Pine Avenue Improvement Project

Similar documents
Pedestrian and Bike Bridge LOGO

GREENING THE BOULEVARD Master Plan Concepts for Venice Boulevard between Lincoln and Sawtelle

The Project. In 2013, construction was completed between 100 Street and 102 Street.

AREA VIEW 1 AREA VIEW 2 DETAIL VIEW 1 KEY PLAN. Proposed Sitting Area. Parallel Parking Bay

Draft Bergamot Area Plan

Metro 2010 Pedestrian Symposium Walking into the Future City

Corridor Investment Projects (FY FY2012)

Lower Merion Commercial Districts Issues and Characteristics Handbook November 2013

NOVEMBER 2016 AARP IN ST. LOUIS & CITIZENS FOR MODERN TRANSIT PLACEMAKING STRATEGIES FOR ST. LOUIS TRANSIT DRAFT

PIKE PINE RENAISSANCE: ACT ONE. October 19, 2017

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

DRAFT. 10% Common Open Space

CHAPTER 8. Mrs. Zimman s Class - Central Elementary

STREETSCAPE IMPROVEMENTS - RECOMMENDATIONS

Figure Example of out door dining in the public right-of-way.

Carson Street Streetscape Improvements. Request for Proposals

Chapter 14 Streetscape Improvements

BUSINESS DISTRICT DESIGN GUIDELINES

PUBLIC RIGHT-OF-WAY IN THIS CHAPTER PUBLIC REALM

September 28, 2017 Wentworth Avenue (CR 8) Sidewalk Improvements Open House

Establish a network of streetscaped vehicle and pedestrian routes that connect within and outside the Plan area.

The Lincoln Neighborhood Corridor Plan. The LiNC

THE CIVIC DISTRICT DEVELOPMENT OPPORTUNITIES

Robbinsdale LRT Station. CDI Development Guidelines. August Overview

NATICK COMPREHENSIVE MASTER PLAN. Natick Center Outreach Meeting. After presentations about the Natick Master Plan process, town staff and

2.0 THE PLATINUM TRIANGLE VISION

Revitalizing Urban Main Streets

Central Avenue Landscape Architect Record of significant community service Worked with the Heart of Naples Committee to create streetscape plans

A Vibrant Downtown. Chapter 5 Cary Public Art Opportunities 31

Study Area. Capitol Way. Greening America s Capitals 11/13/2014. A Greening America s Capitals Project

Transportation. Strategies for Action

2. Form and Character. 2.1 Introduction. 2.2 The Downtown Addition Plan. 2.1 Introduction

Maplewood Avenue Downtown Complete Street Project

CONTEXT + PROGRAM. CONTEXT - Site Photos RIALTO THEATRE STATION DEPOT HOTEL CONGRESS GREYHOUND SITE 4TH AVENUE BROADWAY BOULEVARD

THE COUTURE AT A GLANCE $122 MILLION TOTAL PROJECT COST 44 STORIES / 700,000 SQUARE FEET PUBLIC PLAZAS, PARK & PEDESTRIAN BRIDGES 302 MARKET RATE

FDOT D4 Complete Streets

ROBBINSDALE LRT STATION CDI DEVELOPMENT GUIDELINES

Introduction. Midtown Loop. This project s purpose is to envision and design an urban greenway known as Midtown Loop for the Detroit Midtown area.

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2.

TRANSIT NEIGHBORHOOD PLANS PROGRAM OVERVIEW

Designing Walkable Urban Thoroughfares: A Context Sensitive Approach

VISION AND GUIDING DESIGN PRINCIPLES

BROOKLYN PARK / 85TH AVE LRT STATION CDI DEVELOPMENT GUIDELINES DRAFT

TAC/CAC, TPO Project Update February 2016

4.9 Mendocino Avenue Corridor Plan Design Guidelines

COMPLETE GREEN STREET CHECKLIST

open house 3 CITY OF SALEM Downtown Streetscape Plan

Streets Vision

Fifth and Detroit Street Design May 2017 Capital Improvements Committee. DOWNTOWN Street Design

Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates).

City of Dallas Complete Streets Program. SAME Infrastructure Forum February 2, 2018

Carlsbad Village Redevelopment Concept Summary of Features

GROUND LEVEL ENLARGEMENT / STREETSCAPE AT PIER AVENUE STRAND & PIER HOTEL HERMOSA BEACH HARDSCAPE MATERIAL KEY MAP PIER AVENUE

Jewel. Platte. of the. Plattsmouth Main Street Landscape Architecture by HDR

appendix and street interface guidelines

Community Design Plan

Please see attached for more detailed project information. Project Schedule Designer Award by SBC Executive Sub-Committee December 21, 2015

FRUITVALE TRANSIT VILLAGE (Phase 2) Residential Project

Convention Center Proposal Supplement January 2015 CURRENT RELATED PLANS & PROJECTS

Sheridan Boulevard S TAT I O N A R E A P L A N S H E R I D A N B O U L E VA R D S TAT I O N A R E A P L A N

Sidewalks Street Lights

WEST LOOP DESIGN GUIDELINES CHECKLIST

D ESIGN REVIEW COMMITTEE

SFMTA PHELAN LOOP AND PUBLIC PLAZA PHELAN OCEAN AVENUE

CHAPTER 1: INTRODUCTION... 1

Potential Green Infrastructure Strategies May 6, 2015 Workshop

VILLAGE OF SKOKIE Design Guidelines for Mixed-Use Districts NX Neighborhood Mixed-Use TX Transit Mixed-Use CX Core Mixed-Use

Public input has been an important part of the plan development process.

EXPO LINE COMMUNITY WORKSHOPS NOVEMBER 27 TH & DECEMBER 3 RD Los Angeles Department of City Planning

The Lower SaLuda Greenway

Prepared by. High Peaks Planning for the City of Placentia. City of Placentia 401 E. Chapman Avenue Placentia, CA (714)

P A I N E S V I L L E D O W N T O W N P L A N

Ivywild On The Creek PRELIMINARY CREEK DISTRICT MASTER PLAN

V. Gateways GATEWAYS / V-1

Shell Beach Road Streetscape Frequently asked Questions

PLAN ELEMENTS WORKSHOP. April 5, 2016

THEMES, VISION, + PRINCIPLES

Citizen Advisory Group Meeting 5: Land Use April 14, 2011

ULI St. Louis Technical Assistance Panel

AGENDA ACTION ITEMS INFORMATION ITEMS

Include new ideas developed during this planning process

Burlington Enhancement Plan

5.0 WAYFINDING STREETSCAPE DESIGN MASTER PLAN 55

Coast Highway Oceanside, California

Baraga Avenue PlacePlan Marquette, MI July 24 th, 2014

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

ROME WATERFRONT VILLAGE PROJECT NARRATIVE January 25, 2018

East Central Area Plan

Copyright, 2010 Hyperform Design Co-op, All Rights Reserved WEST COLFAX AVENUE GREEN PILOT: STREETSCAPE

City of Long Beach. creating vibrant and exciting places

Construction Engineering & Inspection Services Transit Bus Stop Infrastructure for the Broward County Transit Division (BCT)

RESEDA - WEST VAN NUYS COMMUNITY PLAN

PUBLIC PARKS AND FACILITIES, SERVING NEIGHBORHOOD RECREATIONAL AND COMMUNITY EVENTS BUILDINGS BUILT TO THE LINE AND ORIENTED TOWARD THE STREET

Central City Non-Parcel Resources - 09/02/16

LOS ANGELES SPORTS AND ENTERTAINMENT DISTRICT Streetscape Plan

DOWNTOWN VISIONING FORUM AGENDA JUNE 5, 2014

Sub Area 2: Downtown Overland Park

Dogpatch/22nd Street Greening

Reinventing Miner Avenue as a

Town Center (part of the Comprehensive Plan)

Transcription:

Seaside Way to ocean Boulevard ocean Boulevard to 7 th Street 7 th Street to anaheim Street L O ng BeACh DeveLOpment ServiC e S Building a Better long Beach Pine Avenue Improvement Project

Seaside Way & pine Avenue pine Ave. Seaside Way Ocean Blvd. First St. Broadway Section 1 Seaside Way to Ocean Boulevard The area from Seaside Way to Ocean Boulevard is the southern entrance to Pine Avenue. The extensive visual, structural and safety enhancements in this block will make the trip up and down the hill more pleasant and invite visitors from the Convention Center and The Pike to visit Pine Avenue s shops and restaurants. Section 1 Highlights new Street trees planting and irrigation Sidewalk and Curb improvement new pedestrian Lights new Wayfinding Signage Street repair Elements Scramble intersection Street tree planting Date palm planting at intersections new pedestrian lighting refurbished pedestrian lighting Bollards

1 St Street & pine Avenue eighth St. Seventh St. Sixth St. Fifth St. Fourth St. third St. Section 2 Ocean Boulevard to 7 th Street This area is the commercial center of Pine Avenue. Here you ll see great natural improvements such as new planting and street trees. There will be plenty of creative additions such as refurbished pedestrian lighting, new street furniture and removable bollards that allow the street to be closed for events. You ll also see something new for Long Beach - scramble crosswalks that let you cross diagonally, like those in Old Pasadena. Section 2 Highlights remove raised planters new Street trees (with Date palms at intersections) planting and irrigation in tree Wells Sidewalk repair refurbish traffic Signals and Street Lights new trash Cans and Bike racks install Bollards for Street Closures Street repair and restriping

10 th Street & pine Avenue ninth St. tenth St. twelfth St. Anaheim St. pine Ave. Section 3 7th Street to Anaheim Street This section of Pine Avenue transitions from the commercial core to a residential neighborhood. The businesses and residents in this area will find safety and walkability greatly enhanced by the installation of new pedestrian lighting. This will be complemented by new street furniture, trees, landscaping, and sidewalk improvements, plus a complete street resurfacing. Removable bollards at 7 th and 8 th Streets will allow street closures during community events. Section 3 Highlights new Street trees (with Date palms at intersections) planting and irrigation in tree Wells and parkways Sidewalk repair new Street and pedestrian Lights new trash Cans and Bike racks install Bollards for Street Closures Street resurfacing

The Pine Avenue Improvement Project is almost ready to go. Funding from multiple sources is in place. The goals are set and now this great addition to Downtown Long Beach is in the final stages of design. When finished, the Pine Avenue Improvement Project will transform Pine Avenue into a cohesive centerpiece for Downtown. It will include numerous pedestrian enhancements, from new street trees and planting to creative lighting and hardscape improvements. The Pine Avenue Improvement Project promises to bring a new vitality to Downtown Long Beach through improved connectivity and a better pedestrian experience. Long Beach Development Services looks forward to making this promise come true. Seaside Way to ocean Boulevard ocean Boulevard to 7 th Street 7 th Street to anaheim Street L O ng BeACh DeveLOpment ServiC e S Building a Better long Beach

Thank you to our partners: Council District 1, Council District 2, Downtown Long Beach Associates, City of Long Beach Public Works, Los Angeles County Metropolitan Transportation Authority Long Beach Development Services 333 W. Ocean Blvd., 3rd Floor Long Beach, CA 90802 (562) 570-LBDS www.lbds.info