Creation of Confluence Park and Input from Vermont River Conservancy

Similar documents
Pittsfield Action Plan (West Branch of the Housatonic River)

A Vision for Walnut Creek

{Best Practices. Summary of Tools, Strategies and Best Practices from 11 Michigan Case Study Communities

DRAFT. Waterfronts and Open Spaces. 10 The Riverfront Open Space System

City of Iowa City Department of Neighborhood and Development Services Department of Parks and Recreation Department of Public Works City Manager s

At first Work Session on October 22, At second Work Session on November 19, At third Work Session on December 3, 2015

TOWN COUNCIL / PLANNING COMMISSION

The following principles guide the development of goals and strategies to protect and promote these amenities:

Mendota Heights 2040 Comprehensive Plan Draft Vers

Office of Greenways & Trails Providing Statewide Leadership and Coordination. Southeast Greenways and Trails Summit October 1-3, 2017

This page intentionally blank.

Silverdale Regional Center

City of Nogales General Plan

Potential Green Infrastructure Strategies May 6, 2015 Workshop

DISCUSSION TOPIC: ST JOHNS RIVER & ITS TRIBUTARIES (BPII) 2030 COMPREHENSIVE PLAN POLICES AND REGULATORY FRAMEWORK

Corridor Vision. 1Pursue Minnehaha-Hiawatha Community Works Project. Mission of Hennepin County Community Works Program

LITTLETON RIVER DISTRICT REDEVELOPMENT PROJECT A LEGACY OF LEADERSHIP & COMMUNITY INVOLVEMENT

Ivywild On The Creek PRELIMINARY CREEK DISTRICT MASTER PLAN

Bloor Street East Potential Ravine Portal Overlook and Access Passage to the Rosedale Valley and Don River Valley Ravine, Toronto, Canada

Transportation. Strategies for Action

Whitemarsh Comprehensive Plan Update: Housing & Land Use. Public Workshop #3: September 20, 2018

Concept Master Plan. for. Draft of. Wildlife Management Area. Prepared for. June, 2008

4 Park Planning and Design

03 HIGH PRIORITY SITES

The Five Components of the McLoughlin Area Plan

Urban Analysis. Downtown Zanesville like any city, has been physically modified through time as it

38 Queen s University Campus Master Plan Part 1

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Preliminary Sketch Plan for Fort Hunter Park

Wisconsin downtown action council Downtown project case study profile

A BLUEPRINT FOR BROCKTON A CITY-WIDE COMPREHENSIVE PLAN

River Corridor Overlay Zone (RCOZ) Article 5

WARM SPRINGS PARK MASTER PLAN

A larger version of this map is located on the last page of this PDF.

Bourne Downtown Site Planning

Taché Promenade Tuesday, October 17, 2017

Reconnecting to a Forgotten River St. Cloud MN. Aaron Hanson Design Design Thesis LA 572, Thesis, Spring 2012

M E M O R A N D U M February 21, 2018

Smart Growth Development Checklist

Our Legacy Projects DOWNTOWN JACKSONVILLE MASTER PLAN

RECREATION, OPEN SPACE AND GREENWAYS ELEMENT GOALS, OBJECTIVES, AND POLICIES

CAL POLY MASTER PLAN UPDATE, March 2015

DRAFT ROOSEVELT ROAD. District Recommendations. Figure 5.23 The Roosevelt Road Corridor

ELK GROVE GENERAL PLAN VISION

The Corporation of Delta. COUNC~L REPORT Regular Meeting. Burnsview Secondary School/Chalmers Park Memorandum of Understanding

Nepean Point CONSULTATION REPORT JUNE 2014

Highland Falls Waterfront Redevelopment Feasibility Study Village Board Meeting March 20, 2017

Parks Master Plan Implementation: Phase I Waterfront Use and Design REPORT #: September 7, 2016 File #

PIKE PINE RENAISSANCE: ACT ONE. October 19, 2017

Draft Stillwater 2030 Comprehensive Plan- Goals and Policies

Developer s Program. The Station at East 54

Please read the entire document

10.0 Open Space and Public Realm

ROBBINSDALE LRT STATION CDI DEVELOPMENT GUIDELINES

ARISE: The Rock Renaissance Area Redevelopment & Implementation Strategy

RECREATION AND OPEN SPACE ELEMENT GOALS, OBJECTIVES, AND POLICIES

Derry Green Corporate Business Park

Planning Commission Retreat March 23 rd Comprehensive Plan Update Discussion

Willamette Falls Downtown District Policies and Design Guidelines

Policies and Code Intent Sections Related to Town Center

Comprehensive Plan ADOPTED APRIL 2014

Oconee Rivers Greenway Project. TSPLOST 2018 Project # 5 Project Concept Sub-projects 7, 8, 9, 10, & 11. Mayor & Commission Work Session

Illustration of Eastlake Farmer s Cooperative Grain Elevator. Chapter 5: implementation 5-1

Route 347. New York State Department of Transportation Region 10, Long Island. THE GREENING of ROUTE 347

ATTACHMENT A AERIAL PHOTO OF McINTIRE PARK EAST

CHAPTER 8 ISSUES, CONCERNS, CONSTRAINTS AND OPPORTUNITIES

V. Vision and Guiding Principles

Concord Community Reuse Project Goals and Guiding Principles. Overarching Goals (OG)

Chairman and Members of the Planning and Development Committee. Thomas S. Mokrzycki, Commissioner of Planning and Building

Great Rivers Greenway CLEAN GREEN CONNEC TED T RAILS

Florida Greenways and Trails System (FGTS) Plan Goals, Strategies and Objectives

An Ambitious Plan: Transforming the blighted South Platte River and surrounding environment into Denver s greatest natural resource.

V. Gateways GATEWAYS / V-1

Keyport. Vision for Keyport

STUDY AREA. Tonight s Agenda. Project Tasks Completed. Next Steps. Town of Oyster Bay Eastern Waterfront Community Vision & Revitalization Plan

Town Center. Block 5 Existing multifamily residential units are expected to remain.

City of Plattsburgh DRI: Downtown Streetscapes & Riverfront Access. Downtown Streetscape and Riverfront Access Design

Northeast Everglades Natural Area

I would like to thank my parents for their unwavering love, patience, and support I would be nowhere without them.

Regional Context Statement

SALISBURY TOMORROW Our Vision

PHASE 3-4 PARKS SOUTH PARK AND CHANNEL PARK

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS

Robbinsdale LRT Station. CDI Development Guidelines. August Overview

A Vibrant Downtown. Chapter 5 Cary Public Art Opportunities 31

5. Father Hennepin Blufs Park and Hennepin Island Father Hennepin Bluffs Park Supporting Initiatives (see Figure 36): 7-22

NARRATIVE: NORTH FERRY STREET PUMP HOUSE, OVERLOOK, AND RIVERWALK IMPROVEMENTS

- Document 2 - Algonquin Interpretation and The Continuing Conversation toward a Vision for a Revitalized Lansdowne

Planning Board Briefing

Community Design Guidelines. Port Wallace DRAFT

Call for Artists for: Design and Construction of Environmental Art Activation Story Mill Community Park, Bozeman, MT

SQUAMISH 2010 AND BEYOND COMMUNITY VISION

We are a determined group residents, industry, and government and by working together an incredible future lies ahead for Troy.

Subregion 4 Central Avenue-Metro Blue Line Corridor Transit-Oriented Development (TOD) Implementation Project. Community Meeting April 27, 2011

Urban runoff in my neighborhood (Capitol Hill) is heavy with trash and other debris.

Arkansas River Corridor

New Auburn Village Center Study Auburn, Maine

The transportation system in a community is an

SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2.

Transcription:

CITY COUNCIL Agenda Item #18-236 Date: August 22, 2018 Consent Discussion X SUBJECT: Creation of Confluence Park and Input from Vermont River Conservancy SUBMITTING DEPARTMENT: Mayor RECOMMENDED ACTION: Direct City Staff to include Confluence Park in the list of City Parks on the City's website. Receive input from the Vermont River Conservancy on putting together a plan for the space. STRATEGIC OUTCOME/INITIATIVE: Thoughtfully Planned Built Environment PRIOR ACTION: N/A EXPENDITURE REQUIRED: None SOURCE OF FUNDS: N/A LEGAL REQUIREMENTS: None BACKGROUND INFORMATION: The Montpelier Rivers Report and the Winooski River Greenway report set forth a vision for Confluence Park where the North Branch meets the Winooski. This location has the potential to be an iconic location for Montpelier as it could be a very inviting place sit and enjoy the river. The Vermont River Conservancy would like to partner with the City to come up with a design for Confluence Park. Any designs would be vetted by City staff for safety, etc. SUPPORTING DOCUMENTS: Winooski River Greenway Master Plan, available: http://www.montpelier-vt.org/documentcenter/view/1420/winooski-river-greenway-pdf?bidid= INTERESTED PARTIES: Conservation Commission, Community Services Department CITY MANAGER S APPROVAL:

Winooski River Greenway The River and the City: transformation of a corridor Whereas in the past, the Winooski River served as an industrial conduit, the waterpower, and waste disposal system for the city, recent years see a more complementary relationship. The river is now seen as a positive attraction, where clean water and an attractive riverbank is an essential element of the city s future economy and quality of life. For almost 10 years, the city has been actively engaged in the planning and implementation of a riverfront improvement plan. River corridor improvements have been included in the City Master Plans, and separate design and planning efforts have resulted in construction of the Winooski West and Winooski East Bikepaths and improvement districts. The city-sponsored Montpelier Rivers Report and the River Visions plan have served as the inspiration for planning efforts, and helped to articulate the community s sentiments about the past, present and future for the river corridors in Montpelier. The Capital District Master Plan represents the missing segment of the riverfront revitalization plan. The plan builds upon the past to preserve the continuity of effort, but also recognizes that there are unique potentials that can be developed within the close proximity of the State Capital. Most important is the undeveloped corridor between Taylor Street and Main Street, and the strong desire to transform the character of the riverfront from the edge of parking lot to a gracious riverside promenade, with open spaces and new development to bene t the city economically and aesthetically. 2 Redevelopment of this section of the riverfront like other sections that the city has sponsored, will involve multiple interests and concerns. On the political side, land acquisition and access must be addressed. The State of Vermont has offered a portion of the State owned land for a riverwalk and park land, but recognizes that the issues of parking for state employees must be dealt with. There are several parcels of land that are privately owned. The owners of those properties have been contacted, and are open to negotiations about land acquisition or development deals where they would receive compensation as part of a public/private partnership for economic development. The city and state have mutually agreed to pursue federal transportation funds through TEA 21 to develop a transit center and adjacent park lands, an effort also supported by the 1 2 5 3 5 3 4 4 6 GREENWAY 18 Capital District Master Plan

Winooski River Greenway Design Features 1. Walking Trail connection from Bikepath bridge to Bailey Avenue This path extends the bikepath connection with a more rustic walking path to complete a riverfront trail system across the Capital Complex. 2. Reorganization of state parking areas to improve aesthetics and pedestrian circulation Parking spaces are rede ned and pedestrian access is improved as part of the trail project and cross paths from parking areas to the State Street area run through the existing spaces between state buildings. Where appropriate, small park and yards areas are created to screen parking areas and reinforce the historic character of State Street. Park area at the Con uence of the North Branch 3. Re nements to the Winooski West Winooski East Bikepath corridor The massive concrete bridge landing needs to be enhanced to be more attractive and to integrate with the nearby park area. The existing path location from the steel bridge to Taylor Street is retained, and the bikepath is relocated to the north where it can interface with the transit center on the east side of Taylor Street.. 4. A linked series of public parks Following the river is a series of park spaces ranging from open grassy spaces to a paved urban promenade and café /overlook near Taylor Street. Larger open spaces are provided both east and west of Taylor Street. 5. Complementary recreation facilities for residents and visitors A visitor kiosk structure and the relocated Rail Baggage Building can provide bike rental and cafe space with direct access to the bikepath system and Capital Complex. 6. Bikepath connection from Taylor Street to Main Street This section of the Winooski Bikepath connects from Taylor Street and the transit center to the riverfront park at the convergence of the North Branch and Stevens Branch. The crossing of the North Branch will be on a combined bike/automobile bridge as part of the new street connection to Barre Street/ Main Street. Bike Path Landing and Kiosk area Capital District Master Plan 1999 19 GREENWAY

River Conservation issues: Coordination between the planning process and the Montpelier Conservation Commission was central in the planning for the riverfront improvements. In October of 1998, the Montpelier Conservation Commission affirmed the following principles for the City State Commission Master Plan for the Capital District: Create a riverside park Ensure a continuous green belt along the river that has trees and shrubs and is wide enough to include a walking/bike path and benches Include small parks for picnicking and family recreation along the path as well as an overall layout that re ects the vitality of the city The path should connect with other pedestrian and bicycle paths and access roads Provide access points for people to walk down to the water Encourage four - season usage The Greenway as a destination for regional trails around central Vermont Montpelier s central location in the state coincides with linkages between the Winooski river corridor and other recreational corridors in Central Vermont. There are many existing and planned trails in the Montpelier area, as well as linkages from the river corridors to other local trails in Montpelier and other nearby towns. Some of these trails include, for example: The Cross Vermont Trail A planned trail that follows the old Wells River Montpelier RR line. Planned as a multiuse trail, there are several segments of this trail already in place, including one from Groton to Marsh eld, Plain eld and East Montpelier. The trail is being planned with assistance of the Rivers and Trails Program of the National Park Service and the State of Vermont, and in cooperation with East Montpelier Trails, Inc. and local snowmobile clubs. The VAOT hired a Cross VT Trail project coordinator in 1999 to support ongoing trail development. Celebrate and draw attention to the river through Historical markers Educational exhibits Displayed art Facilities for music and other cultural events Maintain the ecological function of the river bank Utilize natural landscaping, Place shade trees along the river edge, Provide habitat for wildlife, and Stabilize and restore the stream bank. Ensure a balance between natural vegetation and landscaped sections. Utilize the greenbelt as a ltration system for stormwater runoff from the adjacent paved areas. All of these themes for river corridor planning are not mutually exclusive, and a diversi ed riverfront plan would allow some of each element to exist: to create a river corridor with complementary areas of ecological, aesthetic, and recreational opportunities. The nal plan preserves both natural riverbanks, historic stone retaining walls that have bordered developed edges, and where appropriate, enhances those features as part of an overall river corridor plan. The simple act of removing several acres of parking with its damaging erosion and runoff and substituting impervious surfaces with park land, grass and tress will improve water quality and wildlife habitat in the corridor. Properly planned pathways and a promenade will allow residents and visitors to walk along the river, appreciating the river as current conditions do not allow. Areas for recreation and activities compatible with a scenic riverwalk have also been accommodated, along with sites where visitors can descend from the higher elevation riverwalk to the water s edge. It is hoped that the end result will be a positive demonstration of the values of river corridor planning and urban design. River interpretation themes There is a strong desire to tell the role of the river in the evolution of Montpelier, and to integrate river interpretation themes in an overall plan for riverfront amenities. Some of the interpretive signage, environmental sculpture, and display themes might include: Explanations of riverbank restorative efforts. A living river: Natural communities. Fish and wildlife habitats. The working river: industry in Montpelier GREENWAY 20 The Central Vermont Bikepath This is a planned four - town bike path project being planned under the leadership of the Central VT Regional Planning Commission (CVRPC). The path originates as part of the Winooski West and Winooski East Pathways and follows the Washington County RR (WCRR) line east towards Berlin, through Barre City and to Barre Town. The path segments from Montpelier to the Ames Plaza in Berlin have been funded by the VTrans, and the Barre City pathway segment is currently ranked #1 in regional priority with the CVRPC Transportation Advisory Committee (TAC). The City of Barre and Barre Granite Center and Heritage Museum are cooperating on future planning efforts. North Branch Greenway As a part of the Montpelier Rivers Study, the concept of a walking route along the North Branch is planned to extend from the Lane Shops to the Wrightsville Dam. This route would follow some of the city s most remote and interesting natural areas, to the site of the new VINS Center, North Branch Park the Elm Street Recreation elds, and eventually to Hubbard Park to the west and to the East Montpelier Trails network to the east and south. This system will ultimately link the downtown to the city s extensive park network. The downtown connection segment from the Lane Shops to the convergence of the Steven s Branch and the North Branch is perhaps the most dif cult to accomplish. The initial phase from State Street to Langdon Street has been supported by the city. Statehouse Trail A new trail is being planned in partnership with the State of Vermont and the City of Montpelier to ascend the hill behind the Capitol, linking to Hubbard Park. East Montpelier Trails East Montpelier Trails, Inc., a non-pro t organization, maintains a network of trails that bring together recreational users of many types. A system of trails is already in place for skiing, walking, snowmobiles, and other uses. Canoe/kayak access along the Winooski River The Winooski River is a popular boating corridor, and below Montpelier the river is very passable for recreational paddlers and families. While there are no current locations where paddlers can put into the river near the downtown, below the last dam west of Main Street, in the same area as the greenway, entry to the river could be an exciting new river oriented use. Capital District Master Plan

Typical Trail Section between the Bikepath and Bailey Avenue Bridges Typical Trail Section between the Bikepath Bridge and the North Branch Looking upriver from the Bailey Avenue Bridge Typical Trail Section at Stone Retaining Walls Capital District Master Plan 1999 21 GREENWAY