambers Piping that will connect to existing water mains Phase 2 of this project is planned for 2040. Project schedule - Phase 1 Now Fall 2016 - Summer 2017 Fall 2017 - Summer 2019 PROJECT ACTIVITY Preliminary Design Detailed Design Construction Stakeholder meetings and Second Open House Regular community updates, COMMUNITY first Open House and Community Meetings consultation events, and OUTREACH prior to construction meetings when required 3
Preliminary site layout 73A Avenue Future Township of Langley 204 Street 80m 40m Proposed Smith View Park Phase 1 Phase 1 Maintenance access road Proposed access ramp to rooftop Proposed staircase access to rooftop Phase 2 Proposed new parking area Project area Existing Township of Langley pump station Future Township of Langley pump station expansion (to be constructed between Phase 1 and Phase 2) Proposed plaza Phase 1 Phase 2 Existing Township of Langley Jericho Hill water tank New trees and shrubs Existing trees and shrubs Future Township of Langley 72B Avenue 4
JERICHO RESERVOIR PROJECT Preliminary construction site plan Future Phase 2 Phase 1 Construction fencing Site trailers and construction lay-down area Existing Township of Langley pump station Future Township of Langley pump station Reservoir valve chamber Future Township of Langley 72B Avenue Construction access Future Township of Langley 204 Street 73A Avenue Phase 1 Phase 2 Existing Township of Langley Jericho Hill water tank 5
Southwest aerial view EXISTING TANK SMITH VIEW PARK EXISTING CELL TOWERS FENCE FOR SMITH VIEW PARK FENCE FOR SPORTS COURTS Future 204 St PLAZA Southwest aerial perspective Note: Renderings are subject to change. 6
Water feature has included a circulating water feature that will re-use storm water. The water feature will be turned off in the dry season. SMITH VIEW PARK CIRCULATING WATER FEATURE PLAZA Southwest perspective Examples of potential water feature details Note: Renderings are subject to change. 7
Options for interpretive features is working with the Township of Langley to include interpretive features on the. We are considering three themes: historical, educational or artistic. We are interested in hearing from you. Which theme would you prefer to see on the? Please take a sticker and place it on your preferred theme. FULL HEIGHT INTERPRETIVE FEATURE INTERPRETIVE FEATURES AT BASE OF RESERVOIR TO RUN LENGTH OF WALLS Historical Educational Artistic Note: Renderings are subject to change. 8
Southeast view with plantings STAIRS TO ROOFTOP SMITH VIEW PARK POTENTIAL PLANTINGS POTENTIAL PLANTINGS Southeast perspective Note: Renderings are subject to change. 9
Northwest perspective SMITH VIEW PARK EXISTING TOWNSHIP OF LANGLEY PUMP STATION BUILDING FENCE FOR SPORTS COURTS FENCE FOR SMITH VIEW PARK Northwest perspective Note: Renderings are subject to change. 10
Rooftop access point STAIRS TO ROOFTOP SMITH VIEW PARK Southeast perspective Note: Renderings are subject to change. 11
Preliminary landscape design will carefully select plant species for the new landscaped areas. Some of the features we are looking for include: Trees with mature heights that allow for broad canopies and shade for open areas Trees that are shaped in a way that allows for views between Drought resistance Characteristics, such as flowers and small fruit, that contribute to biodiversity and support species like bees and songbirds Native species when possible Proposed Smith View Aesthetics Park Phase 2 Existing Township of Langley pump station Future Township of Langley pump station Phase 1 Existing Township of Langley Jericho Hill water tank Proposed plaza Existing trees Existing dense trees/shrubs New trees New dense shrubs 12
Proposed plaza design and seating is working with the Township of Langley to develop plans for a feature plaza with seating. The plaza would be located near the southwest corner of the by the water feature. To help shape the proposed plaza, please provide us with your input on what kind of seating and aesthetic features you would like included in the plaza design. Please use the provided handouts and stickers to show us your ideal plaza design. Proposed plaza near southwest corner of Future Township of Langley 204 Street SIDEWALK CIRCULATING WATER FEATURE JERICHO RESERVOIR SIDEWALK SIDEWALK Paving inset to represent pipes below Future Township of Langley 72B Avenue Valve chamber hatch set into paving 13