Be P ave Beav enn State r er Campus Exterior Architectural Plan Spring 2010

Similar documents
York. Campus Exterior Architectural Plan. November 2006

Penn State P Dubois Campus Exterior Architectural Plan October

Penn State. Harrisburg. The Capital College. Campus Exterior Architectural Plan

Worthington Scranton. Campus Exterior Architectural Plan

Mont Alto. Penn State

Learning in the Landscape

Penn State Wi W lkes-barre ilkes-barre Campus Exterior Architectural Plan Spring 2010

VEHICULAR AND PEDESTRIAN CIRCULATION

Landscape and Streetscape Design 2.5

Erie. The Behrend College. Penn State. Campus Exterior Architectural Plan

Hidden Pointe Landscape Master Plan. June, archi terra

The Vision. Photo provided by The Minervini Group. 46 Vision, Objectives & Strategies

DESIGN GUIDELINES. Seattle Children s Major Institution Master Plan. Approved May 7, 2010

FREEWAY/TOURIST DISTRICT

\\ Comprehensive Facilities Master Plan. Design Guidelines

Landscape Design Guidelines

STORMWATER MANAGEMENT FACILITIES/STORMWATER PONDS - What Are They?

EXISTING CONDITIONS 41. Existing Conditions

The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape..

3.13. Development Guidelines

Building and Site Design Standards

14.0 BUILT FORM DESIGN CRITERIA

Georgeson Botanical Garden Master Plan

EXISTING VEHICULAR & PEDESTRIAN CIRCULATION

Design Guidelines for the Route 30 Corridor Master Plan: Subdivision and Land Development Elements

Assessment of the Extent and Quality of the Landscape Features of the Campus.

Town Center Design Guidelines

Kittson Parkway / Watershed Park Parking Lot

Chapter 5: Mixed Use Neighborhood Character District

Corridor Identity. Section 9. Introduction. Corridor Guiding Principles

COMPLETE GREEN STREET CHECKLIST

D. Landscape Design. 1. Coverage Intent: To provide adequate landscaping materials that enhance the appearance of development projects.

4. INDUSTRIAL 53 CASTLE ROCK DESIGN

SOUTH DAKOTA STATE UNIVERSITY GROUNDS MANAGEMENT PLAN FY 2013

MIAMI 21 PUBLIC HEARING-FIRST READING 2009

SOUTH UNIVERSITY Street Design Setting a Direction for Schematic Design

DIVISION 32 EXTERIOR IMPROVEMENTS

Project Consulting Team:

Landscape and fencing requirements of this Chapter shall apply to all new landscaped areas.

Indiana University Campus Division. A brief description of the Division that makes Indiana University a beautiful place to be

Landscaping Standards

11.0. Design Manual: Sustainable Initiatives. Chapel Hill Streetscape and Lighting Master Plan mikyoung kim design all rights reserved.

South Bend Park. Visioning Plan

CAMPUS MASTER PLAN UPDATE

Goal 1: To Encourage the Orderly, Harmonious and Judicious Use of University Resources in the Development of University Land.

SITE FURNISHINGS STANDARDS MANUAL

Master Plan Presentation August 12, 2015

Long Branch-Wayne Local Park Renovation Project

West Dennis Center: Bass River to Old Main Street. West Dennis Business District: Old Main Street to Dennis Commons

EXISTING CONDITIONS. Bellevue College Fountain Renovation

Project purpose. advise. The purpose of the Beaumaris Lake Open Space Rehabilitation project is to: + Develop a Functional Program Concept

Tips for Maintaining and Enhancing Stormwater Management Areas

What is the EDPA? The EDPA has three objectives: 1. Protect biodiversity. 2. Mitigate damage during development. 3. Restore degraded ecosystems

City of Aurora Planning Department DESIGN STANDARDS FOR MOTOR VEHICLE FUEL DISPENSING STATION. August 3, 1998

CAMPUS MASTER PLAN. Steering Committee Meeting. July 29, 2014 CAMPUS MASTER PLAN UPDATE

Harmony Technology Park Third Filing, Second Replat Custom Blending, Project Development Plan/Final Development Plan - FDP #130021

implementation r expression in landscape

Figure Example of out door dining in the public right-of-way.

Preci nct P l ans Figure 56 Campus Aerial Photo, 2008 CAL STATE EAST BAY, HAYWARD CAMPUS MASTER PLAN

LANDSCAPING. Design. Development of the site shall not unreasonably impair the ability of adjoining properties to utilize solar energy.

MILL POND OVERLOOK. A project of the Town of Oyster Bay. Prepared by Cameron Engineering & Associates, LLP

Philip A. Ginsburg, General Manager Toks Ajike, Acting Planning and Capital Program Director

TURN TO THE RIVER CITY PLAZA LANDSCAPE DESIGN CONCEPT May 25, 2016

Preliminary Sketch Plan for Fort Hunter Park

AS ADOPTED - JULY 2012

Design Guidelines. Roosevelt. Mike Podowski DPD Design Guidelines Ordinance ATT 13 August 13, 2012 Version #1

AESTHETIC APPEARANCE. Design Guidelines for Grade-Separated Pedestrian, Cyclist and Equestrian Structures

Wayfinding. North Gateway: Integrate a vertical gateway marker on the west side of Ward Street at the south corner of Vernon Street.

MULTIFAMILY RESIDENTIAL DESIGN PRINCIPLES Site Plan and Design Review Principles Checklist

GUIDELINES REPLACEMENT HOUSING GUIDELINES LOCATION INTRODUCTION URBAN DESIGN GUIDELINES

Community Design Plan

Reynoldsburg Major Commercial Corridors Streetscape and Development Design Guidelines/Standards. Development Design Guidelines/Standards

E. Natural areas include habitats such as wetlands, tidal marshes, waterways, natural drainage-ways, woodlands and grassland meadows.

COMMUNITY DESIGN. GOAL: Create livable and attractive communities. Intent

section five BEAUTIFICATION PLAN

HOMEOWNER S ENHANCEMENT GUIDE. Chapter 2: The Ranch

5.1.1 The streetscape along US Highway 64 (Brevard Road); and, The built environment within new residential developments; and,

Campus Outdoor Lighting Plan

URBAN DESIGN BRIEF New Street Burlington, ON

Ohlone College Measure G Project Scope Revisions

Planning Board Hearing October 20th, 2016

OBJECTIVE 1.1: To develop and adopt a Landscape Master Plan for the University of Central Florida campus by 2015.

Streetscape Patterns. Design Guidelines, Ridgewood Village Center Historic District, Ridgewood, N.J. page 20

Design Considerations

EXISTING CONDITIONS SUMMARY

FY Capital Improvement Program Arroyo Projects

City of Langley, WA, Request for Qualifications (RFQ) Seawall Park Design

Weston s Wetlands, Stormwater, & Open Space

HICKORY NUT FOREST DESIGN GUIDELINES

Greater East Wenatchee Urban Growth Area. Design Standards & Guidelines

ANCHORAGE PARK REPORT CARD Assessing A Park s Appearance, Function, & Condition

MASTER PLAN QUEEN ST. WEST BIA

GYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado. Schematic Design January 2015

DEVELOPMENT CONTROLS MEDICAL DISTRICT

Benches Trash & Recycling Containers Railings and Bullrail Edges Paving Planting Pier Apron Lighting Interpretive Signage

Dover Landscape Master Plan

BUFFERS, TREE PROTECTION AND LANDSCAPING. Sec Purpose and Intent.

SUBCHAPTER 4-B GUIDELINES FOR THE B-3 COMMERCIAL CHARACTER AREA

CHAPTER 4: GENERAL LANDSCAPING STANDARDS 4.1 ALL PLANT STOCK 4.2 TREES

Sustaining Historic Public Landscapes Preservation & Sustainability for Our Shared Heritage To Enhance Quality of Life & Experience of Place

Transcription:

Penn State Spring 2010

Introduction and Purpose Contents Existing Conditions Inventory Improvement Recommendations 1 ARCHITECTURE A Paint Doors of Study Learning Center B Demolish Hartenbach Residence C Screen General Classroom Building Utilities D Pressure Wash E Replace Railings on Student Union Building Bridge F Backfi ll and Remove Library Bridge G Relocate Electrical Services at Communications Facility H Campus Building Entrance Study 2 SITE FURNISHINGS A Site Furnishings 3 LIGHTING A Lighting 4 LANDSCAPE A Plant Stormwater Basin B Plant Along Waterway C Baker Dungan Museum Stairs Rebuild D Consider Turf Replacement E Screen Parking F Paint Handrails G Relocate Gas Service Equipment H Regrade Tree Bases I Screen Physical Plant Services Building J Shade Trees at Laboratory Classroom Building K Planting Beds at Ross Administration Building L Cowpath Behind Baker Engineering Building M Planters N Parking Lot Trees O Extend Campus Tree Program 5 OTHER A B C D Remove Gravel and Landscape at Study Learning Center Reconfi gure Parking at Harmony Hall Remove Telephone Base Screen Dumpsters

Introduction and purpose Penn State s Mission: Penn State is a multi-campus public land-grant university that improves the lives of the people of Pennsylvania, the nation, and the world through integrated, high-quality programs in teaching, research, and service. To assist in achieving this mission, a Campus Exterior Architecture Plan, know as a CEAP, is developed to suggest ways to improve the exterior aesthetic qualities of campus with low-cost and easy-to-implement concepts that can have meaningful impacts. The CEAP is a planning tool that is an outgrowth of the campus master planning process. The CEAP includes graphic and narrative descriptions of existing conditions on campus and approximately 15-20 improvement concepts. Positive features may also be identifi ed as elements to emulate. The improvement concepts are ranked or prioritized according to their visual impact and estimated cost. The concepts are not fi nal designs. Further study and design are required prior to implementation.

Existing Conditions Inventory Background: A detailed site analysis, campus vision and future development strategy are fully documented in the campus master plan process. In addition to the analysis performed during the master planning process, a focused visual assessment of the campus exterior is conducted which establishes the foundation for the recommendations and concepts contained in this CEAP document. A thorough site development document for campus was prepared by LaQuatra Bonci Associates in September 2009. Most of the recommendations from that document are consistent with typical CEAP recommendations. This CEAP will therefore focus on other low-cost and easy-to-implement concepts at campus. General Observations: This forty-fi ve year old campus has occupied its present site since 1965 with a donation of land and buildings from the County Board of Commissioners. This 100 acre commuter campus lies 35 miles west of Pittsburgh in County. The brick buildings on campus are modern, surrounded by rolling lawns puctuated by mature tree groupings. A few remnant landscape features and walkways remain from buildings that have been razed. The campus is surrounded by rural residences and forest canopy and lies about a half mile from the Ohio River. Parking is suitably relegated to the campus perimeter. Pedestrian circulation in the campus core is functional however the opportunity exists to modify alignments and materials, as proposed in the LaQuatra Bonci study. Existing exterior gathering spaces can be enhanced to be more inviting. Upgraded signage and wayfi nding for the campus has been developed and is being implemented.

Architecture Existing Conditions Inventory Major architectural modifi cations, additions, and new construction are beyond the scope of this CEAP. However, the aesthetic character of campus is defi ned to a great extent by the structures that comprise it. Brick masonry is the predominant building material of most buildings on campus.

Site Furnishings Existing Conditions Inventory Benches, trash receptacles, tables and bike racks across the campus are varied in design, color and material. It is recommended that a standard design for furnishings be selected that will aid in unifying the campus aesthetic. In addition to aesthetic appropriateness, the longevity and maintenance of site furnishings should be considered when specifying.

Lighting Existing Conditions Inventory Exterior light fi xture types are relatively uniform on campus. Fixtures and poles appear to be in good condition and are appropriately scaled. Inappropriate wall-mounted fi xtures on buildings should be replaced. The fi xtures at the Brodhead Cultural Center are in need of replacement.

Signage Existing Conditions Inventory Consistent design and placement of directional and identifi cation signs is key to a unifi ed aesthetic as well as an intuitive and clear means of way fi nding. Consistent utilization of Penn State graphic standards throughout the commonwealth system strengthens the University s identity. Signage upgrades prompted by CEAP recommendations made at other Commonwealth campuses has resulted in a complete renovation program at as well. The program has been recently implemented at campus.

Landscape Existing Conditions Inventory The landscape aesthetic of the campus can be characterized as park-like with groves of large, quality specimen trees and vast open grassy lawns. Ornamental plantings beds are well-maintianed. Opportunities exist for the limited use of perennial and annual fl ower color. Any and all invasive plant species should be eradicated. Turf areas appear to be weedfree and well maintained. Both formal and informal outdoor gathering spaces exist on campus though there is opportunity for more.

Pedestrian Circulation Existing Conditions Inventory Some redundancies exist in the current network of concrete sidewalks on campus. This was studied by LaQuatra Bonci in 2009 and their recommendations were reviewed by the Campus Planning and Design offi ce.

Unique Features Existing Conditions Inventory The character and aesthetic of the campus is defi ned primarily by the central green and the views across campus from pedestrian walkways. Groves of heritage trees dot the campus. Dramatic changes in topography maximize views into and out from campus. The entrance into campus is memorable with the new entrance sign, pond and surrounding landscape.

1A Paint doors of Study-Learning Center Improvement Recommendation The color of the exterior doors on the Study-Learning Center should match the trim elements on the rest of the building. Existing Proposed Existing Proposed

1B Demolish Hartenbach Residence Improvement Recommendation The ramshackle Hartenbach residence has become an attractive nuisance that should be demolished and cleared.

Improvement Recommendation 1C Screen General Classroom Building Utilities The rooftop mechanical equipment on the General Classroom Building are plainly visible to passers-by. Recommend that the equipment be screened from view. Existing Proposed

1D Pressure Wash Improvement Recommendation A cost effective strategy for freshening the appearance of existing buildings is the use of pressure washing to remove dirt and mildew stains. Propose the implementation of an annual cleaning program campus wide. Hand-cleaning may be necessary on certain fi nishes to avoid damage.

Replace Railings on Student Union Building Bridge Improvement Recommendation 1E The north entrance to the Student Union Building, with its concrete bridge and precipitous slope, is uninviting and hazardous to maintain. A glass panel railing that echoes the window trim treatment would open up this side of the building. Low shade tolerant plantings are proposed. The design should accentuate the vantage point provided by the bridge. Existing Proposed

Backfill and Remove Library Bridge Improvement Recommendation 1F An alternative to a library entrance plaza, as conceptualized in the LaQuantra Bonci study, would be to backfill the grade, remove the bridge, provide a generous entry walk and landscape. Existing Proposed Existing

1G Existing view from Baker Engineering Building Relocate Electrical Service and Regrade Around Communications Facility Improvement Recommendation Electrical lines for generator service during power outages can be re-routed to the parking area next to the Baker Engineering Building. This would allow for the removal of the wooden shed next to the communications facility. Low brick walls constructed as illustrated will contain the condensing unit and camofl auge the access doors. Regrade the surrounding earth to minimize the visual impact of the roof of the facility in the center of the campus green. Proposed view from Baker Engineering Building Elevation at top of brick wall surounds same as top of Communications Facility Existing view from Library General Classroom Building Communications facility Library Study Learning Center Relocated Line Baker Eng. Building Proposed view from Library

Improvement Recommendation 1H Complete an Architectural Study of Campus Building Entrances The entrances into some campus buildings are dark and uninviting. Building heating and cooling is also impacted by the lack of entrance vestibules. An architectural analysis of the fl oor plan and site plan at campus building entrances should be completed to determine the best architectural remedy for these defi ciencies. Both interior and exterior options, budget, timing and aesthetic implications should be considered. The University Architect can help with this process. The outcomes of an entrance study will impact exterior landscape plans and should be considered as projects are prioritized and scheduled.

2A Site Furnishings Improvement Recommendation Site furnishings designed in a style family are aesthetically unifying. The examples shown here will compliment the contemporary architectural style present on the campus. Powder coated metal is attractive, comfortable and durable. Planters should be appropriately sized for the space they occupy and be constructed of durable, quality material.

3A Lighting Improvement Recommendation Replacement of any antiquated, ineffi cient pedestrian walkway and parking lot lighting is recommended. Metal halide or LED lamps in cut-off luminaires mounted to poles are recommended for pedestrian walkways. High pressure sodium lamping is acceptable for parking lot lights. Color/fi nish for all fi xtures should be consistent campus wide. Avoid the use of bollards due to vulnerability to snow removal operations and vandalism. Site Light Parking Lot Light

4A Plant Stormwater Basin Improvement Recommendation Retrofi tting the stormwater basin with native plantings will beautify this utilitarian landscape element, reduce the grass-cutting burden, and promote Penn State s commitment to environmentally sustainable landscape practices. Existing Proposed

4B Plant Along Waterway Improvement Recommendation An opportunity exists to stabilize the slopes of the waterway/swale between the entrance drive and the Brodhead Cultural Center. Native plants with ornamental qualities would beautify this highly visible area.

4C Baker Dungan Museum Stairs Rebuild Improvement Recommendation If the Museum is to remain in operation, the stairs to the Brodhead Cultural Center need to be rebuilt. The current confi guration does not meet ADA requirements or provide a safe route from the Giusti Amphitheater.

4D Sites for Possible Lawn Replacement Consider Turf Replacement Improvement Recommendation campus has a large turf-mowing burden. Areas of campus that are not regularly used by students can be converted to warm-season meadows to decrease the mowing burden and increase wildlife habitat. Once established, warm season meadows require minimal mowing and deep roots encourage stormwater infi ltration. Warm-season meadow grasses in the highlighted areas along the entrance drive would complement the naturalistic entrance drive island plantings. These relatively small scale plots could serve as pilot test areas for an expanded meadow establishment program at Penn State. Example of a warm season meadow in summer Example of a warm season meadow in fall/winter

4E Screen Parking Improvement Recommendation Wherever possible, parked cars should be screened from view. The east lot next to the Physical Plant Services Building is a good example. Utility access will impact tree and shrub locations. Sites to Screen Parking Existing Proposed

4F Paint Handrails Improvement Recommendation Chipping handrails should be painted.

4G Relocate Gas Service Equipment Improvement Recommendation As mentioned in the LaQuantra Bonci study, the gas service equipment should be relocated from its current location on the main campus green. If relocation is not feasible, the equipment should be repainted and the landscape should be replaced to minimize the visual impact.

4H Regrade Tree Bases Improvement Recommendation The bases of the trees fronting the Baker Engineering & Science Building have been air-spaded for root examination by Bartlett Tree Services. After backfi lling with stone, as Bartlett suggests, cover with mulch to the dripline. drip line drip line root flare crown

4I Screen Physical Plant Services Building Improvement Recommendation During the planning of the Overlook Pavilion next to the library, care should be taken to screen the view to the Physical Plant Services Building without obscuring the long desirable views to the mountains beyond. This stair and railings are in need of replacement and should be included in plans for the Overlook Pavilion.

Improvement Recommendation 4J Shade Trees at Laboratory Classroom Building The landscaping at the Laboratory Classroom Building is not in scale. Large shade trees are recommended.

Improvement Recommendation 4K Planting Bed at Ross Administration Building A stronger planting design that is visually tied to the surrounding plantings is recommended for the bed on the southeast corner of Ross Adminstration Building. Right now the bed is dominated by perennials in need of thinning. The illustrated planting design would provide balance and scale and would unite this overgrown bed with the rest of the elegant plantings within the plaza. Concrete walk Itea to match Amelanchier to match Concrete walk Grasses to match Ross Administration Building Paperbark Maple aligned with existing maple Lawn Itea to match

Cowpath Behind Baker Engineering Building Improvement Recommendation 4L Install stairs at north end of parking lot behind Baker Engineering at site of existng cowpath desire line. Plant the remainder of the space between stairs to encourage use of stairs. Existing Existing desire line - site for new stairs To Campus Core Baker Engineering Building Exisitng stairs To Parking New stairs Groundcover to fi ll space Replace missing tree Drought tolerant shrubs Proposed Existing Trees

Planters Improvement Recommendation4M The use of perennial plant and ornamental grass beds near Ross Administration Building has a dramatic impact. A dramatic visual effect can also be achieved by annual and perennial plantings in appropriately scaled containers placed strategically near building entrances and outdoor gathering spaces. Examples of container plantings designed to incorporate all types of vegetation with dramatic visual effect Recommend the placement of planters at various building entrances. =Recommended planter locations

Parking Lot Improvement Recommendation4N Trees Campus representatives are considering a redesign of the parking lot east of the campus core. Plant island shade trees as part of existing or new confi guration. Existing Proposed

Extend Campus Tree Program Improvement Recommendation4O Establish a database accounting of campus trees to ensure a net gain of signifi cant trees over time. A campus inventory should include a ranking of value to encourage appropriate replacements for lost specimens when opportunities arise for new installations.

Improvement Recommendation 5A Remove Gravel and Landscape at Study Learning Center Campus representatives state that water does not fl ow from drainage pipes during storm events. Replace gravel with turf. Engineering plans of drainage system should be studied to determine if further plantings can be supported. If so, evergreen trees and shrubs such as American Holly and Inkberry Holly should be planted in corner and surrounding pipes. Screen the support for the stairs. Existing Plantings to camoflauge stairs Evergreen plantings Proposed tree Existing trees Proposed

Improvement Recommendation 5B Reconfigure Parking at Harmony Hall Overabundance of pavement contributes to excess water runoff and solar heat island effect. Green space is more visually pleasing than paved surfaces. The opportunity exists to reduce pavement and provide a more functional handicapped parking area outside Harmony Hall. Existing Proposed

5C Remove Telephone Base Improvement Recommendation Remove the non-functioning phone booth as soon as possible.

5D Screen Dumpsters Improvement Recommendation Unsightly transformers, AC units and other utility infrastructure are necessary for the operation of the campus. Recommend that landscape planting and/or view obstructing fence material be installed to diminish the negative visual impact of utilities. Existing Proposed

Penn State Project Prioritization Matrix Monday, February 01, 2010 Proposed exterior improvement projects have been assessed with respect to the following criteria and assigned an implementation priority value. Criteria include: Visual Impact - degree to which the project improves the visual quality of the campus Cost - level of capital investment required to implement the project (assumes no volunteer or donor contribution) The projects with the highest numeric score should be given the highest priority for implementation VISUAL IMPACT COST 1 - Little or no impact 1 - Greater than $25,000 2 - Minor Impact 2 - $15,001 to $25,000 3 - Moderate Impact 3 - $5,001 to $15,000 4 - Major Impact # PROJECT IMPACT COST SCORE 1 2 3 4 1 2 3 4E 1A Paint Doors of Study Learning ng Center X X 5 1B Demolish Hartenbach Residence X X 5 1C Screen General Classroom Building Utilities X X 4 1D Pressure Wash X X 5 1E Replace Railings on Student Union Building "Bridge" X X 5 1F Backfill and Remove Library "Bridge" X X 4 1G Relocate Electrical Service @ Communications Facility X X 7 1H Campus Building Entrance Study X X 6 2A Site Furnishings X X 5 4D 4E 4K 1A 5E 5A 1G 1E 4H 4E 4F 1H 1G 4H 1H 4J 5C 1H 1H 1F 1D 1C 4I 3A Lighting X X 4 4A Plant Stormwater Basin X X 5 4B Plant Along Waterway X X 7 4C Baker Dungan Museum Stairs Rebuild X X 4 4D Consider Turf Replacement X X 3 4E Screen Parking X X 6 4F Paint Handrails X X 7 4G Relocate Gas Service Equipment X X 6 4H Regrade Tree Bases X X 7 4I Screen Physical Plant Services Building X X 5 4J Shade Trees at Laboratory Classroom Building X X 5 4K Planting Bed at Ross Administration Buiulding X X 6 4L "Cowpath" Behind Baker Engineering Building X X 6 4M Planters X X 6 4N Parking Lot Trees X X 5 4O Extend Campus Tree Program X X 7 4D 4B 4C 4A 5B 4G 3B 4E 4N 4E 4L 5A Remove Gravel and Landscape at Study Learning Center X X 7 5B Reconfigure Parking at Harmony Hall X X 5 5C Remove Telephone Base X X 7 5D Screen Dumpsters X X 5 1B Note: Cost ranges identified in this matrix are for planning purposes only. Actual costs will be dependent upon fully developed plans for the respective project. Some of the projects listed above can be broken down into smaller pieces and implemented in phases.