1 PART VI TECHNICAL SPECIFICATIONS SECTION 1 CHILLER TS-CH-1

2 TECHNICAL SPECIFICATION OF 1 GENERAL CHILLER 1.1 SYSTEM DESCRIPTION Microprocessor-controlled liquid chiller with single/multi compressors (VFD), using refrigerant HFC-134a only. Refrigerant offered shall not have a planned phase out date. 1.2 QUALITY ASSURANCE A. performance shall be rated in accordance with ARI Standard 550/ B. Equipment and installation shall be in compliance with ANSI/ASHRAE 15 (latest edition). C. Cooler and condenser refrigerant side shall include ASME U stamp and nameplate certifying compliance with ASME Section VIII, Division 1 code for unfired pressure vessels. D. A manufacturer s data report is required to verify pressure vessel construction adherence to ASME vessel construction requirements. Form U-1 as required per ASME code rules is to be furnished to the owner. The U-1 Form must be signed by a qualified inspector, holding a National Board Commission, certifying that construction conforms to the latest ASME Code Section VIII, Div. 1 for pressure vessels. The ASME symbol U must also be stamped on the heat exchanger. Vessels specifically exempted from the scope of the code must come with material, test, and construction methods certification and detailed documents similar to ASME U-1; further, these must be signed by an officer of the company. E. shall be designed and constructed to meet UL and UL of Canada requirements and have labels appropriately affixed. F. Each compressor assembly shall undergo a mechanical run-in test to verify vibration levels, oil pressures, and temperatures are within acceptable limits. Each compressor assembly shall be proof tested at a minimum 204 psig (1407 kpa) and leak tested at 185 psig (1276 kpa) with a tracer gas mixture. G. Entire chiller assembly shall be proof tested at 204 psig (1407 kpa) and leak tested at 185 psig (1276 kpa) with a tracer gas mixture on the refrigerant side. The leak test shall not allow any leaks greater than 0.5 oz per year of refrigerant. The water side of each heat exchanger shall be hydrostatically tested at 1.3 times rated working pressure. H. Prior to shipment, the chiller automated controls test shall be executed to check for proper wiring and ensure correct controls operation. I. The starter shall be variable frequency drive (VFD) with build in Harmonic Filter. TS-CH-2

3 1.3 DELIVERY, STORAGE AND HANDLING A. Unit shall be stored and handled in accordance with manufacturer s instructions. B. Unit shall be shipped with all refrigerant piping and control wiring factoryinstalled. C. Unit shall be shipped charged with oil and full charge of refrigerant HFC-134a or a nitrogen holding charge as specified on the equipment schedule. D. Unit shall be shipped with firmly attached labels that indicate name of manufacturer, chiller model number, chiller serial number, and refrigerant used. E. If the unit is to be exported, the manufacturer shall provide sufficient protection against sea water corrosion, making the unit suitable for shipment in a standard open top ocean shipping container. 1.4 WARRANTY Warranty shall include parts and labor for 12 months from date of completion. A refrigerant warranty shall be provided for a period of five years. 2 PRODUCTS 2.1 EQUIPMENT A. General: Factory-assembled, single piece, liquid chiller shall consist of compressor, motor, lubrication system, cooler, condenser, initial oil and refrigerant operating charges, microprocessor control system, and documentation required prior to start-up. B. Compressor: 1. Single/multiple, screw/centrifugal compressor of the high performance type. 2. Compressor and motor shall be open type or hermetically sealed into a common assembly and arranged for easy field servicing. 3. The compressor motor shall be accessible for servicing without removing the compressor base from the chiller. Connections to the compressor casing shall use O-rings and gaskets to reduce the occurrence of refrigerant leakage. Connections to the compressor shall be flanged or bolted for easy disassembly. 4. Compressor bearings must have individual design life of 50,000 hours or greater. 5. Compressor shall provide capacity modulation from 100% to 20% capacity without the use of hot gas bypass or mechanical unloaders. 6. Compressor shall be provided with a factory-installed positive pressure lubrication system to deliver oil under pressure to bearings and rotors at all operating conditions. Lubrication system shall include: a. Oil pump with factory-installed motor contactor with overload protection. TS-CH-3

4 b. Oil pressure sensor with differential readout at main control center. c. Oil pressure regulator. d. Oil filter with isolation valves to allow filter change without removal of refrigerant charge. e. Oil sump heater [115 V, 50 or 60 Hz] controlled from unit microprocessor. f. Oil reservoir temperature sensor with main control center digital readout. g. All wiring to oil pump, oil heater, and controls shall be pre-wired in the factory and power shall be applied to check proper operation prior to shipment. 7. Compressor shall be fully field serviceable. Compressors that must be removed and returned to the factory for service shall be unacceptable. 8. Acoustical attenuation shall be provided as required, to achieve a maximum (full load or part load) sound level, measured per ARI Standard 575 (latest edition). C. Motor: 1. Compressor motor shall be of the open-type/semi-hermetic, air or liquid refrigerant cooled, squirrel cage, induction type suitable for voltage shown on the equipment schedule. 2. For hermetic motors, it shall be suitable for operation in a refrigerant atmosphere and shall be cooled by atomized refrigerant in contact with the motor windings. 3. Motor stator shall be arranged for service or removal with only minor compressor disassembly and without removing main refrigerant piping connections. 4. Full load operation of the motor shall not exceed nameplate rating. 5. Three motor winding temperature sensors shall be provided. 6. An Electric heater shall be added for open-type motor to prevent moisture inside motor insulation D. Evaporator and Condenser: 1. Evaporator and condenser shall be of shell and tube type construction, each in separate shells. Units shall be fabricated with high-performance tubing, steel shell and tube sheets with fabricated steel waterboxes. Waterboxes shall be nozzle-in-head type with stub out nozzles having Victaulic grooves to allow for use of Victaulic couplings. 2. Tubing shall be copper, high-efficiency type, with integral internal and external enhancement unless otherwise noted. Tubes shall be nominal 3/4-in. OD with minimum wall thickness of in. measured at the root of the fin unless otherwise noted. Tubes shall be rolled into tube sheets and shall be individually replaceable. Tube sheet holes shall be double grooved for joint structural integrity. Intermediate support sheet spacing shall not exceed 36 in. (914 mm). 3. Condenser Waterboxes and nozzle connections shall be designed for 150 psig (1034 kpa) minimum working pressure; Cooler Waterboxes and nozzle connections shall be designed for 150 psig (1034 kpa) minimum working pressure, unless otherwise noted. Nozzles should have grooves to allow use of Victaulic couplings. TS-CH-4

5 4. The tube sheets and waterboxes of the cooler and condenser shall be epoxy coated from the factory and bolted together to allow for field disassembly and reassembly. 5. The vessel shall display an ASME nameplate that shows the pressure and temperature data and the U stamp for ASME Section VIII, Division 1. A reseating pressure relief valve(s) shall be installed on each heat exchanger. If a non-reseating type is used, a backup reseating type shall be installed in series. 6. Waterboxes shall have vents, drains, and covers to permit tube cleaning within the space shown on the drawings. A thermistor type temperature sensor with quick connects shall be factory-installed in each water nozzle. 7. Cooler shall be designed to prevent liquid refrigerant from entering the compressor. Devices that introduce pressure losses (such as mist eliminators) shall not be acceptable because they are subject to structural failures that can result in extensive compressor damage. 8. Tubes shall be individually replaceable from either end of the heat exchanger without affecting the strength and durability of the tube sheet and without causing leakage in adjacent tubes. E. Refrigerant Flow Control: To improve part-load efficiency, for chiller with capacity exceed 300 RT, liquid refrigerant shall be metered from the condenser to the cooler using a float-type metering valve or variable orifice to maintain the proper liquid level of refrigerant in the heat exchangers under both full and part load operating conditions. By maintaining a liquid seal at the float valve, bypassed hot gas from the condenser to the cooler is eliminated. For chiller with smaller capacity and multi compressors, electronic expansion valve may be used for the refrigerant flow control. F. Controls, Safeties, and Diagnostics: 1. Controls: a. The chiller shall be provided with a factory-installed and factory-wired microprocessor control center. The control center shall include an user friendly interface with display, visible start/stop button, alarm light and adequate text message. Display with code message is not acceptable. b. All chiller and motor control monitoring shall be displayed at the chiller control panel. c. The controls shall make use of non-volatile memory. d. The chiller control system shall have the ability to interface and communicate directly to the building control system. e. The default standard display screen shall simultaneously indicate the following minimum information: 1) Date and time of day 2) 24-character primary system status message 3) 24-character secondary status message 4) operating hours 5) Entering chilled water temperature 6) Leaving chilled water temperature TS-CH-5

6 7) Evaporator refrigerant temperature 8) Entering condenser water temperature 9) Leaving condenser water temperature 10) Condenser refrigerant temperature 11) Oil supply pressure 12) Oil sump temperature 13) Percent motor rated load amps (RLA) f. In addition to the default screen, status screens shall be accessible to view the status of every point monitored by the control center including: 1) Evaporator pressure 2) Condenser pressure 3) Compressor speed 4) Bearing oil supply temperature 5) Compressor discharge temperature 6) Motor winding temperature 7) Number of compressor starts 8) Control point settings 9) Discrete output status of various devices 10) Optional spare input channels 11) Line current and voltage for each phase 12) Frequency, kw, kwhr, demand kw g. Schedule Function: The chiller controls shall be configurable for manual or automatic start-up and shutdown. In automatic operation mode, the controls shall be capable of automatically starting and stopping the chiller according to a stored user programmable occupancy schedule. The controls shall include built-in provisions for accepting: 1) A minimum of two 365-day occupancy schedules. 2) Minimum of 8 separate occupied/unoccupied periods per day 3) Daylight savings start/end 4) 18 user-defined holidays 5) Means of configuring occupancy timed override 6) start-up and shutdown via remote contact closure h. Service Function: The controls shall provide a password protected service function which allows authorized individuals to view an alarm history file which shall contain the last 25 alarm/alert messages with time and date stamp. These messages shall be displayed in text form, not codes. i. Network Window Function: Each chiller control panel shall be capable of viewing multiple point values and statuses from other like controls connected on a common network, including controller maintenance data. The operator shall be able to alter the remote controller s set points or time schedule and to force point values or statuses for those points that are operator forcible. The control panel shall also have access to the alarm history file of all like controllers connected on the network. TS-CH-6

7 j. Pump Control: Upon request to start the compressor, the control system shall start the chilled and condenser water pumps and shall verify that flows have been established. k. Ramp Loading: A user-configurable ramp loading rate, effective during the chilled water temperature pull down period, shall prevent a rapid increase in compressor power consumption. The controls shall allow configuration of the ramp loading rate in either degrees per minute of chilled water temperature pull down or percent motor amps per minute. During the ramp loading period, a message shall be displayed informing the operator that the chiller is operating in ramp loading mode. l. Chilled Water Reset: The control center shall allow reset of the chilled water temperature set point based on any one of the following criteria: 1) Chilled water reset based on an external 4 to 20 ma signal. 2) Chilled water reset based on a remote temperature sensor (such as outdoor air). 3) Chilled water reset based on water temperature rise across the evaporator. m. Demand Limit: The control center shall limit amp draw of the compressor to the rated load amps or to a lower value based on one of the following criteria: 1) Demand limit based on a user input ranging from 40% to 100% of compressor rated load amps 2) Demand limit based on external 4 to 20 ma signal. n. Controlled Compressor Shutdown: The controls shall be capable of being configured to soft stop the compressor. The display shall indicate shutdown in progress. 2. Safeties: a. Unit shall automatically shut down when any of the following conditions occur (each of these protective limits shall require manual reset and cause an alarm message to be displayed on the control panel screen, informing the operator of the shutdown cause): 1) Motor overcurrent 2) Over voltage* 3) Under voltage* 4) Single cycle dropout* 5) Low oil sump temperature 6) Low evaporator refrigerant temperature 7) High condenser pressure 8) High motor temperature 9) High compressor discharge temperature 10) Low oil pressure 11) Prolonged stall TS-CH-7

8 12) Loss of cooler water flow 13) Loss of condenser water flow * Shall not require manual reset or cause an alarm if auto-restart after power failure is enabled. b. The control system shall detect conditions that approach protective limits and take self-corrective action prior to an alarm occurring. The system shall automatically reduce chiller capacity when any of the following parameters are outside their normal operating range: 1) High condenser pressure 2) High motor temperature 3) Low evaporator refrigerant temperature 4) High motor amps c. During the capacity override period, a pre-alarm (alert) message shall be displayed informing the operator which condition is causing the capacity override. Once the condition is again within acceptable limits, the override condition shall be terminated and the chiller shall revert to normal chilled water control. If during either condition the protective limit is reached, the chiller shall shut down and a message shall be displayed informing the operator which condition caused the shutdown and alarm. d. Internal built in safeties shall protect the chiller from loss of water flow. Differential pressure switches shall not be allowed to be the only form of freeze protection. 3. Diagnostics and Service: A self diagnostic controls test shall be an integral part of the control system to allow quick identification of malfunctioning components. Once the controls test has been initiated, all pressure and temperature sensors shall be checked to ensure they are within normal operating range. A pump test shall automatically energize the chilled water pump, condenser water pump, and oil pump. The control system shall confirm that water flow and oil pressure have been established and require operator confirmation before proceeding to the next test. In addition to the automated controls test, the controls shall provide a manual test which permits selection and testing of individual control components and inputs. A thermistor test and transducer test shall display on the ICVC screen the actual reading of each transducer and each thermistor installed on the chiller. All out-of-range sensors shall be identified. Pressure transducers shall be serviceable without the need for refrigerant charge removal or isolation. G Electrical Requirements: 1. The tenderer shall supply and install main electrical power line, disconnect switches, circuit breakers, and electrical protection devices per local code requirements and as indicated necessary by the chiller manufacturer. 2. The tenderer shall wire the chilled water pump and flow, condenser water pump and flow, and tower fan control circuit to the chiller control circuit. 3. The tenderer shall supply and install electrical wiring and devices required to interface the chiller controls with the building control system if applicable. TS-CH-8

9 4. Electrical power shall be supplied to the unit at the voltage, phase, and frequency listed in the equipment schedule. H. Piping Requirements Instrumentation and Safeties: Mechanical tenderer shall supply and install pressure gages in readily accessible locations in piping adjacent to the chiller such that they can be easily read from a standing position on the floor. Scale range shall be such that design values shall be indicated at approximately mid-scale. Gages shall be installed in the entering and leaving water lines of the cooler and condenser. I. Vibration Isolation: manufacturer shall furnish 2 spring isolator for mounting equipment on a level concrete surface. J. Start-Up: 1. The chiller manufacturer shall provide a factory-trained representative, employed by the chiller manufacturer, to perform the start-up procedures as outlined in the Start-Up, Operation and Maintenance manual provided by the chiller manufacturer. 2. Manufacturer shall supply the following literature: a. Start-up, operation and maintenance instructions. b. Installation instructions. c. Field wiring diagrams. d. One complete set of certified drawings. K. Site Performance Test : Site Performance Test by Accredited ESCO. The accredited ESCO shall be an objective party with ISO 9001:2000 and 14001:2004 certifications and must not connected to equipment or system sales. 1. The Chilled /Condenser Water Supply / Return Temperatures will be measured and logged at one-minute intervals using high accuracy thermistors for: Chilled /Condenser Water Temperature Profile a. Supply Temperature profile (super-imposed) b. Supply Temperature Histogram in percentage during operating hours only c. Return Temperature profile (Super-imposed) d. Return Temperature Histogram in percentage during operating hours only e. Chilled Water Temperature differential Histogram during operating hours only 2. Chilled /Condenser Water flow rate will be measured at one-minute intervals using high accuracy ultrasonic flow meter so as to plot the followings: Chilled /Condenser Water flowrate profile of each chiller (Super-imposed) TS-CH-9

10 3. The Power Consumption of each chiller will be logged at one-minute intervals using high accuracy power meters. a. kw profile (Super-imposed) b. Real-time 3 phase Power factor profile (Super-imposed) c. Histogram of Power factor occurrence d. Provide voltage unbalance occurrence using bin method based on NEMA standards MG e. Provide current unbalance occurrence using bin method based on NEMA standards MG Tonnage a. Tonnage profile of each chiller using super-imposed plot b. tonnage Histogram in percentage during operating hours only c. Tonnage vs percentage full load ampere. 5. Efficiency Measurement The Efficiency obtained from data acquisition should comprise of the following charts: Correlation between individual chiller operating tonnage and chiller efficiency L. Accessories: 1. Soleplate Package: Unit manufacturer shall furnish a soleplate package consisting of soleplates, jacking screws, leveling pads, and neoprene pads. 2. Spring Isolators: Spring isolators shall be field furnished and selected for the desired degree of isolation. 3. Spare Sensors with Leads: Unit manufacturer shall furnish additional temperature sensors and leads. 4. Sound Insulation Kit: Unit manufacturer shall furnish a sound insulation kit that covers the compressor housing, motor housing, compressor discharge pipe, condenser shell, suction line, evaporator, and economizer. Insulation design shall accommodate temperature and pressure sensors, gages, tubing, piping and brackets. 5. Chilled Plant Automation System Interface (BACnet ): The chiller control system shall have the ability to interface and communicate directly to the CPA using a BACnet based system. 6. The chiller shall ship from the factory charged with Nitrogen to 15PSI. 7. Field installed Thermal Insulation (Class 1 armaflux): Tenderer shall insulate the cooler shell, condenser shell (lower half) economizer, suction elbow, motor shell and motor cooling lines. Insulation shall be 2 layer of 1 in. (25.4 mm) thick with a thermal conductivity not exceeding w/m, and shall conform to UL standard 94, classification 94 HF-1. TS-CH-10

11 8. Cooler and Condenser Passes: Unit manufacturer shall provide the cooler and/ or condenser with minimum 2 pass configuration on the water side. 9. Nozzle-In-Head, 150 psig (1034 kpa): Unit manufacturer shall furnish nozzle-in-head style waterboxes on the cooler and/or condenser rated at 150 psig (1034 kpa). 10. Compressor Discharge Isolation Valve and Liquid Line Ball Valve: These items shall be factory-installed to allow isolation of the refrigerant charge in the condenser for servicing the compressor. 11. Plant Automation System Interface: The chiller shall be supplied with Bacnet and Modbus based HLI module which shall translate the information in the chiller microprocessor to an ASCII stream of data which can be read or written to by any manufacturer's chiller plant automation system. A suitable configured driver software to interface the chiller control unit to the CPA shall be provided by chiller manufacturer to enable CPA directly access to retrieved the data. M FACTORY PERFORMANCE TEST FOR CHILLERS Factory performance test shall be conducted for each typical chiller at the manufacturer s test facility. Factory witness performance testing shall be conducted for 4 points of loading at 25%, 50%, 75% and 100% of the full loading for each typical chiller. Performance testing shall be carried out to validate that the achieved efficiency at each loading condition shall be within the tolerance of the theoretical data based on the AHRI 550/590 conditions. 3 AUTOMATIC TUBE BRUSHING (ATB) SYSTEM 3.1 General: This section of the specification covers the supply, delivery, installation, testing and commissioning and warranty of automatic tube brush (ATB) type cleaning system. Any Automatic Tube Cleaning System that works by probability to clean the tubes shall not be accepted. Every condenser tube shall be assigned a cleaning brush unless the basket is obstructed The chiller supply shall supply ATB as a package and guarantee the performance. The ATB System shall install at all the water-cooled chillers indicated. The supplier shall include all the associated accessories to ensure the whole system is complete. The equipment shall be certified by Singapore Green Building Council (SGBC) or Singapore Environment Council (SEC).The chiller supplier shall supply the Automatic On-line Tube Cleaning System as a package and guarantee the performance. The System shall be installed at all the water-cooled chillers indicated. The supplier shall include all the associated accessories to ensure the whole system is complete. 3.2 Equipment: TS-CH-11

12 An Automatic Tube Brushing System shall be installed for each condenser/heat exchanger to maintain a fouling factor for all condenser tubes at or below hr sq ft Deg F/ BTU. The Automatic Tube Brushing System shall include the following: One brush and basket set (one brush/two baskets with two end clips) is to be furnished for each tube. Brushes are to be made of nylon bristles, with titanium wire and polypropylene tips. Each basket assembly consists of a cage and a removable locking end clip, having a minimum of four (4) prongs. The end clips can be removed and reinserted into the baskets without deformation to the basket. Basket is to be made of polypropylene. The baskets are to be directly fastened to the tube end using special epoxy and able to withstand a 10 pound pull test. The basket shall be designed so that, when attached to the tube, full access to the tube is provided by removing the end clip. This allows removal of the brush from the tube. Brush and Baskets sets shall be installed at site by trained technicians of the supplier. The top of the ATBS valve is to have a removable cover for easy access for service and maintenance. Valve shall be hydrostatic pressure tested to 1.5 times design working pressure or to 225 psig whichever is higher. The packing gland is to be stainless steel. The valve shall have a stainless steel seat at both Normal and Reverse position. Each valve shall be a 400V/3phase/50Hz electric actuator complete with gear and motor that turns the diverter valve with high torque. The electric actuator shall be equipped with torque, position limit, thermal switches and heaters. The electric actuator shall have a hand wheel to turn valve manually. The electric actuator shall have a minimum protection of IP67. The 4 way valve shaft and electric actuator shaft shall be connected by a heavy duty axially split rigid spacer type coupling to allow the packing gland of the 4 way valve to be fully accessible for removal and replacement with new packing without removal of electric actuator The primary function of each control panel is to provide signals to the ATBS valve actuator at preset time intervals. There shall be one control panel for each ATBS valve The Control Panel shall include: PLC or PLR to initiate cleaning cycle. Test Pushbutton to start brushing cycle. Push-button for Fault Light Indication Reset Power On Indicator Light ATBS Valve Position Indication Lights (Normal & Reverse) TS-CH-12

13 Cycle counter. Controls panel shall have at least IP 55 protection. Dry contacts for Power On, Normal Flow, Reverse Flow and Fault for BAS interface Remote Control and Monitor from BAS Mounting of control panel shall be close to ATB valve and chiller. 3.3 Equipment Warranty: The contractor is to guarantee all system components, except brushes to be free from defects in material and workmanship for period of 12 months from the date of completion. Brush life to be guaranteed for five (5) years from initial start up based on manufacturers recommended of a maximum of 4 cycles per 24 hours. 3.4 Performance Guarantee: When the system is installed and in operation in accordance with the instructions furnished by the manufacturer, the fouling factor for the tubes with brush and basket is to be maintained at or below hr sq ft Deg F/ BTU. Condenser water approach temperature being trend logged by BMS through High level Interface shall be monitored as the indication of clearness of the condenser tube. The condenser approach temperature shall not increase more than 1 o C each year. At anytime during two years defect liability period, if the condenser approach temperature exceed 2 C when chiller operating above 75% part load condition, chiller supplier shall carry out manual tube cleaning and/or descaling to bring down the approach temperature to below 1 C. In addition, verification of cleanliness of the condenser tubes for all chillers shall be performed before the end of 12 months defect liability period to verify that the tubes are cleaned. Verification of cleanliness shall be by manual brushing through the condenser tubes by a rotating brush. In addition, a videoscope shall be provided by the Automatic Tube Brush System Manufacturer for the verification. Still picture shots and video of the inside of the condenser tubes shall be provided. Hardcopies of still picture shots and soft copy of video of the inside of condenser tubes shall be provided and submitted to customer as well. The Owner or its representative shall randomly select 15% of tubes population to perform this verification by the Automatic Tube Brush System Manufacturer. 3.5 Installation: Prior to installing the brush and baskets, the condenser tubes shall be cleaned and brushed. The installation of brush and basket will be performed by the ATB manufacturer s qualified personnel on all condenser tubes that are not obstructed. TS-CH-13

14 3.6 Service and Maintenance: The Automatic Tube Brush System shall be serviced at least quarterly to check and verify the condenser tubes are clean. TS-CH-14

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1. SECTION 236426 - ROTARY-SCREW WATER CHILLERS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes packaged, water cooled or air cooled as scheduled, electric-motor-driven, rotary-screw water chillers

More information

A. Air-conditioning and Refrigeration Institute (ARI) - Standard 550/590, latest edition, and ARI certification program.

A. Air-conditioning and Refrigeration Institute (ARI) - Standard 550/590, latest edition, and ARI certification program. 15684 ROTARY SCREW WATER CHILLERS ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 236423 An optional

More information

Date: August 21, Proposal Number: G Engineer: Payment Terms: Net 30 Days

Date: August 21, Proposal Number: G Engineer: Payment Terms: Net 30 Days Proposal Trane A Division of American Standard Inc. Prepared For: John Weston Desmet Ballestra Job Name: LAUER1 Biodiesel Chiller Pennsylvania Date: August 21, 2006 Proposal Number: G1-95502-1 Engineer:

More information

SECTION CHILLERS

SECTION CHILLERS SECTION 15650 PART I - GENERAL 1.01 WORK INCLUDED A. Extent of work shall be as indicated on Drawings and provisions of this section, including schedules and equipment lists associated with either Drawings

More information

A. Air-conditioning and Refrigeration Institute (ARI) - Standard 550/590, latest edition, and ARI certification program.

A. Air-conditioning and Refrigeration Institute (ARI) - Standard 550/590, latest edition, and ARI certification program. 15682 CENTRIFUGAL WATER CHILLERS ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 236416 An optional

More information

SECTION ROTARY-SCREW WATER CHILLERS

SECTION ROTARY-SCREW WATER CHILLERS PART 1 GENERAL 1.01 SECTION INCLUDES A. Factory-assembled packaged chiller. B. Charge of refrigerant and oil. C. Controls and control connections. D. Chilled water connections. E. Electrical power connections.

More information

B. Unit construction shall comply with ASHRAE 15 Safety Code, NEC, and ASME applicable codes (U.S.A. codes).

B. Unit construction shall comply with ASHRAE 15 Safety Code, NEC, and ASME applicable codes (U.S.A. codes). Guide Specifications PART 1 GENERAL 1.01 SYSTEM DESCRIPTION Microprocessor controlled, air-cooled liquid chiller utilizing scroll compressors, low sound fans, hydronic pump system and optional fluid storage

More information

SECTION ROTARY SCREW WATER CHILLERS Vibration Isolation Pumping Equipment (HVAC) Induced Draft Cooling Tower

SECTION ROTARY SCREW WATER CHILLERS Vibration Isolation Pumping Equipment (HVAC) Induced Draft Cooling Tower SECTION 15684 ROTARY SCREW WATER CHILLERS PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 15240 - Vibration Isolation. 2. 15540 - Pumping Equipment (HVAC) 3. 15711 - Induced Draft Cooling Tower B.

More information

SECTION CENTRIFUGAL WATER CHILLERS Vibration Isolation Pumping Equipment (HVAC) Induced Draft Cooling Tower

SECTION CENTRIFUGAL WATER CHILLERS Vibration Isolation Pumping Equipment (HVAC) Induced Draft Cooling Tower SECTION 15682 CENTRIFUGAL WATER CHILLERS PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 15240 - Vibration Isolation. 2. 15540 - Pumping Equipment (HVAC) 3. 15711 - Induced Draft Cooling Tower B. Removal

More information

Nomenclature. Cooling Capacity 19XRD 5 T T U U MF MF H 5A -

Nomenclature. Cooling Capacity 19XRD 5 T T U U MF MF H 5A - DUAL-COMPRESSOR HERMETIC CENTRIFUGAL LIQUID CHILLER 19XRD Cooling Capacity 8790-10548kW Advanced dual compressor modual design, Energy-saving and High Efficency, Reliability, Environmental Leadership,

More information

SECTION ROTARY SCREW WATER CHILLERS. B. Removal of Existing Refrigerant in Existing Chiller:

SECTION ROTARY SCREW WATER CHILLERS. B. Removal of Existing Refrigerant in Existing Chiller: SECTION 15684 ROTARY SCREW WATER CHILLERS PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 15240 - Vibration Isolation. 2. 15540 - Pumping Equipment (HVAC). 3. 15711 - Induced Draft Cooling Tower. B.

More information

.2 Section Waste Management and Disposal.

.2 Section Waste Management and Disposal. Issued 2005/06/01 Section 15624 Packaged Rotary Screw Water Chillers Page 1 of 5 PART 1 General 1.1 RELATED SECTIONS.1 Section 01330 Submittal Procedures..2 Section 01355 Waste Management and Disposal..3

More information

Multi-Institutional Academic Health Science & Research Center Evansville, IN

Multi-Institutional Academic Health Science & Research Center Evansville, IN SECTION 236426.11 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

Call us today! (800)

Call us today! (800) 150 TON AIR-COOLED CHILLER PA-ACCTR-150 Call us today! (800)341-4297 The 150-Ton portable chiller package features a Trane RTAC chiller unit. Trane leads the industry in providing some of the most reliable,

More information

Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA

Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA Page 236423-1 Copyright 2009 by The American Institute of Architects (AIA) Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA Modified by MSU Physical Plant

More information

Call us today! (800)

Call us today! (800) 500 TON AIR-COOLED CHILLER PA-ACCTR-500 Call us today! (800)341-4297 The 500-Ton portable chiller package features a Trane RTAC chiller unit. Trane leads the industry in providing some of the most reliable,

More information

Call us today! (800)

Call us today! (800) PA-ACCTR-200 Call us today! (800)341-4297 The 200-Ton portable chiller package features a Trane RTAC chiller unit. Trane leads the industry in providing some of the most reliable, efficient and quiet chiller

More information

1.2 REFERENCES - comply with the following codes and standards:

1.2 REFERENCES - comply with the following codes and standards: 15684 ROTARY SCREW AND SCROLL CHILLERS ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 236423 SPECIFIER;

More information

Chiller Manufacturer should have been manufacturing chillers utilizing magnetic bearing, oil free technology for more than 10 years.

Chiller Manufacturer should have been manufacturing chillers utilizing magnetic bearing, oil free technology for more than 10 years. TURBOCOR COMPRESOR CHILLERS General Description Microprocessor controlled, water chiller using HFC 134a refrigerant, two stage centrifugal oil free variable speed compressor's and electronic expansion

More information

SECTION PACKAGED COMPRESSOR AND CONDENSER UNITS

SECTION PACKAGED COMPRESSOR AND CONDENSER UNITS SECTION 236200 - PACKAGED COMPRESSOR AND CONDENSER UNITS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions apply

More information

60 TON AIR-COOLED CHILLER. Call us today! (800) PA-ACCTR-60 GENERAL DIMENSIONS ELECTRICAL DATA 60 TON AIR-COOLED CHILLER FEATURES

60 TON AIR-COOLED CHILLER. Call us today! (800) PA-ACCTR-60 GENERAL DIMENSIONS ELECTRICAL DATA 60 TON AIR-COOLED CHILLER FEATURES 60 TON AIR-COOLED CHILLER PA-ACCTR-60 Call us today! (800)341-4297 The 60-Ton portable chiller package features a Trane CGAM chiller unit. Trane leads the industry in providing some of the most reliable,

More information

Guide Specifications

Guide Specifications Guide Specifications Hot Water fired Adsorption Liquid Chillers Bry-Air Adsorption Chiller Overview The chiller shall be a Bry-Air ADC series. The chiller shall consist of a robust, compact, packaged chiller

More information

100 TON AIR-COOLED SCROLL PACKAGED. Call us today! (800) SPECIFICATIONS GENERAL DIMENSIONS ELECTRICAL DATA ADDITIONAL INFORMATION

100 TON AIR-COOLED SCROLL PACKAGED. Call us today! (800) SPECIFICATIONS GENERAL DIMENSIONS ELECTRICAL DATA ADDITIONAL INFORMATION 100 TON AIR-COOLED SCROLL PACKAGED SPECIFICATIONS Call us today! (800)341-4297 Trane Portable Packaged Air Conditioner units contain the best compressor technology available, in order to achieve the highest

More information

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION REFRIGERATION

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION REFRIGERATION PART 0 A/E INSTRUCTIONS 0.01 DESIGN REQUIREMENTS A. General: 1. Design and specify refrigeration systems and equipment in accordance with "Energy Conservation Standards" stipulated in Section 15010, Basic

More information

SECTION GENERAL-SERVICE COMPRESSED-AIR SYSTEMS

SECTION GENERAL-SERVICE COMPRESSED-AIR SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. Pipe and Pipe Fittings. B. Air compressor. C. Air receiver and accessories. D. Aftercooler. E. Refrigerated air dryer. F. Pressure reducing station. 1.02 RELATED

More information

Liebert CSU3000 Chiller

Liebert CSU3000 Chiller CSI 15620 - Packaged Water Chillers Liebert CSU3000 Chiller Guide Specifications for 7.5-37 Ton CS/CD/CT Models 1.0 GENERAL 1.1 CS/CD MODELS The main-frame coolant supply unit shall be a Liebert Model,

More information

Soft Start Series MP700 Solid State, Reduced Voltage

Soft Start Series MP700 Solid State, Reduced Voltage Metron Fire Pump Controls and Accessories Soft Start Series MP700 Solid State, Reduced Voltage Metron Fire Pump Controllers conform to the latest requirements of National Fire Protection Association s

More information

Revitalize Building Mechanical Systems (4619)

Revitalize Building Mechanical Systems (4619) SECTION 235216 FIRE-TUBE CONDENSING BOILERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION PACKAGED HEAT TRANSFER SYSTEM

SECTION PACKAGED HEAT TRANSFER SYSTEM PACKAGED HEAT TRANSFER SYSTEM Page 1 of 6 SECTION PACKAGED HEAT TRANSFER SYSTEM 1 GENERAL 1.1 SUMMARY A. Packaged steam-to-water heat transfer system 1.2 REFERENCES A. ASHRAE American Society of Heating,

More information

Technical Development Program

Technical Development Program Technical Development Program COMMERCIAL HVAC CHILLER EQUIPMENT Water-Cooled Chillers PRESENTED BY: Omar Rojas Sales Engineer Menu Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section 7

More information

Variable Frequency Drive SERIES MP800 VFD

Variable Frequency Drive SERIES MP800 VFD Metron Fire Pump Controls and Accessories Variable Frequency Drive SERIES MP800 VFD Metron Fire Pump Controllers conform to the latest requirements of National Fire Protection Association s Standard for

More information

CxA to Answer this Section

CxA to Answer this Section EXHIBIT 01 91 13-3, SAMPLE Construction checklist items are to be completed as part of initial checkout and subsequent startup, preparatory to Functional testing. This checklist does not take the place

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-42 22 16.00 40 (August 2017) --------------------------------- Preparing Activity: NASA Superseding UFGS-42 22 16.00 40 (August 2014) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

SECTION PACKAGE AIR COOLED WATER CHILLER PART 1 GENERAL 1.01 SECTION INCLUDES. A. Chiller package. B. Charge of refrigerant and oil.

SECTION PACKAGE AIR COOLED WATER CHILLER PART 1 GENERAL 1.01 SECTION INCLUDES. A. Chiller package. B. Charge of refrigerant and oil. 1 1 1 1 1 1 1 1 0 1 0 1 SECTION 1 PACKAGE AIR COOLED WATER CHILLER PART 1 GENERAL 1.01 SECTION INCLUDES A. Chiller package. B. Charge of refrigerant and oil. C. Controls and control connections. D. Chilled

More information

SECTION COMPRESSED AIR SYSTEM. A. Pipe and pipe fittings, including valves, unions and couplings.

SECTION COMPRESSED AIR SYSTEM. A. Pipe and pipe fittings, including valves, unions and couplings. SECTION 15481 COMPRESSED AIR SYSTEM PART 1 - GENERAL 1.1 SECTION INCLUDES A. Pipe and pipe fittings, including valves, unions and couplings. B. Air compressor. C. After cooler. D. Refrigerated air dryer.

More information

SECTION CENTRIFUGAL WATER CHILLERS

SECTION CENTRIFUGAL WATER CHILLERS PART 1 GENERAL 1.01 SECTION INCLUDES A. Chiller package. B. Charge of refrigerant and oil. C. Controls and control connections. D. Chilled water connections. E. Condenser water connections. F. Variable

More information

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: HVAC Standards

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: HVAC Standards Date Description of Change Pages / Sections Modified ID 6/15/16 Entire document - mgl44 PART 1 - INTRODUCTION 1.1 PURPOSE A. This section is intended to define the general installation and minimum product

More information

SECTION FIRE PUMP AND CONTROLS

SECTION FIRE PUMP AND CONTROLS SECTION 15320 FIRE PUMP AND CONTROLS PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Fire pump, jockey pump, and controls including necessary accessories as shown in Construction Documents, specified

More information

Modified by MSU Physical Plant / Engineering and Architectural Services

Modified by MSU Physical Plant / Engineering and Architectural Services Page 236426-1 Copyright 2009 by The American Institute of Architects (AIA) Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA Modified by MSU Physical Plant

More information

Across-the-Line SERIES MP300 Combined Manual and Automatic

Across-the-Line SERIES MP300 Combined Manual and Automatic Across-the-Line SERIES MP300 Combined Manual and Automatic Metron Fire Pump Controllers conform to the latest requirements of National Fire Protection Association s Standard for Centrifugal Fire Pumps

More information

SPECIFICATION GUIDE NEOSYS. Air-cooled Liquid Chiller for outdoor installation (NAC) Nominal cooling capacity: 200 to 460 kw

SPECIFICATION GUIDE NEOSYS. Air-cooled Liquid Chiller for outdoor installation (NAC) Nominal cooling capacity: 200 to 460 kw SPECIFICATION GUIDE NEOSYS Air-cooled Liquid Chiller for outdoor installation (NAC) Nominal cooling capacity: 200 to 460 kw Air-to-water Heat Pump for outdoor installation (NAH) Nominal cooling capacity:

More information

Water-Cooled Dual Compressor Screw Chiller

Water-Cooled Dual Compressor Screw Chiller Installation Manual IM 692-1 Group: Chiller Part Number: 629955 Effective: May 1997 Supersedes: IM663-1 IM683 IM692 Water-Cooled Dual Compressor Screw Chiller Installation Manual PFS 155C through PFS 210C,

More information

SECTION AIR COOLED WATER CHILLERS

SECTION AIR COOLED WATER CHILLERS PART 1 GENERAL 1.1 SECTION INCLUDES A. Chiller package B. Charge of refrigerant and oil C. Controls and control connections D. Chilled water connections E. Starters F. Electrical power connections 1.2

More information

TECHNICAL GUIDE DESCRIPTION SPLIT-SYSTEM AIR-COOLED CONDENSING UNITS MODELS: HF-07 FEATURES B-0703

TECHNICAL GUIDE DESCRIPTION SPLIT-SYSTEM AIR-COOLED CONDENSING UNITS MODELS: HF-07 FEATURES B-0703 TECHNICAL GUIDE SPLIT-SYSTEM AIR-COOLED CONDENSING UNITS MODELS: HF-07 DESCRIPTION These Sunline 2000 units are completely assembled, piped and wired at the factory to provide one-piece shipment and rigging.

More information

DTW Works Master Specification Version 2006 Issued 2006/08/01 Section15621 Packaged Reciprocating Water Chillers Page 1 of 5

DTW Works Master Specification Version 2006 Issued 2006/08/01 Section15621 Packaged Reciprocating Water Chillers Page 1 of 5 Issued 2006/08/01 Section15621 Packaged Reciprocating Water Chillers Page 1 of 5 PART 1 GENERAL 1.1 RELATED SECTIONS.1 Section 01330 Submittal Procedures..2 Section 01355 Waste Management and Disposal..3

More information

Dunham Bush Air Cooled Screw Chiller AFVX B 6SR Series

Dunham Bush Air Cooled Screw Chiller AFVX B 6SR Series Dunham Bush Air Cooled Screw Chiller AFVX B 6SR Series Type of Compressors Compressor Rotary Scroll Reciprocating Screw Centrifugal Air Cooled Chiller 77 ~ 329TR (270 ~ 1156 kw) ACDX Series 100 ~ 520TR

More information

PART 1 - GENERAL 1.1 WORK INCLUDED

PART 1 - GENERAL 1.1 WORK INCLUDED PART 1 - GENERAL 1.1 WORK INCLUDED A. Nortec HP Series high pressure adiabatic in-duct system[s] as indicated on drawing[s] and as indicated on schedule[s]. B. Complete and operable humidification system

More information

PART 1 - GENERAL 1.1 WORK INCLUDED

PART 1 - GENERAL 1.1 WORK INCLUDED PART 1 - GENERAL 1.1 WORK INCLUDED A. Nortec ML Series high pressure adiabatic in-space system[s] as indicated on drawing[s] and as indicated on schedule[s]. B. Complete and operable humidification system

More information

VariCool VAV Engineering Guide

VariCool VAV Engineering Guide Engineering Guide Effective September 2017 Water-Cooled and Chilled Water, Variable Air Volume Contents Product Features... 3 UNIT FEATURES... 3 Product Features... 4 Marvel Plus Microprocessor Control

More information

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS - CUSTOM

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS - CUSTOM SECTION 23 81 06 - PACKAGED ROOFTOP AIR CONDITIONING UNITS - CUSTOM PART 1 - GENERAL 1.1 SUMMARY A. This Section includes equipment types that contain all the components of the refrigeration process within

More information

PHYSICAL FACILITIES Consultant s Handbook Specifications Division 21 Fire Suppression 3000 Fire Pumps

PHYSICAL FACILITIES Consultant s Handbook Specifications Division 21 Fire Suppression 3000 Fire Pumps Note: The A/E must choose all design values in brackets below before using in project specifications 1 General 1.1 Provide UL listed and FM approved fire pump complete with pump, driver, controller and

More information

SECTION AUTOMATIC TRANSFER SWITCHES

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 36 23 SPEC WRITER NOTE: Use this section only for NCA projects. Delete between //--// if not applicable to project. Also, delete any other item or paragraph

More information

1.1 REFERENCES.1 American National Standards Institute/National Fire Protection Association (ANSI/NFPA).1 ANSI/NFPA 20, Centrifugal Fire Pumps.

1.1 REFERENCES.1 American National Standards Institute/National Fire Protection Association (ANSI/NFPA).1 ANSI/NFPA 20, Centrifugal Fire Pumps. Issued 2006/08/01 Section 13920 Packaged Fire Pumps and Controllers Page 1 of 7 PART 1 GENERAL 1.1 REFERENCES.1 American National Standards Institute/National Fire Protection Association (ANSI/NFPA).1

More information

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION PUMPS

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION PUMPS PART 0 A/E INSTRUCTIONS 0.01 Design Requirements A. Pumping system design 1. A primary-secondary pumping system is preferred. Redundant pipes are required for chillers and boilers. 2. Select pumps to operate

More information

SECTION AIR COOLED WATER CHILLERS (LESS THAN 150 TONS)

SECTION AIR COOLED WATER CHILLERS (LESS THAN 150 TONS) SECTION 23 64 01 AIR COOLED WATER CHILLERS (LESS THAN 150 TONS) PART 1: GENERAL 1.1 GENERAL A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish

More information

SECTION DOMESTIC WATER PRESSURE BOOSTING SYSTEMS (VFD) PART 1 - GENERAL 1.1 SUMMARY

SECTION DOMESTIC WATER PRESSURE BOOSTING SYSTEMS (VFD) PART 1 - GENERAL 1.1 SUMMARY SECTION 22 11 23.13 DOMESTIC WATER PRESSURE BOOSTING PART 1 - GENERAL 1.1 SUMMARY A. Where utility water pressure cannot adequately meet the pressure requirements of the domestic water systems and where

More information

As a standard, heat exchangers are provided with flange water connections (BS Standard Table E). All evaporator are supplied fully insulated.

As a standard, heat exchangers are provided with flange water connections (BS Standard Table E). All evaporator are supplied fully insulated. NOMENCLATURE INTRODUCTION The HTT HWDX water-cooled chillers range is the latest addition to HTT s growing family of commercial products, featuring the most current technologies advances. The HWDX main

More information

SECTION STEAM CONDENSATE PUMPS

SECTION STEAM CONDENSATE PUMPS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 23 22 23 STEAM CONDENSATE PUMPS SPEC WRITER NOTES: 1. Delete between // ---- // if not applicable to project. Also delete any other item or paragraph not applicable

More information

THE FOLLOWING CHANGES/ADDITIONS TO THE ABOVE CITED SOLICITATION ARE ANNOUNCED:

THE FOLLOWING CHANGES/ADDITIONS TO THE ABOVE CITED SOLICITATION ARE ANNOUNCED: Business Services Procurement and Contracting 16550 SW Merlo Road Beaverton, OR 97003 (503) 356-4324 February 20, 2018 SOLICITATION ADDENDUM NO. 2 ITB 18-0003 Kinnaman-Hiteon Chiller Replacement THE FOLLOWING

More information

1.1 This section applies to air handling units for HVAC Systems.

1.1 This section applies to air handling units for HVAC Systems. AIR HANDLING UNITS GENERAL INFORMATION 1.1 This section applies to air handling units for HVAC Systems. DESIGN REQUIREMENTS 2.1 Design Criteria a. The decision to use modular central station air handling

More information

Update In Progress. Division 23 Heating, Ventilation, and Air Conditioning Page Section FLUID SYSTEMS EQUIPMENT PART 1 GENERAL

Update In Progress. Division 23 Heating, Ventilation, and Air Conditioning Page Section FLUID SYSTEMS EQUIPMENT PART 1 GENERAL Section 23 20 00 FLUID SYSTEMS EQUIPMENT PART 1 GENERAL 1. CHILLERS Page 23 20 00-1 A. Provide chiller packages with centrifugal compressors, or screw compressors, and water cooled condensers. B. Design

More information

SECTION AIR COOLED WATER CHILLER

SECTION AIR COOLED WATER CHILLER Note: Shading in the body of the specification is to identify work that will be given to the installing contractor in the subsequent Request for Chiller Installation documents to be issued by the Owner.

More information

Product Data. Features/Benefits. EVERGREEN 23XRV High-Efficiency Variable Speed Screw Chiller with FOXFIRE Compression Technology 50/60 Hz HFC-134a

Product Data. Features/Benefits. EVERGREEN 23XRV High-Efficiency Variable Speed Screw Chiller with FOXFIRE Compression Technology 50/60 Hz HFC-134a Product Data EVERGREEN 23RV High-Efficiency Variable Speed Screw Chiller with FOFIRE Compression Technology 50/60 Hz HFC-134a 300 to 550 Nominal Tons (1055 to 1934 Nominal kw) Carrier s Evergreen 23RV

More information

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION SECTION 237433, PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to

More information

SCA 620C AIR COOLED SCREW CHILLER

SCA 620C AIR COOLED SCREW CHILLER DUNNAIR I N T E R N A T I O N A L L I M I T E D SCA 620C AIR COOLED SCREW CHILLER MV6 CONTROL Refrigerant: R22 Standard NOMINAL CAPACITY 620 kw(r) DUNNAIR INTERNATIONAL LIMITED Subject to change without

More information

Process Water Heater For Industrial Applications All Voltages, Single or Three Phase Up To 88 KW

Process Water Heater For Industrial Applications All Voltages, Single or Three Phase Up To 88 KW MODEL V Process Water Heater For Industrial Applications All Voltages, Single or Three Phase Up To 88 KW Features Industrial Grade Construction Stainless steel pressure vessel provides maximum service

More information

SECTION PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS

SECTION PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS SECTION 237413 - PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes packaged, outdoor, central-station air-handling units (rooftop units) with the

More information

INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

INSTRUMENTATION AND CONTROL DEVICES FOR HVAC PART 1 GENERAL 1.01 RELATED REQUIREMENTS SECTION 23 0913 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC A. Section 26 2717 - Equipment Wiring: Electrical characteristics and wiring connections. 1.02 ADMINISTRATIVE

More information

MACH N-407 Heat Pump Air-Cooled Chiller

MACH N-407 Heat Pump Air-Cooled Chiller MACH060-01-N-407 Heat Pump Air-Cooled Chiller Heat Pump Air-Cooled Chillers for Global Residential and Light Commercial Microclimates MACH NOMENCLATURE BREAKDOWN MACH-060-01 - N - 407 Refrigerant Type

More information

PhiloWilke Partnership Addendum No. 2 A/E Project No April 2016

PhiloWilke Partnership Addendum No. 2 A/E Project No April 2016 SECTION 23 21 23 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions and Division 01 Specification Sections, apply to this Section.

More information

SECTION AIR COILS

SECTION AIR COILS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 23 82 16 AIR COILS SPEC WRITER NOTE: Delete between //---// if not applicable to project. Also delete any other item or paragraph not applicable in the section

More information

INITIAL START-UP CHECKLIST FOR 23XL HERMETIC SCREW LIQUID CHILLER

INITIAL START-UP CHECKLIST FOR 23XL HERMETIC SCREW LIQUID CHILLER INITIAL START-UP CHECKLIST FOR 23XL HERMETIC SCREW LIQUID CHILLER (Remove and use for job file.) MACHINE INFORMATION: NAME ADDRESS JOB NO. MODEL CITY STATE ZIP S/N DESIGN CONDITIONS: TONS BRINE FLOW RATE

More information

4 route 147, C.P.33 Coaticook, Qc J1A 2S8

4 route 147, C.P.33 Coaticook, Qc J1A 2S8 4 route 147, C.P.33 Coaticook, Qc J1A 2S8 TABLE OF CONTENTS INSTALLATION Nozzles p.3 Clearance for dismantling p.4 Foundations p.4 Foundation bolts p.5 Leveling p.5 Bolted joints p.5 Recommended bolt tightening

More information

CONTENTS AUTOMATIC TRANSFER SWITCHES

CONTENTS AUTOMATIC TRANSFER SWITCHES CONTENTS AUTOMATIC TRANSFER SWITCHES PART 1 GENERAL 1.1 Related Documents 1.2 Summary 1.3 References 1.4 Quality Assurance 1.5 Submittals 1.6 Delivery, Storage and Handling 1.7 Instructions And Training

More information

RECORD SUBMITTAL COVER SHEET

RECORD SUBMITTAL COVER SHEET RECORD SUBMITTAL COVER SHEET PROJECT TITLE: AXCELLERATE PHARMA EQUIPMENT DESCRIPTION: CARRIER AQUASNAP AIR-COOLED CHILLER CH-1 OWNER: AXCELLERATE PHARMA MECHANICAL ENGINEER: ARDEN DATE: JUNE 27, 2014 SUBMITTED

More information

1. Product Data for Prerequisite EQ 1: Documentation indicating that units comply with ASHRAE 62.1, Section 5 - "Systems and Equipment.

1. Product Data for Prerequisite EQ 1: Documentation indicating that units comply with ASHRAE 62.1, Section 5 - Systems and Equipment. Page 238239-1 SECTION 238239 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

Water-Cooled Modular Chillers. Product Data Catalog. Standard and Total Access Modules MS010X, MS015X, MS020X, MS030X, MS040X, MS050X, MS070X, MS085X

Water-Cooled Modular Chillers. Product Data Catalog. Standard and Total Access Modules MS010X, MS015X, MS020X, MS030X, MS040X, MS050X, MS070X, MS085X Product Data Catalog Standard and Total Access Modules MS010X, MS015X, MS020X, MS030X, MS040X, MS050X, MS070X, MS085X Variable Speed Total Access Modules MS010W, MS020W, MS030W, MS050W MS010V, MS020V,

More information

SECTION REFRIGERATION. 1. Reciprocating Compressors (Hermetic). 2. Reciprocating Compressors (Open Drive). 3. Water Cooled Condensing Units.

SECTION REFRIGERATION. 1. Reciprocating Compressors (Hermetic). 2. Reciprocating Compressors (Open Drive). 3. Water Cooled Condensing Units. SECTION 15650 REFRIGERATION PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Reciprocating Compressors (Hermetic). 2. Reciprocating Compressors (Open Drive). 3. Water Cooled Condensing Units. 4. Air

More information

SECTION DOMESTIC WATER HEATERS

SECTION DOMESTIC WATER HEATERS SECTION 223500 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to

More information

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION AIR HANDLING UNITS

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION AIR HANDLING UNITS SECTION 23 70 00 AIR HANDLING UNITS PART 1. GENERAL 1.1 Section includes air-handling units to 15,000 cfm and accessories. 1.2 Related Sections 1 : A. Division 01 - Brown University Standard for Narragansett

More information

Product Data. Features/Benefits. 19EX Centrifugal Liquid Chiller to 2200 Nominal Tons (5280 to 7740 kw)

Product Data. Features/Benefits. 19EX Centrifugal Liquid Chiller to 2200 Nominal Tons (5280 to 7740 kw) Product Data 19E Centrifugal Liquid Chiller 1500 to 2200 Nominal Tons (5280 to 7740 kw) Carrier s 19E Hermetic 19E Centrifugal Liquid Chillers operate with environmentally safe HFC-134a. These chillers

More information

1025, BOUL. MARCEL-LAURIN INSTRUCTION MANUAL FOR WATER COOLED ENVIROCHILL CHILLER. Prepared par Claude Gadoury, P. Eng MTL TECHNOLOGIES INC.

1025, BOUL. MARCEL-LAURIN INSTRUCTION MANUAL FOR WATER COOLED ENVIROCHILL CHILLER. Prepared par Claude Gadoury, P. Eng MTL TECHNOLOGIES INC. WYETH-AYERST CANADA INC. 1025, BOUL. MARCEL-LAURIN S T - L A U R E N T, Q U É B E C INSTRUCTION MANUAL FOR WATER COOLED ENVIROCHILL CHILLER MODEL P448800LT--55WC--22C66S Prepared par Claude Gadoury, P.

More information

MicroTech Series 200 Centrifugal Chiller

MicroTech Series 200 Centrifugal Chiller Protocol Data Information Packet Version 2.2 Group: Controls Date: March 1999 MicroTech Series 200 Centrifugal Chiller Data Communications Packet for Protocol 2002 McQuay International Revision History

More information

DIVISION FINNED WATER-TUBE BOILERS

DIVISION FINNED WATER-TUBE BOILERS MVB, TYPE H - MODELS 504A-2004A SUGGESTED SPECIFICATIONS Catalog No.: 2000.933C Effective: 06-25-15 Replaces: 12-21-09 DIVISION 23 52 33.13 FINNED WATER-TUBE BOILERS PART 1 - GENERAL 1.1 SUMMARY A. Section

More information

GENERAL TABLE OF CONTENTS NOMENCLATURE DCLC D V

GENERAL TABLE OF CONTENTS NOMENCLATURE DCLC D V GENERAL From the beginning of 20 th Century, DB has been providing innovative solutions for the heating, air conditioning and refrigeration needs of its customers. Today s global company has a proud heritage

More information

SECTION COOLING TOWERS

SECTION COOLING TOWERS SECTION 23 65 00 COOLING TOWERS PART 1 - GENERAL 1.1 DESCRIPTION A. Packaged, induced draft open circuit cooling tower complete with fill, fan, inlet louvers and associated accessories and equipment. 1.2

More information

PACKAGED AIR COOLED Product Data Catalog

PACKAGED AIR COOLED Product Data Catalog PACKAGED AIR COOLED Product Data Catalog MODELS ASP-10A ASP-15A ASP-20A ASP-00P ASP-00F ASP-00G A MEMBER OF MARDUK HOLDING COMPANY, LLC The Leader in Modular Chillers ETL and CSA Approved CHILLER MODULES

More information

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS SECTION 15732 - PACKAGED ROOFTOP AIR CONDITIONING UNITS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Package roof top unit. B. Heat exchanger. C. Refrigeration components. D. Unit operating controls. E. Roof

More information

SECTION AIR COILS

SECTION AIR COILS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Specification Sections, apply to this Section. B. Related Sections:

More information

TITAN SERIES Complete Central Chiller & Pump Tank Package 20 to 70 Tons 20 F to 70 F

TITAN SERIES Complete Central Chiller & Pump Tank Package 20 to 70 Tons 20 F to 70 F Temperature Control Units Water & Oil - F Portable Chillers Air & Water-Cooled - 7 F Central Chillers Air & Water-Cooled Packages & Modules - 7 F Pump Tank Stations Chilled or Tower Water - gallons Cooling

More information

CPF PRODUCT DESCRIPTION

CPF PRODUCT DESCRIPTION CPF 175 340 PRODUCT DESCRIPTION The CHICAGO PNEUMATIC CPF 175-340 compressor is a quiet, complete and ready-for-use unit for the production of compressed air in industrial applications. OVERVIEW The CHICAGO

More information

INITIAL START-UP CHECKLIST FOR 19XR HERMETIC CENTRIFUGAL LIQUID CHILLER

INITIAL START-UP CHECKLIST FOR 19XR HERMETIC CENTRIFUGAL LIQUID CHILLER INITIAL START-UP CHECKLIST FOR 19XR HERMETIC CENTRIFUGAL LIQUID CHILLER (Remove and use for job file.) MACHINE INFORMATION: NAME JOB NO. ADDRESS MODEL CITY STATE ZIP S/N DESIGN CONDITIONS: TONS BRINE FLOW

More information

XTHERM, TYPE WH - MODELS 1005A- 2005A DIVISION COMMERCIAL, WATER-TUBE, CONDENSING GAS DOMESTIC WATER HEATERS

XTHERM, TYPE WH - MODELS 1005A- 2005A DIVISION COMMERCIAL, WATER-TUBE, CONDENSING GAS DOMESTIC WATER HEATERS XTHERM, TYPE WH - MODELS 1005A- 2005A Catalog No.: 3500.801 Effective: 11-15-14 Replaces: NEW PART 1 - GENERAL 1.1 SUMMARY DIVISION 23 34 36.29 COMMERCIAL, WATER-TUBE, CONDENSING GAS DOMESTIC WATER HEATERS

More information

opti-visor ultra-efficient chiller plant automation Typical specification

opti-visor ultra-efficient chiller plant automation Typical specification opti-visor ultra-efficient chiller plant automation Typical File No: 90.893 Date: february 9, 2015 Supersedes: 90.893 Date: april 20, 2012 contents 1.0 Chilled water plant 4 1.1 General system requirements

More information

Cutting Edge Compressor Technology

Cutting Edge Compressor Technology CHILLER MODULES Cutting Edge Compressor Technology MagLev ; magnetic levitation Oil Free design Quieter than typical background noise Soft start; pulls only 2 amps at 460V Superior part load efficiency

More information

SECTION DOMESTIC WATER PUMPS

SECTION DOMESTIC WATER PUMPS SECTION 22 11 23 DOMESTIC WATER PUMPS PART 1 - GENERAL 1.1 SUMMARY A. Section includes the following all-bronze and bronze-fitted centrifugal pumps for domestic cold- and hot-water circulation: 1. Close-coupled,

More information

SECTION WATER-SOURCE UNITARY HEAT PUMPS

SECTION WATER-SOURCE UNITARY HEAT PUMPS SECTION 23 81 46 WATER-SOURCE UNITARY HEAT PUMPS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification

More information

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and other equipment. B. See Division 23 Section

More information

Advanced Centrifugal Engineering

Advanced Centrifugal Engineering Product Data 19XT Hermetic Centrifugal Liquid Chiller 50/60 Hz HFC-134a 300 to 550 Nominal Tons (1055 to 1934 kw) Advanced Centrifugal Engineering Reduced operating costs are achieved through an improvement

More information

Leadership, Innovation, Advanced Technology Synergise Here!

Leadership, Innovation, Advanced Technology Synergise Here! Cooling Synergies Leadership, Innovation, Advanced Technology Synergise Here! 125 years of Engineering Innovation Kirloskar Chillers is proud to be a part of 125 years old Kirloskar Group. The diversified

More information