OPERATIONS AND STORAGE BUILDING

Similar documents
CHAPTER 8 ELECTRICAL

ELECTRICAL SYSTEMS ASSESSMENT Hanover High School

Nightfall. led emergency egress lighting

GARCIA GALUSKA DESOUSA Consulting Engineers

CHAPTER 8 ELECTRICAL

SECTION INTERIOR LIGHTING

A. Furnish and install luminaires, lamps, ballasts and in-line fuses as herein specified and shown on the Drawings.

Moreno Valley Fire Department Fire Prevention Bureau. New and Existing Fire Alarm & Signaling Systems Guideline

SPECIAL AMUSEMENT OCCUPANCIES HAUNTED HOUSE, SCARE HOUSE OR MAZE

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA

HMC ARCHITECTS 2495 Natomas Park Drive, Studio 100 Sacramento, California ADDENDUM NO. 3

STATE OF MARYLAND DEPARTMENT OF STATE POLICE OFFICE OF THE STATE FIRE MARSHAL

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority.

Vanilla Box Design Criteria

Currently, all electrical upgrades would be voluntary, but there are situations in which upgrades would be required.

NEC Requirements for Standby Power Systems. New England Building Officials Education Association Annual Conference October 5, 2015

APPENDIX - L INTERNATIONAL RESIDENTIAL CODE ELECTRICAL

Construction Management at Risk Services. New North East Branch Library Project. August 3, 2018

DOCUMENT TABLE OF CONTENTS

FIRE ALARM: BY OTHERS, IF REQUIRED.

Lindsay Frederick. Lighting + Electrical. Ron Dodson Faculty Advisor. Native American Cultural Center Arizona. Technical Report 2

FIRE ALARM: BY OTHERS, IF REQUIRED.

Building Division 201 SE 3 rd STREET (Second Floor) OCALA, FL Phone: (352) BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS

Electrical Design Guidelines Table of Contents

13. ELECTRICAL - TECHNICAL

SETION EMERGENCY LIGHTING NATIONAL FIRE PROTECTION ASSOCIATION (NEPA) (2006) Life Safety Code, 2006 Edition

SECTION COMMERCIAL-KITCHEN HOODS

Common Fire Code Violation Checklist. Listed are some of the most commonly found fire code violations and should not be considered as all inclusive.

School Fire Safety Checklist

TABLE OF CONTENTS GENERAL... 2 A. DEFINITIONS DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2

Consultant shall design elevators to comply with current ASME A117.1, ASME A117.2, UBC and NEC codes.


Fire District Dwelling Construction Requirements

ELECTRICAL - V DESCRIPTION 16.1 GENERAL

Chapter 1 General... 5

WINDSOR FOREST HIGH SCHOOL HVAC REPLACEMENT ADDENDUM #2 SAVANNAH CHATHAM COUNTY PUBLIC SCHOOL SYSTEM FEBRUARY 18, 2016

SECTION C. Section Cable Trays for Electrical Systems: Additional identification requirements for cable tray systems.

6. ENGINEERING SYSTEMS REQUIREMENTS H50 WATERFRONT UTILITIES

Element D Services Electrical

Southaven Fire Department Fire Marshal s Office 8710 Northwest Drive Southaven, Mississippi Phone: Fax:

Springpoint Architects, pc SECTION Childcare Center Architect s Project No TABLE OF CONTENTS Monroe County Comm. Sch. Corp.

Page 1 of General

PLATTEVILLE MIDDLE SCHOOL

CITY OF FARMINGTON 800 Municipal Drive Farmington, NM (505) Fax (505)

ELECTRICAL DESIGN GUIDELINES SECTION GUIDELINE SPECIFICATIONS-DUVAL COUNTY PUBLIC SCHOOL

Appendix B. Facilities Assessment Report

Sprinkler: The building does not have a fire protection system installed. MECHANICAL / PLUMBING / SPRINKLER SYSTEMS RECOMMENDATIONS

DOD FUELS LABORATORY STANDARDS UFC

ENGINE GENERATORS AND ACCESSORIES

SECTION INTERIOR LIGHTING

SECTION INTERIOR LIGHTING

3. Provide revised typed circuit directory in panelboards that have circuits removed.

Ten-Point Checklist for Emergency Preparedness

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant.

SECTION EXTERIOR LIGHTING

SEISCO MOUNTING CLEARANCES

Element D Services Electrical ODG010107

The Owner will provide the QEI inspection and certification services.

IMPORTANT NOTICE BUILDERS AND CONTRACTORS WORKING IN NORTH RICHLAND HILLS, TEXAS. June 17th, 2016

INSPECTION AND TESTING FORM

MINOOKA FIRE PROTECTION DISTRICT Fire Prevention Bureau Fire Inspector Rodney Bradberry

Winnipeg Fire Department Fire Prevention Branch

PENNSYLVANIA. Downloaded

Michigan State University DESIGN GUIDELINES. ELECTRICAL DESIGN Page 1 TABLE OF CONTENTS 1

Is the address of your property clearly visible and marked in large numbers that can be easily seen from the street?

DIVISION 16 - ELECTRICAL

ELECTRICAL POWER SYSTEMS

New Construction Fire Inspection Process

Table of Contents CHAPTER 10 ADMINISTRATIVE RULES FOR CERTIFICATION OF CHILD CARE FACILITIES FIRE STANDARDS FOR FAMILY CHILD CARE HOME

MULTI-LEVEL & COVERED BOOTH CONDITIONS

NFPA Changes

Technical II Report Electrical Systems

SECTION LIGHTING CONTROLS

PLAN REVIEW SUBMITTAL GUIDE

2009 ELECTRICAL CODE REQUIREMENTS

A. Product Data: For each electrical identification product indicated. B. Comply with 29 CFR and 29 CFR

Technical Report Two

FIRE INSPECTORS GUIDELINES FOR PLAN REVIEWS AND INSPECTIONS OF NEW CONSTRUCTION / ADDITIONS AND CHANGE OF OCCUPANCY

Facilities Management

FRONT END ENCLOSURE (FEE) - ROOM DATA SHEET

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU INSPECTION CHECKLIST

Model LTN-3R Outdoor Rated Uninterruptible Power System Single Phase

NYC Approved Product Series


Library stacks and records storage 150 LB/SF live load

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

GENERAL AREAS OF INSPECTION

REQUIREMENTS & GUIDELINES

Interior signs are an extension of the exterior sign system and their content and design should take this into consideration.

Surface Materials. Surface Material Reflectance. Acoustic Ceiling 80% Tile. Painted Gypsum 75% Wall Board. Vinyl Composition 32% Tile

NATIONAL ELECTRICAL CODE (NEC) & NFPA 70E ARC FLASH ELECTRICAL SAFETY

MARY CRAPO CENTER Miller Road, Swartz Creek, Michigan

Renovate MCRC Facilities Great Lakes, IL

Alex Masterton, PE Electrical Engineer Reviewer AHCA Neal Boothe, PE Electrical Engineer/Principal

TECHNICAL EDUCATION FACILITY SAFETY AUDIT

Section: TABLE OF CONTENTS Lighting. 07.A General B Lighting Levels Minimum Lighting Requirements

Introduction Limited-Use / Limited-Application

Transcription:

OPERATIONS AND STORAGE BUILDING Standard and Large OPERATIONS AND STORAGE

Purpose The Operations and Storage Building provides office space for range personnel and a storage area for range maintenance equipment, spare parts, tools, and supplies. Many installations use the storage area for light target maintenance and testing. The standard sized building is included in the standard set of buildings for most small arms ranges; the larger version is standard on some of the larger ranges, see matrix for specifics. Design Requirements See the standard drawings in the RDG for details of construction not included in this document. General The standard design must be site adapted to local conditions such as climate, typical construction materials and methods, and the installation design guide. Design the facility in accordance with the design codes and criteria of the specific location, geotechnical information, structural loads, mechanical design criteria, etc. The facility typically requires access by able-bodied personnel only and does not require ADA compliance. Siting The primary use of the facility is range maintenance; accessed mainly by range maintenance personnel. When siting the facility, consider vehicle access and circulation, access to downrange areas, and keeping separation between the areas used by maintenance personnel and trainees. Operations and Storage Building Jul2014 RTLP-MCX Range Design Guide Architectural The size of the standard facility is 800 square feet (74.3 square meters). The building is typically 20 feet wide and 40 feet long with half of the space set aside as office area. The Large Operations and Storage Building is 1800 square feet (167.2 square meters). The actual size of the office area is determined during the design process and can be reduced or eliminated as needed by the installation. Some installations prefer to combine this building with other ROCA facilities. This is not necessarily a problem; however, larger buildings can trigger an increase in requirements for LEED, Fire Protection, AT/FP, etc. It is allowable to change the outside dimensions of the building as needed by a specific range, but the overall square footage must meet the DD1391. For the standard size facility, the office area typically has windows; windows in the storage area can provide natural light and ventilation. It has either a double or an overhead door for access to the storage area. The minimum ceiling height is 9 foot. Taller ceilings are acceptable, especially in the storage area or when needed to provide clearance for an overhead door. Coordinate security requirements with the installation. Most installations require forced entry resistant windows and doors. The Large Operations and Storage Facility is a typically open bay structure. It has two overhead doors 10 feet high and wide. It may also have windows in the office area. Designing the building for vehicle maintenance or battery charging is not standard for a SRP Range Project. The 1

addition of either of these usages adds a complete set of additional requirements and requires an exception to standard. Coordinate building material choices with the user and the installation design guide. The standard designs depict both Concrete Masonry Unit (CMU) and pre-engineered metal building versions as these are the most commonly used materials. Coordinate security requirements with the installation. Most installations require forced entry resistant windows and doors. Covered entries and ice guards may be required in northern climates. Provide interior finishes that are easily cleanable, durable and maintainable. Due to the location and training environment of the ranges, these facilities commonly have sealed concrete floors. The office sometimes includes vinyl tile, acoustical tile suspended ceilings, and impact resistant gypsum wallboard or other durable finished wall. Mechanical There are no range specific mechanical requirements for this building. The standard design does provide heating and cooling in the office area with ventilation only in the storage area; add heat to the storage area if required by the installation. The design process determines what is actually included in the project based on installation and local design code requirements. Electrical Power Distribution Primary distribution service may be overhead or underground. Consider the type of tactical vehicles used in the Range Operations and Control Area, proximity of building to Ammunition Supply/Breakdown/Distribution points, and local utility requirements for determining the routing of primary power to the facility. Provide 120/240V, single-phase, 3-wire secondary power with a Surge Protective Device (SPD) on the incoming service to the facility. Provide this facility with a panelboard supplied with main circuit breaker that serves separate circuits for the lighting, convenience outlets, and HVAC equipment. Operations and Storage Building Jul2014 RTLP-MCX Range Design Guide General Power Requirements Provide general purpose 120V, 20A duplex convenience receptacles; mounted 18 (450mm) above the finished floor in office area. Provide 120/240V power for the HVAC unit(s) as required. Provide one set of target power outlets in the storage side of the facility for target lifter testing; coordinate the location with the installation. Provide maintenance outlets in storage area. Lightning Protection and Grounding Grounding and lightning protection systems are required for safety. Building electrical system grounding will consist of one or more ground rods connected to the service panel in accordance with NFPA 70. Provide lightning protection system if required by NFPA 780 Risk Assessment. Follow local installation requirements for lightning protection systems where they are more stringent than the requirements defined in the Range Design Guide; there are no range program specific requirements for this building. The lightning protection system may be provided as a mast-style system or air terminals located on the building structure. Use exothermic welds for cable connections and connections to the ground rods and structural steel. 2

Lighting Design illumination levels in accordance with the IES. Provide red lenses or red lamps in addition to standard lighting on ranges where training will occur at night. See Night Operations Lighting paragraph for more information. Provide Emergency and Exit lighting in accordance with NFPA 101 and NFPA 70. Provide 3-way switching for exterior lighting, with one switch located inside the Control Room and one switch located at ground level next to the bottom of the stairwell. Night Operations Lighting To prevent interference with specialized equipment used during night operations, provide separate fixtures with red lenses or red lamps in addition to standard lighting on ranges used for night training where the lights will be visible from training and/or staging areas. Include the following areas as a minimum exterior lighting visible from the training area rooms where ROCA building has windows that are facing the training area and cannot be covered rooms where the building has a doors that opens to the training area Operations and Storage Building Jul2014 RTLP-MCX Range Design Guide Provide separate switching for the standard and red lighting. Clearly label switches and provide covers over white lights, or similar protective measures, to deter turning on white lights while red lights are in use. Locate switches near points of egress. Provide a means to turn off all exterior white lights including an over-ride for lights controlled by a photocell. Common User Cable Systems All ranges are required to have two forms of communications for safety during training exercises. These forms of communications do not have to be wired telephone service to the range. The requirement for telephone and/or common user data is a local requirement specific to each range site. It is extremely important to identify telephone and common user data requirements during the planning phase of every range project, or funding will not be available for telephones and common user data. Provide recessed telephone outlets in the office area if service is available at the range. Do not connect downrange instrumentation and control systems to common user data networks or telephone systems; downrange instrumentation and control systems are not certified or 3

approved for external connection. Telephone and common user cable systems and equipment must be contained completely separated from down range control systems and equipment. Each system must have its own separate enclosures and/or cabinets, and each must be specifically labeled to indicate the systems it serves. Design and construct common user telephone and data systems in accordance with Technical Criteria for the Installation Information Infrastructure Architecture (I3A) and local Network Enterprise Center (NEC) requirements. Special Considerations Fire protection is not normally required for this facility, though installation requirements may control. Consult the installation Fire Marshal for local requirements. Typically, a local audible fire alarm is required. Fire extinguishers and cabinets are required per NFPA. Battery Charging and Storage Charging and storing batteries can add building code requirements to the facility. The number, type, and size of batteries that are charged and stored in the building will dictate the number of circuits as well as the code requirements. These may include an increased number of emergency exits, increased ventilation, additional fire alarm/detection/protection, eyewash stations, etc. Also, many common battery types have special charging and ventilation requirements and need separate charging areas; Lead Acid batteries, (including Sealed Lead Acid (SLA) and variations like Gel, Absorbed Glass Mat (AGM), etc.), Nickel Cadmium (NiCd), Nickel Metal Hydride (NiMH), and Lithium Ion (Li Ion). Refer to NFPA for information and requirements. Coordinate with the installation to determine battery-charging requirements; include batteries for cordless tools, targetry, etc. For Instrumented ranges, include an area with dedicated circuits for charging the player unit Li Ion batteries. Include six (6) 20-amp circuits for a DAGIR or DMPRC and four (4) 20-amp circuits to the OPs Storage Building for a DMPTR or BAX. Provide five (5) single receptacles to support up to five (5) chargers on each circuit. Coordinate with the targetry provider on how the battery chargers are used and how the batteries will be stored to determine best location for the receptacles. Provide signs indicating battery charging areas and allowable battery types. Operations and Storage Building Jul2014 RTLP-MCX Range Design Guide 4