CORCORAN HALL ADDITION

Similar documents
The George Washington University Museum Foggy Bottom Campus Plan Site 102B - Z.C. Case No F/06-12F April 5, 2012

The George Washington University Square Phase 1 Design Garage Base Building

SCIENCE AND ENGINEERING COMPLEX

SCIENCE AND ENGINEERING COMPLEX

LEED 2009 for New Construction and Major Renovation

2100 PENNSYLVANIA AVENUE, NW Z.C. CASE NO O/06-12O PRE-HEARING SUBMISSION

THE GEORGE WASHINGTON UNIVERSITY School of Public Health and Health Services

NEW CITY HALL COUNCIL MEETING PRESENTATION

THE GEORGE WASHINGTON UNIVERSITY MOUNT VERNON CAMPUS

FRAMEWORK OF DESIGN REVIEW:

University of Maryland FIRE EVACUATION PLAN NATIONAL DENTAL MUSEUM POLICE FIRE MEDICAL EMERGENCY Anyone discovering excessive heat,

SMALL LOT DESIGN STANDARDS. An Illustrated Working Draft for Test Implementation

11.0 TRANSPORTATION ELEMENT

Institutional Master Plan The Arnold Arboretum of Harvard University

FIRE SAFETY INSPECTION REPORT

PREMISES FIRE SAFETY HANDBOOK

(RE)ICEBERG BECAUSE THERE IS MUCH MORE TO SEE

New Berlin City Center Concept Review PDQ Food Stores, Inc

D1 September 11, 2013 Public Hearing APPLICANT:

Garden edges provide vertical plantings to buffer the neighbors from the building facilities around the entire campus.

St. John s University Fire Safety Plan

ANC 2A Presentation. November 9, 2006

LOS ANGELES MISSION COLLEGE MASTER PLAN Master Plan DESIGN & DEVELOPMENT PRINCIPLES

Sunol Yard Improvements Civic Design Review Phase 1 March 18, 2013 BUILDING DESIGN & CONSTRUCTION S.F. DEPARTMENT OF PUBLIC WORKS

Campus Police Department Fire Safety Guidelines

Security Plan Handout

HIGH-RISE RETROFIT ORDINANCES - NO and NO

Vision & Land Use. Discussion. Historic Preservation Plan. Foggy Bottom Campus Plan:

EXISTING CONDITIONS SUMMARY

ADA Checklist Transient Lodging, Hotels, Motels, Inns, Boarding Houses, Dormitories and similar facilities

DEVELOPMENT CONTROLS MEDICAL DISTRICT

Mulch fires, trash can fires, or other fire outside a building should be reported by the following methods:

r.i.s.e demonstration center

University of Michigan Guidelines for Emergency Evacuation Maps/Plans

Facilities Procedure for Accessibility or Compliance Related Requests:

Rezoning Petition Pre-Hearing Staff Analysis April 16, 2018

FIRE SAFETY INSPECTION REPORT

II. PROJECT DESCRIPTION

Public Frontage Regulations Map

B115/B116, B117, B118, B132, B205, B206,

NOTICE OF AVAILABILITY (NOA) OF A DRAFT ENVIRONMENTAL IMPACT REPORT AND NOTICE OF PUBLIC HEARING 2190 Shattuck Avenue Mixed-Use Project

THE FOLGER SHAKESPEARE LIBRARY ANC 6B Meeting

~P'~'~; SAN FRANCISCO

112 College Street Zoning Amendment Application Preliminary Report

Chapter 7 Route window W20 Dover Road and Leigh Road bridges. Transport for London

Center for Health Research and Rural Advocacy

South Castell Avenue Masterplan Mixed Use Infill Development City of New Braunfels Industrial Development Corporation.

PENNSYLVANIA. Downloaded

UNIVERSITY COLLEGE LONDON EMERGENCY PLAN. Regulatory Reform (Fire Safety) Order 2005 PART ONE - SPECIFIC INSTRUCTIONS & OTHER RELEVANT INFORMATION:

PBK K-12 Bryan ISD Administration Building Bryan Independent School District \\ Bryan, Texas. Design Presentation.

BUILD Central Main Street Corridor Redevelopment Plan Public Meeting No. 3. September 14, 2017

Request by Fareway Stores Inc. to Initiate Neighborhood Commercial Zoning Text Amendments

Yonge Eglinton Centre Urban Design Guidelines

Planned Development Application 1450 Sherman Avenue Evanston, IL Responses to DAPR Meeting I City Staff Comments

July 12, Columbus City Council City Hall 90 West Broad Street Columbus, OH RE: I-70/71 Columbus Crossroads Project

ALCORN STATE UNIVERSITY NATCHEZ CAMPUS. Emergency Procedures

SCOUT HALL INSPECTION CHECKLIST

ADA Checklist AIRPORTS

PUBLIC FRONTAGE REGULATIONS MAP

THE REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE RISK ASSESSMENT SPORTS CENTRE

B115/B116, B117, B118, B132, B205, B206,

Campus Sign Plan. Adopted by the Campus Planning Committee Adopted: June 26, 2006 Revised: April 14, 2016

Adam R. Lid Addendum to Proposed Amendments List for Mobility Plan 2035

ACTIONS IN THE EVENT OF A FIRE ALARM (updated Nov 9, 2009)

Call to Artists Public Art for Los Angeles Metro Stations

PLAN REVIEW SUBMITTAL GUIDE

Bel-Air Lexus Automobile Service Station

CITY OF HELSINKI ACCESSIBILITY GUIDELINES

LANGAN LANDSCAPE ARCHITECTURE + PLANNING FOR COLLEGES & UNIVERSITIES

Common Building Code Misinterpretations

COUNCIL FOR THE BUILT ENVIRONMENT TRACK B REPORT. SUP3 Access Zone and Future Expansion 1/24/2017. Jim Riley, Utilities & Energy Services 12/2/2016

4 January 11, 2012 Public Hearing APPLICANT:

INDOOR SPORTS COMPLEX PROJECT BRIEF

PROJECT OVERVIEW Project type: Project name: Phase One, $21.5M, completed May 2013 Location: Completion date: responsibility of the architect

Thames Hall Modernization. Town Hall Meeting December 3, 2018

Access Aisle (Van) (Flow Test) Water Mains (Location & Sizes) Building Entrances. Building, Facilities, Element. Curb Ramps (Built-up)

The West College Avenue Corridor Redevelopment Plan

DEPARTMENT OF CONSUMER AND INDUSTRY SERVICES DIVISION OF ADULT FOSTER CARE LICENSING ADULT FOSTER CARE FACILITIES

FIRE SAFETY REQUIREMENTS FOR PRE RESIDENTIAL BUILDINGS OF THREE OR MORE STORIES (DOROTHY MAE ORDINANCE - NO. 158,963)

U n i v e r s i t y o f S o u t h C a r o l i n a A i k e n. Land Plan Study

SITE PLAN REVIEW COMMITTEE MEETING AGENDA Clarendon Boulevard Conference Room 311 Arlington, VA 22201

r.i.s.e demonstration center washington, dc project category: architecture

SITE PLANNING. USC Village will be a mixeduse urban environment. creating a common ground with the surrounding community. Our planning goals include:

SUBJECT: PREDEVELOPMENT PLAN REVIEW OF PROJECT LOCATED AT E. COLORADO BOULEVARD (PASEO COLORADO)

Sample Evacuation I Fire Safety Plan

Cambridgeshire, England. Build Your Dream Country Estate

PROJECT INFORMATION UNBUILT PUBLIC LIBRARY LATE 2017 TYPE II-B CONCRETE MASONRY WEATHERING STEEL GLASS GABION WALLS $6.4 MILLION 13,000 SF

Rocky Mountain Fire Protection District 4390 Eldorado Springs Drive Boulder, CO

D E S I G N R E V I E W B OA R D

Analysis of Environs of Clinton Park located at 901 W 5 th Street

COUNTY COURT HOUSE REDEVELOPMENT AREA PLAN

WORKING AT A HIGHER LEVEL

WORKING AT A HIGHER LEVEL

CHESAPEAKE CHILD DEVELOPMENT CENTER

Chapter 16: Project Alternatives A. INTRODUCTION

PREMISES FIRE SAFETY HANDBOOK

Principle 7. Architectural Style and Historic Preservation PRINCIPLE 7

Nu Skin Innovation Center. Location: Provo, Utah Lot Size: 435,600 GSF Building Size: 168,000 GSF Project Type: Commercial LEED Gold Certified

Preliminary Design Review. Poudre Garage Mixed Use December 14, 2015

SCCCD District Wide Facilities Master Plan FRESNO CITY COLLEGE TOWN HALL MEETING MAY2012

Transcription:

GW MUSEUM (INFILL) ADDITION Corcoran Hall Addition Section A-14

SITE AREA BELL ADDITION MUSEUM SUPPORT/ADMINISTRATIVE 37.50 WOODHULL HOUSE Level B2 Plan LEVEL B2 PLAN A-15

SITE AREA BELL ADDITION GALLERY GALLERY 51.00 MECHANICAL MECHANICAL LEVEL B1 PLAN Level B1 Plan A-16

SITE AREA BELL ADDITION MULTIPURPOSE ROOM LOBBY 67.50 BUILDING SUPPORT Ground Floor Plan GROUND FLOOR PLAN A-17

SITE AREA BELL ADDITION GALLERY GALLERY 83.50 GALLERY GALLERY SECOND FLOOR PLAN Second Floor Plan A-18

SITE AREA BELL ADDITION GALLERY 101.00 ACCESS FROM BELL OPEN TO BELOW Third Floor Plan THIRD FLOOR PLAN A-19

SITE AREA BELL ADDITION 118.50 BELOW MUSEUM SUPPORT / ADMINISTRATIVE FOURTH FLOOR PLAN TERRACE Fourth Floor Plan A-20

SITE AREA BELL 130.50 BELOW Penthouse Floor Plan PENTHOUSE FLOOR PLAN TERRACE A-21

SITE AREA BELL 149.00 130.50 BELOW TERRACE PLAN Roof Plan A-22

STAIR EXIT ADDITION (ONE-WAY TRAFFIC) LOADING ENTRANCE 21 STREET STAIR SERVICE EXIT DOOR STAIR EXIT GW MUSEUM (INFILL) MULTI-PURPOSE ROOM ACCESS PASSAGE TO STREET MAIN ENTRANCE Y BB LO XIT E E STAIR SERVIC EXIT DOOR PASSAGE TO YARD BELL GW MUSEUM (WOODHULL) Circulation and Loading Plan A-23 KEY SECONDARY ENTRANCE 24 Interior Loading Berth G STREET (ONE-WAY TRAFFIC)

I STREET PEN NSY LVA N IA A VEN UE 21 STREET 22 STREET 20 STREET H STREET 2. PERSPECTIVE VIEW, LOOKING NORTHEAST ON G STREET 23 STREET 1. PERSPECTIVE VIEW, LOOKING SOUTHEAST ON 21 STREET 1 G STREET 2 21 St & G ST Perspective Views A-24

17-4 PENTHOUSE EL. 147.83 17-4 PENTHOUSE EL. 147.83 EL. 130.50 12-0 12-0 EL. 130.50 FOURTH FLOOR EL. 118.50 A-25 0 16 32 NOTE: SIGNAGE IS SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. TEXT AND DESIGN ARE SUBJECT TO CHANGE ON FINAL PLAN. 16-0 2-0 16-0 CURB EL. 65.50 SECOND FLOOR EL. 83.50 2-0 GROUND FLOOR EL. 67.50 21 ST Elevation THIRD FLOOR EL. 101.00 SECOND FLOOR EL. 83.50 65-0 OVERALL HEIGHT THIRD FLOOR EL. 101.00 65-0 OVERALL HEIGHT FOURTH FLOOR EL. 118.50 GROUND FLOOR EL. 67.50 CURB EL. 65.50

PENTHOUSE EL. 147.83 EL. 130.50 THIRD FLOOR EL. 101.00 65-0 OVERALL HEIGHT 65-0 OVERALL HEIGHT FOURTH FLOOR EL. 118.50 THIRD FLOOR EL. 101.00 SECOND FLOOR EL. 83.50 16-0 2-0 16-0 SECOND FLOOR EL. 83.50 2-0 CURB EL. 65.50 12-0 12-0 EL. 130.50 FOURTH FLOOR EL. 118.50 GROUND FLOOR EL. 67.50 17-4 17-4 PENTHOUSE EL. 147.83 GROUND FLOOR EL. 67.50 CURB EL. 65.50 0 16 32 NOTE: SIGNAGE IS SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. TEXT AND DESIGN ARE SUBJECT TO CHANGE ON FINAL PLAN. G ST Elevation A-26

PENTHOUSE EL. 147.83 17-4 PENTHOUSE EL. 147.83 17-4 EL. 130.50 12-0 EL. 130.50 12-0 FOURTH FLOOR EL. 118.50 Yard Elevation A-27 2-0 CURB EL. 65.50 16-0 SECOND FLOOR EL. 83.50 2-0 GROUND FLOOR EL. 67.50 THIRD FLOOR EL. 101.00 SECOND FLOOR EL. 83.50 16-0 65-0 OVERALL HEIGHT THIRD FLOOR EL. 101.00 65-0 OVERALL HEIGHT FOURTH FLOOR EL. 118.50 0 16 32 NOTE: SIGNAGE IS SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. TEXT AND DESIGN ARE SUBJECT TO CHANGE ON FINAL PLAN. GROUND FLOOR EL. 67.50 CURB EL. 65.50

EL. 147.83 PENTHOUSE 16-0 12-0 17-4 EL. 130.50 EL. 118.50 FOURTH FLOOR EL. 101.00 THIRD FLOOR EL. 83.50 SECOND FLOOR EL. 67.50 GROUND FLOOR 13-6 16-6 EL. 51.00 BASEMENT FLOOR EL. 37.50 SUB-BASEMENT FLOOR North-South Section A-28

EL. 147.83 PENTHOUSE 16-0 12-0 17-4 EL. 130.50 EL. 118.50 FOURTH FLOOR EL. 101.00 THIRD FLOOR EL. 83.50 SECOND FLOOR EL. 67.50 GROUND FLOOR East-West Sections A-29 13-6 16-6 EL. 51.00 BASEMENT FLOOR EL. 37.50 SUB-BASEMENT FLOOR EAST-WEST SECTION A-A EAST-WEST SECTION B-B

Note: 2007 Foggy Bottom Campus Plan commits GW to achieving the equivalency of 16 points, using USGBC s LEED V2.2 Scorecard as an evaluator of the sustainable quotient of a project. This scorecard reflects GW s anticipated goal of submitting this project to GBCI under LEED-NC 2009 with a target of Silver level certification. LEED Checklist A-30