TECHNICAL MANUAL BIOTEC 25 AND BIOTEC 40

Size: px
Start display at page:

Download "TECHNICAL MANUAL BIOTEC 25 AND BIOTEC 40"

Transcription

1 TECHNICAL MANUAL BIOTEC 25 AND BIOTEC 40

2 2

3 INDEX INDEX Safety information Technical data...5 Boiler features...6 Technical information Fuel Construction and function Hydraulic Schemes...10 & 11 Installation.. 12 & 13 Boiler controller...14, 15 & 16 Control parameters...17, 18 & 19 Operational phases Maintenance Possible faults Commissioning...23 Relocating and boiler disposal Guarantee Terminal connections Strebel will not be liable for Typographical and printing errors, changes in construction and dimensions which are stated throughout this manual. 3

4 Safety information Basics The boiler must be installed by a competent professional. The Biotec is manufactured according to current safety standards. If safety rules are ignored, injury or even death of the user could result. Damage to the boiler and accessories can result if the manual and safety instruction are not adhered to.. The specialist responsible for the installation must explain the proper handling of the boiler to the user. Only use the boiler if it is installed properly. Always follow the instructions of this manual. Any boiler failure must be repaired as soon as possible. Use of the boiler The manufacturer is not responsible for damages resulting from incorrect use. The appliance must be installed in accordance with local building regulations as appropriate to the country in which the boiler is being installed. The operational parameters and adjustments can only be modified with the approval of Strebel ltd. The use of parameters and adjustments outside the approved range can cause damage or faults to the Boiler, accessories and or the system. Prescribed fuel This boiler is designed for the combustion of wood pellets. The use of other fuels is prohibited. Wood pellets are cylindrical and made from wood without additives or chemical binders. The pellets must have specific dimensions ( as below) and a low moisture level. STREBEL recommends pellets with a diameter of 6 to 8 mm and length of 10 to 30 mm. Quality and form are as per standards ÖNORM 7135 and DIN Only use pellets that comply with ÖNORM, DIN ENplus or equal. More information on page 8. Signs and symbols Possible risks Carbon monoxide During boiler operation, carbon monoxide can emit through the boiler doors when they are DANGER open. Only leave the boiler doors open as long as necessary. Insufficient ventilation during boiler operation can cause death. Closing the ventilation openings of the boiler room or the boiler is prohibited. Please adhere to BS 6798 & BS5440:2 Wood requires one and a half times the ventilation needed for gas. Surfaces with high temperatures Touching hot surfaces can cause burns. Surfaces marked with this symbol may only be touched when the system is fully cooled down. Text passages with this symbol hold information relating to hot boiler parts. SAFETY INFORMATION Possible Injury Working on parts marked with this symbol can cause injury. Text showing this symbol give safety information where applicable Possible hand injuries Working on parts marked with this symbol can cause hand injuries. Fire hazard Flammable items must not be positioned near the boiler. Text passages with this symbol give information about fire prevention. Danger of frost Frost forming in the system pipes during cold weather can cause severe damages. Text passages with this symbol contain information relating to frost prevention. Additional information or advice Adhere to local and national regulations concerning positioning, installation, operation and disposal of the boiler. Every person intending to operate the boiler is advised to carefully read this manual especially to the safety information. Persons intending to clean the boiler or perform other maintenance must read this manual otherwise the warranty is invalid. Risk of electric shock Sections marked with this symbol are only to be carried out by an electrician. Text showing this symbol give information about electrical connections. 4

5 TECHNICAL DATA Biotec 25 Biotec 40 NOMINAL OUTPUT KW MINIMUM OUTPUT KW 8 13 MAXIMUM BOILER TEMPERATURE C MINIMUM BOILER TEMPERATURE C FLUE TEMPERATURE MAXIMUM OUTPUT C FLUE TEMPERATURE MINIMUM OUTPUT C FLUE EXHAUST GAS FLOW RATE MAX OUTPUT Kg/Sec FLUE EXHAUST GAS FLOW RATE MIN OUTPUT Kg/Sec EFFICIENCY % BOILER WATER CONTENT LTR HYDRAULIC RESISTANCE DELTA T 10 C mbar 7 7 HYDRAULIC RESISTANCE DELTA T 20 C mbar 2 2 BOILER WEIGHT Kg BOILER CLASS EN MAXIMUM OPERATING PRESSURE BAR MAXIMUM TEST PRESSURE BAR 5 5 MAXIMUM CHIMNEY (DRAUGHT) NEGATIVE PRESSURE PA FLOW & RETURN CONNECTION SIZE INCH 1 1¼ FLUE CONNECTION DIAMETER mm MAXIMUM CAPACITY OF THE STANDARD PELLET HOPPER Kg ELECTRICAL SUPPLY/AMPERAGE 230V 50HZ MAX 1 AMP 230V 50HZ MAX 1 AMP WATTAGE DURING NORMAL OPERATION W WATTAGE DURING IGNITION PHASE W Data subject to change without notice. 5

6 BOILER FEATURES 1 Boiler features 1.1 General information The Biotec Boiler has a modern design and is made of high quality material. The boiler tests were carried out conforming to EN 303-5, therefore the boiler fulfils all requirements for the connection to a central heating system. The maximum permitted system pressure is 2.5 bar. This boiler is suitable for central heating system of familyhomes, small businesses or workshops. The automatic operation is very user-friendly, because the only action during operation is re-filling the pellet silo depending on the usage. The Biotec includes the silo and pellet screw with the silo on the right hand side. The silo can be mounted on the left hand side on application and at extra cost. 1.2 Conformity declaration The company STREBEL confirms according to EN45014:1998 tha the boiler Biotec complies with the following standards: EC-guidelines: MD 98/37/EC PED 97/23/EC LVD 2006/95/EC EMC 2004/108/EC General standards: EN 303-5:1999; EN :2006; EN :2002; EN 50165:1997+A1; EN :2001; EN ISO :2003; EN ISO :2003; EN 1050:1997 Other standards and technical specifications: EN 287-1:2004, EN 288-3:1992; EN 10204:2004; EN ISO 7000:2004. Testing method conformity: Module B1 Limit of Emission combustion products (class) 3 Certificates: EC Control Type Certificate Nr. 0745/350/09 STREBEL Responsible laboratory: TÜV Thüringen e.v. Service- Centre South Germany, Industry.13, D in the town Zella Mehlis We hereby declare that the stated products were produced under safety and specific guidelines and standards. All working conditions and terms of use comply with this manual. Wood pellets are an excellent renewable fuel they are cylindrical in shape with a low ash-percentage after combustion which accounts for about 1 %. The caloric value of pellets is approx kj/kg, which means that 2 kg pellets is roughly equivalent to 1 ltr of light heating oil. If the product is changed and changes are unapproved by Strebel the above confirmation loses its validity. The storing qualities and the high energy value of pellets make them the ideal replacement for oil or gas. 6

7 TECHNICAL INFORMATION SIDE VIEW R2 R1 D H C G R1 R3 F B E A TOTAL WIDTH WITH TOTAL HEIGHT FLUE DIA BOILER BODY RETURN FLOW FLUE HOPPER DEPTH B C D WIDTH E HEIGHT F HEIGHT G HEIGHT Biotec (200LTR HOPPER) Biotec (300LTR HOPPER) Flow & Return Vent Drain

8 SPECIALIST UK FUEL PROVIDER 3 Fuel 3.1 Strebel Biotec boilers require fuels complying to ENplus-A1 PELLET INFORMATION Information kindly provided by Forever Fuels Pellet-size HP5, made from by-products of wood and wood shavings, without additives. The energy value of 2 kg pellets complies with the energy of 1 l light heating oil (10 kwh). Comply DIN ÖNORM 7135 The Austrian standard comprises quality requirements of pellets, testing regulations, supervision of pellet production and labelling. DIN Plus Standard DIN Plus combines Standard DIN and Standard ÖNORM The certification procedure at the manufacturer s works is carried out by a responsible certified DIN-inspector. The quality of the pellets is supervised and checked regularly. 8

9 12 11 CONSTRUCTION & FUNCTION Boiler Construction Legend: 1.) Combustion chamber 2.) Heat exchanger 3.) Pellet silo 4.) Pellet screw 5.) Gear motor 6.) Heat exchanger top 7.) Air supply 8.) Fan 9.) Burner-door 10.) Flue connection 11.) Flue exhaust probe 12.) Boiler-controller 13.) Exhaust pipe 14.) Ash drawer 4.2 Function The pellets are conveyed from the silo (3) to the burner (1) via the pellet screw (4). The ignition system (16) automatically ignites the pellets during start-up or after an operating pause. The fan (8) supplies the burner with primary and secondary air. The air ducts in the combustion chamber supply the correct amount of air for primary and secondary combustion. NOTE THE PELLET SCREW AND AUGER MEN- TIONED IN THIS MANUAL ARE THE SAME ITEM. 15.) Heat exchanger cleaning system 16.) Ignition system 9

10 HYDRAULIC SCHEME See your quotation for items that are supplied. Positions & orientation below are for ease of illustration DHW THERMAL VALVE COLD WATER SUPPLY TO REGULATIONS Fill STREBEL TEMPERATURE GAUGE PUMP DRAIN OFF COCK AUTOMATIC 3 PORT MIXING VALVE for maintained return HEAT STORE PRESSURE GAUGE temperature SAFETY ISOLATING VALVE AUTO AIR VENT EXPANSION VESSEL 10

11 HYDRAULIC SCHEME See your quotation for items that are supplied. Positions & orientation below are for ease of illustration THERMAL VALVE COLD WATER SUPPLY TO REGULATIONS DHW Fill STREBEL TEMPERATURE GAUGE PUMP DRAIN OFF COCK AUTOMATIC 3 PORT MIXING VALVE for maintained return LOW LOSS HEADER PRESSURE GAUGE temperature SAFETY ISOLATING VALVE AUTO AIR VENT EXPANSION VESSEL 11

12 FLUE DIAMETER IN CM 5.2 Installation of the chimney INSTALLATION The boiler must be installed near a chimney. It is prohibited to close air vents. DANGER Insufficient flue draught can cause a fire which can spread from the burner on to the screw and then to the pellets in the silo. This must not happen however a safety extinguishing valve is fitted as standard. 1.) The boiler must be placed on a solid and stable floor. 2.) The installation must be carried out by qualified technicians and the electrical supply must be to regulations 3.) The boiler room must have a water supply 4) Servicing access should be considered 5) A waste water drain is useful. 6.) The boiler room must have ventilation to current regulations 7) Floor, walls, ceiling, door and equipment of the boiler room must be made of non-flammable material. 8.) Humidity should be kept at a low level to avoid corrosion of metal parts. 9) For filling the boiler we advise the use of soft water ) The circulation pump must not operate before the heating system is completely filled with water. The system must be bled of air completely 11) When connecting the boiler to the flue it is necessary to make sure that all connections are sealed properly. 12) Before the first start-up, check the position of the combustion chamber bricks. 13) Consider protection from freezing. 1.5 TO 3MT 1500mm FIRE BRICKS 12

13 INSTALLATION 5.3 Connection of the boiler parts To prevent the system freezing when the boiler is not to be used for a long period of ELECTRICAL time, we advise draining the system. Connect the pump to the power supply. (max. current 1 A). Connection of the controller Connect the controller to the power supply. The installation of the electrical accessories of the boiler need a power supply with 230 V/50 Hz. Connection of the room thermostat A room thermostat can be connected to the controller. Before starting up the boiler, check the following: HYDRAULIC 1.) Water pressure in boiler and system is adequate. 2.) The system must be bled of air 3.) The boiler wiring is installed correctly and is undamaged and not touching surfaces that heat up during operation. 4.) The combustion chamber bricks are correctly positioned 5.) The pellet silo is clean. A certified safety valve (2.5 bar) must be installed in the heating system. Do not install other valves between the safety valve and boiler The return temperature must not fall below 60 C to prevent the build of condensate inside the boiler. When the boiler is not producing heat, other heaters should be in place to protect the Boiler and system from frost where freezing could be imminent 13

14 BOILER CONTROL 6.2 Basic display 6 Boiler controller 6.1 Control panel The controller is used for regulating the pellet boiler operation and should be set before commissioning The design of the control panel is shown below: 1. IGNITION The controller has an LCD display and 6 buttons on the right side of the display. Functions of the buttons Increase of parameter values Escape, boiler power off Browse menu go back Browse menu go forward Decrease the parameter values Enter, confirm selected parameter Legend 1 Time 1. IGNITION Boiler operation 3 DHW temperature 4 Fan activated 5 Pump 6 Pellet auger 7 Ignition system 8 Boiler pump 9 Pre-set power output 10 Flue gas temperature 11 Current set boiler temperature 12 Program 13 Boiler operation phase Inputs - Boiler probe (Pt 1000) - Flue gas probe (Pt 1000) - Domestic water probe (NTC, 10 kω) - Heat store probe (NTC, 10 kω) - Room thermostat - Input GSM controller Outputs - Ignition system (relay,8a, NO) - Pellet auger (relay, 5A, NO) - Fan (PWM) EXPLANATION OF THE DISPLAY (legend 13) Boiler operational phase, information about the current phase of boiler operation Boiler OFF, First ignition-phase, Combustion-phase, Cooldown phase, Room thermostat,off etc. The symbol Boiler operation shows if the boiler is active or not. If the boiler is set to run in a pre-programmed operation mode, the display shows TIME. The symbols in the bottom line show the operational availability of the controller outputs such as fan, pump, auger, ignition, boiler pump and whether they are active or not. If the symbol shows, that component is active. 14

15 BOILER CONTROL 6.3 Start and stop of the boiler To start the boiler, activate the red main switch on the right side of the boiler. After activation, the boiler controller turns on and shows the basic display. To start boiler operation, press the enter button for about 2 seconds. The display shows ON and the boiler switches into the pre-pulse phase with maximum fan power. To switch to automatic operation, the enter button is again pressed for about 2 seconds. Then, the display shows TIMER PROGRAM BOILER. To shut down the boiler, the escape button is pressed for about 2 seconds until the display shows OFF. The boiler switches to the cool-down phase with decreased fan power. To deactivate the boiler, the escape button is again pressed for about 2seconds. By deactivating (after a cooling down period) the main switch, the boiler is powered down completely. 6.4 Setting of the time and date For the setting of the date and time the button is pressed for about 2 seconds. 6.5 Automatic operation To set the hours of operation for the automatic operation, press the button for about 2 seconds. The weekday can be selected by pressing or. To change the operating hours for the selected day, press the enter button. TIMER PROGRAM BOILER MONDAY The display shows two rows each with settable times, the first is the start time, the second is the stop time. In the example below, the boiler starts at 06:00 am and is switched off at 04:00 pm. After a pause the Boiler switches on again at 07:00 pm and stops at 10:00 pm. Then the boiler is deactivated until the next day. The operation times can be set individually for every day of the week. The values can be changed with the buttons and then confirmed with the enter button. After confirming, the display now moves to the next adjustable position. MONDAY The current selection can be changed with the buttons and By pressing the enter button the selection is confirmed. After confirming the display now moves to the next adjustable position. (the seconds cannot be set) Continue as above to make the desired changes. When all positions are set, the user returns to the basic display. To escape the setting without making changes, press the escape button. After all four sets of times are confirmed, the display shows COPY. If this is confirmed with the enter button, the settings are copied to the next day. Pressing the escape button leads to the settings for the next weekday, without copying the changes. NO YES 15

16 6.6 Operation parameters The following parameters are relevant for boiler operation, pellet combustion, and flue gas temperature. The parameters are set by the technician before commissioning (see page 14). The operation parameters are displayed by pressing the button in the basic display. Press the buttons or to set the value for the selected parameter. Press the escape Press the enter button 1.) Boiler temperature set value: button to go back to the basic display. to confirm the selection. BOILER TEMPERATURE SET POINT BOILER CONTROL 4.) POWER: The centre of the display shows the set power stage. P1: Minimum output operation P2: Intermediate output operation P3: Maximum output operation The bottom row shows the set values. R= The operating duration of the auger P= The Pause duration of the auger V= The Fan-power during heating operation POWER 2.) DHW temperature set value: DHW TEMPERATURE SET POINT 3.) Domestic Hot Water setting HOT WATER HWS PRIORITY HEATING ONLY PARALLEL OPERATION 5.) Switching between summer and winter-mode In summer mode, the boiler only produces domestic hot water. CHANGEOVER SUMMER WINTER SUMMER WINTER Parallel operation = both heating and hot water at the same time to set point. 16

17 CONTROL PARAMETERS 6.7 Setting parameters Changes of parameters can be carried out by pressing the buttons and together. Below is a list of parameters with the factory settings. The parameters can be changed by pressing or. The setting is confirmed with the enter button then the menu directs the user back to the basic display. 17

18 CONTROL PARAMETERS Start on page 17 The parameters can be changed by pressing or. The setting is confirmed with the enter button then the menu directs the user back to the basic display. 18

19 CONTROL PARAMETERS Start on page 17 The parameters can be changed by pressing or. The setting is confirmed with the enter button then the menu directs the user back to the basic display. Temperature difference between heat store & boiler Heat store probe adjustment P2 DHW temperature The asterisk is displayed when DHW is present 19

20 7 Operational phases OPERATIONAL PHASES 7.1 Ignition phase If the flue gas temperature is above the temperature requiring auto ignition of the pellets, the controller knows that the combustion chamber holds enough ember temperature to successfully continue combustion. In this case the ignition device is not required. The dosage of pellets continues. If the flue gas temperature shows the temperature to be low the controller knows that the combustion chamber has not enough ember temperature to successfully continue combustion. First the fan is switched on to clear the combustion chamber and vents below the ignition device Second the pellet auger pushes enough pellets for light up into the combustion chamber. If a room thermostat or on off control (if used ) switches off, it activates the setting that turns off the boiler and therefore it sends the boiler into a phase of after-run., the boiler will then quickly reach the required temperature and operation will stop. The pump will start if the boiler temperature rises beyond the required temperature and also if the room thermostat demands heat. If the room thermostat /control does not call for heat the pump runs for a period of 5 minutes after the boiler has switched off then the pump stops until the room thermostat/ control calls for heat again. Third the ignition device is switched on The Boiler now enters the warm up phase of operation 7.2 Warm-up phase The ignition device is switched off and the dosage of pellets is reduced. The fan runs with increased speed (according to the setting). in comparison to the combustion phase. The warm-up phase has the purpose to fan the fire and let it spread across the pellets in the combustion chamber. The duration of the warmup phase is fairly short. After this phase, the combustion phase starts. In the case that the flue gas temperature does not rise beyond a pre programmed set temperature the controller recognises that the pellets can not be burning and the boiler stops operation. The display shows FAILED IGNITION. 7.3 Combustion phase During combustion phase, the pellet and air supply are regulated based on the parameter settings. The controller aims for the boiler to increase the temperature up to the Maximum boiler temperature. when this is reached the boiler slowly reduces its output to prevent repeated turning off and on. The boiler shifts to pause mode when the temperature reaches the Maximum boiler temperature. On the top row the display shows Rated temp reached. The boiler re starts operation when the temperature of the boiler flow drops below the set parameter Maximum boiler temperature. The detected flue gas temperature determines if the boiler operation starts with the warm-up phase or the ignition phase as described above 20

21 8 Maintenance MAINTENANCE 8.1. Intervals of maintenance and cleaning Maintenance work performed periodically is very important for a problem-free operation and the guarantee of a long life of the boiler and other system components. The maintenance period is affected by to the pellet quality and boiler usage. Soot and tar cling to the combustion chamber walls, so their cleaning by hand.is very important Before you start cleaning, turn off the boiler controller and deactivate the main switch. Let the boiler cool to a safe temperature that is not a burn or injury risk Interval Every 3 days Components Clean the heat exchanger and combustion chamber Action Required Move the lever of the heat exchanger cleaning system back and forth 5 to 6 times. Remove the front refractory brick and clean the combustion chamber with a vacuum cleaner. Every month Clean the pellet silo Empty out the pellet silo and remove any wood dust with a vacuum cleaner. Clean the display Carefully clean with slightly damp cloth. Every 6 months Check and clean the flue exhaust passes Check and clean the boiler and flue gas probe The exhaust pipes can be removed and cleaned with the cleaning tool when the system is cooled down. Once a year Clean all part as stated As above & pull out the probes, remove soot and debris. When cleaning the combustion chamber with a vacuum cleaner, the ash inside must be allowed to cool down to prevent accidents. When removing the front brick of the burner, there is a risk of a burn injury Wait for the brick to fully cool down. There is a risk of burns when cleaning the exhaust passes because these surfaces can reach a temperature of up to 200 C during operation. Wait until these parts cool down fully before cleaning. While cleaning, be aware that deadly carbon DANGER monoxide can emit from an opened boiler door or cover. Do not leave the boiler doors open longer than necessary. The ash quantity in the boiler depends on the pellet quality and usage. High quality pellets leave less ash and reduce wood dust in the pellet silo. To prolong the live of the ignition system which ignites the pellets, the ignition system and the air vent must be cleaned regularly. Thoroughly clean the boiler system at the end of the heating season to prolong its live and maintain its efficiency. 21

22 POSSIBLE FAULTS 9 Possible faults 3) The refractory bricks in the combustion chamber are misaligned System dirty 22

23 POSSIBLE FAULTS COMMISSIONING Fire Prevention of the Biotec Thermal valve If the boiler is not connected to a suitable flue system (not enough height, wrong diameter of the chimney, dirt or heavily polluted boiler), there is a possibility that fire can spread from the burner into the silo. A part of the combustion air supply is led through the screw channel and thus prevents backfire in the pellet silo. This air current is present at all times during operation but if the flue gas system is badly designed or heavily polluted, the air supply may not be enough to stop the fire spreading up the auger feed. A thermal valve and a probe are mounted on the boiler ex works. If a temperature of 95 C or more is measured by the inbuilt thermal valve (in the auger feed) it is activated and releases water extinguishing the fire The buyer must provide a water supply to the thermal valve (1/2 connection) and comply fully with regulations in force. If the flue gas system is designed incorrectly or heavily polluted or if the boiler is not cleaned regularly or the water supply fails, the manufacturer is not liable for damage caused by such failures. probe Boiler auger showing the thermal valve and probe 10 Commissioning the Biotec Boiler The commissioning of the Biotec boiler may only be carried out by STREBEL or an experienced installer with the approval of Strebel If the start-up is not carried out correctly, the boiler and the system can be damaged or destroyed and be unrepairable. Injury could result from non observation of this manual and general health and safety rules 10.1 Precautions for the first commissioning 1.) Disconnect the boiler from the power supply. 2.) Check if the red main switch is off 9.2 Measures after thermal valve release 1.) Disconnect the boiler from the power supply. 2.) Remove the screw and gear motor. 3.) Remove wet or damp pellets from the silo and the screw channel. 4.) Remove residual water and dry all system parts. NOTE Moisture can cause electrical shorts. 3.) Check that the following parts are installed professionally and working correctly - All mechanical parts of the boiler, - burner and firebricks, - fan, - boiler pump and circuit pump/pumps, - safety valve. 5) Remount the screw and gear motor. 6 )Re fill the silo with dry pellets 7.) Connect to the power supply and test. If wet or damp pellets are not removed completely the screw and motor may jam. The manufacturer rejects responsibility and the warranty expires if material damage occurs because of such failures. 4.) Check all electrical components, connections and devices for correct installation IE gear motor, fan, controller and display. - protect all unused connections, - check earthing - check the power supply. 23

24 RELOCATION AND BOILER DISPOSAL GUARANTEE 11 Disposal of the boiler 11.1 Removal The boiler removal must be carried out by qualified technicians. Otherwise personal injury or material damage can occur. Guarantee 12.1 Warranty Period The product is guaranteed for two years The guarantee is valid, when - the boiler is installed, mounted and commissioned by STREBEL or a qualified installer, - the boiler is installed complying with national and local regulations - the used pellet quality conforms with the standards stated in this manual. Procedure for relocating the Biotec 1.) Stop the boiler operation. 2.) Wait until the pellets in the combustion chamber are burnt up and the boiler has cooled down. 3.) Disconnect the boiler from power supply. 4.) Disconnect the boiler from the rest of the heating installation and drain the water from the boiler. 5.) Remove the pellet silo. 6.) Remove the boiler shell. 7.) Remove the casing &insulation from the boiler body. Reassemble the Biotec in its new location observing the information with this manual 11.2 Disposal 12.3 The guarantee is invalid, if - the boiler heating system and-flue gas system is designed incorrectly, - the installation and commissioning was not carried out by an approved person, - the repair and maintenance was not carried out by an approved person, The Warranty does not cover: - Damages caused by weather (natural disasters, earthquakes, flood, fire, electric lightening etc.) - damages to electric leads, - use of parts from other manufacturers, - damages caused by faulty system parts such as circuit pumps, expansion vessels etc. The steel parts of the boiler can be delivered to a recycling centre: - Boiler body, - boiler shell, - pellet silo, - screw, - gear motor, - burner. The electrical parts as well as glass parts, mineral wool and plastic parts are separately delivered to a recycling centre. The boiler parts must not be disposed of in a domestic waste bin. 24

25 TERMINAL CONNECTIONS HEAT STORE PROBE NTC 10K DHW SENSOR NTC 10K AUGER 230V 50HZ 50W FAN 230V 50HZ 41W IGNITION DEVICE 230V 50HZ 400W ROOM STAT OR ON OFF CONTROL BOILER RETURN LIFTING 230V 50HZ <400W DHW PRIMARY PUMP 230V 50HZ <400W HEATING PUMP 230V 50HZ <400W POWER SUPPLY 230 V AC 50HZ 13 AMP 25

26 26

Operating Instructions

Operating Instructions Operating Instructions P4 Pellet 8-60 Read and follow the operating instructions and safety information. Subject to technical change. July 2009 Fröling Heizkessel- und Behälterbau Ges.m.b.H, Industriestrasse

More information

Electronic Pellet Burner Controller NPBC-V3-1

Electronic Pellet Burner Controller NPBC-V3-1 Electronic Pellet Burner Controller NPBC-V3- SOFTWARE VERSION 3.2/3. page of 3 CHANGES IN THE TECHNICAL AND USER GUIDE OR IN THE SOFTWARE VERSION Technical and User Guide's version Changes Page 2.8. The

More information

Electronic Pellet Burner Controller NPBC-V3M

Electronic Pellet Burner Controller NPBC-V3M Electronic Pellet Burner Controller NPBC-V3M SOFTWARE VERSION 3.3a/3.2 page of 27 CHANGES IN THE USER MANUAL OR IN THE CONTROLLER'S SOFTWARE Version of the user manual Changes Page 2.2. The software version

More information

E-COMBI EVO E-SYSTEM EVO

E-COMBI EVO E-SYSTEM EVO E-COMBI EVO E-SYSTEM EVO User s manual CONDENSING WALL-HUNG GAS BOILER G.C.N.:47-116-68 (24 kw) G.C.N.:47-116-69 (30 kw) G.C.N.:47-116-70 (38 kw) G.C.N.:41-116-39 (24 kw) G.C.N.:41-116-40 (30 kw) Country

More information

Boiler Technical Specifications (2013)

Boiler Technical Specifications (2013) ACT Bioenergy Boiler Dimensions 0.5-0.85 Million Btu/h (150-250kW) Model CP500 CP600 CP750 CP850 Heat Output in MBtu/h (kw) 510 (150) 610 (180) 750 (220) 850 (250) Height ft (mm) 6 1 (1855) 6 1 (1855)

More information

Operating instructions

Operating instructions Operating instructions Capriz 2 24c 28c GB, IE Contents Contents 1 Safety... 3 1.1 Action-related warnings... 3 1.2 Intended use... 3 1.3 General safety information... 4 2 Notes on the documentation...

More information

Operating instructions

Operating instructions The energy you need Operating instructions Betacom 3 24c -A (H-GB) 30c -A (H-GB) GB, IE Contents Contents 1 Safety... 3 1.1 Action-related warnings... 3 1.2 Intended use... 3 1.3 General safety information...

More information

MURELLE EV HE 25/55-30/55

MURELLE EV HE 25/55-30/55 UK ENSURE THAT THESE INSTRUCTIONS ARE LEFT FOR THE USER AFTER COMPLETION OF THE BENCHMARK SECTION MURELLE EV HE 25/55-30/55 User instructions 199838 Please read the Important Notice within this guide regarding

More information

USER MANUAL 9kW LILLY PELLET STOVE

USER MANUAL 9kW LILLY PELLET STOVE USER MANUAL 9kW LILLY PELLET STOVE Table of Contents.Overview of Stove Parts... 2.Technical Characteristics... 3 3.Important Information... 4 4.Pellet Specification...5 5.Technology... 6 6.Installation...

More information

SD2. Differential Controller. Operating and Installation Instructions F2 72.3

SD2. Differential Controller. Operating and Installation Instructions F2 72.3 SD2 Differential Controller Operating and Installation Instructions F2 72.3 i Please follow the safety information and read these Instructions carefully before putting the system into operation. Safety

More information

Operating instructions

Operating instructions Operating instructions For the operator Operating instructions ecotec plus Gas-fired wall-hung high-efficiency boiler GB, IE Publisher/manufacturer Vaillant GmbH Berghauser Str. 40 D-42859 Remscheid Telefon

More information

CentroPelet ZV14 TECHNICAL INSTRUCTIONS HEATING TECHNIQUE. for regulation, use and maintenance of pellet stove

CentroPelet ZV14 TECHNICAL INSTRUCTIONS HEATING TECHNIQUE. for regulation, use and maintenance of pellet stove HEATING TECHNIQUE Centrometal d.o.o. - Glavna 12, 40306 Macinec, Croatia, tel: +385 40 372 600, fax: +385 40 372 611 TECHNICAL INSTRUCTIONS for regulation, use and maintenance of pellet stove CentroPelet

More information

USERS MANUAL FOR GAS BOILERS

USERS MANUAL FOR GAS BOILERS USERS MANUAL FOR GAS BOILERS PLEASE READ THE MANUAL CAREFULLY: IT CONTAINS IMPORTANT INFORMATION REGARDING SAFETY, INSTALLATION, USE AND MAINTENANCE OF THE APPLIANCE MODELS: NOVADENS 24 NOVADENS 24C NOVADENS

More information

INSTALLATION AND OPERATING INSTRUCTIONS BIOCLASS HM

INSTALLATION AND OPERATING INSTRUCTIONS BIOCLASS HM INSTALLATION AND OPERATING INSTRUCTIONS BIOCLASS HM Thank you for choosing a DOMUSA TEKNIK heating boiler. Within the product range offered by DOMUSA TEKNIK you have chosen BioClass HM model. With a suitable

More information

Operating instructions

Operating instructions Operating instructions For the operator Operating instructions HOME SYSTEM GB, IE Publisher/manufacturer Vaillant GmbH Berghauser Str. 40 D-42859 Remscheid Tel. +49 21 91 18 0 Fax +49 21 91 18 28 10 info@vaillant.de

More information

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Vedo

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Vedo INSTALLATION, OPERATION AND MAINTENANCE Ariterm Vedo CONTENTS General...3 Installation...4-5 Laddomat 21 Connection diagram...6 Temperature control valve...7 About burning wood...8 Operation...9-11 Service

More information

INSTRUCTIONS FOR USE OF COMBINED BOILER INTENDED FOR COMBUSTION OF BOTH PELLETS AND SOLID FUEL ABC COMBO

INSTRUCTIONS FOR USE OF COMBINED BOILER INTENDED FOR COMBUSTION OF BOTH PELLETS AND SOLID FUEL ABC COMBO INSTRUCTIONS FOR USE OF COMBINED BOILER INTENDED FOR COMBUSTION OF BOTH PELLETS AND SOLID FUEL ABC COMBO .Technical specifications Boiler power DESCRIPTION Water content in a boiler Required draft Supply

More information

INSTALLATION AND OPERATING INSTRUCTIONS BIOCLASS HM OD (FOR EXTERNAL USE)

INSTALLATION AND OPERATING INSTRUCTIONS BIOCLASS HM OD (FOR EXTERNAL USE) INSTALLATION AND OPERATING INSTRUCTIONS BIOCLASS HM OD (FOR EXTERNAL USE) Thank you for choosing a DOMUSA TEKNIK heating boiler. Within the product range offered by DOMUSA TEKNIK you have chosen BioClass

More information

Biomass. Biomass solid fuel boiler range

Biomass. Biomass solid fuel boiler range Biomass Biomass solid fuel boiler range Biomass Fuelling positive change For more than150 years, Baxi has been at the forefront of heating technology Baxi leads the way with new and pioneering heating

More information

Electronic pellet burner controller - NPBC-V3M. Electronic Pellet Burner Controller NPBC-V3M

Electronic pellet burner controller - NPBC-V3M. Electronic Pellet Burner Controller NPBC-V3M Electronic Pellet Burner Controller NPBC-V3M page 1 of 11 INTRODUCTION NPBC-V3M is an advanced, functionally completed controller for pellet burners. All the mechanisms and sensors of the burner, as well

More information

PELLET BURNER PV 350

PELLET BURNER PV 350 PELLET BURNER PV 350 INSTRUCTION MANUAL v1.1 1 PRODUCT DESCRIPTION...3 2 SAFETY RULES...3 3 WARNINGS...4 4 INSTALLATION INSTRUCTIONS...5 4.1 BOILER REQUIREMENTS...5 4.2 PELLET CONTAINER...6 4.3 INSTALLATION

More information

1. GENERAL SAFETY RULES

1. GENERAL SAFETY RULES ID180 & ID290 Indirect-Fired Diesel/Oil Construction Heaters Sure Flame Products Lethbridge, Alberta, Canada Telephone: (403)328-5353 Fax: (403)328-9956 www.sureflame.ca July 12, 2006 Service and Maintenance

More information

VIESMANN. Operating instructions VITODENS 050-W. for the system user. With constant temperature or weather-compensated control unit

VIESMANN. Operating instructions VITODENS 050-W. for the system user. With constant temperature or weather-compensated control unit Operating instructions for the system user VIESMANN With constant temperature or weather-compensated control unit VITODENS 050-W 9/2014 Please keep safe. Safety instructions For your safety Please follow

More information

WHE 2.24 / WHE 2.24 FF

WHE 2.24 / WHE 2.24 FF EN Wall-hung gas boilers WHE 2.24 WHE 2.24 FF User Guide 300011777-001-C . Contents 1 Introduction.............................................................................3 1.1 Symbols used...........................................................................................3

More information

Forward-looking and energy effi cient Biomass heating

Forward-looking and energy effi cient Biomass heating English Forward-looking and energy effi cient Biomass heating 349-499 kw Large buildings Hotel complexes Housing estate projects 1 Competence is our success... HERZ FACTS: 50 companies Group headquarter

More information

Domestic Gas Safety Assessments (DGA) Competency Assessment Certification Scheme for Registered Gas Installers

Domestic Gas Safety Assessments (DGA) Competency Assessment Certification Scheme for Registered Gas Installers Domestic Gas Safety Assessments (DGA) Competency Assessment Certification Scheme for Registered Gas Installers Issue 1 September 2013 Public Version REFERENCE: QUERIES TO: CER/13/273 Paul Tierney (ptierney@cer.ie)

More information

Boiler controller S-Tronic Plus

Boiler controller S-Tronic Plus Operating Instructions Boiler controller S-Tronic Plus Version 50.0 - Build 05.0 Translation of the original German operating instructions for technicians and operators Read and follow the instructions

More information

Solid fuel hot water boiler TKH KW INSTRUCTIONS MANUAL for usage and maintenance

Solid fuel hot water boiler TKH KW INSTRUCTIONS MANUAL for usage and maintenance Solid fuel hot water boiler TKH 250-400 KW INSTRUCTIONS MANUAL for usage and maintenance Prhovacka bb 22310 Simanovci, Srbija Tel/Fax. +381 22 480404 +381 63 259422 oce@termomont.rs www.termomont.rs April

More information

Boiler controller Lambdatronic S 3200

Boiler controller Lambdatronic S 3200 Operating Instructions Boiler controller Lambdatronic S 3200 Version 50.04 - Build 05.04 Translation of the original German operating instructions for technicians and operators Read and follow the instructions

More information

Combined boiler. for solid fuel and pellets

Combined boiler. for solid fuel and pellets Combined boiler ATTACK WOOD&PELLET for solid fuel and pellets W W W. A T T A C K. S K MODEL STRUC TURE OF THE AT TACK BOILERS THE NEW LINE OF ATTACK BOILERS FOR WOOD AND PELLETS 3000 000 6000 4 ATTACK

More information

HOT CUPBOARD WITH BAIN MARIE

HOT CUPBOARD WITH BAIN MARIE Page 1 of 8 INSTALLATION INSTRUCTIONS SAFETY INSTRUCTIONS USER INSTRUCTIONS HOT CUPBOARD WITH BAIN MARIE MODEL: HOT12BM, HOT15BM, HOT18BM Page 2 of 8 OPERATING THE CABINET 1. Plug machine in to power supply.

More information

1 DOCUMENT REVISION CONTROL ELEMENTS... 9

1 DOCUMENT REVISION CONTROL ELEMENTS... 9 CONTENTS Contents 1 DOCUMENT REVISION... 8 2 SOFTWARE VERSION... 8 3 BASIC DESCRIPTION... 8 4 CONTROL ELEMENTS... 9 4.1 BASIC DISPLAYS...10 4.2 CONTROL KEYS...11 4.2.1 Rotary button (Press / Turn)...11

More information

Biomass Pellet Boilers

Biomass Pellet Boilers Biomass Pellet Boilers simplicity, modern design and technological perfection biomass green energy Quality doesn t have to cost the earth KOVAN Ekoline with its headquarters in Gračanica (BIH) where the

More information

T UNI 7000 F. Operating instructions For the user (2006/05) AU/GB

T UNI 7000 F. Operating instructions For the user (2006/05) AU/GB 6 720 648 662-00.1T UNI 7000 F Operating instructions For the user AU/G 2 Contents Contents Contents 2 1 Safety information and explanation of symbols 3 1.1 For your safety 3 1.2 Explanation of symbols

More information

PLEASE LEAVE THIS INSTRUCTION WITH THE USER ECOMFORT PLUS 25 HE. User instructions

PLEASE LEAVE THIS INSTRUCTION WITH THE USER ECOMFORT PLUS 25 HE. User instructions GB PLEASE LEAVE THIS INSTRUCTION WH THE USER ECOMFORT PLUS 25 HE User instructions All descriptions and illustrations provided in this manual have been carefully prepared but we reserve the right to make

More information

USER MANUAL ACQUAHOME 32 B BLU

USER MANUAL ACQUAHOME 32 B BLU USER MANUAL ACQUAHOME 32 B BLU Dear Customer, Thank you for preferring a T heating unit, a modern, high-quality product that is able to guarantee your maximum well-being for a long period of time, with

More information

VIESMANN. Service instructions VITOCELL 300-B VITOCELL 300-V. for contractors

VIESMANN. Service instructions VITOCELL 300-B VITOCELL 300-V. for contractors Service instructions for contractors VIESMANN Vitocell 300-B Type EVB DHW cylinder, 300 and 500 l Vitocell 300-V Type EVI DHW cylinder, 200 to 500 l For applicability, see the last page VITOCELL 300-B

More information

Installation, operating and servicing instructions

Installation, operating and servicing instructions English 57-115 - 144-1 - 259 Installation, operating and servicing instructions ITALIA EN 1 ITALIA English INDEX WARnINGS 3 Who should read these instructions 3 Symbols 3 Recommendations 3 Importants notes

More information

Cooker Hood Instruction Manual

Cooker Hood Instruction Manual Cooker Hood Instruction Manual Model number(s): RHSCH601SS/B & RHSCH901SS/B IMPORTANT: RETAIN FOR FUTURE REFERENCE Contents Safety Instructions. 3-6 Product Overview. 7 Positioning. 8 Operational modes.

More information

INLINE СENTRIFUGAL FAN BOX BOX-R OPERATION MANUAL

INLINE СENTRIFUGAL FAN BOX BOX-R OPERATION MANUAL INLINE СENTRIFUGAL FAN BOX BOX-R OPERATION MANUAL CONTENT 3 Introduction 3 General 3 Safety rules 3 Storage and transportation rules 3 Manufacturer s warranty 4 Fan design 4 Delivery set 5 Technical data

More information

INSTRUCTIONS MODEL: BT1 MOBILE BANQUETING TROLLEY

INSTRUCTIONS MODEL: BT1 MOBILE BANQUETING TROLLEY Page 1 of 13 INSTRUCTIONS MODEL: BT1 MOBILE BANQUETING TROLLEY SAFETY INSTRUCTIONS TECHNICAL DATA INSTALLATION INSTRUCTIONS OPERATION INSTRUCTIONS MAINTENANCE INSTRUCTIONS EXPLODED VIEW / PARTS LIST FAULT

More information

Biotec. Ökotec 25. Installation and user manual. Bedienungsanleitung. Produktinformation

Biotec. Ökotec 25. Installation and user manual. Bedienungsanleitung. Produktinformation Biotec Ökotec 25 Installation and user manual AufstellungsProduct information und Bedienungsanleitung Produktinformation Safety information Safety information Basics The boiler must be installed by a competent

More information

BIOMASS BOILER ATTACK PELLET 30 AUTOMATIC PLUS

BIOMASS BOILER ATTACK PELLET 30 AUTOMATIC PLUS BIOMASS BOILER ATTACK PELLET 30 AUTOMATIC PLUS W W W. A T T A C K. S K MODEL STRUC TURE OF THE AT TACK BOILERS THE NEW LINE OF ATTACK BOILERS FOR WOOD AND PELLETS 3000 000 6000 4 ATTACK FD PELLET yattack

More information

Forced draught gas burner

Forced draught gas burner Installation, use and maintenance instructions Forced draught gas burner Code Model Type 3751982 GAS 3 519T80 291 (3) - 02/2010 DECLARATION Declaration of conformity in accordance with ISO / IEC 17050-1

More information

Fusion 200, 300 & 500

Fusion 200, 300 & 500 Fusion 200, 300 & 500 Installation and Operating Manual Issue 07/07 Part of The Mikrofill Group Contents 1 Fusion 2 1.1. Safety Provisions 3 1.2. Delivery 3 1.3. Hydraulic system Diagram 3 1.4. 2 Fusions

More information

High Performance Electronic Modulation Automatic Cleaning Easy Installation 4 Power Levels: 9,15,25,42kW. Pellet Boilers. Future of Ecological Heating

High Performance Electronic Modulation Automatic Cleaning Easy Installation 4 Power Levels: 9,15,25,42kW. Pellet Boilers. Future of Ecological Heating Pellet Boilers High Performance Electronic Modulation Automatic Cleaning Easy Installation 4 Power Levels: 9,15,25,42kW Future of Ecological Heating Why choose an Ekoheat boiler? Ekopower is an innovative

More information

INSTALLATION INSTRUCTIONS SAFETY INSTRUCTIONS USER INSTRUCTIONS DRY BAIN MARIE

INSTALLATION INSTRUCTIONS SAFETY INSTRUCTIONS USER INSTRUCTIONS DRY BAIN MARIE Page 1 of 8 INSTALLATION INSTRUCTIONS SAFETY INSTRUCTIONS USER INSTRUCTIONS DRY BAIN MARIE MODEL: GBM2 MODEL: GBM4 MODEL: 1939 MODEL: 1940 MODEL: 1945 MODEL: PDB2 MODEL: PDB4 MODEL: PDB6 MODEL: PDDGB MODEL:

More information

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Hybrid 20

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Hybrid 20 INSTALLATION, OPERATION AND MAINTENANCE Ariterm Hybrid 20 TABLE OF CONTENTS General...3 Installation... 4-5 Dimensions - with flue gas exhauster...6 Dimensions - without flue gas exhauster...7 Pipe installations...8

More information

IDE 20 / IDE 30 / IDE 50 IDE 60 / IDE 80

IDE 20 / IDE 30 / IDE 50 IDE 60 / IDE 80 IDE 20 / IDE 30 / IDE 50 IDE 60 / IDE 80 EN OPERATING MANUAL OIL HEATER TRT-BA-IDE20-30-50-60-80-TC-001-EN Table of contents Information on the use of this manual... 1 Scope of delivery... 1 General safety...

More information

British Gas 330+ High Efficiency Condensing Boiler. Instructions for Use. To b e l e f t w i t h t h e u s e r. British Gas Service Tel:

British Gas 330+ High Efficiency Condensing Boiler. Instructions for Use. To b e l e f t w i t h t h e u s e r. British Gas Service Tel: 0020051423-02 10.07 British Gas 330+ High Efficiency Condensing Boiler Instructions for Use To b e l e f t w i t h t h e u s e r British Gas Service Tel: 0845 9500400 WARNING GAS LEAK OR FAULT Turn off

More information

EKO Line Pellet Boiler Wood Pellet Storage Solutions And Pellet Dosage Systems

EKO Line Pellet Boiler Wood Pellet Storage Solutions And Pellet Dosage Systems EKO Line Pellet Boiler Wood Pellet Storage Solutions And Pellet Dosage Systems 1 EkoLine Wood Pellet Boilers EKOLINE boilers have been designed specifically for the purpose of heating water to temperatures

More information

INSTRUCTIONS MODEL: MFBU WET WELL BAIN MARIE

INSTRUCTIONS MODEL: MFBU WET WELL BAIN MARIE Page 1 of 12 INSTRUCTIONS MODEL: MFBU WET WELL BAIN MARIE SAFETY INSTRUCTIONS TECHNICAL DATA INSTALLATION INSTRUCTIONS OPERATION INSTRUCTIONS MAINTENANCE INSTRUCTIONS EXPLODED VIEW / PARTS LIST FAULT DIAGNOSTICS

More information

HVG620 & HVG720 Gas Hob Manual for Installation, Use and Maintenance

HVG620 & HVG720 Gas Hob Manual for Installation, Use and Maintenance HVG620 & HVG720 Gas Hob Manual for Installation, Use and Maintenance Customer Care Department The Group Ltd. Harby Road Langar Nottinghamshire NG13 9HY T : 01949 862 012 F : 01949 862 003 E : customer

More information

Installation and operation manual for pellet boiler TANGRA HP 30. Manufactured in accordance with standard: - EN Rev.

Installation and operation manual for pellet boiler TANGRA HP 30. Manufactured in accordance with standard: - EN Rev. Installation and operation manual for pellet boiler TANGRA HP 30 Manufactured in accordance with standard: - EN 303-5 Rev. 04-2014-03-28 User manual TANGRA HP30 - Rev. 04-2014-03-28 2 Content 1. Introduction...

More information

SIME FORMAT WALL HUNG BOILERS MODEL 34i AND MODEL 34e. cod A

SIME FORMAT WALL HUNG BOILERS MODEL 34i AND MODEL 34e. cod A cod. 6272262A GENERAL DATA Heating Data Heat Output Input (Adjustable) (Adjustable) Format 34i 11.2 34KW 45 145MJ/hr Format 34e 11.2 34KW 45 145MJ/hr General Specifications FORMAT 34i 34e Main burner injectors

More information

Aqua Balance. AquaBalance TM CONTROL MODULE QUICK START GUIDE LEGEND

Aqua Balance. AquaBalance TM CONTROL MODULE QUICK START GUIDE LEGEND Aqua Balance AquaBalance TM CONTROL MODULE QUICK START GUIDE 10 1 Domestic Hot Water temperature setpoint decreasing button 2 Domestic Hot Water temperature setpoint increasing button 3 Central Heating

More information

Baxi System 100 HE Plus. User s Operating Instructions. Wall Mounted Powered Flue Condensing Gas Fired Central Heating Boiler

Baxi System 100 HE Plus. User s Operating Instructions. Wall Mounted Powered Flue Condensing Gas Fired Central Heating Boiler User s Operating Instructions Baxi System 100 HE Plus Wall Mounted Powered Flue Condensing Gas Fired Central Heating Boiler Please keep these instructions safe. Should you move house, please hand them

More information

INSTRUCTIONS. MODEL: CPC and CPC1 PIE CABINETS

INSTRUCTIONS. MODEL: CPC and CPC1 PIE CABINETS Page 1 of 14 INSTRUCTIONS MODEL: CPC and CPC1 PIE CABINETS SAFETY INSTRUCTIONS TECHNICAL DATA INSTALLATION INSTRUCTIONS OPERATION INSTRUCTIONS MAINTENANCE INSTRUCTIONS FAULT DIAGNOSTIC WIRING DIAGRAM EXPLODED

More information

INSTRUCTION FOR THE USER THC V E OIL BLU

INSTRUCTION FOR THE USER THC V E OIL BLU INSTRUCTION FOR THE THC V E OIL BLU CONTENTS General safety information 4 Precautions 4 Control panel 5 Mode selection 8 User levels 10 Start-up 12 Temporary shutdown 15 Preparing for extended periods

More information

Smart Heating Technology Ltd. U Statku 653/24, Ostrava-Bartovice Czech Republic

Smart Heating Technology Ltd. U Statku 653/24, Ostrava-Bartovice Czech Republic Smart Heating Technology Ltd. U Statku 653/24, 717 00 Ostrava-Bartovice Czech Republic AUTOMATIC BIOMASS BOILERS Smart 150 500 1500 kw SMART INDUSTRIAL PARK Ostrava-Bartovice 18 000 m 2 Automatic Boilers

More information

ETA PE-K. The pellet boiler with technology that's built to last, for larger heating needs. 35 to 90 kw. A passion for perfection.

ETA PE-K. The pellet boiler with technology that's built to last, for larger heating needs. 35 to 90 kw. A passion for perfection. ETA PE-K ETA PE-K The pellet boiler with technology that's built to last, for larger heating needs. 35 to 90 kw A passion for perfection. www.eta.co.at ETA PE-K Pellet heating for domestic and commercial

More information

English. Heating with logs & wood pellets 20-40

English. Heating with logs & wood pellets 20-40 English Heating with logs & wood pellets 20-40 1 Competence is our success... HERZ FACTS: 60 subsidiaries Group headquarter in Austria Research & development in Austria Austrian owner 2.600 employees in

More information

User s Information Manual

User s Information Manual User s Information Manual Model NPE-24AWE NPE-24SWE NPE-32AWE NPE-32SWE Condensing Water Heater These appliances are for use with natural gas or LPG. (An LPG conversion kit is included with the water heater.)

More information

The guarantee on this appliance is valid for 12 months from the first day of installation.

The guarantee on this appliance is valid for 12 months from the first day of installation. Users Manual Dear Customer, Thank you for choosing an ARISTON boiler. We guarantee that your boiler is a reliable and technically sound product. This Users Manual provides detailed instructions and recommendations

More information

MHG201 Gas Hob Manual for Installation, Use and Maintenance

MHG201 Gas Hob Manual for Installation, Use and Maintenance MHG201 Gas Hob Manual for Installation, Use and Maintenance 1 Customer Care Department The Group Ltd. Harby Road Langar Nottinghamshire NG13 9HY T : 01949 862 012 F : 01949 862 003 E : customer.care@cda.eu

More information

INSTALLATION AND OPERATION MANUAL

INSTALLATION AND OPERATION MANUAL INSTALLATION AND OPERATION MANUAL Approved for use in Smoke Control Areas Eco Design Ready MODEL : - CARRON REVOLUTION 5 Document REV Version 3 Dated 16 th November 2018 External Air Supply High Efficiency

More information

VULCAIN OIL STOVE. Warmth, from the heart of J.A. Roby. Certified and tested according to CAN/CSA B UL norms

VULCAIN OIL STOVE. Warmth, from the heart of J.A. Roby. Certified and tested according to CAN/CSA B UL norms Warmth, from the heart of J.A. Roby Certified and tested according to CAN/CSA B140.3-62 UL 896-99 norms September 4 th, 2007 Review VULCAIN OIL STOVE 490, rue de l'argon Quebec (Québec) G2N 2C9 Phone:

More information

SOUND-INSULATED FAN. Iso-K OPERATION MANUAL. Iso-K_v.1(2)-EN.indd :20:59

SOUND-INSULATED FAN. Iso-K OPERATION MANUAL. Iso-K_v.1(2)-EN.indd :20:59 SOUND-INSULATED FAN OPERATION MANUAL _v.1(2)-en.indd 1 10.08.2015 15:20:59 CONTENT Introduction 3 General 3 Safety rules 3 Transport and storage requirements 3 Manufacturer's warranty 3 Fan design 4 Delivery

More information

VIESMANN. Service instructions VITOLADENS 300-T. for contractors. Vitoladens 300-T Type VW3B Inox-Radial heat exchanger for oil fired condensing Unit

VIESMANN. Service instructions VITOLADENS 300-T. for contractors. Vitoladens 300-T Type VW3B Inox-Radial heat exchanger for oil fired condensing Unit Service instructions for contractors VIESMANN Vitoladens 300-T Type VW3B Inox-Radial heat exchanger for oil fired condensing Unit VITOLADENS 300-T 1/2007 Please keep safe. Safety instructions Safety instructions

More information

Residential Gas Condensing Boiler Greenstar ZBR16/21/28/35/42-3A... ZWB28/35/42-3A...

Residential Gas Condensing Boiler Greenstar ZBR16/21/28/35/42-3A... ZWB28/35/42-3A... 70 80 99-00-O Residential Gas Condensing Boiler ZBR//8/35/4-3A... ZWB8/35/4-3A... 70 80 993 (03/03) CA/US Operating Instructions Contents Contents Key to symbols and safety instructions............................

More information

ecotec pro Operating instructions Operating instructions For the operator GB, IE Gas-fired wall-hung high-efficiency boiler

ecotec pro Operating instructions Operating instructions For the operator GB, IE Gas-fired wall-hung high-efficiency boiler Operating instructions For the operator Operating instructions ecotec pro Gas-fired wall-hung high-efficiency boiler GB, IE Publisher/manufacturer Vaillant GmbH Berghauser Str. 40 D-42859 Remscheid Tel.

More information

Installation & User Instructions:

Installation & User Instructions: Installation & User Instructions: Models: Amathus,Albany,Almyra,Brooklyn,Cestino,Casal,Caleta,Costanza,Casis,Fusion,Harlem, Iowa,Londa,Nebraska,Phantom,Ridgewood,Seraph,Saphir,Soul16,Scala,Tiago Once installed,

More information

Ultracom cxi. Instructions for Use. High Efficiency Condensing System Boilers. To b e l e f t w i t h t h e u s e r.

Ultracom cxi. Instructions for Use. High Efficiency Condensing System Boilers. To b e l e f t w i t h t h e u s e r. Ultracom cxi High Efficiency Condensing System Boilers Instructions for Use To b e l e f t w i t h t h e u s e r WARNING GAS LEAK OR FAULT Turn off the gas emergency control valve immediately. Eliminate

More information

Illustration shows item no Z Original operating manual. Operating manual. BlueMobil 60. Item no: Z-3285

Illustration shows item no Z Original operating manual. Operating manual. BlueMobil 60. Item no: Z-3285 Operating manual BlueMobil 60 Item no: Z-3285 Original operating manual Illustration shows item no Z-3285 Important Copyright It is essential that you read this manual thoroughly before the initial operation

More information

HERZ ECO-Line Heating with logs or wood pellets

HERZ ECO-Line Heating with logs or wood pellets English HERZ ECO-Line Heating with logs or wood pellets Lambda 18-40 10-60 1 Competence is our success... HERZ FACTS: 50 companies Group headquarter in Austria Research & development in Austria Austrian

More information

WOOD GASIFYING BOILER ATTACK DPX STANDARD / PROFI / LAMBDA INSTRUCTIONS FOR USE WWW. ATTACK.SK

WOOD GASIFYING BOILER ATTACK DPX STANDARD / PROFI / LAMBDA INSTRUCTIONS FOR USE WWW. ATTACK.SK WOOD GASIFYING BOILER ATTACK DPX STANDARD / PROFI / LAMBDA INSTRUCTIONS FOR USE WWW. ATTACK.SK CONTENTS EN ATTACK DPX THE WOOD GASIFYING BOILER... 4 1 INTRODUCTION... 6 2 3 4 1.1 GENERAL DESCRIPTION...

More information

Vote for your Installer of the year at. 9/14, 14/19 & 19/24CBi. Worcester supports the Benchmark code of practice

Vote for your Installer of the year at. 9/14, 14/19 & 19/24CBi. Worcester supports the Benchmark code of practice Vote for your Installer of the year at www.worcester-bosch.co.uk 9/14, 14/19 & 19/24CBi Worcester supports the Benchmark code of practice G. C. NUMBERS APPLIANCE NATURAL GAS LPG 9/14CBi 41 311 50 41 311

More information

Eco Angus Wood Pellet Boilers

Eco Angus Wood Pellet Boilers Eco Angus Wood Pellet Boilers ISO 9001 ISO 14001 1 Contents 3 Our product philosophy 3 Our approach 3 Manufacturing credentials 4 Orligno 400 4 Boiler construction 5 Boiler description 5 Burner 6 Technical

More information

INSTRUCTIONS MODEL: CBM / CMB2

INSTRUCTIONS MODEL: CBM / CMB2 Page 1 of 13 INSTRUCTIONS MODEL: CBM / CMB2 SAFETY INSTRUCTIONS TECHNICAL DATA INSTALLATION INSTRUCTIONS OPERATION INSTRUCTIONS FAULT FINDING EXPLODED VIEW WIRING DIAGRAM WARRANTY INFORMATION DISPOSAL

More information

Cooker Hood Instruction Manual

Cooker Hood Instruction Manual Cooker Hood Instruction Manual Model number(s): RHGCH702B IMPORTANT: RETAIN FOR FUTURE REFERENCE Contents Safety Instructions. 3-6 Product Overview. 7 Positioning. 8 Operating modes. 9 Installation. 10-15

More information

ISCG90SS _03 ISCG90SS

ISCG90SS _03 ISCG90SS ISCG90SS 60900355_03 ISCG90SS GB IE [01] x 1 [02] x 1 [03] x 1 [04] x 8 [05] x 1 [06] x 4 [07] x 1 [08] x 1 [09] x 1 [10] x 4 [11] x 4 [12] x 1 [13] x 4 (6x70mm) [14] x 8 (6.3x17x2mm) 1 : 1 [15] x 4 (3.9x18mm)

More information

Air-Water heat pump Small GT

Air-Water heat pump Small GT Catalogue No.... KJ... Production date... Installation and operation manual Air-Water heat pump Small GT The heat pump generates DHW at a maximum temperature of 50 C Distributor: ver. 21/04/2015 Please

More information

Heating with wood chips

Heating with wood chips Heating with wood chips YOUR RELIABLE PARTNER Present years on the market 110 for over 20-60 Our success is our expertise... HERZ-Armaturen Ges.m.b.H The company Founded in 1896, HERZ has had an ongoing

More information

Installation, operation and care. Pellmax UB. Burner not included Replaces:

Installation, operation and care. Pellmax UB. Burner not included Replaces: Installation, operation and care Burner not included 2011-11-11 ver: Replaces: Contents 11.11 otes...3 General...4 Function...4 Technical data...5 System principle Pellmax with radiator and tank-in-tank

More information

Q - Series Boiler. Troubleshooting Manual

Q - Series Boiler. Troubleshooting Manual Q - Series Boiler Troubleshooting Manual WARNING There are a number of live tests that are required when fault finding this product. Extreme care should be used at all times to avoid contact with energized

More information

HDG K SERIES. Wood pellet boiler. The perfect alternative to fossil fuels. Receive up to

HDG K SERIES. Wood pellet boiler.   The perfect alternative to fossil fuels. Receive up to (56.81) April 2013 Receive up to 2635 RHI back every year for the next seven years HDG K SERIES Wood pellet boiler The perfect alternative to fossil fuels www.euroheat.co.uk The K Series pellet boiler,

More information

USER INSTRUCTIONS & CUSTOMER CARE GUIDE Si II SERIES

USER INSTRUCTIONS & CUSTOMER CARE GUIDE Si II SERIES 24-28Si II SERIES G.C. NUMBERS APPLIANCE NATURAL GAS L.P.G. 24Si II 47 311 65 47 311 66 28Si II 47 311 67 47 311 68 USER INSTRUCTIONS & CUSTOMER CARE GUIDE EXCELLENCE COMES AS STANDARD CONTENTS Page No.

More information

Format System 25 HE. User instructions. Please read the Important Notice within this guide regarding your boiler warranty

Format System 25 HE. User instructions. Please read the Important Notice within this guide regarding your boiler warranty UK ENSURE THAT THESE INSTRUCTIONS ARE LEFT FOR THE USER AFTER COMPLETION OF THE BENCHMARK SECTION Format System 25 HE User instructions 199838 Please read the Important Notice within this guide regarding

More information

Heating with log wood

Heating with log wood English Heating with log wood De Luxe 18-40 Lambda 18-40 1 Competence is our success... HERZ FACTS: 60 subsidiaries Group headquarter in Austria Research & development in Austria Austrian owner 2.600 employees

More information

USERS GUIDE 24, 30. For installation guide see reverse of book

USERS GUIDE 24, 30. For installation guide see reverse of book USERS GUIDE 24, 30 For installation guide see reverse of book When replacing any part on this appliance, use only spare parts that you can be assured conform to the safety and performance specification

More information

Technical Datasheet. P4 Pellet Boiler Models 8/15, 20/25, 32/38, 48/60. Benefits at a Glance:

Technical Datasheet. P4 Pellet Boiler Models 8/15, 20/25, 32/38, 48/60. Benefits at a Glance: P4 Pellet Boiler Models 8/15, 20/25, 32/38, 48/60 Technical Datasheet FrÖling P4 Pellet Boiler The P4 is a patented, wood pellet boiler available in four sizes with outputs from 35,800197,900 Btu/hr. Benefits

More information

INSTRUCTIONS MODEL: MWBT

INSTRUCTIONS MODEL: MWBT Page 1 of 15 INSTRUCTIONS MODEL: MWBT SAFETY INSTRUCTIONS INSTALLATION INSTRUCTIONS OPERATION INSTRUCTIONS MAINTENANCE INSTRUCTIONS WIRING DIAGRAM EXPLODED VIEW / PARTS LIST WARRANTY INFORMATION DISPOSAL

More information

VIESMANN. Service instructions VITORONDENS 200-T. for contractors. Vitorondens 200-T Type BR2A, 20.2 to 53.7 kw Oil Unit condensing boiler

VIESMANN. Service instructions VITORONDENS 200-T. for contractors. Vitorondens 200-T Type BR2A, 20.2 to 53.7 kw Oil Unit condensing boiler Service instructions for contractors VIESMANN Vitorondens 200-T Type BR2A, 20.2 to 53.7 kw Oil Unit condensing boiler For applicability, see the last page VITORONDENS 200-T 6/2011 Please keep safe. Safety

More information

Baxi Bahama 100. Gas Fired Wall Mounted Combination Boiler. User s Operating Instructions

Baxi Bahama 100. Gas Fired Wall Mounted Combination Boiler. User s Operating Instructions Baxi Bahama 100 Please keep these instructions safe. Should you move house, please hand them over to the next occupier. Gas Fired Wall Mounted Combination Boiler User s Operating Instructions Natural Gas

More information

BIX B-One 100 kw INSTALLATION GUIDE

BIX B-One 100 kw INSTALLATION GUIDE BIX B-One 100 kw INSTALLATION GUIDE Dear Customer, We thank you for choosing our product. The Bix B-One 100 Kw is a burner of advanced concept and technology, with a high reliability and construction quality.

More information

ARITERM OY. Arimatic 500. User manual

ARITERM OY. Arimatic 500. User manual ARITERM OY Arimatic 500 User manual Table of contents 1. General information... 3 2. Transport, storage and package opening... 3 3. Warranty... 3 4. Installation and commissioning... 4 5. System description...

More information

100 step modulated Wood Pellet Boiler

100 step modulated Wood Pellet Boiler 100 step modulated Wood Pellet Boiler EN 303-5 approved by DTI (Danish Technological Institute) Approved for pressure expansion Energy class AA Approved www.kedco.ie Kedco Boiler Manual Version 1.3 Page

More information

ATMOSPHERIC GAS BOILER INSTALLATION, OPERATING AND MAINTENANCE MANUAL

ATMOSPHERIC GAS BOILER INSTALLATION, OPERATING AND MAINTENANCE MANUAL STREBEL GENEVA CE ATMOSPHERIC GAS BOILER INSTALLATION, OPERATING AND MAINTENANCE MANUAL INDEX TABLE 1 TECHNICAL DATA SECTION 1 SECTION 2 SECTION 3 SECTION 4 SECTION 5 SECTION 6 SECTION 7 SECTION 8 SECTION

More information

PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION INSTALLATION MANUAL

PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION INSTALLATION MANUAL PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION SOLARCYL IM/SC INSTALLATION MANUAL This manual gives detailed advice for installation and should be read carefully prior to fitting any unvented

More information

Heating with wood pellets kw

Heating with wood pellets kw Heating with wood pellets 0-60 kw Competence is our success... HERZ FACTS: 60 companies Group headquarter in Austria Research & development in Austria Austrian owner 2.600 employees in over 00 countries

More information