f r e d e r i c k s b u r g v i r g i n i a

Similar documents
MONTCO 2040: A SHARED VISION The New Comprehensive Plan for Montgomery County. Dra Themes and Goals March, 2014

Welcome! Get On Board!

Windsor Locks Transit-Oriented Development Planning Grant Request. Project Background

REDEFINING QUEENSWAY CONCEPT DESIGN DESIGN RATIONALE

The Placemaking Process so far

CHAPTER 4: LAND USE PLAN

Project Goal. RRRC Living Towns Planning Workshp. Town of Halifax Revitalization Project. Dynamic Planning & Management Duo: July 12, 2006

Planning Districts INTRODUCTION

Illustration of Eastlake Farmer s Cooperative Grain Elevator. Chapter 5: implementation 5-1

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2.

EXHIBIT A. Tax Increment Reinvestment Zone No. 1 (Town Center) First Amended Project Plan 1

History: a Grand Urban Boulevard

Robbinsdale LRT Station. CDI Development Guidelines. August Overview

Sheridan Boulevard S TAT I O N A R E A P L A N S H E R I D A N B O U L E VA R D S TAT I O N A R E A P L A N

Downtown Dubuque...it s a great time.

Small Area Plan. South Gateway

Wadsworth Boulevard S TAT I O N A R E A P L A N

Community Design Plan

ROBBINSDALE LRT STATION CDI DEVELOPMENT GUIDELINES

Carlsbad Village Redevelopment Concept Summary of Features

TABLE OF CONTENTS INTRODUCTION PLAN CONCEPT... 3

WEST BROADWAY BIZ MASTER PLAN

Chapter 4. Linking Land Use with Transportation. Chapter 4

POCKET COMMUNITY PLAN

The Lower SaLuda Greenway

Dyersville Downtown Plan. Open House October 24, 2017

EXISTING COMPREHENSIVE PLAN

Create Policy Options Draft Plan Plan Approval. Public Consultation Events. Phase 2

Implementation Status Jan 2013

Envision Front Royal Workshop 1 of 2

Olde Towne Vision Plan

CHAPTER 1. Ms. Guajardo s Class - Central Elementary CH 1 1

Existing Built Form By-Law (R1) Lot size 954 sq m, median 540 sq m, minimum Coverage 15%, median 35%, maximum Height 6.5m, maximum 9.

Elliot Park 2. Neighborhood Master Plan. Historical Perspective

7Page 91 CLEMMONS COMMUNITY COMPASS 7 COMMUNITY CHARACTER

Roanoke Rapids Streetscape Master Plan. City Council Presentation

Downtown Lead Revitalization Project Final Recommendations. Three Proposed Options for the Revitalization of Downtown Lead

CHAPTER 3 VISION, GOALS, & PLANNING PRINCIPLES. City of Greensburg Comprehensive Plan. Introduction. Vision Statement. Growth Management Goals.

Downtown Revitalization: Preserve, Rehabilitate and Promote, a Unique and Thriving Downtown.

C. Westerly Creek Village & The Montview Corridor

7-PARKS, OPEN SPACE & PUBLIC ART

Status Update (2006 vs. Now) Citizen s Advisory Committee February Plan for Prosperity

CONCESSIONS. Tenant Design Manual Addendum Dallas/Fort Worth Interna onal Airport Terminal D - South Village Improvements

Study Area. Capitol Way. Greening America s Capitals 11/13/2014. A Greening America s Capitals Project

Metro. Activity Center Design Guidelines. Recommendations For Developing Focused, Mixed-Use Commercial/Residential Centers

V. Vision and Guiding Principles

Complete Streets Master Plan for Downtown New Britain CRCOG Transportation Committee Meeting Monday, December 9, 2013

About Momentum Midland

Anatomy of A Vibrant Downtown. Anatomy of a Vibrant Downtown

4- PA - LD - LIVELY DOWNTOWN. LD - Background

Port Lavaca Future Land Use

Welcome. Comprehensive Plan & Transportation Plan Open House November 7, 2012

R STREET CORRIDOR NEIGHBORHOOD Site Plan and Design Review Supplemental Guidelines Checklist

NEIGHBORHOOD DESIGN ELEMENT

CHAPTER 2 THE GEORGE WASHINGTON REGION TODAY

Bringing Quality Affordable Housing to the Inverness Community. Shean Housing Coali on 2012

TRAFFIC AND TRANSPORTATION ADDENDUM GOAL: ENSURE SAFE ACCESS TO PARKS AND INSTITUTIONS FOR PHILADELPHIA PARKS AND RECREATION

Policies and Code Intent Sections Related to Town Center

GREENING THE BOULEVARD Master Plan Concepts for Venice Boulevard between Lincoln and Sawtelle

Mark-up of the effect of the proposed Bronte Village Growth Area OPA No.18 on the text of section 24, Bronte Village, of the Livable Oakville Plan

LAND PARK COMMUNITY PLAN

CHAPTER 2: HISTORIC BACKGROUND

City of Hermosa Beach Administrative Policy #

HE VISION. Building a Better Connected Place

The Village of Shirlington

Historic Preservation Element

Table L-1 Summary Action Strategy. Action Item Timing Status Responsible Agency

appendix and street interface guidelines

SPRINGHILL LAKE TRANSIT VILLAGE

2. Form and Character. 2.1 Introduction. 2.2 The Downtown Addition Plan. 2.1 Introduction

Chapter 2, Section C: Urban Design and Visual Resources A. INTRODUCTION

2.1 Location and Size

TOWN COUNCIL / PLANNING COMMISSION

TORTI GALLAS and partners, inc. How to Retrofit Your Suburb to Make a Downtown

Page 1 of 19 URBAN DESIGN FRAMEWORK FOR BOLTON STREET WATERFORD

Project Consulting Team:

Key Ac on Strategies & Plan Recommenda ons

P A I N E S V I L L E D O W N T O W N P L A N

Fifth and Detroit Street Design May 2017 Capital Improvements Committee. DOWNTOWN Street Design

13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154

Today Land & People. Northeast Nampa Gateway District. Employment. Land Use Characteristics. Demographics. Current Zoning

WELCOME AN INTEGRATED APPROACH TO BOROUGH REVITALIZATION

Transportation Working Team Duane Diggs, Co-Chair (VOICE Buffalo) Kelly Dixon, Co-Chair (GBNRTC) Paul Ray, Facilitator (UB Regional Institute)

1.0 Introduction. Purpose and Basis for Updating the TMP. Introduction 1

Amtrak Station Area Planning and Land Use Analysis

Lambeth Main Street Streetscape Improvements

1 Adapted from the Statewide Transit-Oriented Development Study by CalTrans, 2006

Chapter 1: Introduction

Comprehensive Plan & Station Area Zoning

Community Advisory Commi ee Mee ng #3 January 20, :30pm - 8:30pm. Minneapolis Sculpture Garden and Cowles Conservatory Reconstruc on Project

APOLLO BEACH COMMUNITY PLAN Comprehensive Plan Amendment

VEHICULAR AND PEDESTRIAN CIRCULATION

OFFICIAL CONTROLS IMPLEMENTATION LEGAL REQUIREMENTS

The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape..

2040 Long Range Transportation Plan

Corridor Vision. 1Pursue Minnehaha-Hiawatha Community Works Project. Mission of Hennepin County Community Works Program

38 Queen s University Campus Master Plan Part 1

WELCOME! TO THE DOWNTOWN MASTER PLAN OPEN HOUSE

SECTION ONE: INTRODUCTION. introduction

THE 355/270 CORRIDOR:

Transcription:

f r e d e r i c k s b u r g v i r g i n i a C o m m u n i t y D e s i g n A s s i s t a n c e C e n t e r a t V i r g i n i a T e c h 1

Fredericksburg Basic Facts City Status: City, incorporated 1782 Popula on (2010 Census): 24,286 Median Age: 28.8 Median Household Income: 43,558 Community Contacts: William M. Beck, Mayor 540-372-1022 bbeck@efredericksburg.net Raymond P. Ocel, Director Planning and Community Development 540-372-1179 rsmigelski@ urg.city.state.va.us Robert Wi ngham, President Historic Fredericksburg Founda on 540-372-4504 ques ons@hffi.org City s Webpage: www.fredericksburgva.gov Introduc on The City of Fredericksburg is located where the coastal plain meets the hilly Piedmont of Virginia. Centrally situated on Interstate 95 and U.S. Route 1 between Washington, D.C. and Richmond, each capital city is only 50 miles away. U.S. Route 17 and State Route 3 provide addi onal east/west access to the City. The Rappahannock River marks the northwest boundary of the downtown area. The many historic sites in the area, including Mary Washington s home, George Washington s boyhood home, and Civil War sites, contribute to tourism and service businesses being the major employers in Fredericksburg. Ge ysburg is recognized principally for Civil War tourism; Williamsburg for Colonial period tourism. Fredericksburg offers a heritage tourism des na on associated with the full spectrum of American history, set in the context of ac ve, healthy, and a rac ve commercial and residen al neighborhoods. 1 Mary Washington Hospital and University of Mary Washington are other major employers. Rather than being an employment or retail center, Fredericksburg has become an urban and cultural center for the region whose popula on is approaching 250,000. Downtown residents, suburban employees and customers, and tourists provide most of the revenue for downtown businesses, though downtown Fredericksburg has yet to reach its peak or realize its full poten al. 2 Fredericksburg, where America grew up, was chartered in 1728 as an official inland port and immediately became a busy colonial seaport. Although passage further upstream on the Rappahannock River was impossible, se lers took advantage of Fredericksburg s loca on on the fall line to harness the water power and build many mills, including grist, tex le, paper, and excelsior, and accompanying warehouses. The town, already an agricultural center, became the 2 C o m m u n i t y D e s i g n A s s i s t a n c e C e n t e r a t V i r g i n i a T e c h

Community Events: seat of Spotsylvania County in 1732. Fredericksburg was an ac ve place during the Revolu onary War, manufacturing muni ons and serving as a loca on for Thomas Jefferson and others to dra the Virginia Statute of Religious Freedom. During the Civil War, Fredericksburg became a ba leground due to its loca on between the northern capitol of Washington, D.C. and the southern capitol of Richmond. The river became a defensive posi on and the railroad, a corridor for army supplies. Fredericksburg changed a er the Civil War as northern investors took over the mills and electrical power in the early 1900s and made it unnecessary for mills to be built near water. Power plants were built on the canal system of the Fredericksburg Water Power Company in the early 1900s. The last of these plants closed when the North Anna nuclear power plant came on line in 1980 because it was too expensive to con nue genera ng electricity at such a small scale. Today, Fredericksburg s main street is Caroline Street, a one-way street that runs northwest and is one block parallel to the Rappahannock River. Princess Anne Street, also one way, runs southeast and parallel to Caroline Street. Travelers can also access Fredericksburg s downtown via AMTRAK. Fredericksburg has weathered 30 years of revitaliza on and refinement and now features completed downtown improvements. The City s a en on has now turned to riverfront improvements, a new City plaza, and the renova on of the light industrial edge of the central business district. Second Saturdays at the Museum Bricks and Boards in the Burg Walking Tours Crab and Music Saturday s at Amy s Cafe Picnic in the Park Juneteenth Celebra on Wicked Woods Haunted Forest Wine Fes val Wings and Wheels Fes val and Airshow Harvest Fes val Candlelight Tour Fredericksburg Holiday Cra Show Fredericksburg First Night Spotsylvania Sprint Triathlon Plus numerous canoe floats, historic tours, plays, lectures, and workshops C o m m u n i t y D e s i g n A s s i s t a n c e C e n t e r a t V i r g i n i a T e c h 3

Downtown Improvement Process Timeline 1953 1972 1980s Following the demolition of several important buildings, the Historic Fredericksburg Foundation is established to preserve remaining landmarks. 40 downtown blocks of Fredericksburg placed on National Register of Historic Places. Initial improvement efforts begin with the revitaliza on of the 900 block of Caroline Street. 1992-1996 New forms of public transportation become available in Fredericksburg. 1997-1999 Charting Downtown s Future commi ee forms and delivers a report. 2000s Renovations move beyond Caroline Street to perpendicular cross streets and away from the central business district. 4 C o m m u n i t y D e s i g n A s s i s t a n c e C e n t e r a t V i r g i n i a T e c h

1980s City zoning updated to allow residential housing over commercial shops in the downtown business district. Mid-1980s Fredericksburg annexes land near I-95 for commercial hub and added tax base. Early 1990s Fredericksburg leaves the Main Street program since revitaliza on nearly complete. 2001-2003 Historic Market Square, in the heart of Fredericksburg, is renovated. 2003 Hurricane Isabel results in the loss of over 400 trees from the streets of Fredericksburg. 2004 Fredericksburg builds a parking garage in the downtown area. C o m m u n i t y D e s i g n A s s i s t a n c e C e n t e r a t V i r g i n i a T e c h 5

Plan of Fredericksburg s Downtown District Amelia Street William Street/King s Highway Market Fredericksburg Square Area Museum and Cultural Ctr. Caroline Street Sophia Street Princess Anne Street Rappahannock River George Street Hanover Street cross sec on A B Charlo e Street Fredericksburg Visitor Ctr. Parking Garage To City Docks and City Dock Park Wolfe Street Not to Scale AMTRAK Sta on Lafaye e Boulevard 6 C o m m u n i t y D e s i g n A s s i s t a n c e C e n t e r a t V i r g i n i a T e c h

Cross-sec on of Caroline Street Sidewalk Tree Pit Parallel Parking Two Lanes, One-Way Traffi c Parallel Parking Tree Pit Sidewalk 6.5 4 6 8 26 8 6 4 8.5 A B 0 10 20 30 C o m m u n i t y D e s i g n A s s i s t a n c e C e n t e r a t V i r g i n i a T e c h 7

William Street Downtown Improvement Process 1953: Something Must Be Done! The early 1950 s saw a number of commercial buildings razed to make room for new development. Local ci zens, par cularly concerned when an excep onally prominent building was destroyed in the downtown area, founded Historic Fredericksburg Founda on, Inc. (HFFI) to save the historic fabric and character of downtown. HFFI, s ll very ac ve today. Despite renewed interest in the downtown commercial core, new roads pulled commercial development to the edges of town in the late 1960s. City government stepped in to begin marke ng Fredericksburg as a place with a unique, historic downtown character to a ract tourists. 1972: An Historic District is Established HFFI laid the groundwork for the establishment of an historic district in Fredericksburg s downtown commercial business area. In 1971, the Fredericksburg Historic District was added to the Na onal Register of Historic Places. The historic district encompasses 40 blocks roughly bounded by the Rappahannock River, Hazel Run Creek and Prince Edward and Canal Streets. HFFI aided the City in the adop on of a municipal historic zoning ordinance allowing mixed uses in the business district. Other incen ves, including par al abatement of real estate taxes for qualifying rehabilitated proper es and capital improvements in the historic district, helped downtown Fredericksburg retain its unique character. The incen ves were so successful that between 1971 and 1990 property values in the historic district rose nearly twice as much as comparable proper es elsewhere in the city. A Na onal Register designa on does not protect an historic district. The City enacted legisla on in the form of a zoning ordinance as early as 1968 to protect the district from inappropriate changes by property owners. Using the zoning 8 C o m m u n i t y D e s i g n A s s i s t a n c e C e n t e r a t V i r g i n i a T e c h

ordinance an Architectural Review Board could review proposed changes, including rehabilita ons and demoli ons and issue Cer ficates of Appropriateness. 1980s: Downtown Improvements Begin Ini al improvements began with the crea on of a Downtown Development and Design Commi ee to develop a plan of ac on. Using this plan as a guide in the early 1980s, improvements began with complete renova on of the 900 block of Caroline Street including brick sidewalks, ornamental lamps, and upgraded curbs and gu ers. By the mid 1980s, Fredericksburg became a member of the Virginia Main Street Program. This ini al work was well received by the community and addi onal improvements to other blocks of Caroline Street, using HUD and CDBG funds, included adding be er drainage and bump-outs at corners to slow traffic and create a more pedestrian friendly environment. A facade improvement plan provided up to $500 to downtown property owners for architectural consul ng from select professionals to prepare plans for improving street fronts of downtown buildings. Working as a loan program, those who qualified did not have to repay the loan if the improvements were implemented. Those who did implement the facade improvements served as a catalyst for others, crea ng a snowball effect that greatly improved the streetscape. 1980s: Zoning Ordinances Updated in Historic District To encourage residen al apartments above commercial shops in the downtown district, the city changed its zoning ordinances to reflect this return to historical usage. Allowing residences in these districts creates a more diverse environment and adds life to the streets during all parts of the day and week. Mid 1980s: Fredericksburg Grows The City of Fredericksburg annexed 4.5 square miles of land near Interstate 95 which has since become a large commercial shopping area. While this may sound William Street C o m m u n i t y D e s i g n A s s i s t a n c e C e n t e r a t V i r g i n i a T e c h 9

George Street detrimental to the downtown area, the advantage is the larger tax base which provides more money to the City for downtown improvements. Early 1990s: Fredericksburg Leaves Main Street Program By the 1990s, Fredericksburg s downtown streetscape improvements on Caroline Street were essen ally complete. Public and private investment had resulted in rehabilitated buildings and very few vacancies in the downtown area. The City decided to leave the Main Street Program since most improvements had been completed. 1992-1996: Local Public Transporta on Becomes Available In 1992, the Virginia Railway Express (VRE) commuter rail line ini ated service on its Fredericksburg line to Washington, D.C. The city received approximately $600,000 in ISTEA funding in 1993 to renovate the historic railroad sta on. Fredericksburg Regional Transit Service (FRED) began opera ng in 1996 with 13 buses to offer local bus service throughout the City and into surrounding coun es. These local services complemented the already-exis ng na onal inter-city and Greyhound services. 1997-1999: Char ng Downtown s Future Consis ng of 29 ci zens, downtown merchants, and City staff, the Char ng Downtown s Future Commi ee (CDFC) was established in 1997 to focus on management, maintenance, and marketing. The CDFC was concerned with developing a course for con nued improvement, development, maintenance, management and sustainability of downtown Fredericksburg. The main objec ves were: to a ract addi onal tourism revenue into the area by crea ng a more enjoyable and diverse experience downtown, to enhance downtown s posi on as the urban center of the Fredericksburg area by providing improved center-city ameni es to the larger regional community, and to con nue to protect the unique 10 C o m m u n i t y D e s i g n A s s i s t a n c e C e n t e r a t V i r g i n i a T e c h

character and historic integrity of the downtown as a neighborhood as well as adjoining neighborhoods. 3 Recognizing that downtown serves three communi es - downtown residents, employees and customers, and tourists - the CDFC sought to enhance Fredericksburg s image as historically and architecturally unique, livable and enjoyable place to work, walk, eat, shop, and visit 4 while strengthening the City s focus on downtown preserva on. Specific guidelines for development of the downtown area included widening the perceived boundaries of downtown; widening the variety of commercial, cultural, and historical offerings; developing pedestrian corridors; expanding sidewalks; creating a district-wide parking program; and developing a downtown advocacy program. The theme of the CDFC was building upon Fredericksburg as a classic American living, working town. 5 Fredericksburg developed and adopted an Historic District Handbook in 1998 that provides guidelines on maintenance, rehabilita on, and new construc on, as well as informa on on how preserva on enhances the community s development. This handbook provides clear guidance to property owners and investors and has been reprinted to keep up with the demand. 2000s: Con nuing Improvements Through the decade, Fredericksburg improved two to three blocks in the downtown area using public monies. Due to changes in the downtown improvement plan, streetscape changes on the 900 block of Caroline Street were redone in 1999-2000 to match the renova ons on other blocks of the street. Later work focused on improving the streets perpendicular to Caroline including water and sewer upgrades. George Street C o m m u n i t y D e s i g n A s s i s t a n c e C e n t e r a t V i r g i n i a T e c h 11

With many of the streetscape improvements completed in the downtown area, the City has begun to look at other areas for improvement. Fredericksburg is focusing on riverfront improvements including crea ng a natural linear trail connec ng parking, downtown, the library, Riverside Park, and the City Dock. Plans include a future plaza on the riverfront. The City is also focusing on the rehabilita on of light industrial buildings on the perimeter of the central business district with some warehouses seeing new lives as offices and apartments. 2001-2003: Market Square Renova ons Market Square was placed on the Na onal Register of Historic Places in 1994 as one of the only 18th century market areas in the country s ll in use as a public space. It was the focus of $500,000 in TEA-21 funding for renova ons and revitaliza on. Addi onal funding was provided by the Gwathmey Founda on. The City matched this funding by providing grading and u lity work. Archaeological work in Market Square uncovered what was once a cemetery in the Southeast corner resul ng in a delay in the comple on of the project. The Old Town Hall/Market House, located on the square, benefi ed from $250,000 worth of grants from the Virginia General Assembly and is now home to the Fredericksburg Area Museum and Cultural Center. Alleys, improved during the project, lead from Caroline, William, and George Streets to Market Square. Formally completed in 2003, Market Square is used for events such as concerts and fes vals. 2003: A Hurricane Strikes Fredericksburg was hit by Hurricane Isabel in the fall of 2003, resul ng in the loss of 400 mature trees from the streets of Fredericksburg. Many of the trees were lost due to narrow, inappropriate tree pits with impervious paving. The trees were unable to grow wide enough root systems to stabilize themselves in hurricane-force winds. The City has since improved its tree program to ensure more appropriate tree selec on and improved plan ng procedures. 12 Hanover Street C o m m u n i t y D e s i g n A s s i s t a n c e C e n t e r a t V i r g i n i a T e c h

Hanover Street 2004: A Place to Park As suggested in the 1999 Comprehensive Plan and also in the report by the Char ng Downtown s Future Commi ee, the City began accep ng proposals for a parking garage in 2004. The garage, located a block from Caroline Street at the corner of Wolfe and Sophia Streets, is five stories and provides 297 spaces. The newly available parking a racted the a en on of investors and a 99-room Courtyard by Marrio was constructed and opened in 2007, enhancing the downtown economy considerably. Future While most of the improvements are complete in the downtown area of Fredericksburg, the community is always seeking improvement. The City con nues to add historical markers to increase interest for tourists. The most recent addi on describes the quest for religious freedom in the City. According to Char ng Downtown s Future, downtown Fredericksburg s preserva on is ul mately dependent on its commercial health. The maintenance of our historic sites, the rental value of downtown proper es, even the quality and a rac veness of our downtown restaurants result from and are dependent upon the flow of money into downtown Fredericksburg. No other element bears as directly on the future of downtown as proper and appropriate marke ng. 7 C o m m u n i t y D e s i g n A s s i s t a n c e C e n t e r a t V i r g i n i a T e c h 13

Elements Accessible curb cut of pebbles in brick sidewalk Streetscape Elements Ligh ng: an que-looking pedestrian ligh ng, both sides of Caroline Street Parking: 2 hour parallel on-street parking, both sides of Caroline Street; 297-space parking garage built at 600 Sophia Street (paid parking) Paving: asphalt roads; brick sidewalks; change in materials at end of blocks Planters: tree pits are planted; plantings at seating areas; individual shop owners have added their own planters in front of businesses Brick sidewalks, period ligh ng, and street trees Informational signage, seating, and planters at visitor center Public Spaces: small open space with built in brick planters and benches beside Visitor Center Brick sidewalk, planters, street trees, and benches Barrels as trash cans Merchants and property owners have claimed ownership of street trees by plan ng in the tree pits 14 C o m m u n i t y D e s i g n A s s i s t a n c e C e n t e r a t V i r g i n i a T e c h

Informa onal signage at intersec on An empty tree pit has become a planter beside the street bench Streetscape Elements: Sea ng: benches placed intermittently on street side of sidewalk; some benches on business side; in public space outside of Visitor Center Site of farmer s market at intersec on of William and Prince Edward Streets Signage: no banners; Fredericksburg Historic Tour, Visitor Center, and bus stop signage; informational signage at intersec ons Trash: standard barrel receptacles; no consistent interval Visitor Center signage Trees: on both sides of Caroline Street; various heights as new trees have replaced declining trees as well as those that fell during Hurricane Isabel U li es: underground on Caroline Street Walking tour signage matches Visitor Center signage City (FRED) bus stop signage An historic method for ge ng around town C o m m u n i t y D e s i g n A s s i s t a n c e C e n t e r a t V i r g i n i a T e c h 15

Conclusions Fredericksburg s unique loca on halfway between Washington D.C. and Richmond has made it part one of the fastest growing regions in the country. Fredericksburg s efforts to revitalize downtown started earlier than many communi es and have proven successful through the con nuous efforts of a variety of interested local organiza ons. The City was one of the first Virginia Main Street Communi es, and though it no longer par cipates in the program, Fredericksburg is s ll a very ac ve and vibrant downtown. Fredericksburg has been able to retain its historical character while modernizing to meet the demands of popula ons from two major metropolises. Due to its size, Fredericksburg has the benefit of a well-orchestrated planning program and significant state interest. The City also has major growth poten al as possible Metro line op ons have been considered to reduce automobile traffic in the region. Fredericksburg gains most from its high profile status, but the commi ed local and private interest groups have helped to capitalize on the City s unique historical character and limit the commercializa on of their community. 16 C o m m u n i t y D e s i g n A s s i s t a n c e C e n t e r a t V i r g i n i a T e c h

Cita ons Text Cita ons 1. Char ng Downtown s Future Final Report to Council. July, 1999. p. 2. 2. Char ng Downtown s Future Final Report to Council. July, 1999. 3. Ibid, p. 1. 4. Ibid. 5. Ibid. 6. Char ng Downtown s Future, p. 4. 7. Ibid, p. 8. C o m m u n i t y D e s i g n A s s i s t a n c e C e n t e r a t V i r g i n i a T e c h 17