South Bend Park. Visioning Plan

Similar documents
ACADEMY AREA CONCEPT PLAN

Adams Park Park Making Plan

Long Branch-Wayne Local Park Renovation Project

WARM SPRINGS PARK MASTER PLAN

I-70/71 Innerbelt Project

3. VISION AND GOALS. Vision Statement. Goals, Objectives and Policies

Hidden Pointe Landscape Master Plan. June, archi terra

M E M O R A N D U M February 21, 2018

Project purpose. advise. The purpose of the Beaumaris Lake Open Space Rehabilitation project is to: + Develop a Functional Program Concept

VEHICULAR AND PEDESTRIAN CIRCULATION

West Dennis Center: Bass River to Old Main Street. West Dennis Business District: Old Main Street to Dennis Commons

A larger version of this map is located on the last page of this PDF.

ANCHORAGE PARK REPORT CARD Assessing A Park s Appearance, Function, & Condition

Charles P. Johnson and Associates. Annapolis Landscape Architects

More than 30 adults and 19 children were involved in these community workshops.

AVONDALE ESTATES GREENSPACE AD-HOC COMMITTEE

Maplewood Avenue Downtown Complete Street Project

5. Father Hennepin Blufs Park and Hennepin Island Father Hennepin Bluffs Park Supporting Initiatives (see Figure 36): 7-22

FY Capital Improvement Program Arroyo Projects

AGENDA ACTION ITEMS INFORMATION ITEMS

The Auburn Plan Designing the Future of Auburn February 28, 2005

Draft Master Plan for Franklin Park

4.0 Concept Plan Implementation

City of Plattsburgh DRI: Downtown Streetscapes & Riverfront Access. Downtown Streetscape and Riverfront Access Design

PUBLIC RIGHT-OF-WAY IN THIS CHAPTER PUBLIC REALM

The Project. In 2013, construction was completed between 100 Street and 102 Street.

Potential Green Infrastructure Strategies May 6, 2015 Workshop

Water Works: Downtown Minneapolis Riverfront Destination

KASPER. City of Georgetown, Texas PUD Planned Unit Development. December 30, 2015 Revised January 27, 2016

BENJAMIN BANNEKER PARK FRAMEWORK PLAN (PLAN ADOPTION)

The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape..

ROME WATERFRONT VILLAGE PROJECT NARRATIVE January 25, 2018

ULI St. Louis Technical Assistance Panel

City of Mahtomedi Park System Plan Public Hearing Draft: September 13, 2006

The following principles guide the development of goals and strategies to protect and promote these amenities:

OPPORTUNITIES AND CONSTRAINTS - OXBOW PARK ENTRANCE AND PUT-IN

Highbridge Park Enhance the picturesque park: Provide more opportunities for healthy activity: Improve forest and ecology health:

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

Public input has been an important part of the plan development process.

BUILDING SCALE AND SETBACKS 5 ELEMENTS:... 5 FAÇADES (COMMERCIAL/RESIDENTIAL) 5

Philip A. Ginsburg, General Manager Toks Ajike, Acting Planning and Capital Program Director

Johnson Street Bridge Public Realm Update

BRADENTON RIVERWALK EXPANSION MASTER PLAN

Fifth and Detroit Street Design May 2017 Capital Improvements Committee. DOWNTOWN Street Design

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS

Canal Winchester Parks Master Plan. Public Meeting 2 Thursday, February 2 6:30pm

Popp s Ferry Causeway Park Back Bay Environmental Educational Center CASHIO COCHRAN LLC

TH E U N IVE RSIT Y O F FLO R I DA LANDSCAPE MASTER PLAN REPORT

Appendix E Section 4(f) Evaluation

The Vision. Photo provided by The Minervini Group. 46 Vision, Objectives & Strategies

Description of Preferred Alternative

New York Avenue Streetscape and Trail Project Public Meeting #1 Summary

Y Sports Complex PROGRAMMING Capitol Improvement Plan. Anticipated/Suggested Improvements. Sedgwick County Park: Sports Complex:

Review of Opportunity Area C Draft Comprehensive Plan and Draft BOS Follow-On Motions. Special Working Group Meeting March 4, 2015

100 Dix Drive Conceptual Master Plan. Wyatt Thompson, PLA, ASLA, Assistant Director Lindsay Stucki, Intern Park Planner

The Turtle Creek Master Plan- A Summary. July 7, 2011

Appendix 1. Private Projects with Respective On Site PUS and Public Parks in the Silver Spring CBD

REQUEST FOR COUNCIL ACTION 6A AGENDA ITEM ORIGINATING DEPT. AGENDA ITEM CITY ADMINISTRATOR APPROVAL

Planning Stage. Mosaic Park. Long Term Project. Restoration of 4 Mile Run. Planning Stage. Herndon and 13 th. Project Underway. Clarendon Central Park

BISCUIT RUN PARK MASTER PLAN

3.0 master plan concept

Arana Gulch Park Master Plan

Presenting a Vision for Thread Lake

Minto-Brown Island. November 18, City of Salem, Parks & Transportation Services

appendix and street interface guidelines

alum creek park public workshop January 16, 2014

TOWN COUNCIL / PLANNING COMMISSION

ALLEN CREEK GREENWAY. Citizens Advisory Committee Meeting #5 July 19, Allen Creek Greenway Master Plan. July 2017

MISSISSIPPI GORGE REGIONAL PARK MASTER PLAN

Please see attached for more detailed project information. Project Schedule Designer Award by SBC Executive Sub-Committee December 21, 2015

2017 General Obligation Bond

Outdoor Activity Center

Introduction. Chapter 1. Purpose of the Comprehensive Plan Plan Organization Planning Process & Community Input 1-1

REZONING APPLICATION MPD SUPPLEMENT

Master Plan Presentation August 12, 2015

Denton. A. Downtown Task Force

Project Overview & Summary of Existing Conditions

STAFF REPORT Agenda Item: J.4 To: Mayor and City Council Date:

Hockessin Community Redevelopment Plan

Sacramento Public Library Authority

The transportation system in a community is an

Davie Village Public Space Improvements

COMPLETE GREEN STREET CHECKLIST

City of San Juan Capistrano PROJECT PRESENTATION NORTHWEST OPEN SPACE COMMUNITY PARK (CIP 09209) March 22, 2016 FOR THE PROJECT PRESENTATION

Call for Artists for: Design and Construction of Environmental Art Activation Story Mill Community Park, Bozeman, MT

At first Work Session on October 22, At second Work Session on November 19, At third Work Session on December 3, 2015

Project Consulting Team:

SFMTA PHELAN LOOP AND PUBLIC PLAZA PHELAN OCEAN AVENUE

W&OD PARK MASTER PLAN. The City s Greenest Street. DRAFT W&OD Trail Master Plan v4.docx Page 1

South th E ast Communit ity Centre (SECC)

PIKE PINE RENAISSANCE: ACT ONE. October 19, 2017

Play areas overlooking climbing hill. School & playgrounds overlooking pond bottom ballfields. Project experience while at Loris and Associates, Inc.

Asbury Chapel Subdivision Sketch Plan

Eastcreek Farm. Planned Development Standards September, 2014

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference

Preliminary Sketch Plan for Fort Hunter Park

City of Kearney Capital Improvement Update October 1, TH STREET AND 17TH AVENUE IMPROVEMENTS

ATTACHMENT A AERIAL PHOTO OF McINTIRE PARK EAST

29 Bella Fontaine Park

Pittsfield Action Plan (West Branch of the Housatonic River)

Transcription:

South Bend Park Visioning Plan 2007

South Bend Park, Visioning Program, Executive Summary The South Bend Park Visioning Program began with the receipt of an application from the Friends of South Bend Park, soliciting help organizing a Conceptual Master Plan for their neighborhood park. Once Park Pride accepted the application for Visioning, the neighborhood was invited to participate in the process. The Steering Committee comprised the existing Friends of South Bend group and met monthly to determine the direction of the public process and design outcome. The Steering Committee promoted their first public meeting, the Visioning Meeting on Tuesday, October 16, 2007. At this meeting, participants were asked to imagine a world-class park in their neighborhood. A list of facilities and activities was developed. The second public meeting was on Tuesday, November 13th. The well-attended meeting gave participants the opportunity to fit the wish list onto the site. Two teams developed concepts that were presented to the other teams for comment and discussion. This led the Park Pride team on the mission of distilling those plans into two preliminary conceptual master plans that were presented at the third public meeting. The third public meeting was rescheduled a day earlier than originally scheduled to Monday, December 17th. This was done to take advantage of the NPU meeting that was being held that same evening. Attendance was strong, and the revised meeting format ensured the most attendance possible. Discussions about each option were held and the pros and cons of each were debated. The Steering Committee met to discuss Park Pride s interpretation of the melding of the two plans. Edits were made and presented at the final public meeting scheduled for Tuesday, January 15, 2008. As before, this public meeting was moved forward a day to take advantage of the neighborhood association meeting on Monday, January 14th. The neighborhood association voted unanimously to approve the plan as presented. Park Pride compiled the project list. The Steering Committee reviewed the list and named their three highestpriority projects. Since there is no funding available at this time for capital improvements in the park, funding opportunities may help serve as priorities for implementation. The plan included herein is meant to serve as a documentation of the community s agreed projects and priorities for South Bend Park. The Visioning plan illustrates concepts and is not considered to be a set of construction documents. It will take cooperation from the City, the neighbors, and the greater Atlanta community to construct all the changes in the park. The Steering Committee will serve an ongoing role in spearheading the changes to the park, finding funding sources, and overseeing project development. Park Pride will continue to serve as a liaison between the community and potential funding sources, including the City of Atlanta. It is expected that the entire build-out of the improvements proposed for South Bend Park will take years, if not decades to complete. The first step, determining the best ways to improve South Bend Park is completed and another chapter in its redevelopment can begin.

South Bend Park Final Visioning Plan Park Pride staff attempted to capture the comments made at the Preliminary Design Review. This illustration is the attempt at consolidating the two previous designs into one, final design. The Visioning Plan was shown to the public at the fourth and final public meeting, where it was approved by the neighborhood association. South Bend Park Final Visioning Plan Illustrative Site Plan, including Prioritized Projects Project List Project Spread Sheet

SOUTH BEND PARK Visioning Plan, January 2008 s s S T z z T U s C r A m f B H e Project List Key A Dog Park B Pool Area Enhancements C* Skate Park D Park Entrance E* Playground Enhancements F Parents Pavilion G Pavilion Enhancements H* Lakewood Ave. Streetscape I Community Garden J Compton Drive Streetscape K Harper Rd. Gateway L Free Play Lawn M Bollards/Barriers Along PATH N Improve Rustic Picnic Area O Large Event Pavilion P Art Center Landscape Enhancements Q Improved Pedestrian Connection R Skate Park/Playground Connector S Woodland Restoration T Soft-Surface Path System U Historic Cottage Marker V* Site-Wide Lighting W Site-Wide Site Furnishings X Sculpture Garden Y Land Acquisition Z Stream Bank Restoration * Top Priority Projects d G 0 80 240 40 160 q z H L N m X P I O K J

SOUTH BEND PARK VISIONING PLAN: PROJECT LIST, JANUARY, 2008 ITEM QUANTITY / DESCRIPTION COST PROJECT TYPE/FUNDING A Dog Park Install 2-acre, enclosed area with double-gated vestibule. Add a separate area for smaller dogs. Consider adding drinking fountain for dogs and people. Add paved path from parking area to gated entrance. $15,000 Neighborhood Fundraising, Community Micro-Grant B Pool Area Enhancements Add landscaping and lighting around pool house and pool. Resurface parking lot. $130,000 C * Skate Park Construct a mid-size skate park over kudzu-covered area below existing pool. Connect additional $3,000,000 *Top Priority parking to pool parking and utilize same entrance/egress as existing parking lot. Build 3-story tower and bridge to connect to pool-level. Consider adding snack bar/concessions at top or bottom of tower. D Park Entrance Enhance existing gateway with aesthetically-pleasing signage, gateway elements, piers, and digital signage advertising park events E* Playground Enhancements Add plantings, lighting, and site furnishings around playground to make it seem more integral to park. Connect playground to PATH Foundation path F Parents' Pavilion Restore existing pavilion. Add comfortable, easily rearranged furniture and Wi-Fi to entice parents to gather there. G Pavilion Enhancements Provide bollards or low stone wall dissuade cars from parking on lawn surrounding pavilion. Restore pavilion as needed. Add new tables, provide water fountain, hose bib, and electric for special events. Add better pedestrian access from Lakewood avenue and from parking area to pavilion. Pave larger area around pavilion for overflow traffic. $60,000 $20,000 * Top Priority. Community Volunteer Days $25,000 Community Grant $45,000 Community Grant H* Lakewood Avenue Streetscape Between Macon Drive and Shady Avenue. Install broad sidewalks on each side, separated from travel lane with curb and gutter and minimum 4' planting strip. Add ornamental street lights and community signage. Include Lakewood Terrace widening to two-way with realigned intersection at Lakewood Avenue, sidewalks, planted strip, ornamental lighting, and site furniture to Compton Drive $1,000,000 * Top Prioritty. DOT funding sources such as: TEA, CMAQ, or possibly LCI funds could be available in future. Also, consider making developer of property across Lakewood adding streetscape of community choosing on east side of street. I Community Garden In front lawn of Art Center, build community garden with raised beds, surrounded by aesthetically-$10,00pleasing Micro-Grant, Neighborhood Fundraiser, Art fence (picket, split rail). Provide water tap and possibly include public art as intigral Center Leadership design feature. J Compton Drive Streetscape End Compton Drive with cul-du-sac. Be sure to maintain access to every residence on Compton $300,000 GDOT, CMAQ, TEA Funds (Federal or Drive. Add earthen berms between Compton Drive's turn-around and new connection road to upper parking level at mixed-use field. Includes new connection between existing drive and section removed for cul-du-sac. Add sidewalk along Compton Drive and into park and PATH Foundation path. State) K Harper Road Gateway Add entrance signage into park and concrete trail connection to upper parking area. $38,000 L Free Play Lawn Convert existing baseball field to mixed-use lawn. Create regular shape (rectangle) with plantings along edge. Create hard-scape area at eastern side that connects to Harper Road entrance and upper parking area. Also, include steps down to PATH Foundation path. Add electric and water for events. $45,000 M Bollards/Barriers Along PATH Design and construct structures to help dissuade vehicles from using the new PATH Foundation for cross-park transportation, combine with gateway bollards where PATH meets existing streets N Improve Rustic Picnic Area Add soft-surface paving, landscaping, picnic furniture, and improved/restored pavilion structures around historic pavilion/fire pit $35,000 45,000 South Bend Park Project List Project List / 2007-08

ITEM QUANTITY / DESCRIPTION COST PROJECT TYPE/FUNDING O Large Event Pavilion On newly-acquired property, construct a large-event pavilion, approximately 30'x90' in size. Add terrace under and surrounding pavilion overlooking woodland. Pavilion should be architecturallyinteresting and a landmark structure in the park. Consider using Lakewood Fairground structures as model. $150,000 P Art Center Landscape Enhancements Provide axial sidewalk between Compton Drive and Art Center front door. Consider reducing size of fence or removing it completely. Add landscaping and gateway signage at entrance from Compton Drive. Include ornamental street lights, matching those in streetscape for Lakewood Avenue and Compton Drive $45,000 Q Improved Pedestrian Connection Between Art Center and playground, add pedestrian spine with new ornamental paving around small, existing pavilions. Landscape woods along path with native plantings. Add low-level lighting along path. R Skate Park/Playground Connector Connect the Skate Park and the Playground area with wide, paved path. Bridge will be needed. Bridge should be ornamental and a key landmark in the park. S Woodland Restoration Remove exotic species such as privet and eleagnus. Introduce native ground covers such as ferns, herbaceous perennials, woodland vines, and bulbs. Plant trees that will replace very old trees or those that are in decline. Maintain tree canopy and introduce new plantings for mix of meadow in flatter areas and woodland in steeper slopes. Introduce wildlife as appropriate $65,000 $75,000 100,000 Tree Grant, Community Micro-Grant, Forestry Grants T Soft-Surface Path System Construct narrow, soft-surface paths through restored woodland. Create loop around perimeter of City-owned property, with nodes of interest and smaller loops around meadows and/or significant land forms. Connect to Macon Drive and Corner of Macon/Lakewood. Add interpretive signage regarding interesting flora, fauna, or historical markers. Can be done in stages $65,000 U Historic Cottage Marker Investigate presence of possible historic cottage and grave sites north of dog park, near $30,000 Federal Funds Lakewood Avenue. If found, preserve and demarcate as appropriate with signage, soft surface paving, and memorial. V* Site-Wide Lighting Investigate ways to light park after hours. Add ornamental lighting in form of 'historic' pedestrianlevel $300,000 *Top Priority lights and bollard lights along paths. Lighting should be soft, not glaring. Consider motion- sensor lights at areas where vandalism is more likely (Art Center and Pavilions and remote parking areas) W Site-Wide Site Furnishings Benches, trash receptacles, and bike racks should be included in any improvement in the park. $35,000 There will be areas throughout the park where no such project has yet happened. X Sculpture Garden Near Art Center, design and provide art/sculpture area for outdoor public displays. Consider locating art (sculpture) at lower flagstone terrace as sculpture garden. Engage local artists to enhance the space. $45,000 City Art Funds Y Land Acquisition Acquire abandoned houses along park side of Compton Drive and Lakewood Terrace. Demolish $1,000,000 and return to woodland. Z Stream Bank Restoration Restore and improve stream bank with regrading, adding native stones, small pools, stabilizing $400,000 319 Grant (Federal) soil and creek bottom. Remove invasive species, add native species of plants South Bend Park Total: $7,078,000 South Bend Park Project List Project List / 2007-08