PART 1: PROJECT SUMMARY. Proposed Land Use: 120 single-family lots. The application is Attachment A. The site plan is Attachment B.

Major Subdivision Sketch Plan Checklist

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

PART 1: PROJECT SUMMARY. The application is Attachment A. The site plan is Attachment B.

Asbury Chapel Subdivision Sketch Plan

City of Waco Stormwater Management Regulations

Importance of Master Planning Marcy Colclough

When planning stormwater management facilities, the following principles shall be applied where possible.

7.0 OPEN SPACE 7.1 OPEN SPACE DEDICATION CHAPTER 7: OPEN SPACE

PLANNED UNIT DEVELOPMENT STAFF REPORT Date: June 2, 2016

One County s Success in Linking Watershed Protection and Land Use Planning

Rezoning Petition Post-Hearing Staff Analysis July 31, 2018

SITE PLAN (REVISED 8/13/18) l. Development Data Table

Metropolitan Area Planning Council 60 Temple Place, Boston, Massachusetts fax

Tree Protection, Open Space, Landscaping, Storm Water Additional Elements Chatham Park Investors LLC s Responses to Comments

VILLAGE OF CLEMMONS PLANNING BOARD DRAFT STAFF REPORT

Chesapeake Bay Critical Area Conservation Plan

TOP TEN LIST OF COMMUNITY CONCERNS REGARDING PROPOSED AMENDMENTS TO CHAPTER 42

AWH REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE TO PLANNED UNIT DEVELOPMENT

PLANNING APPROVAL & SIDEWALK WAIVER STAFF REPORT Date: December 1, 2016

CROWN POINT SUBDIVISION

COMMUNITY DESIGN. GOAL: Create livable and attractive communities. Intent

VILLAGE OF CLEMMONS PLANNING BOARD DRAFT STAFF REPORT. Single Family Residential, Townhomes

ARTICLE IV: DEVELOPMENT STANDARDS 404 MASTER PLANNING

Landscaping Standards

Chapter Purpose and Intent. 7.2 Applicability. 7.3 General Provisions RECREATIONAL OPEN SPACE

Planned Development Review Revisions (Project No. PLNPCM )

Rezoning Petition Pre-Hearing Staff Analysis July 16, 2018

Low Density Projects. Design Objective

ORDINANCE NUMBER DRAFT. An ordinance amending Title 12 Environmental Protection of the Los Angeles County

SECTION UNIFIED DEVELOPMENT ORDINANCE SECTION Part 1 Ordinance. ARTICLE 1 Zoning Districts

Net Land Area (NLA): Area within zoning lot boundaries NLA= sq. ft. a) Credited Street Area (total adjacent frontage) x ½ width of public rightof-way

Article 6 Tree Protection

Neighborhood Drainage Infrastructure Improvements Using Green Initiatives. Village of Hinsdale, IL

City of Petersburg, VA Stormwater Utility Frequently Asked Questions

ZONING COMPLIANCE PERMIT APPLICATION

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017

Draft Rhode Island Stormwater Design and Installation Standards Manual

Red Fox Commercial Outline Plan

Chapter 10 IMPLEMENTATION RECOMMENDATIONS

COUNTY COUNCIL OF PRINCE GEORGE'S COUNTY, MARYLAND SITTING AS THE DISTRICT COUNCIL 2010 Legislative Session. Council Members Dernoga and Olson

The Five Components of the McLoughlin Area Plan

CHAPTER 22 Rural Open Space Community Developments

Small Area Plan. South Gateway

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2007 SESSION LAW SENATE BILL 1967

Rezoning Petition Pre-Hearing Staff Analysis May 21, 2018

Northeast Ohio Regional Sewer District Stormwater Management Plan Review Policy

Drexel, Barrell & Co.

Rezoning Petition Zoning Committee Recommendation August 1, 2017

Huntington Stormwater Utility

Drexel, Barrell & Co.

ARTICLE 2 FORM BASED DISTRICT STANDARDS

g) "Minor repair" means repairs dealing primarily with nonstructural portions of the fence, as well as appearance.

Rezoning Petition Pre-Hearing Staff Analysis May 21, 2018

Highway Oriented Commercial Development Criteria

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

PLANNED UNIT DEVELOPMENT Date: April 5, 2018

CITY OF ZEELAND PLANNING COMMISSION

2.4 FUTURE LAND USE ELEMENT Goals, Objectives and Policies

RESIDENTIAL DISTRICTS

ARTICLE 6: Special and Planned Development Districts

2. Would the proposed project comply with the Land Use map? 3. Would the proposed project require a rezoning? 4. What is the proposed zoning district?

Minnesota Department of Natural Resource - Natural Resource Guidance Checklist Conserving Natural Resources through Density Bonuses

Net Land Area (NLA): Area within zoning lot boundaries NLA= 1,076,181 sq. ft.

Rezoning Petition Final Staff Analysis June 18, 2018

HISTORIC LANDMARK COMMISSION STAFF REPORT

Rezoning Petition Pre-Hearing Staff Analysis March 19, 2018

RECREATION AND OPEN SPACE ELEMENT GOALS, OBJECTIVES, AND POLICIES

DISCUSSION TOPIC: ST JOHNS RIVER & ITS TRIBUTARIES (BPII) 2030 COMPREHENSIVE PLAN POLICES AND REGULATORY FRAMEWORK

SUBMITTAL REQUIREMENTS: FINAL PLAN REVIEW- PROJECT DEVELOPMENT PLAN (PDP)

Best Practices Appendix: Waterfront Communities

STREAM BUFFERS

3 Vision and Goals. Vision and Goals. Blueprint for Bloomsburg. Vision. Town of Bloomsburg Comprehensive Plan,

3. VISION AND GOALS. Vision Statement. Goals, Objectives and Policies

Fixer Upper. MS4 Post-Construction and Redevelopment. Anthony Betters, CSI City of Waco Environmental Storm Water Compliance

SUBMITTAL REQUIREMENTS

Coffee Creek Park Development Low Impact Development (LID)

Experiences and Adoption of Low Impact Development in City of Fort Worth

NEW CASTLE COUNTY S ZONING DISTRICTS

Pennsylvania Stormwater Best Management Practices Manual

C HAPTER 9: E NVIRONMENTAL P ROTECTION

CITY OF INVER GROVE HEIGHTS 8150 Barbara Avenue Inver Grove Heights, MN (651) Fax: (651)

Tennessee Stormwater Management Program. Stormwater Management Site Assessment and Inventory Checklist. Quick Check o Vicinity Map within Watershed

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: March 15, 2012

The scale of intervention:

Rezoning Petition Pre-Hearing Staff Analysis April 16, 2018

City of Shady Cove Riparian Ordinance Ordinance XXX

Cahill Associates Inc. West Chester, PA

Metropolitan Area Planning Council 60 Temple Place, Boston, Massachusetts fax

STORMWATER GREEN INFRASTRUCTURE AND PLANNING/ZONING BOARDS

Guiding Principles, Objectives, Strategies and Policies

ARTICLE RRCO RED ROCK CORRIDOR OVERLAY DISTRICT

Chapter 3 Site Planning and Low Impact Development

Detroit Stormwater Rules and Drainage Fee Updates

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

3. Are there any projects exempt from the definition of Regulated Projects?

SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST

EXHIBIT B PROJECT NARRATIVE POULSBO MEADOWS

STAFF REPORT INTRODUCTION

A Growing Community Rural Settlement Areas

Transcription:

Catawba Area Plan Advisory Group Meeting #3 Natural Environment, Part I September 23, 2008

Advisory Group Meeting #3 Welcome and Introductions Review Handouts Vision Statement GDP - Environment

Draft Vision Statement The vision for the Catawba River Area should have a central focus on the river itself and the maximization of its enjoyment for the benefit of the community. Proper integration of all uses within the area shall create a sustainable community for all ages known for its:

Draft Vision Statement (continued) High quality design reflective of the river and recreational characteristics of the area; Enhanced public facilities and services; Greenways, parks and natural areas accessible and visually adjacent to major and minor thoroughfares; Mixture of housing types and neighborhood-serving land uses; Safe and well-connected transportation network that provides options for pedestrians, cyclists, motorists and transit users; Viable employment centers integrated in appropriate locations; and Mature trees, open space and greenways integrated within neighborhoods.

General Development Policies GDP Environment Protect the natural environment by preserving air quality, water quality and the tree canopy; retaining natural areas; providing open space; and minimizing impervious cover, as feasible.

Storm Water Protection Storm Water Services Surface Water Improvement and Management (SWIM) Buffer Post Construction Controls Ordinance (PCCO) Watershed Protection The SWIM Buffers protect streams by means of vegetative buffers. The width of these buffers increase as the area draining to the stream increases. The PCCO incorporates most SWIM Buffers and also includes requirements for the following: Treat the first flush (1 ) of runoff for 85% Total Suspended Solids Removal and 70% Total Phosphorous Removal in Western Catawba, Yadkin, and Southeast Catawba Provide extended detention for 1-Year Storm for 2-5 days Control Peak runoff from site for 10- year and 25-year storms Provide Natural Area Have additional buffers for smaller watersheds to treat the runoff at its source These are the general requirements and vary based on location and zoning of the site

PCCO Requirements APPLICABILITY (A) Applicability Ordinance applies to almost all new construction, unless certain criteria have been met for prior plan approval. (B) Exemptions (1) Residential Development and Redevelopment that cumulatively disturbs less than one acre and cumulatively creates less than 24% built upon area based on lot size or the lot is less than 20,000 square feet (lot must have been described by metes and bounds in a recorded deed prior to the effective date of the ordinance and can not be part of a larger Development or Redevelopment); (2) Commercial and industrial Development and Redevelopment that cumulatively disturbs less than one acre and cumulatively creates less than 20,000 square feet of built upon area (built upon area includes gravel and other partially impervious materials); (3) Redevelopment that disturbs less than 20,000 square feet, does not decrease existing storm water controls and renovation and/or construction costs (excluding trade fixtures) do not exceed 100% of the tax value of the property; and (4) Activities exempt from permit requirements of Section 404 of the federal Clean Water Act, as specified in 40 CFR 232 (primarily, ongoing farming and forestry activities).

PCCO Requirements Western Catawba Yadkin-Southeast Catawba Central Catawba

Western Catawba Watershed Standards For Low Density Projects Less than or equal to 12% built upon area Storm water runoff shall be transported by vegetated conveyances to the maximum extent practicable. Stream Buffers Same buffers as required by SWIM (Zoning Chapter 12) plus the following All perennial and intermittent streams draining less than 50 acres shall have a minimum 30-foot vegetated buffer All perennial and intermittent streams draining greater than or equal to 50 acres and less than 300 acres shall have a 35-foot buffer Streams draining greater than or equal to 300 acres and less than 640 acres shall have a 50-foot Streams draining greater than or equal to 640 acres shall have a 100-foot buffer, plus 50% of the area of the flood fringe beyond 100 feet.

Western Catawba Watershed Standards For High Density Projects (Greater than or equal to 12% built upon area) Storm water quality treatment systems shall treat the runoff generated from the first inch of rainfall. All structural storm water treatment systems used to meet these requirements shall be designed to have a minimum of 85% average annual removal for Total Suspended Solids and 70% average annual removal for Total Phosphorus except I-1 and I-2 zoned developments which are exempt from the Total Phosphorus removal requirement. I-1 and I-2 zoned developments shall implement a management plan for the proper handling and application of pesticides and fertilizers to reduce negative water quality impacts. Stream Buffers Same buffers as required by SWIM (Zoning Chapter 12) plus the following All perennial and intermittent streams draining less than 50 acres shall have a minimum 30-foot vegetated buffer All perennial and intermittent streams draining greater than or equal to 50 acres and less than 300 acres shall have a 35-foot buffer Streams draining greater than or equal to 300 acres and less than 640 acres shall have a 50-foot Streams draining greater than or equal to 640 acres shall have a 100-foot buffer, plus 50% of the area of the flood fringe beyond 100 feet.

Western Catawba Watershed Standards For High Density Projects (continued) Storm water treatment systems shall be installed to control the volume leaving the project site at post-development for the 1-year, 24-hour storm except I-1 and I-2 zoned developments which are exempt from this requirement. Runoff volume drawdown time shall be a minimum of 48 hours, but not more than 120 hours. For residential land disturbing activities exceeding 12% built-upon area, peak control shall be installed for the appropriate storm frequency (i.e., 10, 25, 50 or 100-yr, 6-hr) as determined by the Storm Water Administrator based on a downstream flood analysis provided by the owner or designee using the criteria specified in the Design Manual or if a downstream analysis is not performed the peak shall be controlled for the 10-yr and 25-yr, 6-hr storms. For commercial land disturbing activities exceeding 12% built-upon area, peak control shall be installed for the 10-yr, 6-hr storm and additional peak control provided for the appropriate storm frequency (i.e., 25, 50 or 100-yr, 6-hr) as determined by the Storm Water Administrator based on a downstream flood analysis provided by the owner or designee using the criteria specified in the Design Manual or if a downstream analysis is not performed the peak shall be controlled for the 10- yr and 25-yr, 6-hr storms. Controlling the 1-year, 24-hour volume achieves peak control for the 2-year, 6-hour storm.

Western Catawba Watershed Lots Less than One Acre Development and Redevelopment on a lot less than one (1) acre in size measured in accordance with Section 106(H) is allowed by right to forego meeting the requirements of this ordinance provided the City is paid a mitigation fee according to rates set forth in the Administrative Manual and provided such Development and Redevelopment are not part of a larger common plan of development or sale, even though multiple, separate or distinct activities take place at different times on different schedules.

Western Catawba Watershed NATURAL AREA REQUIREMENTS: Less Than 24% Built-Upon Area A project with less than 24% built-upon area shall include as Natural Area within the boundaries of the project a minimum of 25% of the project area. Greater Than or Equal to 24% and Less Than 50% Built-Upon Area A project with greater than or equal to 24% and less than 50% built-upon area shall include as Natural Area within the boundaries of the project a minimum of 17.5% of the project area. Greater Than or Equal to 50% Built-Upon Area A project with greater than or equal to 50% built-upon area shall include as Natural Area Space within the boundaries of the project a minimum of 10% of the project area. I-1 and I-2 Development and Redevelopment Projects I-1 and I-2 zoned developments are exempt from the Natural Area requirement in the Central and Western Catawba Districts.

Buffer Zones SWIM and PCCO Buffers

Watershed Overlay Regulations

Upper Lake Wylie Watershed Buffers Upper Lake Wylie Watershed Zone Built Upon Area Lake/Stream Buffer Protected Area (PA) < 24% - Low Density 40 Feet < 70% - High Density 100 Feet Critical Area (CA) < 24% - Low Density 100 Feet < 50% - High Density 100 Feet

Tree Cover Tree Ordinance Chapter 21 City Code

Current Ordinance Provisions Tree Protection/Save Trees in the Right of Way- City/public property Trees in Commercial Development - Private property Trees in Residential Subdivisions Private property How much is protected can be affected by lot shape, overhead power lines, zoning category Does not apply to existing single family prior to 2002 revision

Current Ordinance Provisions Protects Public/Right Of Way Trees Trees 2 caliper or larger planted in the right of way All trees 8 diameter or larger in the right of way (Typically between sidewalk and street)

Current Ordinance Provisions Protects Private Property Trees - Commercial in the setback 8 diameter or larger Smaller caliper trees can count towards planting requirements (Typically between sidewalk and buildings)

Current Ordinance Provisions Protects single family development trees in new subdivisions (since 2002) Minimum 10% anywhere on site Incentives to preserve more

Current Ordinance Provisions Tree Planting Commercial Perimeter trees Internal trees Single-family Street trees Supplemental trees (to meet required percentage)

Current Ordinance Provisions Tree Planting in Commercial Development: Perimeter trees Every 30 ft for small maturing trees, or Every 40 ft for large maturing trees Planted in the set-back or the right of way depending on zoning category

Current Ordinance Provisions Tree Planting in Commercial Development: Internal trees 1 tree/10,000 sq ft impervious (approx. 4 trees/acre) All parking spaces within 60 ft of tree

Current Ordinance Provisions Tree Planting in Single- Family Development: Street trees Spaced every 40-50 feet along new streets Within 20 ft of curb Supplemental trees Sites that did not meet minimum requirement

Current Ordinance Provisions Continuing Compliance 1, 2, & 5 Years after installation Random Non compliance letter Missing trees Dead trees Violations During development Upon compliance inspection Random Complaint Violation Letter sent Fines Mitigation

Natural Environment Discussion with Charlotte Mecklenburg Utilities

Next Steps Our next meeting will be September 30, 2008; we will continue our discussion of the Natural Environment, focusing on land and air quality. Thank you for your continued participation!