1 RFP E Composting Facility Heat Recovery System Upgrades Appendix A - Composter Heat Recovery Options Assessment Report (Associated Engineering, Dec 2017) The Resort Municipality of Whistler A1

2 REPORT Resort Municipality of Whistler Composter Heat Recovery Composter Facility Heat Recovery Assessment December 2017

3

4 REPORT Table of Contents SECTION PAGE NO. Table of Contents i List of Tables ii 1 Background Facility Overview Methodology Data Analysis and Heat Potential 2 2 Heat Recovery Concepts Basic heat recovery for building heating Expanded heat recovery and utilization Top concepts for further analysis 6 3 Basic Heat Recovery System General description Fan coil for building heat Hydronic heat recovery coils Hydronic circulation loop Economic analysis 10 4 Expanded Heat Recovery - Biomass Drying General description Air REQUIREMENTS and Power Consumption Energy and costs recommendations 13 Certification Page Appendix A - Technical Data 4.5 TEST Measurements Raw Data 3 i

5 Resort Municipality of Whistler Composter Heat Recovery List of Tables PAGE NO. Table 1-1 Pressures in Composter Tunnel Zones vs Fan Operation 1 Table 1-2 Potential Renewable Heat Recovery 3 Table 2-1 Preliminary Heat Recovery Concepts 4 Table 3-1 Class D Cost Estimates: Basic Heat Recovery for Building eating 10 Table 4-1 Energy for Forced Drying of 30,000 m 3 /year Wood Chips 11 Table 4-2 Energy Costs (CDN$) for Wood Chip Drying 12 Table 4-3 Cost Estimates: Expanded Heat Recovery for Wood Chip Drying 13 ii \\s-bur-fs-01\projects\ \00_heat_potent_asmnt\engineering\04.00_preliminary_design\rpt_rmow_compost_heat_assess_ _ak.docx

6 REPORT 1 Background The Resort Municipality of Whistler (RMOW) engaged Associated Engineering (AE) to evaluate alternatives for heat recovery systems for the Whistler Composting Facility (WCF). A previous heat recovery system (HRS) had failed due to corrosion issues, depriving the facility of renewable source of building heat energy worth about $ per year. At a minimum, this demand should be covered by the new heat recovery system, but without the corrosion problems of the original system. The cost-benefits of expanded heat recovery to serve additional uses were also investigated and are presented in this report. After review of the report RMOW will be in an improved position to decide on the option that provides the best value to them and a proposal for detailed design will be submitted. 1.1 FACILITY OVERVIEW The facility is a continuous biosolids composter taking biosolids from Squamish, Whistler and Pemberton. The composter has two parallel tunnels with trays of feedstock pushed through the system by large hydraulic rams. The facility operates on a diurnal cycle, with loading and pushing of compost only during the day. Each composter tunnel has two zones; Zone 1 (Aerobic Heating Zone at the front of the tunnels) and Zone 2 (Drying Zone back of the tunnels). Zone 1 is negatively aerated primarily by the Primary Exhaust fan. Zone 1 is allowed to heat up to temperatures above 70 C to provide pathogen reduction and also to generate heat which is transferred by the heat pipe to the Zone 2 supply air. Zone 2 is positively aerated by tempered air drawn from inside the process building which is then heated using the heat pipe. Zone 2 is negatively aerated by both the Primary and Secondary exhaust fans depending on whether the secondary exhaust fan is operating or not. The WCF has two basic modes of operation: (a) Biofuel (biodryer) mode (b) Compost mode. The secondary exhaust fan is temperature controlled in Compost mode and is permanently on in Biofuel mode on at maximum speed to make product drier. Both modes accomplish pathogen reduction, but vector attraction reduction is not accomplished during Biofuel mode as the operating temperatures in Zone 2 are too low. See the Table 1-1 for an overview of operating modes. Table 1-1 Pressures in Composter Tunnel Zones vs Fan Operation Compost Mode Biofuel Mode Exhaust fans: Primary Secondary Primary Secondary Zone1 (-) n/a (-) n/a Zone 2 (+) (-) when fan on (+) (-) fan always on -1

7 Resort Municipality of Whistler Composter Heat Recovery Original Heat Recovery System The original HRS circulated refrigerant from a heat pump system, with separate heat recovery units for each composter. The evaporator (heat pickup) coils were in the exhaust stream of the front section, upstream of the heat pipe. The heat pumps, which still exist, are located at the condensers that are suspended in the process building. The evaporator coils have corroded and were removed rendering the system inoperative. The condensers in the building were showing signs of corrosion as well but when coated the corrosion stopped. 1.2 METHODOLOGY Site measurements of flow, pressure, temperature and relative humidity entering and leaving each section of both composters, and across the heat pipe. Measurements by Stasis, an air testing and balancing contractor under direction from Associated Engineering. After the site visit the team evaluated the data and produced data sheets and metrics as shown in a table in Appendix A, for each of four operational modes. Data in each column of that table is for a single exhaust fan only. There are two such fans in each of the exhaust systems. Measured airspeeds and pressures did not correspond to the primary fan s performance curve. Airflows were derived from fan curves using the measured static pressures are considered more realistic. This can be achieved during periods with normal air resistance in the biofilter and/or by adjusting fan speed. Measured building airflow did not balance with exhaust airflows, due to flows from outside air. The following anomalous test results are commented: Test 2 Night biofuel mode shows the building air increasing in temperature from 10.5 C to 41.8 C and at the same time the R.H. increasing from 10 to 42.5%. A similar anomaly is shown on the Test1 Night compost mode results. Leakage has been ruled out as a possible explanation, after discussions with plant personnel. The most likely explanation is that the recorded values are reversed. These data are not critical to the calculations and conclusions presented in the report. 1.3 DATA ANALYSIS AND HEAT POTENTIAL Heat Energy Potential The total potential heating power was calculated for each of the operating modes, as shown in Table 1-2, based on a 10 C air temperature drop and latent heat recovery in the coils. Night biofuel mode has the highest potential, and compost modes the lowest. The exhaust air stream with greatest potential is highlighted in the table. 2 \\s-bur-fs-01\projects\ \00_heat_potent_asmnt\engineering\04.00_preliminary_design\rpt_rmow_compost_heat_assess_ _ak.docx

8 Table 1-2 Potential Renewable Heat Recovery Potential Renewable Heat Recovery Night Compost Night Biofuel Day Compost Day Biofuel Primary air temperature ( C) Secondary air temperature ( C) n/a 38 n/a 49 Primary heating power (kw) Secondary heating power (kw) Total heating power (kw) Annual potential energy (kwh) 470,000 1,451, ,000 1,295,000 At any given time, there is an exhaust stream, primary or secondary, with air temperatures entering the heat recovery of at least 37 C. Heat may be recovered from the primary exhaust in all modes except daytime Biofuel mode, when the temperature (22 C) is too low for practical recovery without the aid of a heat pump. The tunnels always maintain a negative air balance. During the daytime, most of the relief air enters through the loading end whereas at night it seems to enter from the opposite end as indicated by the measured exhaust temperatures in the different operating modes. Air monitoring by another firm was made in response to corrosion issues within the facility. Results 1 showed high levels of ammonia (approx. 40 ppm) in the exhaust ductwork. 2 Heat Recovery Concepts 2.1 BASIC HEAT RECOVERY FOR BUILDING HEATING AE s original assignment was to assess replacement options for the evaporators and to help get the original system operating again. The original system recovered about 70 kw from the composting facility. However, replacement options are limited by the high operating pressures of the refrigerant and the corrosive air mixture. The replacement evaporator coil in that case would be very expensive due to the quality and amount of materials required. Another disadvantage with re-instating the original refrigerant-based system is its fixed capacity to provide heat only to the process building and inflexibility of recovering from only one airstream. This represents only 1 Air Monitoring for Acetic Acid, Ammonia, and Hydrogen Sulfide from Whistler Compost Facility, by Levelton Consultants, for Municipality of Whistler,

9 Resort Municipality of Whistler Composter Heat Recovery a fraction of the renewable heat energy in the exhaust air streams, which could be extracted for other purposes as well. Therefore, if the system is to be significantly modified or replaced, consideration should be given on how to include future extra capacity and/or more end-uses for the energy that can be extracted. New, more robust hydronic coils and an intermediate water-glycol loop operating at lower pressure is recommended as the basis for heat recovery for all concepts reviewed in this report, as shown in Table EXPANDED HEAT RECOVERY AND UTILIZATION The alternatives initially discussed with RMOW for expanded use of waste heat energy were: (a) to supplement the composter s dryer section (b) accelerated drying of wood chips in nearby area (c) drying to decreasing the moisture content of the final composter biofuel product. If moisture content of compost could be decreased, then it could be a marketable commodity such as fuel for the Lafarge or Lehigh cement plants in Richmond. To be able to sell the compost as a fuel, it would require a moisture content of around 20%, down from the current 45% levels. Roughly 18 GJ/tonne heating value is the threshold at which efficiency gains make this fuel attractive for such clients. Table 2-1 Preliminary Heat Recovery Concepts Concept Advantages Disadvantages 1. Using existing building heat pump & condensers with new water-glycol recovery coils 2. New water-to-water building heat pump with new water-glycol recovery coils Re-use of existing heat pump equipment in the building. All new equipment, no conversion risk. More corrosionresistant options on the type of coil material used. Risk with converting to an intermediate heat exchanger. Existing condensers have already experienced corrosion prior to being coated. Higher cost due to new heat pump and coils. 3. Run-around loop without heat pump, using recovery coils in both primary and secondary exhaust, for building heating. Low equipment cost. No heat pump = low service and maintenance costs. Can be retrofitted with heat pumps in the future to increase capacity Increased airflow pressure drop and fan energy consumption. 4 \\s-bur-fs-01\projects\ \00_heat_potent_asmnt\engineering\04.00_preliminary_design\rpt_rmow_compost_heat_assess_ _ak.docx

10 Concept Advantages Disadvantages 4. Same as #3, but using heat pipe No hydronics, no heat pump = instead of coils and pumped circuit. low service and maintenance costs. Air-to-air transfer would be used to transfer heat to the building Concepts for expanded heat utilization: Limited capacity: provides ventilation and building heat only. Installation cost due ducting building air out to heat pipe. Increased fan energy Cannot easily be expanded in the future without complete replacement. Risk of breakthrough of contaminated air if air to air transfer is used 5. Same concept as #3 but with a heat pump to supplement the composter s drying section with new heat exchangers downstream of the heat pipes. Higher quality biofuel product with less moisture; lower transport costs. Use of existing facility; no need for separate air-bed dryer Increases the drying section airflow, which will require more heat to the building as it acts as the supply plenum and more outside air would be drawn in. More energy required for dryer supply air to maintain the same supply temperature. 6. Same concept as #3 but with a heat pump supplying a new airdrying bed with blowers for accelerated drying of wood chips in a separate area. 7. Same concept as #3 but with a heat pump supplying a new biomass dryer process unit to make compost suitable for sale as fuel More effective drying of woodchips using dry air instead of already saturated exhaust air. Improved process performance with regard to moisture removal Reduced ROI compared with option #6 More effective and extended drying season compared to option #6 Improved process performance with regard to moisture removal Higher airflow would be needed due to the limited drying capacity of already saturated air. This may require re-ducting of secondary section. Greatly increased energy consumption for blowers vs natural drying. Large capital cost for new equipment Greatly increased energy vs natural drying. Not as effective as concept#5. Complex system with high maintenance costs Very large initial capital cost 5

11 Resort Municipality of Whistler Composter Heat Recovery 2.3 TOP CONCEPTS FOR FURTHER ANALYSIS Based on discussions and a preliminary analysis of all the initial concepts, it was concluded that #3 is the best concept for heat recovery to resupply the building with waste heat, but which also has flexibility for a future expansion. Of the most promising concepts for expanded heat utilization for drying, we looked at #6 in detail, but consider #7 also worthy of investigation. Both concepts build on the heat recovery loop described in Concept #3. 3 Basic Heat Recovery System 3.1 GENERAL DESCRIPTION Four new, more robust hydronic coils connected to a water-glycol runaround loop is recommended as the basis for heat recovery from the composter exhaust airstreams. For basic heat recovery, this energy is transferred to a fan coil for building heat. The coils will be sized for building heat, but can recover more if aided by a heat pump in the future. The loop piping will have provision to connect a future water-to-water heat pump, as shown in Figure \\s-bur-fs-01\projects\ \00_heat_potent_asmnt\engineering\04.00_preliminary_design\rpt_rmow_compost_heat_assess_ _ak.docx

12 Figure 3-1 Basic heat recovery system schematic 7

13 Resort Municipality of Whistler Composter Heat Recovery 3.2 FAN COIL FOR BUILDING HEAT The building heating in the plant could be provided by a suspended fan coil unit with overall heating capacity equal to the original system. The original system s capacity of 100 kw is based on a 30 kw heat pump compressor and assuming a COP slightly over 3. This size provided a comfortable environment inside the plant, according to staff. It is difficult to properly size a unit in a building with an open door as in certain conditions it will not be very effective. If a warmer indoor climate was desired, then system sizing could be adjusted. The 100 kw water-glycol heating coil would be installed within the new fan coil unit. This would be a hung unit, suspended in the same or similar location to the original condenser unit; only minimal new ducting is required, as the hot air can be directed into existing nearby ductwork in two places. A high-volume ceiling fan should be considered for improved air destratification in the building, but this cost is not considered here. Specifications used in cost estimation: Electrical components for Class 1, Division 2 building atmosphere MERV 8 filter 10 C air in from building 32 C water in from run-around loop Material mild steel and epoxy construction, with Heresite on the cu/al coils 3.3 HYDRONIC HEAT RECOVERY COILS Sizing of the exhaust air heat recovery coils depends on the required heat load and whether it is aided by a heat pump. To supply only building heat load with the help of a heat pump, then it will be sufficient with coils only in the primary exhaust airstream, as in the original system, but downstream of the heat pipes. A run-around water-glycol loop without a heat pump will require a larger coil surface area and access to higher temperatures. This is most easily achieved by putting additional coils in the secondary airstreams as well. These added coils will allow expanded heat recovery if a heat pump is installed in the future. All coils in the corrosive exhaust air should have a corrosion resistant Heresite coating. Heresite is used on the existing heat-pipes, which show no signs of corrosion after many years in service. Due to the large volume of material for a 10-row configuration, stainless steel was found to be too expensive. The coating must withstand ammonia air and repeated pressure-washing. The heat recovery coils should be sized such that either primary of secondary systems can supply the entire load of 100 kw. 8 \\s-bur-fs-01\projects\ \00_heat_potent_asmnt\engineering\04.00_preliminary_design\rpt_rmow_compost_heat_assess_ _ak.docx

14 Specifications used in cost estimation are: Each secondary exhaust coil sized for C. (for nighttime biofuel mode). Each primary exhaust coil sized for C (for all compost modes). Coil material: Heresite coated cu-alu to resistant corrosive ammonia atmosphere. Capable of being pressure washed. Water out of coil 32 C. Delta T of water-glycol about 10 C. Control of system for coil switching for optimal heat recovery performance. The specified coils will increase static pressure by about 330 Pa (1.3 inches water column) in each duct. Design airflow can be maintained by using existing VFDs to increase fan speed. This will use slightly more energy, but some of this will be recovered as heat anyway Coil Ducting and Condensate Collection Coils will be flanged into existing 450 mm PVC ventilation duct. The coils will be in a housing with access hatch for cleaning and service to maintain optimal performance. If made removable, it may be advantageous to relocate the exhaust fans and place the coils on the suction side to reduce the possibility of leaks, and allow service while in operation, this would only be possible with the secondary exhaust. This relocation is not included in the current cost estimate. Condensate carryover from the recovery coils will be collected in a drain pan with clean-out drain. While the original HR system was operational, there was reportedly a large amount of condensate produced. Since a condensate collection and coil cleaning system must be developed anyway for the new coils, it is recommended to extended it include collection condensate after the heat pipe, but not cost estimated here. Condensate is contaminated water and was previously discharged to ground as there is no sewage main from the composting plant to the wastewater treatment plant. Provision for collection and alternate disposal should be considered through the septic system, but this is not cost estimated here. 3.4 HYDRONIC CIRCULATION LOOP Specifications used in cost estimation: Plastic piping 90 mm diameter Circulation pump 0.5 hp Expansion tank 3-way temperature control valve Isolation valves on all coils 9

15 Resort Municipality of Whistler Composter Heat Recovery In compost mode there is no secondary airflow: water-glycol to those coils may be may turned off or allowed to flow. In Biofuel mode during the daytime, use the coils in secondary exhaust, due to low primary temperatures. In Biofuel mode during nighttime the coils in primary exhaust can be prioritised. 3.5 ECONOMIC ANALYSIS Table 3-1 shows Class D cost estimates (30% accuracy) for a basic heat recovery system to cover building heat demand, but with provision for expanded heat recovery later. This system has a simple payback of 9.5 years, assuming an annual cost savings of $25,000 on reduced propane heating and increased annual fan energy consumption of $1,500 (from about 22,000 kwh/year) The supplier s estimate for a fan-coil unit with stainless steel coils and cabinet was three times the cost for a typical steel coated unit. Stainless steel is not needed for the fan coil, so the lower typical price is used. Table 3-1 Class D Cost Estimates: Basic Heat Recovery for Building eating Description Price estimate (CDN $) Comment Fan coil unit 50,000 Equipment and installation Heat recovery coils (4) 42,000 Equipment only, 10 row configuration Coil ducting 40,000 Incl. coil install, transitions and access hatches Hydronic Circulation Loop 20,000 Incl. pump, piping, valves Power and Automation 20,000 SUBTOTAL (Capex) 155,000 Engineering & Administration (20%) 31,000 Unforeseen (10%) 16,000 TOTAL 225,000 Rounded 4 Expanded Heat Recovery - Biomass Drying 4.1 GENERAL DESCRIPTION Increasing the hydronic capacity of the HR system will allow use of waste heat from the composter to be used in other nearby applications, in addition for building heating. The most promising application is as a heat source for hot air drying of wood chips. Drier wood chips are lighter, burn more reliably and at much higher efficiency. This drying would take place in an existing covered area, where wood chips are currently seasoned. RMOW initially set a target of m 3 /yr ( yd 3 ) wood chips to be processed. 10 \\s-bur-fs-01\projects\ \00_heat_potent_asmnt\engineering\04.00_preliminary_design\rpt_rmow_compost_heat_assess_ _ak.docx

16 Hot air drying would require a heat pump for greater heating power extraction from the composting facility. An insulated water-glycol hydronic line and pump would transport the heat to the nearby wood drying area. There are many different types of modular, wood biomass dryers which can be connected to a waste heat source. Low-temperature belt and fluid air-bed dryers would allow the heat pump to operate effectively compared to other, high-temperature drying methods. These dryers are available as complete packaged units, but a custom-built, open design is chosen here for increased future flexibility for drying of other biomass, such as compost. The main equipment items are the air bed itself, the water-to-water heat pump, blower fans, and the heating coils. Any need for additional equipment for exhaust air cleaning from the dryer was not investigated, and such equipment is not included in the price estimates here. 4.2 AIR REQUIREMENTS AND POWER CONSUMPTION The energy needed for drying down to about 20% water content depends on throughput; yearly volume of woodchips divided by the length of the length of the drying season, assuming continual operation. The air requirement for air-bed drying is 400 to 500 m 3 /h/m 3 for green wood chips in fan beds with depths 0.8 to 1.5 m (Helin, 2005). Normal static pressure drop through a typical air bed is 7 in. water (1.74 kpa). High velocities are needed to prevent re-condensation in upper layers of biomass. In this simplified analysis based on empirical data 2, the use of waste heat for drying is modelled by assuming a longer drying season. Table 4-1 shows results for drying of 30,000 m 3 /year of wood chips. Table 4-1 Energy for Forced Drying of 30,000 m 3 /year Wood Chips Fan with Ambient Air Only Fan with Waste- Heated Air Drying season months 7 9 Days on air bed days Batches # Batch size m Air requirement cfm 210,000 64,000 Fan power kw Fan energy input kwh/y 1,490, ,912 Heat pump output kw Heat pump input kw Heat pump energy kwh/y 0 660,000 Total energy input kwh/y 1,490,000 1,240,000 Total energy input kwh/m Woodchip Drying, by M. Price, Centre for Forest Resources & Management, UK,

17 Resort Municipality of Whistler Composter Heat Recovery Scenario with Reduced Yearly Volumes Reduced yearly volumes will reduce fan airflows proportionately, but fan power will be reduced by much a higher factor. In the above example, reducing the annual volume to 12,000 m 3 /year over the same length of drying season will reduce the needed airflow by 65%. This will reduce the pressure drop by over one-third 3. Fan power is pressure drop x flow, so the necessary fan power, and energy costs, will be more than onefifth of the original values. In the above example, halving the annual volume will reduce fan power to roughly 50 kw instead of 290 kw. Annual fan energy consumption will be about 250,000 kwh/yr, costing roughly $16,000 per year which is $1.3 per m 3. This analysis assumes that the total drying time remains the same as in the high-volume scenario. If drying time is limited to only the shoulder seasons, then energy costs per m 3 will be the same as in the highvolume scenario. 4.3 ENERGY AND COSTS Energy costs are shown in the table below. Maintenance costs are estimated at between $5,000 up to $10,000 for system with heat pump. Power demand charge used was 5$/kW, and energy charge 5 cents per kwh. Taken together, these give an average total energy cost of between 6.0 to 8.2 cents per kwh, depending on the scenario. Fan Motor Costs Table 4-2 Energy Costs (CDN$) for Wood Chip Drying Fan Air Only With Heat Demand costs 17,000 5,000 Energy costs 75,000 29,000 Subtotal 92,000 34,000 Heat Pump Costs Demand costs 0 6,000 Energy costs 0 33,000 Subtotal 0 39,000 Total costs Demand costs 17,000 11,000 Energy costs 75,000 62,000 TOTAL 92,000 73,000 Per m 3 wood chips Pressure resistance to air flow during ventilation of different types of wood fuel chip, Kristensen \\s-bur-fs-01\projects\ \00_heat_potent_asmnt\engineering\04.00_preliminary_design\rpt_rmow_compost_heat_assess_ _ak.docx

18 Estimates of the capital costs are shown in Table 4-3, to 40% accuracy. Table 4-3 Cost Estimates: Expanded Heat Recovery for Wood Chip Drying Description Price Estimate (CDN $) Water-Water Heat Pump 45,000 Hydronic Lines 20,000 Pumps 15,000 Blower Fans 80,000 Drying Bed 100,000 Power and Automation 20,000 Building-related 50,000 SUBTOTAL (Capex) 330,000 Engineering and Admin (20%) 66,000 Unforeseen (20%) 66,000 TOTAL 462, RECOMMENDATIONS The results show only marginal benefit to using heat for forced drying of wood chips, compared to forced airdrying only. Energy costs are significant for annual drying 30,000 m 3, ranging from $2.40 to $3.00 per m 3 of wood chips. This represents 14% to 18% of a typical market price of about 75 $/tonne. Capital depreciation costs will be extra. Reduced volumes, dried over the same period of 32 weeks, will have much lower energy costs, corresponding to about 8% of the market price. The concept for drying using heat and increased airflows in the existing composting tunnels may be a better alternative, but was not investigated in detail this report. Increasing the air flow, balance or temperature of the supply air to the drying section would lower the moisture content, although this could have an adverse effect on the lifetime of the biofilter media. Perhaps the most economical alternative of all for wood chip drying would be to establish a larger covered area optimized for natural drying using ambient air. 13

19

20

21

22 REPORT Appendix A - Technical Data SITE PLAN Figure A-1: Site Plan and Source of Air Pressure Drops A-1

23 Resort Municipality of Whistler Composter Heat Recovery TEST RESULTS AND CALCULATIONS SUMMARY Results from the test measurements are shown, after minor adjustment for error. Adjusted data is highlighted in yellow in Table A-1 (see table key). Table A-1 Preliminary Test Results and Calculations Summary A-2 \\s-bur-fs-01\projects\ \00_heat_potent_asmnt\engineering\04.00_preliminary_design\rpt_rmow_compost_heat_assess_ _ak.docx

24 Appendix A - Technical Data REFERENCES WCF drawings and documents: 1. Results from airflow measurements by C. Smeenk, AE, Air Monitoring for WC, report# R by Levelton, Fan drawings and specs, drawing # by Daltec Industries Ltd, Tunnel Layout Drawings, by Wright Tech Systems, RFP# for Supply & Installation of a Heat Exchange System at WCF, Wood Chip Storage Building Extension (preliminary), drawing #005-P1, General references: 1. Woodchip Drying, by M. Price, Centre for Forest Resources & Management, UK, A.1 TEST MEASUREMENTS RAW DATA The following datasheets show three sets of recorded measurements. Each set measured properties of primary, building and secondary airstreams during each of the four modes of operation. Measurements were made by Stasis, an air testing and balancing contractor under direction from Associated Engineering. A-3

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

Adding More Fan Power Can Be a Good Thing

Adding More Fan Power Can Be a Good Thing This article was published in ASHE Journal, May 14. Copyright 14 ASHE. Posted at www.ashrae.org. This article may not be copied and/or distributed electronically or in paper form without permission of

More information

COLD STORAGE WAREHOUSE, USING DIRECT EXPANSION AMMONIA REFRIGERANT Ray Clarke ISECO Consulting Services Pty Ltd

COLD STORAGE WAREHOUSE, USING DIRECT EXPANSION AMMONIA REFRIGERANT Ray Clarke ISECO Consulting Services Pty Ltd COLD STORAGE WAREHOUSE, USING DIRECT EXPANSION AMMONIA REFRIGERANT Ray Clarke ISECO Consulting Services Pty Ltd Abstract This paper presents the design approach adopted for the expansion of a large existing

More information

Aeration vs NAD vs NAD+heating vs Heated Air Drying

Aeration vs NAD vs NAD+heating vs Heated Air Drying Aeration vs NAD vs NAD+heating vs Heated Air Drying SEPTEMBER, 2018 @JoyAgnew3 @PAMI_Machinery General grain drying principles Effect of adding heat on air s capacity to dry grain Sources of heat, sizing

More information

Energy-Efficient Makeup Air Units BY HUGH CROWTHER, P.ENG., MEMBER ASHRAE

Energy-Efficient Makeup Air Units BY HUGH CROWTHER, P.ENG., MEMBER ASHRAE This article was published in ASHRAE Journal, March 20145 Copyright 2015 ASHRAE. Posted at www.ashrae.org. This article may not be copied and/or distributed electronically or in paper form without permission

More information

Reducing Energy Use in Grain Dryers

Reducing Energy Use in Grain Dryers Reducing Energy Use in Grain Dryers J. Dyck, P. Eng. FACTSHEET 17-001 Agdex 111/736 january 2017 (replaces OMAFRA factsheet 88-003, Reclaiming Corn Drying Energy) INTRODUCTION Are you paying too much to

More information

Heat pump and energy recovery systems

Heat pump and energy recovery systems SBS5311 HVACR II http://ibse.hk/sbs5311/ Heat pump and energy recovery systems Ir. Dr. Sam C. M. Hui Faculty of Science and Technology E-mail: cmhui@vtc.edu.hk Oct 2017 Contents Basic concepts Air-to-air

More information

ASHRAE JOURNAL ON REHEAT

ASHRAE JOURNAL ON REHEAT Page: 1 of 7 ASHRAE JOURNAL ON REHEAT Dan Int-Hout Chief Engineer Page: 2 of 7 Overhead Heating: A lost art. March 2007 ASHRAE Journal Article Dan Int-Hout Chief Engineer, Krueger VAV terminals provide

More information

APC APPLICATION NOTE #109

APC APPLICATION NOTE #109 #109 Application Guidelines for the InfraStruXure InRow SC Condenser By David Roden Abstract The InfraStruXure InRow SC (ACSC100 and ACSC101) is a self-contained air conditioner for server rooms and wiring

More information

THERMAL ICE STORAGE: Application & Design Guide

THERMAL ICE STORAGE: Application & Design Guide THERMAL ICE STORAGE: Application & Design Guide Table of Contents: 1. Introduction A. History of Thermal Energy Storage B. Operating and Cost Benefits 2. Applications A Fundamental System B. HVAC Cooling

More information

A Technical Introduction to Cool Thermal Energy Storage Commercial Applications

A Technical Introduction to Cool Thermal Energy Storage Commercial Applications A Technical Introduction to Cool Thermal Energy Storage Commercial Applications Cool Thermal Energy Storage is a new application of an old idea that can cut air conditioning energy costs in half while

More information

Management of In-Bin Natural Air Grain Drying Systems to Minimize Energy Cost

Management of In-Bin Natural Air Grain Drying Systems to Minimize Energy Cost Know how. Know now. EC710 Management of In-Bin Natural Air Grain Drying Systems to Minimize Energy Cost Thomas W. Dorn, Extension Educator With prices for all energy sources rising dramatically in recent

More information

WHITE PAPER. ANSI/AHRI Standard for Fan and Coil Evaporators - Benefits and Costs

WHITE PAPER. ANSI/AHRI Standard for Fan and Coil Evaporators - Benefits and Costs Abstract Fan and coil evaporators as used in the industrial refrigeration industry can be certified for performance per ANSI/AHRI Standard 420-2008, Performance Rating of Forced-Circulation Free-Delivery

More information

Heat Recovery Units. Heat Recovery 1

Heat Recovery Units. Heat Recovery 1 Heat Recovery Units Heat Recovery 1 Heat Recovery Unit Why? A heat recovery unit (HRU) can help make mechanical ventilation more cost effective by reclaiming energy from exhaust airflows. HRUs use air-to-air

More information

Best Practices for Condensing Boilers

Best Practices for Condensing Boilers ASHRAE www.ashrae.org. Used with permission from ASHRAE Journal at www.cleaverbrooks.com. This article may not be copied nor distributed in either paper or digital form without ASHRAE s permission. For

More information

7. MECHANICAL SYSTEM DESIGN

7. MECHANICAL SYSTEM DESIGN 7. MECHANICAL SYSTEM DESIGN The second primary topic of this thesis is to investigate the application of a dedicated outdoor air system (DOAS) to the SLCC. The stated goals for this thesis of improved

More information

InterNACHI Home Energy Inspection for th Street

InterNACHI Home Energy Inspection for th Street InterNACHI Home Energy Inspection for 1750 30th Street Estimated Yearly Energy Costs: $1,491 per year Dear Client, This house has been scored on a scale of 1 to 100. A 100 would represent a home with perfect

More information

Pharmaceutical Facility Design

Pharmaceutical Facility Design PhEn-602 Pharmaceutical Facility Design J. Manfredi Notes 9A PhEn-602 J. Manfredi 1 Primary & Secondary HVAC units Primary Primary air handling unit arrangement: One unit is responsible for all of the

More information

This summarises results from our inspection of the Rendering Plant air extraction system at the Imlay meat works on 12 December 2013.

This  summarises results from our inspection of the Rendering Plant air extraction system at the Imlay meat works on 12 December 2013. Aurecon New Zealand Limited Level 1, 102 Customhouse Quay Wellington 6011 PO Box 1591 Wellington 6140 New Zealand T F E W +64 4 472 9589 +64 4 472 9922 wellington@aurecongroup.com aurecongroup.com 3 February

More information

Reconciliation of ventilation and production expansion in a potash mine

Reconciliation of ventilation and production expansion in a potash mine Reconciliation of ventilation and production expansion in a potash mine Kyle Penner a, Euler De Souza b a PotashCorp, Rocanville Division, Saskatchewan, Canada b Queen's University, Kingston, Ontario,

More information

TOTAL SYSTEM EFFICIENCY: SYSTEM APPLICATIONS & DESIGNS. David Grassl PE Mechanical Engineer Principal

TOTAL SYSTEM EFFICIENCY: SYSTEM APPLICATIONS & DESIGNS. David Grassl PE Mechanical Engineer Principal TOTAL SYSTEM EFFICIENCY: SYSTEM APPLICATIONS & DESIGNS David Grassl PE Mechanical Engineer Principal Similar to traditional boiler systems, condensing boiler systems have many designs they can operate

More information

EADQUARTERS. Technical Report One. Stephanie Kunkel Mechanical Option

EADQUARTERS. Technical Report One. Stephanie Kunkel   Mechanical Option EADQUARTERS 707 N. Calvert St. Technical Report One ASHRAE Standard 62.1 Ventilation ASHRAE Standard 90.1 Energy Design Stephanie Kunkel www.engr.psu.edu/ae/thesis/portfolios/2011/slk5061 Mechanical Option

More information

ENGINEERING. Edition No. 13 October 2002

ENGINEERING. Edition No. 13 October 2002 Edition No. 13 October 2002 ENGINEERING S Y S T E M S O L U T I O N S W e at McQuay are very proud of our tradition of producing industry leading water source heat pumps. Our heritage stretches back more

More information

ASHRAE Region VI CRC Track III: Session 3 Ventilation Energy Recovery. Steven T. Taylor, PE Principal Taylor Engineering

ASHRAE Region VI CRC Track III: Session 3 Ventilation Energy Recovery. Steven T. Taylor, PE Principal Taylor Engineering ASHRAE Region VI CRC Track III: Session 3 Ventilation Energy Recovery Steven T. Taylor, PE Principal Taylor Engineering This program is registered with the AIA/CES for continuing professional education.

More information

BOOK 1 OVERVIEW RD2XIN INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1:

BOOK 1 OVERVIEW RD2XIN INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1: 4510 Helgesen Drive, Madison, WI, 53718 608.221.4499, 800.627.4499, Fax: 608.221.2824 support@renewaire.com www.renewaire.com RD2XIN INSTALLATION AND OPERATION MANUAL BOOK 1 OVERVIEW ABOUT BOOK 1: This

More information

Boiler Basics. Design and operation

Boiler Basics. Design and operation Boiler Basics Design and operation A boiler is an enclosed vessel that provides a means for combustion heat to be transferred into water until it becomes heated water or steam. The hot water or steam under

More information

BOOK 1 OVERVIEW RD2XRT INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1:

BOOK 1 OVERVIEW RD2XRT INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1: 4510 Helgesen Drive, Madison, WI, 53718 608.221.4499, 800.627.4499, Fax: 608.221.2824 support@renewaire.com www.renewaire.com RD2XRT INSTALLATION AND OPERATION MANUAL BOOK 1 OVERVIEW ABOUT BOOK 1: This

More information

Senior Thesis Centre Community Hospital East Wing Addition - Proposal Keith Beidel Mechanical Option 12/05/02 1

Senior Thesis Centre Community Hospital East Wing Addition - Proposal Keith Beidel Mechanical Option 12/05/02 1 Table of Contents Page Number(s) Executive Summary 2 Project Background 3 Proposed Depth Alternatives 4 Proposed Depth Redesign 5-7 Justification of Proposed Depth Redesign 8 Proposed Breath Redesign 9

More information

NEW DAIKIN FTQ SERIES HEATING AND COOLING SYSTEMS. MULTI-POSITIONAL AIR HANDLER Up to 16 SEER / Up to 10.4 HSPF / Up to 12.5 EER

NEW DAIKIN FTQ SERIES HEATING AND COOLING SYSTEMS. MULTI-POSITIONAL AIR HANDLER Up to 16 SEER / Up to 10.4 HSPF / Up to 12.5 EER NEW DAIKIN FTQ SERIES HEATING AND COOLING SYSTEMS MULTI-POSITIONAL AIR HANDLER Up to 16 SEER / Up to 10.4 HSPF / Up to 12.5 EER FTQ SERIES HEATING AND COOLING SYSTEMS MULTI-POSITIONAL AIR HANDLER Up to

More information

Small Commercial Business Energy Audits. Recognizing and addressing the special requirements of the small business market segment.

Small Commercial Business Energy Audits. Recognizing and addressing the special requirements of the small business market segment. Small Commercial Business Energy Audits Recognizing and addressing the special requirements of the small business market segment. Class 7 Class 7: Refrigeration Fundamentals The Vapor-compression cycle

More information

Greenheck Coils A Complete Line of Custom Coils to Meet Your Needs. 3/8, 1/2 and 5/8 inch OD Tubing

Greenheck Coils A Complete Line of Custom Coils to Meet Your Needs. 3/8, 1/2 and 5/8 inch OD Tubing Greenheck Coils A Complete Line of Custom Coils to Meet Your Needs 3/8, 1/2 and 5/8 inch OD Tubing April 2012 Custom Coils Custom Coils Configured to Meet Your Needs Greenheck is proud to offer a complete

More information

B. Use UT Austin specifications and equipment schedule format for HVAC equipment where available.

B. Use UT Austin specifications and equipment schedule format for HVAC equipment where available. PART 1: GENERAL 1.01 General Requirements A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the

More information

CARRIER edesign SUITE NEWS. Interpreting High (Low) Peak Design Airflow Sizing Results for HVAC. Equipment Selection.

CARRIER edesign SUITE NEWS. Interpreting High (Low) Peak Design Airflow Sizing Results for HVAC. Equipment Selection. Volume 5, Issue 1 CARRIER edesign SUITE NEWS Interpreting High (Low) Peak Design Airflow Sizing Results for HVAC Equipment Selection A design challenge sometimes occurs when computing design loads using

More information

Summary of Comments (Washington Revisions November 7, 2000) Update November 27, 2000

Summary of Comments (Washington Revisions November 7, 2000) Update November 27, 2000 SAE Alternate Refrigerant Cooperative Research Program Summary of Comments (Washington Revisions November 7, 2000) Update November 27, 2000 To: Alternate Refrigerant Task Force Members From: Ward Atkinson

More information

RN/RQ. Series PACKAGED ROOFTOP UNITS, AIR-SOURCE HEAT PUMPS, WATER-SOURCE/ GEOTHERMAL HEAT PUMPS, & OUTDOOR AIR HANDLING UNITS.

RN/RQ. Series PACKAGED ROOFTOP UNITS, AIR-SOURCE HEAT PUMPS, WATER-SOURCE/ GEOTHERMAL HEAT PUMPS, & OUTDOOR AIR HANDLING UNITS. RN/RQ Series PACKAGED ROOFTOP UNITS, AIR-SOURCE HEAT PUMPS, WATER-SOURCE/ GEOTHERMAL HEAT PUMPS, & OUTDOOR AIR HANDLING UNITS RQ Series Features: Air-cooled or water-cooled condenser, with unit capacities

More information

Greenheck Coils. A Complete Line of Custom Coils to Meet Your Needs. 3/8, 1/2 and 5/8 inch OD Tubing

Greenheck Coils. A Complete Line of Custom Coils to Meet Your Needs. 3/8, 1/2 and 5/8 inch OD Tubing Greenheck Coils A Complete Line of Custom Coils to Meet Your Needs 3/8, 1/2 and 5/8 inch OD Tubing March 2010 Custom Coils Custom Coils Configured to Meet Your Needs Greenheck is proud to offer a complete

More information

AHRI 920 Performance Rating and Comparisons of DX-DOAS Unit Efficiency

AHRI 920 Performance Rating and Comparisons of DX-DOAS Unit Efficiency Application Note 24 AHRI 920 Performance Rating and Comparisons I NTRODUCTION In 2015, the Air-Conditioning, Heating, and Refrigeration Institute (AHRI) introduced a performance rating for dedicated outside

More information

H3/V3 Series Horizontal and Vertical Indoor Air Handling Units. Engineering Catalog

H3/V3 Series Horizontal and Vertical Indoor Air Handling Units. Engineering Catalog H3/V3 Series Horizontal and Vertical Indoor Air Handling Units Engineering Catalog Table of Contents AAON H3/V3 Series Features and Options Introduction... 6 H3/V3 Base Model Description... 7 Unit Size...

More information

DRYING YELLOW-POPLAR IN A SOLAR-DEHUMIDIFIER KILN WITH HEAT STORAGE AND HEAT RECOVERY SYSTEMS

DRYING YELLOW-POPLAR IN A SOLAR-DEHUMIDIFIER KILN WITH HEAT STORAGE AND HEAT RECOVERY SYSTEMS DRYING YELLOW-POPLAR IN A SOLAR-DEHUMIDIFIER KILN WITH HEAT STORAGE AND HEAT RECOVERY SYSTEMS Peter Y. S. Chen North Central Forest Experiment Station Carbondale, Illinois and Wayne A. Helmer Southern

More information

DES CHAMPS PRODUCTS. Specializing in: -- Air-to-Air Energy Recovery -- Conditioning Outdoor Air -- Controlling IAQ -- Indirect Evaporative Cooling

DES CHAMPS PRODUCTS. Specializing in: -- Air-to-Air Energy Recovery -- Conditioning Outdoor Air -- Controlling IAQ -- Indirect Evaporative Cooling DES CHAMPS PRODUCTS Specializing in: -- Air-to-Air Energy Recovery -- Conditioning Outdoor Air -- Controlling IAQ -- Indirect Evaporative Cooling DES CHAMPS PRODUCTS Packaged Heat Recovery Systems Micro-Z

More information

Emerging Technologies: VFDs for Condensers. Douglas T. Reindl Director, IRC University of Wisconsin-Madison. University of Wisconsin-Madison

Emerging Technologies: VFDs for Condensers. Douglas T. Reindl Director, IRC University of Wisconsin-Madison. University of Wisconsin-Madison Emerging Technologies: VFDs for Condensers Douglas T. Reindl Director, IRC University of Wisconsin-Madison University of Wisconsin-Madison 1 We ve looked at VFDs on Evaporators and compressors, what is

More information

Service Step by Step Trouble-Shooting Check-List

Service Step by Step Trouble-Shooting Check-List WARNING: Only Data Aire trained technician or experience technicians should be working on Data Aire Equipment. Protect yourself at all times and work safe. Date: Dates at the job site: From: to Job#: Serial#:

More information

Building air conditioning systems using Ice-Cel thermal storage can be designed which cost little or no more than conventional chiller-only systems.

Building air conditioning systems using Ice-Cel thermal storage can be designed which cost little or no more than conventional chiller-only systems. WHY THERMAL STORAGE? Thermal storage is a technology that has come of age. It meets today's need for flexible energy management. Whether you're the owner of a large building, a school executive, a hospital

More information

Air Handling Units. T F E.

Air Handling Units.  T F E. Air Handling Units Extract from BS EN ISO 15138:2007 Petroleum & natural gas industries- Offshore production installations-heating, ventilation & air-conditioning. A.12.1 Function Installations provided

More information

Off Design Operation of Hybrid Noncondensable Gas Removal Systems for Flash Steam Cycle Geothermal Power Plants

Off Design Operation of Hybrid Noncondensable Gas Removal Systems for Flash Steam Cycle Geothermal Power Plants GRC Transactions, Vol. 40, 2016 Off Design Operation of Hybrid Noncondensable Gas Removal Systems for Flash Steam Cycle Geothermal Power Plants Jason Project Engineer, Vooner FloGard Corporation, Charlotte

More information

PINNACLE SERIES DEDICATED OUTDOOR AIR SYSTEM ENERGY EFFICIENT DEHUMIDIFICATION

PINNACLE SERIES DEDICATED OUTDOOR AIR SYSTEM ENERGY EFFICIENT DEHUMIDIFICATION ENERGY EFFICIENT DEHUMIDIFICATION PINNACLE SERIES DEDICATED OUTDOOR AIR SYSTEM Provides a very high degree of latent cooling using only a minimal amount of conventional cooling input Substantial energy

More information

ENERGY SAVING IN A DOMESTIC SPLIT-TYPE AIR CONDITIONER WITH EVAPORATIVE COOLING SYSTEMS

ENERGY SAVING IN A DOMESTIC SPLIT-TYPE AIR CONDITIONER WITH EVAPORATIVE COOLING SYSTEMS ENERGY SAVING IN A DOMESTIC SPLIT-TYPE AIR CONDITIONER WITH EVAPORATIVE COOLING SYSTEMS Chainarong Chaktranond *, and Peachrakha Doungsong Department of Mechanical Engineering, Faculty of Engineering,

More information

Heat pump supplemental heating system for motor vehicles

Heat pump supplemental heating system for motor vehicles 1 Heat pump supplemental heating system for motor vehicles D Antonijevic and R Heckt Visteon Automotive Systems, Visteon Deutschland GmbH, Kerpen, Germany Abstract: The paper deals with the importance

More information

May, 2004 Commercial & Industrial Applied Product Line Heating Ventilating Cooling Make-Up Air

May, 2004 Commercial & Industrial Applied Product Line Heating Ventilating Cooling Make-Up Air 75-137.5 May, 2004 Commercial & Industrial Applied Product Line Heating Ventilating Cooling Make-Up Air MODINE COMMERCIAL & INDUSTRIAL APPLIED PRODUCT LINE Modine has always been the industry standard

More information

A TRUE GAME CHANGER - The Vortex Heat Recovery Center CONDENSING EFFICIENCIES FOR TRADITIONAL BOILERS & HEATERS

A TRUE GAME CHANGER - The Vortex Heat Recovery Center CONDENSING EFFICIENCIES FOR TRADITIONAL BOILERS & HEATERS A TRUE GAME CHANGER - The Vortex Heat Recovery Center CONDENSING EFFICIENCIES FOR TRADITIONAL BOILERS & HEATERS Flexibility and Performance - Unlike any other Heat Recovery System FEATURES Exceptional

More information

GARCIA GALUSKA DESOUSA Consulting Engineers

GARCIA GALUSKA DESOUSA Consulting Engineers L#57295/Page 1/July 21, 2017 HVAC SYSTEMS NARRATIVE REPORT The following is the HVAC system narrative, which defines the scope of work and capacities of the HVAC system as well as the Basis of Design.

More information

Custom Air Handler Solutions Custom Units to Meet Your Unique Design Needs

Custom Air Handler Solutions Custom Units to Meet Your Unique Design Needs Custom Units to Meet Your Unique Design Needs Engineered for flexibility and performance Contents Horizontal Configuration....1 Horizontal with Standard Economizer Configuration...2 Stacked Configuration...3

More information

Retrocommissioning Findings Summary: Building X #1 Priority: Major Comfort/Control Problems

Retrocommissioning Findings Summary: Building X #1 Priority: Major Comfort/Control Problems IMPORTANT NOTICE: This sample document is provided for instructional purposes only. CCC is not rendering advice concerning any commission project or practices. This document is neither approved nor intended

More information

Greenheck Coils A Complete Line of Custom Coils to Meet Your Needs. 5/16, 3/8, 1/2, 5/8 and 1 inch OD Tubing

Greenheck Coils A Complete Line of Custom Coils to Meet Your Needs. 5/16, 3/8, 1/2, 5/8 and 1 inch OD Tubing Greenheck Coils A Complete Line of Custom Coils to Meet Your Needs 5/16, 3/8, 1/2, 5/8 and 1 inch OD Tubing April 2016 Custom Coils Custom Coils Configured to Meet Your Needs Greenheck is proud to offer

More information

BRINE CIRCULATED ICE THERMAL STORAGE SYSTEM DESIGN - CASE ILLUSTRATION - Partial Ice Storage for Air Conditioning Application

BRINE CIRCULATED ICE THERMAL STORAGE SYSTEM DESIGN - CASE ILLUSTRATION - Partial Ice Storage for Air Conditioning Application 1 BRINE CIRCULATED ICE THERMAL STORAGE SYSTEM DESIGN - CASE ILLUSTRATION - Partial Ice Storage for Air Conditioning Application By: T. S. Wan Date: Oct. 7, 1995 Copy Right 1995 by T. S. Wan All rights

More information

HVAC 101. H V A C S y s t e m s

HVAC 101. H V A C S y s t e m s H V A C 1 0 1 S y s t e m s Introduction & Overview Should you care? Mechanical System Types Components & operation Popular Application Key Issues and Design Considerations System Comparisons First Cost

More information

BASE LEVEL AUDIT REQUIREMENTS REFRIGERATION SYSTEMS 1. SITE DATA COLLECTION. Business Name. Site physical address (Street, Suburb, City)

BASE LEVEL AUDIT REQUIREMENTS REFRIGERATION SYSTEMS 1. SITE DATA COLLECTION. Business Name. Site physical address (Street, Suburb, City) BASE LEVEL AUDIT REQUIREMENTS REFRIGERATION SYSTEMS 1. SITE DATA COLLECTION Business Name Site physical address (Street, Suburb, City) Nature of site / business operation Electricity Supplier Power factor

More information

Air-Handling System Cooling Options

Air-Handling System Cooling Options Air-Handling System Cooling Options High-Capacity, Economical Evaporative Cooling High-Efficiency, DX & CW Mechanical Cooling Pure and Simple Solutions AbsolutAire Air-Handling System Cooling Options Economical

More information

5. ASSESSMENT RECOMMENDATIONS

5. ASSESSMENT RECOMMENDATIONS 5. ASSESSMENT RECOMMENDATIONS AR No. 1 Reduce Discharge Pressure Recommended Action Reduce the minimum condensing temperatures on your warehouse refrigeration systems from 110 F to 60 F. In order to reduce

More information

Technical Criteria for District Energy Ready Buildings Master Requirement ENG 108 Building Department: ,

Technical Criteria for District Energy Ready Buildings Master Requirement ENG 108 Building Department: , Purpose 355 West Queens Road Technical Criteria for District Energy Ready Buildings Master Requirement ENG 108 Building Department: 604-990-2480, building@dnv.org The purpose of this document is to provide

More information

COOLING FOR ELECTRONIC PROCESS CONTROL SYSTEMS IN HOSTILE FACTORY ENVIRONMENTS

COOLING FOR ELECTRONIC PROCESS CONTROL SYSTEMS IN HOSTILE FACTORY ENVIRONMENTS BERTECH Industrial Environments Pty.Ltd. A.C.N. 007 121 440 Environments for Technology 12 Queen Street Telephone (03) 9874 6800 Nunawading VIC 3131 Fax (03) 9874 6866 Australia Int. Country Code: +61

More information

Mechanical Redesign, Proposal Elizabeth C. Krauss Mechanical Option September 18, 2013

Mechanical Redesign, Proposal Elizabeth C. Krauss Mechanical Option September 18, 2013 Mechanical Redesign, Proposal Elizabeth C. Mechanical Option September 18, 2013 State Institute of Rehabilitation T e c h n i c a l R e p o r t I 1 Mechanical Redesign, Proposal... 0 Executive Summary...

More information

GEOTHERMAL DESIGN GUIDE

GEOTHERMAL DESIGN GUIDE GEOTHERMAL DESIGN GUIDE BENEFITS OF THE BULLDOG SYSTEM CGC Version CGC Group of Companies Incorporated 2018 CONTENTS INTRODUCTION... 2 CHALLENGES FACING CONVENTIONAL GSHP SYSTEMS... 3 FACTORS WHICH IMPACTS

More information

Bill McCullough. Director ERV Products. Dallas, TX

Bill McCullough. Director ERV Products. Dallas, TX Bill McCullough Director ERV Products Dallas, TX TOPICS 1. ERV Definition & Benefit 2. Indoor Air Quality 3. Energy Efficiency 4. ERV Technology & Operation 5. Stand-Alone ERVs 6. Compact ERVs What is

More information

APPLICATION, INSTALLATION, AND MAINTENANCE MANUAL CA2XRT, CA3XRT, CA4XRT

APPLICATION, INSTALLATION, AND MAINTENANCE MANUAL CA2XRT, CA3XRT, CA4XRT 4510 Helgesen Drive, Madison, WI 53718 (608) 221-4499, (800) 627-4499, Fax: (608) 221-2824 support@renewaire.com www.renewaire.com APPLICATION, INSTALLATION, AND MAINTENANCE MANUAL CA2XRT, CA3XRT, CA4XRT

More information

FTQ SERIES DUCTED HEAT PUMP SYSTEMS. INDOOR AND OUTDOOR UNITS Up to 20 SEER / Up to 12 HSPF / Up to 14.5 EER INVERTER, VARIABLE SPEED COMPRESSOR

FTQ SERIES DUCTED HEAT PUMP SYSTEMS. INDOOR AND OUTDOOR UNITS Up to 20 SEER / Up to 12 HSPF / Up to 14.5 EER INVERTER, VARIABLE SPEED COMPRESSOR FTQ SERIES DUCTED HEAT PUMP SYSTEMS INDOOR AND OUTDOOR UNITS Up to 20 SEER / Up to 12 HSPF / Up to 14.5 EER INVERTER, VARIABLE SPEED COMPRESSOR FTQ SERIES DUCTED HEAT PUMP SYSTEMS LEADING TECHNICAL PERFORMANCE

More information

White Paper. Executive Summary. Overview of Membrane Exchangers CLCH-PRB063A-EN. June 2017

White Paper. Executive Summary. Overview of Membrane Exchangers CLCH-PRB063A-EN. June 2017 White Paper Overview of Membrane Exchangers Executive Summary Membrane exchangers, also called enthalpy cores, are used to recover sensible and latent energy between exhaust air and outside air. The most

More information

Natatorium Economizer Vs. Conventional Dehumidifier

Natatorium Economizer Vs. Conventional Dehumidifier Technical Bulletin 18 Natatorium s. Conventional Dehumidifier I NTODCTION This technical bulletin will review how an economizer-type indoor pool dehumidifier functions, and provide details on its control

More information

Air-Handling System Cooling Options

Air-Handling System Cooling Options Air-Handling System Cooling Options High-Capacity, Economical Evaporative Cooling High-Efficiency, DX & CW Mechanical Cooling Pure and Simple Solutions AbsolutAire Air-Handling System Cooling Options Economical

More information

CHAPTER 4. HVAC DELIVERY SYSTEMS

CHAPTER 4. HVAC DELIVERY SYSTEMS CHAPTER 4. HVAC DELIVERY SYSTEMS 4.1 Introduction 4.2 Centralized System versus Individual System 4.3 Heat Transfer Fluids 4.4 CAV versus VAV Systems 4.5 Common Systems for Heating and Cooling 4.6 Economizer

More information

Review on Waste Heat Recovery Techniques in Air Conditioning Application

Review on Waste Heat Recovery Techniques in Air Conditioning Application International Journal of Current Engineering and Technology E-ISSN 2277 4106, P-ISSN 2347 5161 2016 INPRESSCO, All Rights Reserved Available at http://inpressco.com/category/ijcet Review Article Review

More information

HOW IT RELATES TO PERFORMANCE IN REFRIGERATED COMPRESSED AIR DRYERS

HOW IT RELATES TO PERFORMANCE IN REFRIGERATED COMPRESSED AIR DRYERS ENERGY CONSUMPTION HOW IT RELATES TO PERFORMANCE IN REFRIGERATED COMPRESSED AIR DRYERS Introduction Those in charge of specifying and purchasing equipment for industrial compressed air systems have many

More information

Hydronic Air Handler Powered by Tankless Technology

Hydronic Air Handler Powered by Tankless Technology Integrated Solutions Hydronic Air Handler Powered by Tankless Technology RW1P/RW1T- Series Nominal Heating Capacities: 40-100 kbtu [11.7-29.3 kw] Tankless Water Heater Models: RTG-64DVL indoor direct vent

More information

MHNCCX DX with Hot Water Heat Ceiling Concealed 4-Pipe Heat / Cool Fan Coil 12,000-36,000 BTUH

MHNCCX DX with Hot Water Heat Ceiling Concealed 4-Pipe Heat / Cool Fan Coil 12,000-36,000 BTUH MHNCCX DX with Hot Water Heat Ceiling Concealed 4-Pipe Heat / Cool Fan Coil 12,000-36,000 BTUH 318 MHNCCX NOMENCLATURE BREAKDOWN 4-Pipe Heat/Cool Ceiling Concealed Fan Coil MHNCCW- XX - XX Ceiling Concealed

More information

TOTAL SYSTEM EFFICIENCY: AN INTRODUCTION TO CONDENSING BOILERS. David Grassl PE Mechanical Engineer Principal

TOTAL SYSTEM EFFICIENCY: AN INTRODUCTION TO CONDENSING BOILERS. David Grassl PE Mechanical Engineer Principal TOTAL SYSTEM EFFICIENCY: AN INTRODUCTION TO CONDENSING BOILERS David Grassl PE Mechanical Engineer Principal Boilers are closed pressure vessels that are used to heat fluids -- either water or steam. They

More information

PRODUCT SERIES. VPR Series VPRX Series VPRE Series VPRP Series VPRC Series

PRODUCT SERIES. VPR Series VPRX Series VPRE Series VPRP Series VPRC Series PRODUCT SERIES VPR Series VPRX Series VPRE Series VPRP Series VPRC Series Valent Air Management Products Valent Air Management Systems designs and manufactures reliable, high-outdoor-air ventilators. Our

More information

Technical Publication. Monitor Your Pump for Process Efficiency By Jim Delee, Sr. Member Technical Staff, Fluid Components International

Technical Publication. Monitor Your Pump for Process Efficiency By Jim Delee, Sr. Member Technical Staff, Fluid Components International Technical Publication Monitor Your Pump for Process Efficiency By Jim Delee, Sr. Member Technical Staff, Fluid Components International Tech Article Monitor Your Pump For Process Efficiency By Jim DeLee,

More information

TRACE 700. Slide 1. Hello, my name is Nick Cavitt and I m a marketing engineer in the C.D.S. group at TRANE.

TRACE 700. Slide 1. Hello, my name is Nick Cavitt and I m a marketing engineer in the C.D.S. group at TRANE. Slide 1 TRACE 700 Chiller Sequencing and Controls Hello, my name is Nick Cavitt and I m a marketing engineer in the C.D.S. group at TRANE. Today, we will be talking about the Plant Sequencing and Controls

More information

HONORABLE MENTION: COMMERCIAL BUILDINGS, EXISTING

HONORABLE MENTION: COMMERCIAL BUILDINGS, EXISTING ASHRAE s BEST This article was published in ASHRAE Journal, November 2010. Copyright 2010 American Society of Heating, Refrigerating and -Conditioning Engineers, Inc. Reprinted here by permission from

More information

ENERGY RECOVERY HEAT PIPE HEAT EXCHANGERS

ENERGY RECOVERY HEAT PIPE HEAT EXCHANGERS WAHX (WRAP-AROUND) AAHX (AIR-TO-AIR) ENERGY RECOVERY HEAT PIPE HEAT EXCHANGERS HVAC PRODUCT GUIDE THERMAL MANAGEMENT EXPERTS ADVANCED COOLING TECHNOLOGIES, INC. IS A PREMIER THERMAL MANAGEMENT SOLUTIONS

More information

LIVING. For heat recovery in multi-occupancy buildings with extract air ventilation. And excellent return on investment.

LIVING. For heat recovery in multi-occupancy buildings with extract air ventilation. And excellent return on investment. s Air Handling Units Air Distribution Products Fire Safety Air Conditioning Air Curtains and Heating Products Tunnel s LIVING For heat recovery in multi-occupancy buildings with extract air ventilation.

More information

Modelling Appliance Loads in Multi-Unit Residential Buildings

Modelling Appliance Loads in Multi-Unit Residential Buildings Modelling Appliance Loads in Multi-Unit Residential Buildings April 2018 Prepared by: Report For: Contents 1. Introduction... 3 2. Resource Review... 5 3. Recommendations... 7 3.1 What is the reference...

More information

SR SERIES WATER SOURCE HEAT PUMP SYSTEM SELECTION AND OPTIMIZATION GUIDE

SR SERIES WATER SOURCE HEAT PUMP SYSTEM SELECTION AND OPTIMIZATION GUIDE SR SERIES WATER SOURCE HEAT PUMP SYSTEM SELECTION AND OPTIMIZATION GUIDE Fresh Access Pro http://freshaccesspro.com/erep/ This guide is intended for use by qualified professionals to assist in properly

More information

FALCON Rooftop Units ACPSE 50/60Hz Cooling Capacity : 36 to 1388 MBH (11 to 407 kw) Heating Capacity : 40 to 1298 MBH (12 to 380 kw)

FALCON Rooftop Units ACPSE 50/60Hz Cooling Capacity : 36 to 1388 MBH (11 to 407 kw) Heating Capacity : 40 to 1298 MBH (12 to 380 kw) FALCON Rooftop Units ACPSE 50/60Hz Cooling : 36 to 1388 MBH (11 to 407 ) Heating : 40 to 1298 MBH (12 to 380 ) R Products that perform...by people who care NOMENCLATURE 6 AC P S E 435 P - HP G Q 6-60 Hz

More information

NC NC Series. NG Series. Seresco s NG Series Fluid Coolers & NC Series Outdoor Condensers Quiet, efficient reliable heat rejection

NC NC Series. NG Series. Seresco s NG Series Fluid Coolers & NC Series Outdoor Condensers Quiet, efficient reliable heat rejection NC NC Series NG NG Series Seresco s NG Series Fluid Coolers & NC Series Outdoor Condensers Quiet, efficient reliable heat rejection NC NC SERIES PERFORMANCE DATA Model Capacity Min. Circuit Ampacity (MCA)

More information

The Role of Air Handling Units in Combating the Spread of Infectious Disease

The Role of Air Handling Units in Combating the Spread of Infectious Disease The Role of Air Handling Units in Combating the Spread of Infectious Disease Goal To identify those areas within an air handler which poses risk to the healthcare industry and recommended four solutions

More information

Adelaide Homes Design Guide 4 - Winter warming

Adelaide Homes Design Guide 4 - Winter warming Adelaide Homes Design Guide 4 - Winter warming Adelaide's temperate climate means home warming is required during winter. There are many efficient heating systems. The most economical method, however,

More information

RESEARCH HIGHLIGHT. Arviat E/2 Northern Sustainable House Energy Consumption Performance Assessment

RESEARCH HIGHLIGHT. Arviat E/2 Northern Sustainable House Energy Consumption Performance Assessment RESEARCH HIGHLIGHT Arviat E/2 Northern Sustainable House Energy Consumption Performance Assessment April 216 Technical Series INTRODUCTION The Arviat E/2 Northern Sustainable House () was designed and

More information

Duct Design and Installation

Duct Design and Installation Duct Design and Installation John Proctor, P.E. Proctor Engineering Group, Ltd. San Rafael, CA 2004 Proctor Engineering Group, Ltd. 1-888-455-5742 mail@proctoreng.com www.proctoreng.com Duct Design ACCA

More information

Drying Groundnuts: Adapting the EasyDry M500 Portable Maize Dryer for Groundnuts

Drying Groundnuts: Adapting the EasyDry M500 Portable Maize Dryer for Groundnuts Drying Groundnuts: Adapting the EasyDry M500 Portable Maize Dryer for Groundnuts (the EasyDry G600) AflaSTOP: Storage and Drying For Aflatoxin Prevention January 2017 PAGE 2 OF 10 TABLE OF CONTENTS I.

More information

1.03 RELATED SECTIONS: The following sections contain requirements that relate to this section.

1.03 RELATED SECTIONS: The following sections contain requirements that relate to this section. SECTION 15855 GAS FURNACE/DX COOLING UNIT PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of contract including General and Supplementary Conditions of Division 1 of Specification

More information

DEHUMIDIFICATION: Ice Arena Application & Product Guide. Design, construct and operate to control indoor humidity in ice rinks

DEHUMIDIFICATION: Ice Arena Application & Product Guide. Design, construct and operate to control indoor humidity in ice rinks DEHUMIDIFICATION: Ice Arena Application & Product Guide Design, construct and operate to control indoor humidity in ice rinks Munters is the world leader in dehumidification Munters is the largest manufacturer

More information

Performance Rating of Variable Refrigerant Flow (VRF) Multi-split Air-conditioning and Heat Pump Equipment

Performance Rating of Variable Refrigerant Flow (VRF) Multi-split Air-conditioning and Heat Pump Equipment AHRI Standard 1230 with Addendum 1 2014 Standard for Performance Rating of Variable Refrigerant Flow (VRF) Multi-split Air-conditioning and Heat Pump Equipment AHRI STANDARD 1230-2014 WITH ADDENDUM 1,

More information

EasyDry. Grain Drying Systems

EasyDry. Grain Drying Systems EasyDry Grain Drying Systems Grain Drying & Storage System Raise your standards high, with EasyDry. EasyDry enhances your on-farm grain storage system efficiency and overall grain quaility. EasyDry from

More information

Capture Waste Heat with Ultra-High Efficiency

Capture Waste Heat with Ultra-High Efficiency H IGH TEMPE R ATURE SOLUTIONS Capture Waste Heat with Ultra-High Efficiency A by-product of many industrial processes is high temperature air. Recovery and re-direction of the heat saves fuel, increases

More information

Museum Archive Dehumidification in Hot & Humid Climates

Museum Archive Dehumidification in Hot & Humid Climates Museum Archive Dehumidification in Hot & Humid Climates B. K. Browning, PE Principal Engineer KWR Services Austin, Texas ABSTRACT This paper discusses some of the difficulties found with a desiccant dehumidification

More information

Solid biofuel solutions

Solid biofuel solutions Solid biofuel solutions Clean heat with locally produced fuel Solid biofuels are the individually most important component in the conversion to a sustainable energy mix. Heat production from wood based

More information

Water engineers and utilities are often

Water engineers and utilities are often FWRJ Horizontal or Vertical? High-Service Pump Selection Mark Ludwigson, Len Rago, and Jeff Greenfield Water engineers and utilities are often faced with a decision concerning the best type of pump when

More information

COMMERCIAL HVAC PACKAGED EQUIPMENT. Rooftop Units Level 1: Constant Volume

COMMERCIAL HVAC PACKAGED EQUIPMENT. Rooftop Units Level 1: Constant Volume COMMERCIAL HVAC PACKAGED EQUIPMENT Rooftop Units Level 1: Constant Volume Technical Development Programs (TDP) are modules of technical training on HVAC theory, system design, equipment selection and application

More information

Executive Summary. Number of Low Number of High Number of Faults , Number of OK

Executive Summary. Number of Low Number of High Number of Faults , Number of OK Unit Lower limit Upper limit Air on Model no evap. F Air off evap. F dt air evap. F Executive Summary Evapo. F This is a summary chart for quick reference and view of all the systems tested. Red boxes

More information

LOW STATIC HYDRONIC DUCTED UNIT

LOW STATIC HYDRONIC DUCTED UNIT LOW STATIC HYDRONIC DUCTED UNIT PDWA-~AC SERIES PDWA(4R)-~-V-MEDC PDWA(4R)-~-V-MEEU PDWA(R)-~-V PDWA(R+1)-~-P Model cooling capacity( KW) at Medium Speed cooling capacity (KW) at Medium Speed cooling capacity

More information