Mounting instruction Please read carefully before installation

Size: px
Start display at page:

Download "Mounting instruction Please read carefully before installation"

Transcription

1 Professional solar systems! Mounting instruction Please read carefully before installation Solarbayer GmbH (09.13) 1

2 Technical specifications CPC 12 CPC 18 type of mounting on roof (pitched/flat roof) gross surface area m² 2,16 3,21 aperture surface area m² 1,89 2,84 number of tubes height mm A width mm B depth mm C interval flow and return line mm D weight unfilled kg collector capacity Liter 1,74 2,60 max. operating pressure bar 6 6 stationary temperature C peak output per module W peak (G*=1000W/m², η 0 ) conversion factor η 0 0,718 thermal conductivity a 1 W/(m²K) 0,974 thermal conductivity a 2 W/(m²K²) 0,005 incident angle modifier IAM50 0,87 collector glazing safety glass connections CU 18 x 1,0 absorber with evacuation tube absorber coating CPC reflector casing thermal insulation collector U shaped tube CU selective AL N/AL highly polished auminum compressed rock wool norm DIN EN hydraulic interconnection distance between collectors permissible collector tilt recommend storage tank dimension max. 6 collectors in a row approx. 50 mm (stand kit available) 50 liter per m² collector surface 2 Solarbayer GmbH (09.13)

3 C D A Manometer Manometer Entlü er VSG Entlü er VSG B C MAG MAG A Right Self draining possible. The solar medium will be ejected almost completely when the system is in stagnation. Wrong Self draining not possible. Solar medium ist left in the collector. Heavy steam formation in, high thermal stress of the system components. Connection example up to a maximum of 6 collectors Connection example (Tichelmann) for larger collector arrays F F single row single row F F F F double row double row three rows These schemes are only an installation example and do not replace technical planning! four rows Solarbayer GmbH (09.13) 3

4 Safety regulations Carefully read the safety instructions before commencing the installation. It s for your own safety. Please follow the structural instructions if the installation location of the solar system is above 600m sea level or possibly exposed to large amounts of snow (higher than zone 4). The installation needs to be carried out on a roof that is capable of bearing that load. The static bearing capacity needs to be checked on site before the installation. The collectors can either be transported vertically or horizontally. Attention: Breakage of glass. Store the collectors in a dry and shadowy place. The protections of the manifolds have to be removed before the solar collectors are exposed to the sun and heat themselves. Working on the roof Appropriate safety measures have to be arranged. Familiarize yourself with the general regulations of accident prevention for construction work of your professional association or let yourself be instructed by an appropriate person.the following aspects have to be respected to achieve a secure installation of the solar system: always use fall protection while working on a roof respect safety regulations when using a ladder while working on roof coverings with corrugated sheets the risk of breaking through exists secure workplaces on steep roofs safety clearances have to be met if an aerial pipeline leads across the roof up to V >1m, more than V to V >3m, with unknown voltage >5m. always wear safety goggles and gloves while working with an angle grinder Flat plate collectors can achieve a stationary temperature of over 200 C due to incident light. The risk of burns exists at the connections of flow and return. Always cover the collectors on sunny days during the installation Even regular daylight might cause the fluid in the collector to vaporize. This vapor leaks from the collector connections. Possible risk of scalding Attention: glass Don t extent mechanical pressure on the glass covering. Glass splinters might evoke cuts Wear safety goggles and gloves while installing the solar system to avoid injuries due to possible damages Electric connections Electric installations have to be accomplished by a licensed tradesman subject to the German regulations VDE 0100 and to those of the local power company.! Caution frost damage: The installation needs solely to be filled with solar fluid not with water only. This is also necessary in summer. Due to the special high selective coating temperature drops into the sub zero area could occur during night time which can lead to the destruction of your solar system! 4 Solarbayer GmbH (09.13)

5 Mounting dimensions 1 m 1 m 1 m 1 m Minimum distance from roof edge: Minimum distance of collector array form roof edge: 1 meter (except: eaves with pitched roofs) With existing lightning protection system: minimum distance from this device: 1 meter collector mounting rail B standard roof hooks rail bond A Distance between roof hooks (standard hooks and slate tile roof hooks) CPC 12 CPC 18 collector height (mm) collector width (mm) A = distance (min. max.) (mm) approx approx B = distance (min. max.) (mm) Solarbayer GmbH (09.13) 5

6 Installation material for standard roof tiles Roof hooks coach bolts (M 8), hexagon nuts with flange torx screws (5x60 mm) with patented drill bit and type approval for fixing the standard hooks on the rafter coach bolts M10 for fixing the collector bearing rails on the roof hooks and the collector mounting rails aluminum collector mounting rail (upper and lower rail are identical) for fixing the collectors 6 Solarbayer GmbH (09.13)

7 Installing the roof hooks on standard tiles Diese Teile werden benötigt: roof hooks 1 Pre mount the roof hook and the base plate, do not yet fasten the bolts. Unroof the rafters and mount the base plate with the torx screws onto the rafter. Always make sure that the roof hook is seated in the tile s bulge. The base plate should additionally be fixed with the roof batten when the bearing surface seems to be problematic. torx screws 5 x 60 mm 2 Make sure that the roof hook has approx. 2 3 mm too much play to the tile. There happen to be tiles that ask for a log of wood as distance piece. Now screw the roof hook solidly onto the base plate with a 13mm flat wrench or ring wrench.! The pictures illustrate the mounting on the roof battens. You probably need longer wood screws, depending on the constructional circumstances of your roof, to guarantee a stable connection between rafter and hook. With possible higher snow loads (grade el. over 600 m sea level, > 2,3 kn/m²) the tiles underneath the hook should be replaced by metal tiles! 3 Grind off as much material from the tile as needed, with the help of an angle grinder, so that the roof hook perfectly fits underneath the tile. Afterwards retile the roof. No grind works on the roof (risk of falling) Next step: Installing the collector bearing rails Solarbayer GmbH (09.13) 7

8 Special solution: Installing the plain tile hooks Diese Teile werden benötigt: Expose the rafters and screw the plain tile roof hook onto the rafter with the torx screws. This kit can generally be used for most types of tiles that are plainly seated. roof hook for plain tiles (special equipment ) torx screws 5 x 60 mm! The pictures illustrate the mounting on the roof battens. You probably need longer wood screws, depending on the constructional circumstances of your roof, to guarantee a stable connection between rafter and hook. With possible higher snow loads (grade el. over 600 m sea level, > 2,3 kn/m²) the tiles underneath the hook should be replaced by metal tiles! Next step: Installing the collector bearing rails 8 Solarbayer GmbH (09.13)

9 Special solution: installing the hanger bolts Diese Teile werden benötigt: self locking nut M12 self locking nut M12 self locking nut M12 sealing hanger bolt moutning rail supporter 1 Define the intervals of the drill holes according to the dimensions of the collector. Drill them in a straight row using a plumb line. Drill only on stable substructure Pre drill with 10mm afterwards use 16mm for the tiles (roof covering). Screw the hanger bolt through the tiles onto the pre drilled rafter. Fix the sealing together with the hexagon nut with flange. Adjust the interval for the mounting rail supporter by means of the nuts. The hanger bolt has a hexagon head (wrench size 8 mm), it can be screwed in by means of a drill chuck. By this a safe installation of the hanger bolt can be guaranteed. Position of the hanger bolt always on the wave crest not in the wave trough. Stockschrauben (Sonderzubehör) Next step: Installing the collector bearing rails Solarbayer GmbH (09.13) 9

10 Special solution: Installation with stand kit recommended tilt angle (guide value for Germany): supplementary heating 60 heating up DHW (all year) 45 heating up DHW (summer) 25 Telescopic U profile to adjust the collector inclination. The U profiles can be telescoped if the collector should be inclined in a weaker way Two stainless steel screws (M8x50) and self locking nuts are used as locking device. Stand kit for the installation on standard roof hooks for tiled roofs Special solution: plain tile hooks Installing the basic hoop on plain tile hooks Special solution: hanger bolts Installing the basic hoop on hanger bolts The figure shows the ready installed base frames on standard roof hooks (with collector bearing rails). Each basic hoop is fixed with a screw M8x55 and a self locking nut. Next step: Installing the collector mounting rails 10 Solarbayer GmbH (09.13)

11 Special solution: Installation with a flat roof stand kit recommended tilt angle (guide value for Germany): supplementary heating 60 heating up DHW (all year) 45 heating up DHW (summer) 25 C Telescopic U profile to adjust the collector Two stainless steel screws (M8x50) and self locking nuts are used as locking device. B A Dimensions of the flat roof stand kit CPC 12 CPC 18 distance A approx mm approx mm depth B 1600 mm 1600 mm telescope heightc extendable to approx. 65 extendable to approx. 65 coach bolts M 10x20 screws M 8x50 self locking nuts Calculating the clouding for flat roof installation (example: vertical angle of the sun 17 on (Germany) collector inclination (α) min min. 65 a a CPC 12 distance (b) 3,65 4,85 5,40 CPC 18 distance (b) 3,65 4,85 5,40 b c Instruction for the installation/fastening of the stand kits: the best solution is to screw the stand kit onto the subsurface it would be possible to use ballast in order to protect the panels against wind load! Due to the different local conditions it is impossible for Solarbayer to make a general statement on the connection of the stand kit to the subsurface (advice on demand) Next step: Installing the collector mounting rails Solarbayer GmbH (09.13) 11

12 Installing the collector mounting rails These parts are necessary: 1 Insert the coach bolts into the slot of the collector mounting rails 2 Insert the collector mounting rail together with the coach bolts into the long slot of the standard roof hooks. 3 Adjust the collector mounting rail and fix it with the self locking nut. 4 This picture shows the special installation type with hanger bolts collector mounting rail coach bolt M10 with self locking nut 5 The collector mounting rails are extended with the enclosed rail bonds. Next step: Installation of the connecting hooks 12 Solarbayer GmbH (09.13)

13 Installation of the connecting hooks These parts are necessary: 1 Insert the coach bolt into the upper and lower groove of the collector. hook with nib for the upper mounting of the collector 2 Adjust the lower hook (without nib) together with the nut to the lower part of the collector, bring it to dimension and tighten the screws. This dimension has to be adjusted exactly because it cannot be changed after the installation. This applies to all collectors. hook w ithout nib for the lower mounting of the collector This nib has to be pre mounted and adjusted correctly. 3 Shift the upper hook (with nib) to the uppermost part of the collector and tighten it hand tight. After the collector is hooked up and after its connection to the other collectors, slide the hook downwards into the aluminium profile. Next step: Installing and connecting the collectors Solarbayer GmbH (09.13) 13

14 Montage und Anschluss der Kollektoren These parts are necessary: collectors 1 You have to check the dimensions of the intervals again before fitting the collectors into the rails. If necessary adjust them again according to the mounting dimensions of the rails. Now fit in the collectors into the lower rail. CPC installation kit! Grease the compression fitting before the installation (e.g. with fermit) Check the proper and safe installation of the collectors and the correct installation of the collector connections 2 Push the collectors with greased fittings together and fix them with a flat wrenchwhile holding up 3 Push the upper (hand tightened hooks) downwards until the nib of the hooks clicks into the groove of the rail. Now fix the hook with a 13mm hex key. Thus the supporting structure is solidly fixed. 14 Solarbayer GmbH (09.13)

15 4 Install the CPC connecting kit as shown in the detailed figure (left and right collector connection). Do neither cant nor damage the sealing. Fix the fitting with a flat wrench while holding up 5 Insert the sensor into the collector s sensor socket (1. collector, flow line). Afterwards pull the shrink hose over the sensor protective tube and sensor socket and shrink it on. Solarbayer GmbH (09.13) 15

16 Initial operation Determine the system s operating pressure and primary pressure of the expansion vessel The professional adjustment of the solar expansion vessel s primary pressure and the operating pressure is the premise for a trouble free operation of the solar system as well as for a long operating life of the solar fluid. operating pressure solar system** Primary pressure expansion vessel** Example: system height* 9 meter Result: operating pressure system ** primary pressure vessel*** 2,4 bar 1,9 bar system height* in meter * The system height is the measured height from the manometer of the solar station to the highest position in the collector array ** The system s operating pressure has to be created with a filling unit after professional de airing of the sysem and can be checked on the manometer of the solar station *** The primary pressure of the expansion vessel is pre set to 2,5 bar (caution: der Ethe set pressure is to be adjusted according to the determined value of the chart) Solar fluid LS Only use our solar fluid LS. The ready to use special heat transfer fluid with high thermal load capacity guarantees antifreeze protection up to 28 C.! CAUTION: The collectors have to be operated with antifreeze fluid even when the outside temperature is above freezing. 16 Solarbayer GmbH (09.13)

17 Solar flow line Solar return line Rinse The solar system has to be rinsed with the ready mixed heat transfer fluid! bleeding device thermal loop min.. 10 x pipe diameter connection for filling and rinsing the system *An intermediate tank (VSG) has to be installed with: vacuum tube collectors collector arrays of more than 10 m² attic heating centers with simple pipeline length < 10 m Remains of liquid might stay in the system depending on hydraulic connection resp. system. Hence, it is necessary to rinse the collectors with solar fluid because steam jets or freezing might lead to damages. Our flat plate collectors are only to be used with solar fluid L. pressure direction VSG* MAG collection tank (e.g. empty solar fluid can) Course of action: check if all screwed connections are tightened check the primary pressure of the solar expansion vessel at zero pressure, if necessary adjust to 2,5 bar switch the solar station s ball valves of flow and return to 45 that will open the gravity brakes close hex key of flow regulator connect the hoses of the filling station with the corresponding valves open any other valve (if existing) adjust the inversion valve (if existing) to manual ; convert the exits one after the other during the rinsing (if possible control them electrically with the control unit) the solar system can now be flushed in both directions; keep an eye on the manometer don t rinse/fill the solar system when it is under direct exposure to light or when the storage tank temperature is > 60 C the rinsing has been successful when the fluid returns clean and without air bubbles into the container operating pressure has to be at least 3 bar close the filling and draining valves and completely open the flow regulator open the ball valves and put the switching valves (if existing) the solar system is now ready for operation Pay attention to possible separate guidlines of the manufacturer of the solar pump concerning the rinsing process. Solarbayer GmbH (09.13) 17

18 Adjusting the flow rate Solar pump RPM controlled: e.g. when using the solarbayer multi loop controller SR 0502 or SR 0603 MC Turn the hex key at the regulation valve as far as possible to the left, it is now completely open. The flow rate is controlled yield optimized by the control unit. Activate RPM control ( ON ) Please read carefully the controller manual. Solar pump without RPM control: Adjust pump function to manual on the controller. Turn the hex key at the regulation valve as far as possible to the left, it is now completely open. Adjust pump to power stage II and meter the flow rate at the flow meter. If necessary boost the power stage until the calculated flow rate is achieved (cf. adjusting flow rate). Hint: always reduce the power stage before throttling the flow rate for electricity saving reasons! The regulator valve stays completely open. Recommended minimum flow rate Solarbayer flat plate collectors: 25 l/m²hh Example: 6m² x 25l/m²h = 150l : 60 min. = 2,5 l/min. Adjust the calculated flow rate at the screw in bolt of the regulation valve (display shows l/min.) while pump is running (turning the screw right reduces flow). Pay attention to the guidelines of the pump manufacturer concerning the flow rate adjustment. 18 Solarbayer GmbH (09.13)

19 Piping Flow and return lines Guiding value: collector surface in m 2 copper pipe mm Solarpipe up to DN 16 up to DN 20 from 28 on 28 DN 25 Attention: determine bigger dimensions if the pipelines are longer than 10m. Pipeline connections: hard soldering (flux free hard solder according to DIN 8513) pressing (only with fittings that are authorized for permanent temperatures >150 C and an operation with propylene glycole by the manufacturer) Thermal insulation of the pipelines the pipeline insulations have the following characteristics: short time temperature resistance > 150 C (e.g. fiberglass, rubber) outdoor parts must be UV resistant and weatherproof (e.g. sheet metal jacket) insulation thickness = pipeline diameter (Minimum) (based on a K value of 0,04 W/mk) Example Profi Befüllstation PRO Leistung 230 V / 1250 Watt Max. Temperatur + 50 C Inhalt 25 Liter, Gewicht 18 kg Bestell Nr.: Backup heating with solar (DHW tank with buffer storage tank): Optional: retrofitting a Solarbayer wood log boiler system with solar to an existing heating system This scheme is only an installation example and does not replace technical planning! Solarbayer GmbH (09.13) 19

20 Maintenance In order to keep your high quality Solarbayer solar system in constant and perfect operating state we recommend an annual maintenance and check of the complete system by a specialist. Minimum requirement for a professional check/maintenance: check the solar fluid with a refractometer (can be bought at our company) check ph value of heat transfer medium. Note: when the ph Wert is < 7 the fluid needs to be changed leakage test as well as rinse and clean the system by the aid of the Solarbayer professional filling unit check the tightness of all connections and mounting elements sight check all collectors for probable defects pressure check of the expansion vessel, as well as a check of all safety devices check all moveable and electrical components check the tanks according to their reliability and security local conditions (e.g. hydraulic systems, electronics, etc.) might necessitate further checks Professional filling unit Vario 1200 This compact filling and flushing has especially been developed to suit the requirements of HVAC installers and convinces with its versatile application possibilites. Suitable for larger collector arrays. Brief description For the initiation and maintenance of closed systems such as solar systems, floor and wall heating. For cost saving rinsing, pre bleeding and filling in one go. robust, high performance pump with water proof onoff switch stainless steel pump casing transparent, pressure proof flow and return hoses for visual control ball valve at the tank s bottom for complete draining solid wheels ready to use unique cost performance ratio Professional filling unit Vario 1200 motor 230 V / 1200 Watt max. perm. fluid temp.: +90 C max. pumping head: 80 m Order number: Solarbayer GmbH (09.13)

21 Mitgeltende Vorschriften für solarthermische Anlagen The general and special quality and test regulations are only applicable in combination with the applicable laws, regulations and norms and their sections that refer to the scope of application of quality regulations for solar systems. The most recent version is to be kept as basis for the quality regulations: BGI 656 Personal protective equipment against falls correct use, BGR 203 Working on roofs, BGV A1 Accident Prevention Regulation Principles of Prevention, BGV A2, A3 Electrical Installations and Equipment, BGV C22 Construction work, Chemicals Act (ChemG), DIN 1055 Actions on structures, DIN EN 1057 Copper and copper alloys Seamless, round copper tubes for water and gas in sanitary and heating applications, Technical rules of DVGW, DIN EN Copper and copper alloys Seamless, round tubes for general purposes, DIN EN 1652 Copper and copper alloys Plate, sheet, strip and circles for general purposes DIN EN Copper and copper alloys Seamless, round copper tubes for air conditioning and refrigeration Part 1: Tubes for piping systems, DIN 1988 Codes of practice for drinking water installations(trwi); general information, DIN Codes of practice for drinking water installations (TRWI); drinking water protection and drinking water quality control, DIN EN Specification for installations inside buildings conveying water for human consumption, DIN EN 1717 Protection against pollution of potable water installations and general requirements of devices to prevent pollution by backflow, DIN Water heaters, water heating installations and storage water heaters for drinking water, DIN Water heaters and hot water systems for drinking and service water; indirect heat exchangers; requirements, testing and marking, DIN EN 1991 Teil 1 3 Eurocode 1, DIN EN 1991 Teil 1 4 Eurocode 1, DIN 1946 Ventilation systems (VDI ventilation code), DIN 4102 Fire behaviour of building materials and building components, DIN 4807 Expansion vessels, DIN Testing of plastics; artifical weathering or exposure in laboratory apparatus; exposure to UV radiation, pr DIN EN Water supply Specification for indirectly heated unvented (closed) storage water heaters, DIN EN Thermal solar systems and components Solar collectors Part 1: General requirements, DIN EN Thermal solar systems and components Solar collectors Part 2: Test methods (including corrigendum AC:2002), DIN EN Thermal solar systems and components Factory made systems Part 1: General requirements, DIN EN Thermal solar systems and components Factory made systems Part 2: Test methods, DIN V ENV Thermal solar systems and components Custom built systems Part 1: General requirements for solar water heaters and combisystems, DIN V ENV Thermal solar systems and components Custom built systems Part 2: Test methods, BDH Inforamtion sheet n 34: Operational safety of solar thermal systems, DIN V ENV Thermal solar systems and components Custom built systems Part 3: Performance test methods for solar water heater stores, DVGW worksheet GW2 Connecting copper pipes for gas and water installations KTW recommendation 1 6, DVGW worksheet W 270 Reproduction of microorganisms on materias for drinking water Test methods and rating, DVGW worksheet W 551 Potable water heating systems; technical measures for the decrease of legionella growth; planning, formation, operation and restoration of potable water systems, EU Pressure equipment directive PED 97/23/EC, EEC directive 89/336/EEC Electromagnetic compatibility, EEC directive 73/23/EEC Low voltage, EEC directive 89/292/EEC Machinery, EU directive 67/548/EEC classification, packaging and labelling of dangerous substances, EU directive 91/155/EEC safety documents, Ordinance on Hazardous Substances (GefStoffV), RAL GZ 429, Roof construction, RAL RG 641/1, Copper pipe, RAL RG 641/2, brazing solder and brazing flux and solder paste for copper, RAL RG 641/3, soft solder, solder flux and solder paste for copper, RAL RG 641/4, Capillary soldered fittings made of copper pipes, RAL GZ 655, Pipe supports, Regulation guidline of the ZVDH (German Central Association of the Roofing Trade), Technical Rule for Hazardous Substances (TRGS 519), Energy Saving regulation EnEV on energy saving thermal insulation and on energy efficiency in buildings, VDI 2067 Economic efficiency of building installations, VDI 6002 Solar heating for potable water, VDI Prevention of damage in water heating installations Scale formation in domestic hot water supply installations and water heating installations, VDI Prevention of damage in water heating installations Water side corrosion, Regulation on the classification on substances hazardous to water (VwVwS), Drinking water Ordinance (TrinkwV). Instructions for lightning protection The general principles for protection against lightning are stated in DIN EN part 3 / VDE (protection against lightning, physical damage to structures and life hazard) and in supplementary sheet 2 (Photovoltaic and solar thermal systems). If a lightning protection system is installed on a structure as external lightning protection the collectors and its installation rails have to be connected to the protection system. A specialist for lightning protection has to check if either the solar system is within the range of a lightning protection system or what arrangements have to be met. Attention: It is not allowed to draw a conductive connection between the collector and the existing lightning protection system (danger of launching the lightning into the house!) A safety clearance of approx. 0,5 m from the collector array to the conductive parts of the lightning protection system has to be maintained to all sides. The exact calculation of the safety clearance is stated in DIN EN part 3. If it is impossible to keep up the safety clearance a specialist for lightning protection has to realize the necessary regulations. Furthermore it has to be considered: If the lightning protection is outdated and no longer in accordance with the norm, the right of continuance expires due to the mounting of the collectors. In this case the lightning protection system has to be revised. Source: information sheet no. 34, march 2009, Operating Reliability of Solar Thermal Systems. For further information see: Koeln.de Overload protection: In order to protect the collector sensor and the control unit against overload you can install an overload arrester. Nearby lightning might induce voltage peaks which can destroy the sensor or the control unit. Protective diodes limit the damage caused by overload to a minimum. Solarbayer control units are regularly equipped with an overload protection. Potential equalization: The solar system is to be connected to the structure s existing potential equalization by a specialist. When planning and mounting, it is always the most recent version of this guidlines and regulations that has to be paid attention to! Solarbayer GmbH (09.13) 21

22 Possible problems and trouble shooting Problem Cause Solution Pump is not working although the collector temperature is at least 10K warmer than that of the tank. No sounds from the pump can be heard No power Either temperature difference is adjusted too big or the controller does not switch Check all pipelines and fuses check controller check temperature sensor diminish temperature difference Maximum temperature is achieved. Check settings Pump shaft is blocked by deposits in the bearings Either switch to maximum rotation speed for a short time or unblock rotor. Put screwdriver into slot and turn manually Pump is broken Exchange pump. Pump is operating, but flow and return have the same temperature. Pump is very hot There is air in the system. Valves are closed check system s pressure flush complete solar system with Solarbayer filling station open valves The tank cools down during the night; flow and return have different temperatures after the pump has been turned off.; during the night collector temperature is higher than outside temperature gravity brakes do not close 100% (particles of dirt) Check the position of the red and blue handle. Probably, jammed cuttings or particles of dirt on the sealing surface. Uninstall and clean The solar gain is unusually low The pipe insulation is too thin, high heat loss; circulation is neither temperature nor time controlled. The system may have been designed incorrectly Check the layout of the system (collector size, shading, pipe length, clock timer, hot water consumption) 22 Solarbayer GmbH (09.13)

23 Warranty certification Based on the following terms of guarantee the company Solarbayer GmbH issues a 5 year guarantee for the high capacity vacuum tube collector CPC. 1. A system warranty for the complete system of the hivacuum tube collector CPC issued. The system consists of collectors, mounting kits, connection lines (Solarpipe), solar stations, expansion vessels, safety devices, heat transfer fluid, boiler and tanks by the company Solarbayer. 2. The time of guarantee is 5 years and starts with the time of delivery of the goods to the customer. The decisive date is the one noted on the packing list. 3. For a call upon guarantee it is required that the system is installed in accordance with the mounting instruction of the Solarbayer GmbH as well as in accordance with the corresponding regulations. Furthermore, the maintenance by a specialized company has to be arranged in regular intervals. The maintenance work is to be documented and proof of evidence is to be given in case of a warranty claim. The costs for the maintenance work are paid by the customer. Moreover, it is understood that the whole system corresponds to the mounting instructions. 4. The guarantee does not cover: normal wear and tear parts heavy strain and improper usage use of inappropriate heat transfer medium damages arisen by reason of chemical and electrochemical influences damages arisen by faulty storage of the system by the ultimate consumer corrosion damages caused by accumulation of humidity in between the collectors breakage of glass glass, except the defect is based on a manufacturing defect or a material defect larceny, natural catastrophes, etc. application of accessories and fluids that are not authorized by the manufacturer electrical and moveable components (pumps, control units, valves/fittings, expansion vessels...) damages in transit 5. The packing list in combination with the original, paid, invoice is regarded as guarantee certificate. 6. In case of a defect, the customer is bound to give notice of existing defects immediately to the company Solarbayer (maximum time to give notice is a fortnight after the delivery). 7. Within guarantee time accorded to the company Solarbayer, the company only provides material replacement in the following way: year: ex works year: 50 % of the value of raw material year: 25 % of the value of raw material 8. Further requirements of any kind, especially indemnity requirements, rectification of defects, redhibition and cancellation of the contract are excluded from the existing guarantee certification. The legal warranty claims are not affected by this guarantee bond. 9. The guarantee expires if defects are not reported immediately if changes are carried out that are not in accordance with the mounting instruction if original parts are exchanged without having conferred to the company Solarbayer if the required services are not accomplished 10. The customer is bound to switch off the system as long as further defects are avoided by this shut off. If the system is not switched off and further defects occur the claim under guarantee does not apply. 11. Deliveries and services are executed according to our General Terms and Conditions 12. If any regulations of this agreement may no longer be effective in law or invalid in any way the validity of the remaining regulations shall not be affected. The parties may replace the ineffective clause by a legally valid regulation that is as close as possible to the invalid one. This translation has been provided for informational purposes only and has no legal force and effect. The German version is the only official, complete and exclusive version Solarbayer GmbH (09.13) 23

24 We develop for your future System technology made in Bavaria Solarbayer GmbH Preith, Am Dörrenhof Pollenfeld Telefon +49(0)8421/ Telefax +49(0)8421/ info@solarbayer.de IStorage systems IFresh water systems IWood log boiler ISolar systems IHeat pumps This manual and the pictures and drawings within are protected by the copyright of SOLARBAYER GmbH. Technical changes and errors reserved. Valid is the most recent version of this handbook which can always be found on our homepage This translation has been provided for informational use only. 24 Solarbayer GmbH (09.13)

Flat plate collector SILVERSUN Mounting instruction Please read carefully before installation. Solarbayer GmbH [21.14] Solarbayer GmbH 1

Flat plate collector SILVERSUN Mounting instruction Please read carefully before installation. Solarbayer GmbH [21.14] Solarbayer GmbH 1 Professional solar systems! Flat plate collector SILVERSUN 2.02 Mounting instruction Please read carefully before installation Solarbayer GmbH [21.14] Solarbayer GmbH 1 Safety regulations Carefully read

More information

PRODUCT INFORMATION. Satellite collector NANOSOL. Solarbayer GmbH (29.14) 1

PRODUCT INFORMATION. Satellite collector NANOSOL. Solarbayer GmbH (29.14) 1 We develop for your future Solarbayer GmbH (29.14) 1 Safety regulations Carefully read the safety instructions before commencing the installation. It s for your own safety. Please follow the structural

More information

PRODUCT INFORMATION. Solar DHW storage tank SKL. Technical description. High performance solar tank, bivalent

PRODUCT INFORMATION. Solar DHW storage tank SKL. Technical description. High performance solar tank, bivalent We develop for your future PRODUCT INFORMATION High performance solar tank, bivalent Technical description Solarbayer GmbH (50.14) Solarbayer GmbH 1 Content Safety regulations...........................................................................

More information

PRODUCT INFORMATION. Technical description. Hygienic stratification storage tank HSK ÖKO Universal heat center for legionella safe preparation of DHW

PRODUCT INFORMATION. Technical description. Hygienic stratification storage tank HSK ÖKO Universal heat center for legionella safe preparation of DHW We develop for your future! PRODUCT INFORMATION Hygienic stratification storage tank Universal heat center for legionella safe preparation of DHW Technical description Solarbayer GmbH (18.12) Solarbayer

More information

Storage systems. Solarbayer. Fire protection insulation ISO B1

Storage systems. Solarbayer. Fire protection insulation ISO B1 Solarbayer We develop for your future Storage systems Heat storage tanks for cozy warmth Perfect heat storing for heating and domestic hot water System technology made in Bavaria Tank types: Stratification

More information

USER S MANUAL ATH WH220

USER S MANUAL ATH WH220 USER S MANUAL ATH WH220 INDEX INTRODUCTION... - 3 - General information s... - 3 - Description of pneumatic jack... - 4 - Operation of jack... - 5 - Technical data... - 6 - Dimension drawing... - 6 - INSTALLATION...

More information

Installation and operation instructions Solar stations SolarBloC midi Premium DN 20 SolarBloC maxi Premium DN 25

Installation and operation instructions Solar stations SolarBloC midi Premium DN 20 SolarBloC maxi Premium DN 25 PAW GmbH & Co. KG Böcklerstr. 11, D-31789 Hameln, Germany Phone: +49-5151-9856-0, Fax: +49-5151-9856-98 E-mail: info@paw.eu, Web: www.paw.eu Installation and operation instructions Solar stations SolarBloC

More information

VIESMANN. Installation instructions VITOCELL 300-B. for contractors. Vitocell 300-B Type EVBA-A. Dual mode DHW cylinder, 300 and 500 l

VIESMANN. Installation instructions VITOCELL 300-B. for contractors. Vitocell 300-B Type EVBA-A. Dual mode DHW cylinder, 300 and 500 l Installation instructions for contractors VIESMANN Vitocell 300-B Type EVBA-A Dual mode DHW cylinder, 300 and 500 l VITOCELL 300-B 1/2017 Dispose after installation. Safety instructions Please follow these

More information

Installation manual Operating instructions

Installation manual Operating instructions WIKORA GmbH Friedrichstr. 9 89568 Hermaringen Phone: (07322) 9605-0 Fax: (07322) 9605-30 email: contact@wikora.de Installation manual Operating instructions DHW storage tank UNO/DUO/H/WPSOL Installation

More information

Friwa Compact. Operating instructions EN

Friwa Compact. Operating instructions EN Operating instructions EN Version 1.1 / Edition 09/2013 Contents 1 Key background information... 3 1.1 Limitation of liability... 3 1.2 Responsibilities of the operator... 3 1.3 Documentation... 3 1.3.1

More information

Installation instructions

Installation instructions 2Power storage tank Installation instructions This installation construction contains important advice for handling, installing and starting up a 2Power solar plant. Read these advice carefully before

More information

General System Layout Sketch

General System Layout Sketch General System Layout Sketch EZ-37 Solar Panels PV panel Glycol Fill Valve Expansion Tank ` 1 Introduction This document describes how to install a Heliatos GH type solar water heating system. These systems

More information

AGS 5/5E, AGS 10/10E INSTALLATION AND SERVICING INSTRUCTIONS SOLAR PUMP STATIONS FOR SEALED SOLAR HEATING SYSTEMS AND INDIRECT FED DOMESTIC HOT WATER

AGS 5/5E, AGS 10/10E INSTALLATION AND SERVICING INSTRUCTIONS SOLAR PUMP STATIONS FOR SEALED SOLAR HEATING SYSTEMS AND INDIRECT FED DOMESTIC HOT WATER INSTALLATION AND SERVICING INSTRUCTIONS SOLAR PUMP STATIONS AGS 5/5E, AGS 0/0E FOR SEALED SOLAR HEATING SYSTEMS AND INDIRECT FED DOMESTIC HOT WATER 7747006489.00-.SD CONTENTS CONTENTS Safety instructions

More information

SOLARHOT. SuperVox. Description / Applications System Overview. Installation/ Owner s Manual

SOLARHOT. SuperVox. Description / Applications System Overview. Installation/ Owner s Manual SOLARHOT SuperVox Installation/ Owner s Manual Description / Applications System Overview The SOLARHOT SuperVox solar thermal glycol system. The SuperVox allows for easy installation of large solar water

More information

VIESMANN. Installation instructions VITOCELL 300-V/W. for contractors. Vitocell 300-V/W Type EVIA-A

VIESMANN. Installation instructions VITOCELL 300-V/W. for contractors. Vitocell 300-V/W Type EVIA-A Installation instructions for contractors VIESMNN Vitocell 300-V/W Type EVI- DHW cylinder with internal indirect coil 160 to 500 l VITOCELL 300-V/W 3/2017 Dispose after installation. Safety instructions

More information

Installation and instruction manual SOLAR STATION

Installation and instruction manual SOLAR STATION INSTALLATION AND INSTRUCTION MANUAL SOLAR STATION Installation and instruction manual SOLAR STATION SST 25-1E / SST25-2E EN April 2015 1 Table of contents Usage 3 Warranty 3 Safety instructions and symbol

More information

Installation and operating instructions. DK energy storage and DK energy buffer

Installation and operating instructions. DK energy storage and DK energy buffer Installation and operating instructions DK energy storage and DK energy buffer Edition: 08-2015 1 Preliminary note With this DK energy storage / DK energy buffer you purchased a DK quality product. The

More information

Solar technology VITOSOL 100-F VITOSOL 200-F VITOSOL 200-T

Solar technology VITOSOL 100-F VITOSOL 200-F VITOSOL 200-T Solar technology VITOSOL 100-F VITOSOL 200-F VITOSOL 200-T Solar technology, flat-plate collectors Vitosol 100-F Powerful and durable flat-plate collectors at an attractive price. The was awarded the rating

More information

General System Layout Sketch

General System Layout Sketch General System Layout Sketch SW-38 Solar Panel(s) Hot Water Cold Water PV panel Glycol RV Water Heater WITH built in Heat Exchanger Water Ports ` Glycol Fill Valve 1 Pump Solar Powered Expansion Tank Glycol

More information

SOLAR TUBE COLLECTORS

SOLAR TUBE COLLECTORS ALPHA-OMEGA SOLAR TUBE COLLECTORS ALPHA OMEGA ECOLOGICAL SOLUTIONS Athens Office: 8, R. Garibaldi & Sofroniskou str. Tel. +30.210.9228225 Email: info@alpha-omega.com.gr Direct Phones: +30.697.42 28 012

More information

AGS 2 SOLAR PUMP STATION FOR SOLAR DOMESTIC HOT WATER SYSTEMS UK/IE

AGS 2 SOLAR PUMP STATION FOR SOLAR DOMESTIC HOT WATER SYSTEMS UK/IE INSTRUCTION MANUAL INSTALLATION AND SERVICING AGS 2 SOLAR PUMP STATION FOR SOLAR DOMESTIC HOT WATER SYSTEMS UK/IE About this manual These installation and maintenance instructions contain important information

More information

ENAMELED INDIRECT WATER HEATERS

ENAMELED INDIRECT WATER HEATERS INSTRUCTIONS ENAMELED INDIRECT WATER HEATERS ST-300DE HEAT PUMPS Please read this manual carefully before installing the heater! Dear Customer, Sinclair Corporationt Ltd. thanks you for your decision

More information

CIRCO 6 Solar Circulation Unit

CIRCO 6 Solar Circulation Unit TECHNICAL INFORMATION / INSTALLATION INSTRUCTIONS CIRCO Solar Circulation Unit CIRCO Solar Circulation Unit in combination with the intelligent SUNGO controllers, it is the safe and reliable heart of a

More information

Technical information for installation and operation

Technical information for installation and operation Technical information for installation and operation PR 24002.65 12-04-2016 Subject to technical modifications LogoFresh 100 & 120 fresh water station Electronically controlled GB Meibes System-Technik

More information

SUN EQUINOX HEATING SYSTEMS

SUN EQUINOX HEATING SYSTEMS SUN EQUINOX HEATING SYSTEMS HIGH-EFFICIENCY HOT WATER SOLUTIONS INSTALLATION & OPERATION MANUAL Production Number: Customer Contact Information Other Resources 260-65-5605 http://www.solarusagenow.com

More information

STARBOX - CONDENSER UNITS

STARBOX - CONDENSER UNITS EN STARBOX - CONDENSER UNITS INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS Table of Contents 1. General Information 1 2. Handling and Storage.. 1 3. Installation. 1 4. Electrical Connections.. 4

More information

TECHNICAL MANUAL HYPERION. Solar water heaters. Installation, maintenance & use instructions

TECHNICAL MANUAL HYPERION. Solar water heaters. Installation, maintenance & use instructions TECHNICAL MANUAL Solar water heaters HYPERION Installation, maintenance & use instructions HYPERION CONTENTS DOMESTIC HOT WATER CONSUMPTION... 4 SOLAR WATER HEATER OPERATION - WATER HEATING... 4 SOLAR

More information

Solar water heating system

Solar water heating system Solar water heating system Perhaps the most popular application of solar systems is for domestic water heating. The popularity of these systems is based on the fact that relatively simple systems are involved

More information

Buffer Tank FWSS 1000 V7-RH

Buffer Tank FWSS 1000 V7-RH Buffer Tank FWSS 1000 V7-RH Manual Art.-Nr.: 700119 (V1.0) Table of content 1. Preface 3 1.1 Usage 3 1.1.1 Usage example Fresh Water Station 3 2. Description 4 3. Warning notices 4 4. Design of the Fresh

More information

FSW300 Series Flow Switch

FSW300 Series Flow Switch . FSW300 Series Flow Switch - 2 - Series FSW300 Series FSW300 Table of contents page 0 About this operating manual... 4 1 Device description... 5 1.1 Intended use... 5 1.1.1 Reed contact - Switching of

More information

Waste water ejection unit

Waste water ejection unit Waste water ejection unit Over ground box SWH 500/50-80 SWH 500/50-80 Operation manual Table of contents: Page Declaration of conformity... 3 1. General... 4 1.1 Introduction... 4 1.2 Enquiries and orders...

More information

VC-1, VC-1-SL, VC-2-L, VC-2-SL

VC-1, VC-1-SL, VC-2-L, VC-2-SL Pre-Cooling Unit Series VC VC-1, VC-1-SL, VC-2-L, VC-2-SL Instruction Manual Version 1.00.02 Dear customer, we have made up this operating manual in such a way that all necessary information about the

More information

Fresh Water Station FWS 20 / FWS 30. Manual. Masterpieces. Art.-Nr.: (V1.0) of Solar Technology

Fresh Water Station FWS 20 / FWS 30. Manual. Masterpieces. Art.-Nr.: (V1.0) of Solar Technology Fresh Water Station FWS 20 / FWS 30 Manual Masterpieces of Solar Technology Art.-Nr.: 700096 (V1.0) Table of content 1 Preface 3 1.1 Usage 3 1.1.1 Usage example Fresh Water Station 4 1.1.2 Usage example

More information

Commissioning a Solar Thermal Installation

Commissioning a Solar Thermal Installation OPERATING INSTRUCTIONS Wagner& Co Commissioning a Solar Thermal Installation Contents. Solar Circuit... 2. Commissioning... 3 3. Service Information... 4. Maintenance.... Solar Circuit Components Pipework

More information

Installation Instructions

Installation Instructions Installation Instructions Solar Collector Kit Solar Collector Add On Kit WARNING: Plumber Be Aware Use copper pipe ONLY. Plastic pipe MUST NOT be used. It is a requirement of a solar water heater installation

More information

The new standard. The advanced solar absorber tube. The collector for every budget. Efficient modular installation system

The new standard. The advanced solar absorber tube. The collector for every budget. Efficient modular installation system The new standard The advanced solar absorber tube The collector for every budget Efficient modular installation system Intelligent DRC system technology 1 The new standard AMK collectors the new standard

More information

Installation and Operation Instructions Domestic hot water module FriwaMini with circulation - DN 15

Installation and Operation Instructions Domestic hot water module FriwaMini with circulation - DN 15 PAW GmbH & Co.KG Böcklerstr. 11, D-31789 Hameln, Germany Phone: +49-5151-9856-0, Fax: +49-5151-9856-98 E-mail: info@paw.eu, Web: www.paw.eu Installation and Operation Instructions Domestic hot water module

More information

Instruction manual. Water treatment Boiler system D 30 L

Instruction manual. Water treatment Boiler system D 30 L Water treatment Boiler system D 30 L Manufacturer: deconta GmbH Im Geer 20, D - 46419 Isselburg Description / Type No.: Water treatment / D 30L /... Serial No.:... Table of contents 1 Introduction 3 2

More information

INSTALLATION AND SERVICING

INSTALLATION AND SERVICING AND SERVICING SOLAR THERMAL For users guide see reverse of book When replacing any part on this appliance, use only spare parts that you can be assured conform to the safety and performance specification

More information

INSTALLATION GUIDE. soft duomatik evoline

INSTALLATION GUIDE. soft duomatik evoline INSTALLATION GUIDE soft duomatik evoline Before introduction of the softener the installation guide has to be read carefully. For any disturbances cause by disregarding the instructions evo-water doesn

More information

EVACUATED TUBE SOLAR HOT WATER SYSTEMS OWNERS MANUAL JULY 2013 BROCMISC100.1

EVACUATED TUBE SOLAR HOT WATER SYSTEMS OWNERS MANUAL JULY 2013 BROCMISC100.1 EVACUATED TUBE SOLAR HOT WATER SYSTEMS OWNERS MANUAL JULY 2013 BROCMISC100.1 Thermann Solar Hot Water System - Owners Manual Thank You Thank you for purchasing a Thermann solar hot water system. Please

More information

SEALED THERMAL STORE

SEALED THERMAL STORE ISSUE 3 0717 INSTALLATION AND USER GUIDE ENERGYMANAGER SEALED THERMAL STORE ADVANCE APPLIANCES LTD PLEASE RETAIN AND ENSURE SERVICE RECORDS ARE KEPT UP TO DATE. SCHEMATIC DIAGRAM OF ENERYMANAGER THERMAL

More information

Hydraulic crimping tool. HO-16 Art QZERTIFIKAT DIN EN ISO convincing solutions

Hydraulic crimping tool. HO-16 Art QZERTIFIKAT DIN EN ISO convincing solutions Hydraulic crimping tools INSTRUCTION MANUAL Hydraulic crimping tool HO-16 Art. 216802 DIN EN ISO 9001 QZERTIFIKAT 1. Technical data Area of application: For the creation of an electrical connection by

More information

Installation and Operation Instructions K36E Modular Heating Circuit - DN 25 Boiler charging set

Installation and Operation Instructions K36E Modular Heating Circuit - DN 25 Boiler charging set PAW GmbH & Co. KG Böcklerstr. 11, D-31789 Hameln, Germany Phone: +49-5151-9856-0, Fax: +49-5151-9856-98 Email: info@paw.eu, Web: www.paw.eu Installation and Operation Instructions K36E Modular Heating

More information

DUCT COOLERS KWK KFK OPERATION MANUAL. KWK_KFK_v2(4)_EN.indd :35:29

DUCT COOLERS KWK KFK OPERATION MANUAL. KWK_KFK_v2(4)_EN.indd :35:29 DUCT COOLERS KWK KFK EN OPERATION MANUAL KWK_KFK_v2(4)_EN.indd 1 13.06.2016 13:35:29 CONTENTS 3 Introduction 3 General 3 Safety rules 3 Transportation and storage regulations 3 Manufacturer s warranty

More information

SOLAR WATER HEATING SYSTEM VERSOSUN THERMAL SOLUTIONS

SOLAR WATER HEATING SYSTEM VERSOSUN THERMAL SOLUTIONS SOLAR WATER HEATING SYSTEM VERSOSUN THERMAL SOLUTIONS SOLAR WATER HEATING SYSTEM VERSOSUN THERMAL SOLUTIONS SOLAR THERMAL SOLUTIONS The great advantage of having a Solar Water heater is ITS FREE! The benefits

More information

Operation Manual R205BV, R209BV

Operation Manual R205BV, R209BV Operation Manual R205BV, R209BV 1 Safety Instruction The rotary evaporator is manufactured according to current methods and accepted safety regulations. However, risks still exist during the installation,

More information

Installation Instructions

Installation Instructions Installation Instructions Collector Kit Collectors with Screwed Fittings NPT200 SOLAR COLLECTOR WARNING: Plumber Be Aware Use copper pipe ONLY. Plastic pipe MUST NOT be used. It is a requirement of a solar

More information

OVSOL Solar System Manual. Solar hot water system installation guide for evacuated tube systems.

OVSOL Solar System Manual. Solar hot water system installation guide for evacuated tube systems. OVSOL Solar System Manual Solar hot water system installation guide for evacuated tube systems. table of contents System Components....................................................... 2 Introduction..............................................................

More information

Operating Manual. VIENNA Hot Display

Operating Manual. VIENNA Hot Display Operating Manual VIENNA Hot Display Operating and Maintenance instructions Please read this manual carefully before you start to operate your heated display case. Following these instructions helps you

More information

Installation & Operation Manual Models: TSU

Installation & Operation Manual Models: TSU TSU-I-O Rev A Installation & Operation Manual Models: TSU 150-940 CAUTION: This appliance is not intended for potable water. This manual must only be used by a qualified heating installer / service technician.

More information

V80-H Multistage Pump Instruction Manual

V80-H Multistage Pump Instruction Manual V80-H Multistage Pump Instruction Manual PRODUCT OVERVIEW The VADA horizontal multistage centrifugal pumps combine the functional benefits of centrifugal pumps and the practical benefits of self priming

More information

INSTALLATION INSTRUCTIONS UNDERCOUNTER DISHWASHERS

INSTALLATION INSTRUCTIONS UNDERCOUNTER DISHWASHERS INSTALLATION INSTRUCTIONS UNDERCOUNTER DISHWASHERS VIKING 111 Front Street Greenwood, Mississippi 38930 USA (662) 455-1200 IMPORTANT - PLEASE READ AND FOLLOW Before beginning - please read these instructions

More information

Operating Instructions. Accessory Units Melitta Cafina XT Series. Melitta Professional Coffee Solutions

Operating Instructions. Accessory Units Melitta Cafina XT Series. Melitta Professional Coffee Solutions Operating Instructions Accessory Units Melitta Cafina XT Series Melitta Professional Coffee Solutions Contents General... 4. Manufacturer information... 4.2 About these instructions... 4.3 Explanation

More information

General System Layout Sketch

General System Layout Sketch General System Layout Sketch EZ-37 Solar Panels PV panel Can use Standard Copper, CPVC or PEX Pipes Pump Existing Water Heater Bottom Feed Connector 1 Introduction This document describes how to install

More information

CA-707. Manual. Read these instructions carefully before you start using the dehumidifier and keep the manual for later usage.

CA-707. Manual. Read these instructions carefully before you start using the dehumidifier and keep the manual for later usage. Dehumidifier 2in1: Dehumidifying & air purifying CA-707 Manual Read these instructions carefully before you start using the dehumidifier and keep the manual for later usage. Copyright : Clean Air Optima

More information

Atmos EasySolar. Installation Instructions for. In-roof and flat roof installation with flat plate collectors

Atmos EasySolar. Installation Instructions for. In-roof and flat roof installation with flat plate collectors Atmos EasySolar Installation Instructions for Atmos EasySolar In-roof and flat roof installation with flat plate collectors Atmos Heating Systems West March Daventry Northants, NN11 4SA Tel: 01327 871990

More information

Solar Water Heaters. Bastián Acevedo Bustos. Electronic Engineering Student, Tarapacá University. Environmental Studies Student, York University

Solar Water Heaters. Bastián Acevedo Bustos. Electronic Engineering Student, Tarapacá University. Environmental Studies Student, York University Solar Water Heaters Bastián Acevedo Bustos Electronic Engineering Student, Tarapacá University Environmental Studies Student, York University Systems Active System Active systems use one or more pumps

More information

Operating instructions

Operating instructions Operating instructions (Translation of the original operating instructions) Type TEKA FILTERCUBE-MV TEKA Absaug- und Entsorgungstechnologie GmbH Industriestraße 13 D-46342 Velen Postfach 1137 D-46334 Velen

More information

Ventilation and air conditioning QUALITY FOR LIFE. Refrigerating systems and heat pumps. Operating manual

Ventilation and air conditioning QUALITY FOR LIFE. Refrigerating systems and heat pumps. Operating manual Ventilation and air conditioning QUALITY FOR LIFE GB Refrigerating systems and heat pumps Operating manual Refrigerating systems and heat pumps 3052967 I 07/2010 Refrigerating systems and heat pumps Table

More information

Solar heating systems

Solar heating systems 03 energy efficiency Compact, "ALL-IN-ONE" solar system Solar panel for swimming pools Hydraulic components Drain-Unit: dual hydraulic unit with drain back system Drain-Unit: hydraulic unit with drain-back

More information

SMHA Hatch High temperature fan HT-fan Installation and Maintenance

SMHA Hatch High temperature fan HT-fan Installation and Maintenance High temperature fan HT-fan Installation and Maintenance 22.8.2012 Contents 1. Important information 2. Safety notes 3. Technical description 4. Transport 5. Mounting instructions 6. Commissioning 7. Maintenance

More information

EHA Hoffmann International GmbH

EHA Hoffmann International GmbH EHA Hoffmann International GmbH User manual EHA-TRANSPRINT HP 2020 Machine-No.: Year: EHA Hoffmann International GmbH Michelsbergstraße 24 D-57080 Siegen/Germany Telephone: +49 271 39 32-0 Telefax: +49

More information

INSTALLATION INSTRUCTIONS GEO PRIME TANK. (Patent Pending) GPC

INSTALLATION INSTRUCTIONS GEO PRIME TANK. (Patent Pending) GPC INSTALLATION INSTRUCTIONS GEO PRIME TANK (Patent Pending) GPC Table of Contents General Description 2 Installation 3 Flushing and Purging 5 Initial Start up 7 Adding or Checking Fluid 8 Replacing a Pump

More information

e Bath Fan with Light User s Guide

e Bath Fan with Light User s Guide e Bath Fan with Light User s Guide abfl100rnl, BFL125RNL Item Stock Number(s): BFL100RNL, BFL125RNL IMPORTANT INSTRUCTIONS - OPERATING MANUAL READ AND SAVE THESE INSTRUCTIONS READ CAREFULLY BEFORE ATTEMPTING

More information

INSTALLATION AND MAINTENANCE GUIDE TRENDY 1000 T ELECTRONIC LAVATORY FAUCET

INSTALLATION AND MAINTENANCE GUIDE TRENDY 1000 T ELECTRONIC LAVATORY FAUCET INSTALLATION AND MAINTENANCE GUIDE TRENDY 1000 T ELECTRONIC LAVATORY FAUCET 1 INDEX 1 TECHNICAL DATA 2 TEMPERATURE ALTERNATIVES 3 PACK CONTENTS 4 PRE-INSTALLATION INFO 5-6 FAUCET INSTALLATION 7 ADJUSTING

More information

User Guide Topax Hygiene System. S Booster MP44/MP66/MP88

User Guide Topax Hygiene System. S Booster MP44/MP66/MP88 User Guide Topax Hygiene System S Booster MP44/MP66/MP88 Vers. 1.0 01.01.2012 Contents 1. Preface... 3 1.0 Application... 3 1.1 Warnings... 3 1.2 Safety Instructions... 4 2. Standard Unit... 5 3. Description

More information

VADA - V80-H PRODUCT OVERVIEW CONSTRUCTION USAGE LIMITATIONS MOTOR WARRANTY

VADA - V80-H PRODUCT OVERVIEW CONSTRUCTION USAGE LIMITATIONS MOTOR WARRANTY PRODUCT OVERVIEW The VADA horizontal multistage centrifugal pumps combine the functional benefits of centrifugal pumps and the practical benefits of self priming pumps. They warrant high hydraulic and

More information

Storage systems. Warmth for coziness. New: HSK SLS. We develop for your future. System technology made in Bavaria

Storage systems. Warmth for coziness. New: HSK SLS. We develop for your future. System technology made in Bavaria We develop for your future Storage systems Warmth for coziness System technology made in Bavaria Stratification buffer tank SPS (with SLS system) Heat pump storage tank WP Solar DHW tank SKL Combination

More information

Operating Instructions

Operating Instructions Operating Instructions TEKA Cartmaster Type PF-W 1, PF-W 2 TEKA Absaug- und Entsorgungstechnologie GmbH Industriestraße 13 D-46342 Velen Postfach 1137 D-46334 Velen Tel.: +49 (0) 2863 9282-0 Fax: +49 (0)

More information

Instruction manual 7FAS Avdel Deutschland GmbH +49 (0) (0)

Instruction manual 7FAS Avdel Deutschland GmbH +49 (0) (0) Instruction manual Part number 7FAS2-00019 Manufacturer Avdel Deutschland GmbH Address Phone Fax email InterNet Klusriede 24 D-30851 Langenhagen +49 (0) 511 7288 0 +49 (0) 511 7288 133 Avdeldeutschland@infastech.com

More information

PREMIUM KITCHEN MIXER TAP. PREMIUM KITCHEN MIXER TAP Assembly, operating and safety instructions IAN

PREMIUM KITCHEN MIXER TAP. PREMIUM KITCHEN MIXER TAP Assembly, operating and safety instructions IAN PREMIUM KITCHEN MIXER TAP PREMIUM KITCHEN MIXER TAP Assembly, operating and safety instructions IAN 282471 GB/IE/NI Assembly, operating and safety instructions Page 5 B 15mm HG00476A HG00476B C 5 4 12

More information

Electrical Mini Tank Water Heater anual, and Warranty nformation

Electrical Mini Tank Water Heater anual, and Warranty nformation Electrical Mini Tank Water Heater Installation uide, ser anual, and Warranty nformation Electrical Mini Tank Water Heater 2.6 Gals 2.6 IMPORTANT SAFETY INFORMATION A SAFETY VALVE MUST BE USED FOR PROPER

More information

CodeNotes. Solar Water Heating Systems Based on the 2018 International Solar Energy Provisions (ISEP ) Introduction OFFICIAL

CodeNotes. Solar Water Heating Systems Based on the 2018 International Solar Energy Provisions (ISEP ) Introduction OFFICIAL CodeNotes is provided courtesy of the ICC PMG Official Membership Council OFFICIAL CodeNotes Solar Water Heating Systems Based on the 2018 International Solar Energy Provisions (ISEP ) Introduction Solar

More information

WKS 4000 SERIES (USA only) --INSTALLATION INSTRUCTIONS--

WKS 4000 SERIES (USA only) --INSTALLATION INSTRUCTIONS-- 8610 Production Avenue San Diego, California 92121 (858) 566-7465 Fax (858) 566-1943 WKS 4000 SERIES (USA only) --INSTALLATION INSTRUCTIONS-- Thank you for choosing a BREEZAIRE cooling unit. We believe

More information

For our present, For their future. Version 11.04

For our present, For their future. Version 11.04 For our present, For their future. SFH-S1 Series Solar Water Heater Assembly Manual Content http://www.sunflower-solar.com/ 1. FEATURES...3 2. SOLAR WATER HEATER SIZE AND WEIGHT...4 3. HOW TO TRANSPORT

More information

UFM-T100H US ES CA Power Alarm Test TM

UFM-T100H US ES CA Power Alarm Test TM Alarm Power TM UFM-T100H US ES CA A E F I J K G B C D H L M N O P Q R S T U V W X US 1 3 2 Power Alarm 4 6 5 Power Alarm 7 9 8 Po we Ala r rm Power Alarm 10 11 Po we Po we Ala rm r 12 Pow Ala Ala rm r

More information

Solar Thermal Energy

Solar Thermal Energy Solar Thermal Energy INDEX Residential Applications Flat Plate Solar Collectors... 5 SOL 200 and SOL 200 H... 7 Mediterráneo 200... 8 Mediterráneo SLIM 200... 9 Hydraulic fittings and mounting systems...

More information

JOHN DEERE GATOR HPX/XUV 2 PASSENGER HEATER INSTALLATION INSTRUCTIONS (p/n: 9PH20S30)

JOHN DEERE GATOR HPX/XUV 2 PASSENGER HEATER INSTALLATION INSTRUCTIONS (p/n: 9PH20S30) P. 1 of 12 JOHN DEERE GATOR HPX/XUV 2 PASSENGER HEATER INSTALLATION INSTRUCTIONS (p/n: 9PH20S30) Item: Qty: Description: 1 2 1 x 1 x 5/8 Tee Fitting 2 2 Plastic Snap-in Hose Grommet 3 4 1-1/2" Hose Clamps

More information

Residential Solar Water Heater

Residential Solar Water Heater Residential Solar Water Heater Residential Solar Water Heater Application Instructions Measure Description: Solar water heating or solar hot water is water heated by the use of solar energy. Solar heating

More information

Installation, Operation, and Maintenance Information

Installation, Operation, and Maintenance Information Installation, Operation, and Maintenance Information Low Velocity Unit Coolers Bulletin No. IOM 110.3 Table of Contents Inspection... 2 Installation... 2 4 General... 2 Location... 2 Drain Line... 3 Refrigerant

More information

PERFECT ORIENTATION ZONE 40 E 40 W GOOD GOOD ORIENTATION ZONE ORIENTATION ZONE

PERFECT ORIENTATION ZONE 40 E 40 W GOOD GOOD ORIENTATION ZONE ORIENTATION ZONE product installation data Roof Location and Pitch For optimum performance the solar collector panels or array of vacuum tubes need to face the equator (facing north for southern hemisphere installations).

More information

KEMPER ThermoSystem. For further information on KTS use the QR code!

KEMPER ThermoSystem. For further information on KTS use the QR code! KEMPER ThermoSystem Heating water hygienically and energy-efficiently with patented cascade rotation for automated operating change among all heating modules For further information on KTS use the QR code!

More information

Conductivity Electrode LRG Original Installation Instructions English

Conductivity Electrode LRG Original Installation Instructions English Conductivity Electrode LRG 16-4 EN English Original Installation Instructions 818854-02 1 Contents Important notes Page Usage for the intended purpose...4 Function...4 Safety note...5 Directives and standards

More information

OPERATION AND MONTAGE MANUAL ROOF FANS

OPERATION AND MONTAGE MANUAL ROOF FANS NO RFEC/U/2017-1 (EN) (valid since 18.08.2017) ROOF FANS RF/EC...-... / RFV/EC...-... Venture Industries Sp. z o.o. is not responsible for any damage caused by improper use of the fan and reserves the

More information

Guide book ASPIMAX 32. Im Geer 20, Isselburg. Type No.: 403. Serial No.:...

Guide book ASPIMAX 32. Im Geer 20, Isselburg. Type No.: 403. Serial No.:... ASPIMAX 32 Manufacturer: deconta GmbH Im Geer 20, 46419 Isselburg Type No.: 403 Serial No.:... Index On page 1 Basic safety advices 3 2 Technical description 4 2.1 Operating mode separator Filter system

More information

USERS MANUAL FOR GAS BOILERS

USERS MANUAL FOR GAS BOILERS USERS MANUAL FOR GAS BOILERS PLEASE READ THE MANUAL CAREFULLY: IT CONTAINS IMPORTANT INFORMATION REGARDING SAFETY, INSTALLATION, USE AND MAINTENANCE OF THE APPLIANCE MODELS: NOVADENS 24 NOVADENS 24C NOVADENS

More information

CodeNotes. Solar Water Heating Systems Based on the 2015 International Solar Energy Provisions. Introduction. Solar Water Heating System Designs

CodeNotes. Solar Water Heating Systems Based on the 2015 International Solar Energy Provisions. Introduction. Solar Water Heating System Designs CodeNotes is provided courtesy of the ICC PMG Official Membership Council CodeNotes Solar Water Heating Systems Based on the 2015 International Solar Energy Provisions Introduction Solar water heating

More information

INSTALLATION GUIDE. soft duomatik evoline

INSTALLATION GUIDE. soft duomatik evoline INSTALLATION GUIDE soft duomatik evoline Before introduction of the softener the installation guide has to be read carefully. For any disturbances cause by disregarding the instructions evo-water doesn

More information

VIESMANN. Installation and service instructions VITOCELL 340-M/360-M. for contractors. Vitocell 340-M/360-M Type SVKA Type SVSA

VIESMANN. Installation and service instructions VITOCELL 340-M/360-M. for contractors. Vitocell 340-M/360-M Type SVKA Type SVSA Installation and service instructions for contractors VIESMANN Vitocell 340-M/360-M Type SVKA Type SVSA Combi cylinder 750 and 950 litre capacity VITOCELL 340-M/360-M 4/2009 Please keep safe. Safety instructions

More information

Ireland. Australia. New Zealand

Ireland. Australia. New Zealand UK Ireland Australia New Zealand 2 3 4 5 Intended use Your Black & Decker vacuum cleaner has been designed to vacuum dry substances. This product is intended for household use only. Safety instructions

More information

Airbrush Compressor & Vacuum Pump AS20W ARTICEL 34202

Airbrush Compressor & Vacuum Pump AS20W ARTICEL 34202 Operation Manual Airbrush Compressor & Vacuum Pump AS20W ARTICEL 34202 Read and follow the operating instructions and safety information before using for the first time. Technical changes reserved! Due

More information

MBWeich 100. Operating manual. 1. Introduction. 2. Use

MBWeich 100. Operating manual. 1. Introduction. 2. Use Soaking Unit MBWeich 100 Meier-Brakenberg GmbH & Co. KG Brakenberg 29 32699 Extertal Germany Tel.: +49-5262/993 99-0 Fax: +49-5262/993 99-3 E-mail: info@meier-brakenberg.de Operating manual 1. Introduction

More information

Installation Manual Universal Single-Arm Side-of-Pole Mount UNI-SA/21.5

Installation Manual Universal Single-Arm Side-of-Pole Mount UNI-SA/21.5 Installation Manual Universal Single-Arm Side-of-Pole Mount UNI-SA/21.5 Solar Mounting Solutions UNI-SA/21.5 March 2009 www.ironridge.com 2009 IronRidge, Inc. All Rights Reserved Version 2.0 2 Universal

More information

SPACESAVER INSTRUCTION MANUAL WARRANTY CERTIFICATE

SPACESAVER INSTRUCTION MANUAL WARRANTY CERTIFICATE SPACESAVER BY INSTRUCTION MANUAL WARRANTY CERTIFICATE Manual design and all elements of manual design are protected by U.S. Federal and/or State Law, including Patent, Trademark and/or Copyright laws.

More information

p Permanent magnet water cooled motors Additional manual

p Permanent magnet water cooled motors Additional manual p Permanent magnet water cooled motors Additional manual Safety Instructions 1 General General safety regulations, safety precautions and specific agreements made for each work site shown in this document

More information

(3 plastic wire connectors,blade balancing kit, 2 extra mounting screws #10-32 for outlet box.)

(3 plastic wire connectors,blade balancing kit, 2 extra mounting screws #10-32 for outlet box.) Excel Lighting & Manufacturing Ltd. Lifetime Limited Warranty Excel Lighting & Manufacturing Ltd. Warrants the fan motor to be free from defects in workmanship and material present at time of shipment

More information

Solar station DKP 6-8 / DKP Installation and Service Manual C

Solar station DKP 6-8 / DKP Installation and Service Manual C EN Solar station DKP 6-8 / DKP 9-20 Installation and Service Manual 300014274-001-C Contents 1 Introduction.............................................................................3 1.1 Used symbols...........................................................................................3

More information

THROUGH-WALL AIR-TO-AIR HEAT PUMP AND AIR CONDITIONER. Instruction Manual. Model AMB-12H

THROUGH-WALL AIR-TO-AIR HEAT PUMP AND AIR CONDITIONER. Instruction Manual. Model AMB-12H THROUGH-WALL AIR-TO-AIR HEAT PUMP AND AIR CONDITIONER Instruction Manual Model AMB-12H PLEASE READ THIS INSTRUCTION MANUAL CAREFULLY BEFORE USING THIS UNIT. Table of Contents 1. SAFETY WARNINGS 2 2. CONSTRUCTION...

More information

Apricus Solar Hot Water Systems

Apricus Solar Hot Water Systems Apricus Solar Hot Water Systems Owners Manual Version 2.0 - March 2012 AA-8.2.1.7.2.Apricus-Owners-Manual-V2.0 www.apricus.com.au Thank You! Thank you for purchasing an Apricus solar hot water system.

More information