ROAD PAVING VARIOUS LOCATIONS LANE KM

Similar documents
Project Output Indicators for Federal Gas Tax Investments

Fall 2017 Construction Update

CITY OF BOYNTON BEACH SE 1 ST STREET COMPLETE STREETS IMPROVEMENTS

Index to Projects by Project Name

Flooding Hearing: Long and Short Term Strategies

Kittson Parkway / Watershed Park Parking Lot

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY

Index to Projects by Project Name

Planning Districts INTRODUCTION

City of Cedar Rapids Public Works Tentative Bid Schedule Issued December 4, 2017 *Subject to Change*

Project Goal. RRRC Living Towns Planning Workshp. Town of Halifax Revitalization Project. Dynamic Planning & Management Duo: July 12, 2006

A Blueprint for Courtenay

Prince William Street Project (Grant Avenue to Wellington Road)

RESIDENTIAL PLANNED UNIT DEVELOPMENT / SUBDIVISION AND REZONING CONCEPT AND DEVELOPMENT STAGE PLAN SUBMITTAL NARRATIVE

Keyport. Vision for Keyport

A BLUEPRINT FOR BROCKTON A CITY-WIDE COMPREHENSIVE PLAN

FY Capital Improvement Program Arroyo Projects - Lower Arroyo Summary

TABLE OF CONTENTS. Transportation Chapter 1 - Introduction and Purpose of Planning to 1-3. Utilities

Thorncrest Village Neighbourhood Improvements Public Drop-In Event

BYLAW NO. 3549/2015. Being a Bylaw of The City of Red Deer to provide a uniform levy of off-site costs in respect of previously undeveloped land.

Public Information Centre. Welcome

SECTION II SECTION II STATEMENT OF GOALS, OBJECTIVES, PRINCIPLES, ASSUMPTIONS, POLICIES AND STANDARDS

Public Meeting May 20, 2014

Construction Engineering & Inspection

Red Fox Commercial Outline Plan

BURTON STATION STRATEGIC GROWTH AREA PLAN UPDATE PUBLIC MEETING 3/26/18

EXHIBIT A 2019 FINANCING: PROJECT AUTHORIZATIONS

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX G - Stormwater Study Findings & Stormwater Solutions

Community Engagement Committee Meeting #1 December 10, :30pm-8:30pm

Marpole Community Plan. Parks and Open Space

City of Richmond. Engineering Design Specifications

Olde Towne Vision Plan

Master Plan Presentation August 12, 2015

City of Kearney Capital Improvement Update October 1, TH STREET AND 17TH AVENUE IMPROVEMENTS

VEHICULAR AND PEDESTRIAN CIRCULATION

Potential Green Infrastructure Strategies May 6, 2015 Workshop

CITY OF SIMI VALLEY MEMORANDUM

VILLAGE & TOWN OF BERGEN: COMPREHENSIVE PLAN

East Whiteland Township Current Land Development Projects

Preserving Our Past. Securing Our Future.

Queensborough Eastern Neighbourhood Node. Community Open House

russell+mills studios

HOT SPRINGS COMPREHENSIVE PLAN OUTLINE

Green Streets. Sustainable Stormwater Solutions for Greener Communities and a Cleaner Bay

Indian River Town Meeting Held June 6, 2017 The following are responses to issues, grouped under headings, raised at the Indian River Town Meeting.

Spring 2018 Construction Update

2018 Primary Road Capital Improvement Plan (CIP) Projects Preservation / Structural Improvement, Non-motorized and Engineering Design Projects

Canal Road City Limits (East of Van Dyke Ave) to Saal Road

HUNTSVILLE PHYSICAL SERVICES DEPARTMENT

Town of Millbury Department of Public Works

2016 WORKSHOP LVR Field Trip

CAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU 10/21/2013

The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape..

Play areas overlooking climbing hill. School & playgrounds overlooking pond bottom ballfields. Project experience while at Loris and Associates, Inc.

Project Location. Jay and Patty Baker Park and Gordon River Greenway Connector Bridge. Naples Beach Golf Club. Gordon River. East. Naples.

A larger version of this map is located on the last page of this PDF.

STORMWATER - GENERAL NOTES

Highway 15 Project - Hutchinson

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

TO: Glynn County Islands Planning Commission. Karl Bursa, AICP, Planner II. SP3124 Aviator Plaza. DATE: November 17, 2015

Engineering Department

APPENDIX F: DETAIL DRAWINGS

Neighborhood One. Location. Existing Land Use

November 15, Dear Ms. Jacobs:

Draft Master Plan for Franklin Park

Green Infrastructure Recommendations For Parks and Public Spaces

CHAPTER 8. Mrs. Zimman s Class - Central Elementary

Project Consulting Team:

MPRD s Keith Mione (Community) Park Midlothian Road Entrance Traffic Signals

City of Hartford Capital Improvement Plan 2009/ /2019. Part II: Project Descriptions. Eddie A. Perez, Mayor

Town Center. Block 5 Existing multifamily residential units are expected to remain.

include playgrounds, sports fields, community gardens and picnic areas.

CTH C RESURFACING Douglas County, Wisconsin

[Leveraging & Improving Neighborhood Connections] Area A Riverfront

Planning Board Briefing

WILLIAM STREET STORM SEWER OUTFALL. PUBLIC INFORMATION CENTRE March 23, 2017

Municipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights

OPPORTUNITIES AND CONSTRAINTS - OXBOW PARK ENTRANCE AND PUT-IN

The transportation system in a community is an

Green Infrastructure The Indianapolis Greenways Connection

Derby-Shelton Bridge Pedestrian and Bicyclist Enhancements [1]

Focus Group First Meeting Belfountain Community Centre Tuesday June 29, :00 p.m. to 9:00 p.m.

DESIGN CRITERIA PACKAGE

CROWN POINT SUBDIVISION

Main Street Reconstruction From Ninth Line to Stouffer Street. Town of Whitchurch-Stouffville. Public Information Centre

Rainscaping. Rainscaping includes rain gardens, bioswales, combinations of. A guide to local projects in St. Louis

2040 Long Range Transportation Plan

APPROXIMATE LIMIT OF CITY LANDFILL LIMIT OF CONTRACTOR WORK ZONE. INSTALL CONSTRUCTION SNOW FENCE.

ALTERNATIVE STATION AREA -

DOWNTOWN COURTENAY PLAYBOOK: A PARTNERSHIP ACTION PLAN

USF System Campus Master Plan Updates Goals, Objectives and Policies

The following concept plans and illustrations are the result of this 10 month study of the alley connections from CSU to the River District.

Construction and Landscaping on Public Property

A G E N D A Council Update Training Room September 26, :45 p.m.

Welcome. Date: Thursday March 2, 2017 Time: 6:30 p.m. 9:00 p.m. Location: Woodview School Gym, 69 Flatt Road, Burlington Presentation Time: 7:00 p.m.

Spokane River Forum: City of Spokane Permeable Pavements

LITTLE ELM CAPTIAL IMPROVEMENT BOND STREET PRESENTATION

University Parkway Corridor Plan. Public Workshop Sept. 18, 2017

City of Plattsburgh DRI: Downtown Streetscapes & Riverfront Access. Downtown Streetscape and Riverfront Access Design

PRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016

Transcription:

ROAD PAVING VARIOUS LOCATIONS 9.317 LANE KM $1,465,200 General: $1,465,200 BASED ON CONDITION ASSESSMENTS OF THE ENTIRE ROAD NETWORK; USING ASSET MANAGEMENT PRINCIPLES, ROADS THAT ARE SUITABLE FOR REPAVING HAVE BEEN SELECTED; GRIND AND RE-PAVE ROADS WITH NEW ASPHALT; INCLUDES PAVING PORTION OF COMOX RD WATERMAIN PROJECT

ROAD PAVING BUCKSTONE WATER PUMP STATION ACCESS IMPROVEMENT $25,000 General: 25,000 CURRENT ROAD IS GRAVEL THROUGH A RETAIL LANDSCAPE CENTRE; IMPROVE ACCESS FOR CITY SERVICE VEHICLES FOR REGULAR MAINTENANCE AND FOR EMERGENCY ACCESS AFTER NORMAL BUSINESS HOURS

ROAD CONSTRUCTION 5 TH ST - FITZGERALD AVE TO MENZIES AVE COMPLETE STREETS PILOT PROJECT DESIGN $496,000 General: $496,000 BASED ON PUBLIC CONSULTATION AND COUNCIL ENDORSEMENT OF THE SELECTED OPTION, DETAILED ENGINEERING DESIGN WILL BE COMPLETED IN 2017

ROAD CONSTRUCTION WATERS PLACE ROAD $404,600 General: $404,600 CONSTRUCTION OF NEW ASPHALT ROAD, CURB, GUTTER, SIDEWALK AND DRAINAGE STRUCTURES FOR WATERS PLACE; NOTE: THIS PROJECT WAS PROVISIONALLY APPROVED IN 2016 AND IS NEARING COMPLETION

TRAFFIC PROJECTS SIGNAL STRUCTURES - DESIGN $69,800 General: $69,800 DESIGN OF TRAFFIC SIGNAL FOR 8 TH ST AND CLIFFE AVE; DESIGN OF ADVANCED WARNING SIGNAL FOR 8 TH ST AND FITZGERALD AVE; INSTALLATION OF AUDIBLE PEDESTRIAN SIGNAL; SIGNAL AND CONTROLLER MASTER PLAN REGULATORY UPGRADES

RECREATION AND CULTURE FILBERG CENTRE $6,400 General: $6,400 BUILDING ENERGY REDUCTION

RECREATION AND CULTURE LEWIS CENTRE $320,000 General: $320,000 INSTALLATION OF SIGNAGE; BUILDING ENERGY REDUCTION; ROOF REPLACEMENT; EQUIPMENT > $5K

RECREATION AND CULTURE SID WILLIAMS THEATRE $55,000 General: $55,000 THEATRE CAPITAL EQUIPMENT; LED THEATRE LIGHTING; BUILDING ENERGY REDUCTION

RECREATION AND CULTURE LIBRARY $8,500 General: $8,500 BUILDING ENERGY REDUCTION

RECREATION AND CULTURE CENTRE FOR THE ARTS $29,000 General: $29,000 SIGNAGE; BUILDING ENERGY REDUCTION

RECREATION AND CULTURE MUSEUM $130,000 General: $130,000 MAIN ROOF REPLACEMENT

RECREATION AND CULTURE NATIVE SONS HALL $9,500 General: $9,500 BUILDING ENERGY REDUCTION

RECREATION AND CULTURE MEMORIAL POOL $135,000 General: $135,000 BOILER REPLACEMENT; DRAIN DE-CHLORINATION CHAMBER

BUILDING FACILITIES PUBLIC WORKS AT PUBLIC WORKS YARD $148,800 General: $148,800 COMPLETE RENOVATIONS DESIGN OF NEW PUBLIC WORKS BUILDING

BUILDING FACILITIES CARPENTRY SHOP $170,000 General: $170,000 CARPENTER / ELECTRICIAN BAY

BUILDING FACILITIES CITY HALL $215,500 General: $215,500 ROOF REPLACEMENT; BUILDING ENERGY REDUCTION

BUILDING FACILITIES FIRE HALL $24,200 General: $24,200 BUILDING ENERGY REDUCTION

BUILDING FACILITIES RENTAL PROPERTIES COOPERATORS BUILDING 685 Cliffe Ave $250,000 General: $250,000 BUILDING RENOVATION

BUILDING FACILITIES CEMETERY BUILDINGS $27,000 General: $27,000 LAWN CRYPTS

STORM WOODS PARK STORM OUTFALL REHABILITATION $50,000 General: $50,000 REHABILITATION OF EXISTING OUTFALL STRUCTURE; DESIGN NEW OUTFALL; MITIGATE THE HAZARD TO THE PUBLIC

STORM CULVERT IMPROVEMENT DESIGN 200 Back Rd $50,000 General: $50,000 LOCAL AREA DRAINAGE PLAN & DESIGN OF AN INTAKE STRUCTURE; MITIGATE FLOOD ISSUES

STORM GLACIER VIEW PLAZA DRAINAGE IMPROVEMENTS 2401 Cliffe Ave $79,800 General: $79,800 IMPROVING DRAINAGE IN ADJACENT PARK TO DIVERT STORMWATER AWAY FROM PRIVATE PROPERTY; MITIGATE CITY LIABILITY

STORM NEW STORM PIPE OLD ISLAND HWY PUNTLEDGE RD TO RYAN RD $168,300 General: $168,300 IMPROVING DRAINAGE IN ROADWAY AND ADJACENT PROPERTIES; ALEVIATE FLOODING IN LEWIS CENTRE AND THE LINC PARKING LOTS

PARKS BUILDINGS LAWN BOWLING ADDITION $56,000 General: $56,000 Water $0 ADDITION TO LAWN BOWLING CLUBHOUSE AT BILL MOORE PARK

PARKS LEWIS PARK RENEWAL $160,000 General: $160,000 REPAIR THE UNDERMINING OF THE CONCRETE WALL FOR STAIRS TO THE RIVER IN TWO LOCATIONS; ADDITION OF PROTECTIVE NETTING; MITIGATE THE HAZARD TO THE PUBLIC

PARKS PUNTLEDGE PARK RENEWAL $95,000 General: $95,000 REPLACEMENT OF BRIDGE DUE TO SAFETY RISK AND CONDITION; REPLACEMENT OF PLAYGROUND EQUIPMENT; MITIGATE THE HAZARD TO THE PUBLIC; MITIGATE THE RISK OF FAILURE

PARKS GREENWAYS & SIGNAGE $33,200 General: $33,200 PAVED GREENWAY ASPHALT UPGRADES AT VARIOUS LOCATIONS; SIGNAGE UPGRADES AT VARIOUS LOCATIONS

WALKWAYS & BIKEWAYS $241,400 General: $241,400 10 NEW SIGNS FOR RAILS TO TRAILS; SILVER SAND PARK PHASE 2 A (CROWN ISLE BLVD) SILVER SAND PARK PHASE 2 B (PRESWICK PL); CONTRIBUTED LIGHTING ON THE COURTENAY RIVERWAY (PRIVATE DONATION)

CEMETERY $102,000 General: $102,000 GENERAL CAPITAL WORK; IRRIGATION RENEWAL; NEW PLANTINGS;

FIRE DEPARTMENT EQUIPMENT & VEHICLES $81,000 General: $81,000 RESCUE TOOLS; LIGHT VEHICLE REPLACEMENT

FLEET MANAGEMENT SCHEDULED VEHICLE REPLACEMENT PROGRAM $776,000 General: $776,000 PUBLIC WORKS LIGHT VEHICLES; PUBLIC WORKS HEAVY VEHICLES; PARKS LIGHT VEHICLES

INFORMATION SYSTEMS EQUIPMENT AND OTHER TANGIBLE CAPITAL ASSETS $670,000 General: $670,000 PHOTOCOPIERS; PC REPLACEMENTS; SERVER REPLACEMENTS; COUNCIL CHAMBERS A/V REPLACEMENT; ASSET MANAGEMENT / GIS TABLETS; RECREATION SOFTWARE; HARDWARE / SOFTWARE; OFFSITE BACKUP DEVELOPMENT; VOIP PHONE IMPLEMENTATION; ERP SOFTWARE; LAND DEVELOPMENT SOFTWARE; DISASTER RECOVERY PLAN PHASE 1

SANITARY SEWER MAIN REPLACEMENT COMOX RD, LEWIS PARK, RIVER CROSSING - DESIGN $100,000 General: $0 Sewer: $100,000 DESIGN OF GRAVITY SANITARY SEWER THROUGH LEWIS PARK AND COMOX RD; DECOMMISSIONING OF SEWER MAIN CROSSING OF COURTENAY RIVER

WATER COMOX RD WATER MAIN REPLACEMENT $2,150,000 General: $0 Water: $2,150,000 REPLACEMENT OF WATER MAIN ALONG COMOX RD FROM EAST OF 17 ST INTERSECTION EAST TO BORDER WITH K ÓMOKS FN RESERVE BOUNDARY; IN CONJUCTION OF MOTI ROAD RE-PAVING ALONG THE SAME ROAD CORRIDOR

WATER BUCKSTONE WATER PUMP STATION $50,000 General: $0 Water: $50,000 IMPROVEMENTS TO CONFIGURATION OF BUCKSTONE PUMP STATION TO PREVENT IN- SERVICE FAILURE

WATER SANDWICK CONVERSION $1,593,000 General: $0 Water: $1,593,000 CHANGE OVER RESIDENTS FROM SANDWICK WATER DISTRICT TO CITY OF COURTENAY WATER; RESULTING FROM BOUNDARY EXTENSION IN 2002