ROCKTON DOWNTOWN STREETSCAPE MASTER PLAN. Plan Commission Presentation April 10, 2018 Teska Associates Christopher Burke Engineering

Similar documents
ROCKTON DOWNTOWN STREETSCAPE MASTER PLAN. Village Board Presentation May 8, 2018 Teska Associates Christopher Burke Engineering

Elm Street Business District: Streetscape and Signage Plan

SOUTH UNIVERSITY Street Design Alternatives in Progress

Main Street Reconstruction From Ninth Line to Stouffer Street. Town of Whitchurch-Stouffville. Public Information Centre

City of Plattsburgh DRI: Downtown Streetscapes & Riverfront Access. Downtown Streetscape and Riverfront Access Design

BRADENTON RIVERWALK EXPANSION MASTER PLAN

PUBLIC RIGHT-OF-WAY IN THIS CHAPTER PUBLIC REALM

VEHICULAR AND PEDESTRIAN CIRCULATION

BUSINESS DISTRICT DESIGN GUIDELINES

Broadway Avenue Streetscape Project City of Albert Lea. Streetscape Design Committee Meeting October 29, 2012

Maplewood Avenue Downtown Complete Street Project

SOUTH UNIVERSITY Street Design Setting a Direction for Schematic Design

open house 3 CITY OF SALEM Downtown Streetscape Plan

Jewel. Platte. of the. Plattsmouth Main Street Landscape Architecture by HDR

TURN TO THE RIVER CITY PLAZA LANDSCAPE DESIGN CONCEPT May 25, 2016

MAIN STREET RECONSTRUCTION PROJECT PRE-CONSTRUCTION PUBLIC INFORMATION SESSION AGENDA

Fifth and Detroit Street Design May 2017 Capital Improvements Committee. DOWNTOWN Street Design

Johnson Street Bridge Public Realm Update

Chapter 14 Streetscape Improvements

Elm Street Business District: Streetscape and Signage Plan

Elm Street Business District: Streetscape and Signage Plan

4.9 Mendocino Avenue Corridor Plan Design Guidelines

Charles P. Johnson and Associates. Annapolis Landscape Architects

TOWN COUNCIL / PLANNING COMMISSION

Streets Vision

SFMTA PHELAN LOOP AND PUBLIC PLAZA PHELAN OCEAN AVENUE

Project Consulting Team:

Property Owners Association. Annual Meeting Notice July 26, :00pm - 7:00pm Park City Marriott 1895 Sidewinder Drive Park City, Utah

Division VI Community Mixed Use (CMU) Architectural Guidelines and Standards

Elm Street Business District: Streetscape and Signage Plan

Fifth and Detroit Street Design/South University Update Capital Improvement Committee Meeting

Conceptual Design. Main Street Enhancement and Extension Project. Bothell, Washington. June 11, 2009

GYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado. Schematic Design January 2015

Spring 2018 Construction Update

The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape..

Pedestrian and Bike Bridge LOGO

GREENING THE BOULEVARD Master Plan Concepts for Venice Boulevard between Lincoln and Sawtelle

Landscape and Streetscape Design 2.5

Wayfinding. North Gateway: Integrate a vertical gateway marker on the west side of Ward Street at the south corner of Vernon Street.

COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING

AVONDALE ESTATES GREENSPACE AD-HOC COMMITTEE

Canal Winchester Parks Master Plan. Public Meeting 2 Thursday, February 2 6:30pm

COMPLETE GREEN STREET CHECKLIST

7-PARKS, OPEN SPACE & PUBLIC ART

The Vision. Photo provided by The Minervini Group. 46 Vision, Objectives & Strategies

Elgin O Hare Western Access Project Local Advisory Committee. February 10, 2014

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2.

West Dennis Center: Bass River to Old Main Street. West Dennis Business District: Old Main Street to Dennis Commons

Building Great Neighbourhoods. Strathcona

CHAPTER 6 URBAN DESIGN

Please see attached for more detailed project information. Project Schedule Designer Award by SBC Executive Sub-Committee December 21, 2015

D ESIGN REVIEW COMMITTEE

FROM DUPONT CIRCLE NORTH TO CALIFORNIA STREET, NW. Welcome!

July 12, Columbus City Council City Hall 90 West Broad Street Columbus, OH RE: I-70/71 Columbus Crossroads Project

1999 Approval to replace World War I monument and relocate plaques Approval to rehabilitate the Chase Mill building and surrounding site

Community Mixed Use Zone Districts (CMU)

\\ Comprehensive Facilities Master Plan. Design Guidelines

CHAPTER 8. Mrs. Zimman s Class - Central Elementary

MASTER PLAN QUEEN ST. WEST BIA

Design Guidelines for the Route 30 Corridor Master Plan: Subdivision and Land Development Elements

Ohlone College Measure G Project Scope Revisions

Project Goal. RRRC Living Towns Planning Workshp. Town of Halifax Revitalization Project. Dynamic Planning & Management Duo: July 12, 2006

Lambeth Main Street Streetscape Improvements

Village of Glenview Appearance Commission

BEMIDJI CITY COUNCIL Work Session Agenda Monday July 9, 2012

V. Gateways GATEWAYS / V-1

Dundas Place Flexible Street Public Information Centre

GOODY CLANCY WITH KITTELSON & ASSOCIATES RHODESIDE & HARWELL FARR ASSOCIATES W-ZHA

SALEM FOREST RIVER PARK PRELIMINARY POOL AREA ASSESSMENT & MASTER PLAN STUDY. For the City of Salem

P A I N E S V I L L E D O W N T O W N P L A N

Streetscape Patterns. Design Guidelines, Ridgewood Village Center Historic District, Ridgewood, N.J. page 20

Lockport Streetscape Plan Primary Streetscape Design 10th Street to 9th Street

Whitemarsh Comprehensive Plan Update: Housing & Land Use. Public Workshop #3: September 20, 2018

Landscape Site Plan BLOCK D BLOCK A BLOCK C BLOCK B DEC 2009 L A N E W AY ARBUTUS 2 MEWS ARBUTUS STREET YEW STREET EXTENSION LEGEND

Preci nct P l ans Figure 56 Campus Aerial Photo, 2008 CAL STATE EAST BAY, HAYWARD CAMPUS MASTER PLAN

The Project. In 2013, construction was completed between 100 Street and 102 Street.

Highway 15 Project - Hutchinson

Dyersville Downtown Plan. Open House October 24, 2017

Appendix 1. Private Projects with Respective On Site PUS and Public Parks in the Silver Spring CBD

City of Los Angeles Department of Public Works

30% DRAFT GAINSBORO PARK IMPROVEMENT PROJECT THE CITY OF PLEASANT RIDGE CITY OF PLEASANT RIDGE, OAKLAND COUNTY, MICHIGAN

DISTRICT OF INVERMERE

Town Center Design Guidelines

Project will Replace: Utilities Curb Pavement Lighting. City of Madison

Community Development Department

CITY OF MERCER ISLAND DESIGN COMMISSION STAFF REPORT

Technical Advisory Committee

Community Design Plan

FOUNTAIN SQUARE RENOVATIONS JOINT WARD 1 & 4 PUBLIC MEETING EVANSTON PUBLIC LIBRARY JUNE 7, 2016, 7:00 PM

Marpole Community Plan. Parks and Open Space

Village of Pemberton DOWNTOWN ENHANCEMENT INITIATIVE FRONTIER STREET PILOT PROJECT WE NEED YOUR HELP TO REVIEW THE PLAN

Commercial Node Plan Devine Street/Jackson Blvd. COLUMBIA, SC

BUSINESS DISTRICT DESIGN GUIDELINES

urban design Introduction

Bow to Bluff Public Realm Plan Design Update

SITE FURNISHINGS STANDARDS MANUAL

Highway 12 Sibley Avenue Reconstruction. Project Overview and Progress To Date Litchfield City Council April 17, 2017

MASTER PLAN IMPLEMENTATION COSTS. Appendix A

Cit of Kitchener Ur 6 an Design Manual PARTA. Desi n for _--::

Construction Engineering & Inspection Services Transit Bus Stop Infrastructure for the Broward County Transit Division (BCT)

Transcription:

ROCKTON DOWNTOWN STREETSCAPE MASTER PLAN Plan Commission Presentation April 10, 2018 Teska Associates Christopher Burke Engineering

AGENDA 1. Project Scope & Schedule 2. Steering Committee & Community Outreach a. Streetscape Strategies 3. Streetscape Master Plan a. Roadway Character & Thematic Approach b. Gateway & Wayfinding Signage c. Streetscape Typologies d. Materials & Products e. Priority Projects & Phasing

PROJECT SCOPE & SCHEDULE Aug Sept Oct Nov Dec Jan Feb Mar Apr c PHASE 1 DATA COLLECTION PHASE 2 OUTREACH p p PHASE 3 PRELIM PLAN c PHASE 4 FINAL PLAN c PHASE 5 IMPLEMENTATION PLAN pc c p pc vb vb committee public Plan Commission Village Board

STUDY AREA 4

STEERING COMMITTEE Jill Martin-Golden, Business Owner, JR Finally Art Studio Mark Golden, Business Owner, JR Finally Art Studio Stephanie McGuire, Business Owner, The Mix Jamie Swanson, Business Owner, S&H Nursery Erica Smith, Business Owner, Rockton Sanctuary Spa 5 Marc Smith, Business Owner, Rockton Sanctuary Spa Megan Gove, Director, Talcott Free Library Nancy Ajrulouvski, Business Owner, Ray s Family Restaurant Kathleen Storm, Business Owner, Rocktek Workspace Scott Fridly, Trustee, Village of Rockton Tricia Diduch, Planning & Development Administrator, Village of Rockton Mayor Adams, Mayor, Village of Rockton

2015 VILLAGE OF ROCKTON RESIDENT SURVEY KEY PRIORITIES Safety; Streets & sidewalks; Water & sanitary service. TOP RATED INFRASTRUCTURE IMPROVEMENTS 65% sidewalk patios 62% landscape planters 57% benches & seating 51% wayfinding signage Downtown Rockton gets a lot of use and people feel safe here

STREETSCAPE STRATEGIES #1: REINFORCE DOWNTOWN STREETS AS THE HISTORIC AND CULTURAL CENTER OF ROCKTON. Evaluate opportunities to balance existing roadway/on-street parking functions with widened sidewalks and active seating/dining areas. #2: PROMOTE ROCKTON S IMAGE AND FUNCTION THROUGH SIGNAGE Create a comprehensive signage program that addresses gateway, wayfinding, parking and business directory signage #3: REINFORCE FESTIVAL SPACES Accommodate a variety of fest types, including large format events at Settlers Park, and smaller format events on Main and/or Hawick Streets. #4: ENHANCE OFF STREET PARKING AND ALLEYWAY CONNECTIONS Improve off street parking functions and alleyway connectivity through design treatments. #5: IMPROVE CONNECTIVITY BETWEEN DOWNTOWN AND RIVERFRONT Provide interconnected experiences that draw users between Downtown and Riverfront. Experiential elements may include interconnected pathways, crosswalks, sidewalks, seating/ gathering areas, river overlooks, passive open space, active play and interpretive landscaping.

COMMUNITY OUTREACH PROJECT WEBSITE 47 email followers 2300+ page views 700+ unique visitors POP UP EVENT: Rockton Holiday Walk, 12.02.2017 PUBLIC OPEN HOUSE: Village Hall, 04.10.2018 Key Themes: Provide better connections to the River; Incorporate more trees & plantings; Add more places to sit; Preference for historical style lighting; Provide more interactive elements for kids & teens

GATEWAY & WAYFINDING SIGNAGE Gateway Sign Directional Sign Parking Identifier Parking Directional Business Directory Kiosk Bicycle/ Pedestrian Directional Sign Preferred Sign Concept

10

11

12

13

14

15

SPLASH PAD CONSIDERATIONS 16

17

18

SHOPPING / DINING STREETS CURB & GUTTER Opportunities to redistribute / expand downtown parking Expanded corner bump outs at intersection corners LIGHTING Decorative LED pedestrian light PLANTINGS Planter pits at intersection corners / bump outs Trees in grates at narrow sidewalk sections Parallel parking PAVING Unit pavers at accent corners Concrete sidewalks with regular joint pattern Unit pavers at crosswalks SITE FURNISHINGS Clustered benches, trash receptacles and planter pots at intersection corners Bike racks and repair stations at intersection corners Diagonal parking Diagonal parking

ON STREET PARKING ASSESSMENT 20

ON-STREET PARKING ASSESSMENT C.1 H.1 HAWICK ST EXISTING PARKING PROPOSED CONCEPT PARKING 49 44 {-5} M.1 MAIN ST 59 40 {-19} M.2 MAIN ST 56 57 {+1} M.2 M.1 M.3 MAIN ST 39 53 {+14} M.2 C.1 CHAPEL ST 34 34 {0} M.3 H.1 TOTAL 237 228 {-9}

22 OFF-STREET PARKING OPPORTUNITIES

STREETSCAPE PHASING H.1 Hawick Street Blackhawk Blvd. to Bridge St. +/- 550 LF C.1 M.1 Main Street Prairie St. to Green St. (Prairie St Intersection Included) M.2 Main Street Center St. to Prairie St. & Prairie Street Main St. to Hawick St. +/- 1,000 LF +/- 650 LF M.2 M.1 M.3 Main Street Cottage St. to Center St. & Hawick Street Center St. to Blackhawk Blvd. +/- 1,700 LF M.2 C.1 Chapel Street Blackhawk Blvd. to Green St. +/- 550 LF M.3 H.1

Blackhawk Boulevard IDOT COORDINATION IDOT requires a formal Phase 1 study for any upgrades that involve Blackhawk Rd (IL-75). Typical timeframe: Main Street Phase 1 review 1 year Phase 2 construction docs 1 year Phase 3 Construction 1 year Design team is meeting with IDOT April 10 to discuss intersection upgrades.

Streetscape budget costs are provided for Village planning purposes. Costs are derived based on past planning efforts, aerial photography and site reviews. Final design and engineering is required to produce final cost estimates. STREETSCAPE BUDGET COSTS: PROJECT CATEGORIES & ELEMENTS Roadway & Drainage Site mobilization; curb & gutter remove and replace; pavement resurfacing; tree removals; pavement marking; detectable warning plates; alternate utility improvements, signal modifications. Lighting Hardscape & Furnishings Utility Upgrades Plantings Design & Engineering (15%) Maintenance of Traffic / Administration Decorative light poles. Decorative pavers, stone outcropping, outcropping seating, stone lighting pier bases, 6 concrete planter curb, sidewalk, benches, planter pots, litter & recycling. Sewer & water utility improvements Trees, shrubs, perennials/groundcover, soils, mulches. Permit/bid document preparation Construction phase activities

STREETSCAPE COSTS SUMMARY C.1 M.2 M.1 M.2 M.3 H.1 H.1 Hawick Street - Blackhawk Blvd. to Bridge St. (approx. 550 LF) M.1 Main Street - Prairie St. to Green St. (Prairie St Intersection Included) (approx. 1,000 LF) M.2 Main Street - Center St. to Prairie St. & Prairie Street - Main St. to Hawick St. (approx. 650 LF) M.3 Main Street - Cottage St. to Center St. & Hawick Street - Center St. to Blackhawk Blvd. (approx. 1,700 LF) C.1 Chapel Street - Blackhawk Blvd. to Green St. (approx. 550 LF) Settlers Park Base Infrastructure TOTAL STREETSCAPE Settlers Park Specialty Amenities Settlers Park Base Infrastructure Improvements Settlers Park Specialty Park Amenities **Not included in total costs $861,800 $2,963,500 $1,518,000 $2,992,500 $499,500 $1,006,500 $9,841,800 $1,485,000 to $2,700,000

COMMITTEE PRIORITIES & IMPLEMENTATION CONSIDERATIONS STREETSCAPE DEVELOPMENT AREA PROS CONS M.1 Main Street, between Prairie & Green Streets Highest return on investment for local businesses Committee identified a preference to develop a complete future project limits of M.1, not a portion thereof Highest infrastructural cost, greatest disruption to businesses H.1 Hawick Street Gateway & Wayfinding Signage Lower infrastructural cost, lesser disruption to businesses Lowest infrastructural cost, relatively high return on investment Gateway signs may be developed separately from wayfinding signs May not directly benefit downtown businesses --

THANK YOU! Jodi Mariano Teska Associates JMariano@TeskaAssociates.com

29

STREETSCAPE COSTS M.1 - Main Street - Prairie St. to Green St Roadway $948,000 Lighting $270,000 Hardscape & Furnishings $590,500 Utility Upgrades (sewer) $271,000 Traffic Signal Modifications $120,000 Plantings $102,500 Design and Engineering (15%) $386,500 Maintenance of Traffic / Admin $275,000 TOTAL $2,963,500 M.1

STREETSCAPE COSTS M.2 M.2 - Main Street - Center St. to Prairie St. & Prairie Street - Main St. to Hawick St. Roadway $606,000 Lighting $130,000 Hardscape & Furnishings $162,000 Utility Upgrades (sewer, structure adjustments) $204,000 Plantings $45,000 Design and Engineering (15%) $198,000 Maintenance of Traffic / Admin $173,000 TOTAL $1,518,000 M.2

STREETSCAPE COSTS M.3 M.3 - Main Street - Cottage St. to Center St. & Hawick Street - Center St. to Blackhawk Blvd. Roadway $778,500 Lighting $270,000 Hardscape & Furnishings $371,500 Utility Upgrades (sewer, water main west of Blackhawk, structure adjustments) $942,500 Plantings $60,000 Design and Engineering (15%) $390,000 Maintenance of Traffic / Admin $180,000 TOTAL $2,992,500 M.3

STREETSCAPE COSTS C.1 C.1 - Chapel Street - Blackhawk Blvd. to Green St Roadway $232,500 Lighting $0 Hardscape & Furnishings $26,500 Utility Upgrades (sewer laterals, structure adjustments) $89,500 Plantings $18,000 Design and Engineering $65,000 Maintenance of Traffic / Admin $68,000 TOTAL $499,500

STREETSCAPE COSTS H.1 - Hawick Street - Blackhawk Blvd. to Bridge St Roadway $366,500 Lighting $86,500 Hardscape & Furnishings $89,000 Utility Upgrades (sewer) $75,000 Plantings $61,500 Design and Engineering (15%) $112,300 Maintenance of Traffic / Admin $71,000 TOTAL $861,800 H.1

PARK COSTS Settlers Park Base Infrastructure Improvements Site Preparations $84,000 Hardscape & Furnishings $212,500 Lighting $432,000 Plantings $104,500 Design and Engineering (15%) $131,500 Maintenance of Traffic / Admin $42,000 TOTAL $1,006,500 Settlers Park Specialty Park Amenities Specialty Amenities Design and Engineering (15%) $1,260,000 to $2,340,000 $165,000 to $300,000 Maintenance of Traffic / Admin $60,000 TOTAL $1,485,000 to $2,700,000 Settlers Park

UTILITY POLE UPGRADES Costs to relocate utilities underground H.1 - Hawick Street - Blackhawk Blvd. to Bridge St. (approx. 550 LF) TOTAL: $208,800 M.1 - Main Street - Prairie St. to Green St. (Prairie St Intersection Included) (approx. 1,000 LF) TOTAL: $295,200 M.2 - Main Street - Center St. to Prairie St. & Prairie Street - Main St. to Hawick St. (approx. 650 LF) TOTAL: $146,400 M.3 - Main Street - Cottage St. to Center St. & Hawick Street - Center St. to Blackhawk Blvd. (approx. 1,700 LF) TOTAL: $590,400 C.1 - Chapel Street - Blackhawk Blvd. to Green St. (approx. 550 LF) TOTAL: $244,800 Settlers Park Base Infrastructure Improvements TOTAL: $2,505,510 Utility Pole Upgrades Project Total: $3,991,110

COMMUNITY IDENTITY WAYFINDING SIGNAGE WAYFINDING SIGNAGE Gateway Sign (Option A) (2 signs) $100,000 Gateway Sign (Option B) (2 signs) $40,000 Directional Sign 4 Letters (7 signs) $70,000 Directional Sign 3 Letters (2 signs) $16,000 Business Directory Kiosk (4 signs) $60,000 Bicycle/Ped Directional Sign (3 signs) $7,500 Parking Identifier (5 signs) $37,500 Parking Directional (5 signs) $25,000 SUBTOTAL $379,200 Design & Engineering (10%) $ 37,920 TOTAL $417,120

M.1 MAIN STREET PRAIRIE ST Rockton Food & Sprirts 6 Landscape Planter Curbs - with Outcropping Stone, Limestone Benches, BLACKHAWK Library Dairyhaus GREEN ST MAIN ST Local Dough Cafe Parallel Parking (both sides) - 17 spaces Village Hall Pedestrian Lighting - with Decorative Planter Pots

M.2 MAIN STREET Corner Bump-outs -Decorative Pavers, Benches, Planter Pots, Bike Racks, and 6 Landscape Planter Curbs Greater Rockton Centre MAIN ST Post Office Trees in Expanded Grates Local Dough Cafe PRAIRIE ST Landscape Bump-outs - Modified for Snow Operations HAWICK

M.3 MAIN STREET COTTAGE New Parking Area - 7 spaces CENTER ST American Legion PRAIRIE ST BLACKHAWK MAIN ST Greater Rockton Centre Post Office Local Dough Cafe Cottage Riverfront Plaza -Decorative Pavers, Benches, Limestone Boulders Riverfront Pathway 8 w Hawick Riverfront Plaza -Limestone Seatwall, Decorative Pavers, Limestone Boulders New Parking Area - 10 spaces Pedestrian Lighting - with Decorative Planter Pots New Parallel Parking - 28 spaces HAWICK

C.1 CHAPEL STREET Village Green Park Village Green Park Entry Plaza & Sidewalk - benches, bike racks, trash receptacles, plantings GREEN ST BLACKHAWK CHAPEL ST Curb & Gutter Landscaped Bump Outs Painted Crosswalks

H.1 HAWICK STREET BLACKHAWK The Mix Cafe Landscape Bump-outs - Modified for Snow Operations Rockton Sanctuary Spa 42 HAWICK ST

SETTLER S PARK IMPROVEMENTS HAWICK BLACKHAWK Splash Pad Area Playground/ Large Games Concrete Walkway Settler s Park Naturalized Area w/paths and seating areas Athletic Fields/ Ice Skating New Park Shelter - 40 x 60 Existing Basketball Courts Existing Soccer Field Potential Pathway Extension New Riverfront Access Pathway New Park Lighting Potential Pathway Extension Riverfront Overlook - Decorative Pavers, Benches, Limestone Boulders or Decking Overlook New Riverfront Dock

44

45

46