1 Dwelling unit feeder/service conductor calculations Whether they're for journeymen, master electricians, or contractors, most electrical licensing exams require you to calculate residential loads and service or feeders sizes using one of two methods. The standard method, which is contained in Art. 220, Part II, involves more steps, but many people use it exclusively to avoid using the wrong method. However, most residential construction qualifies for the optional method in Art. 220, Part III, so it's prudent to understand both methods. In either case, you're free to exceed the NEC requirements these are minimum requirements, not design specifications. The standard method is where we'll start. It requires six sets of calculations for general lighting and receptacles, small-appliance, and laundry; air conditioning versus heat; appliances; clothes dryer; cooking equipment; and conductor size. The following example should help illustrate how to apply these steps. What size service conductor does a 1,500 sq ft dwelling unit need, if it contains the following loads? The service is 120/240V. Disposal (940VA) Dishwasher (1,250VA) Trash compactor (1,100VA) Water heater (4,500VA) Dryer (4,000VA) Cooktop (6,000VA) Two ovens (each 3,000VA) Air conditioning (5 hp, 230V) Three electric space heating units (each 3,000W) General lighting and receptacles, small-appliance, and laundry. The NEC recognizes these circuits won't all be on (loaded) simultaneously. Thus, you may apply a demand factor to the total connected general lighting and receptacle load (220.16). To determine the service/feeder demand load, refer to Table and follow these steps: Fig. 1. In calculating conductor sizes for a dwelling unit, the NEC recognizes a homeowner won t run all the appliances, turn on all the lights, and load all receptacles at the same time. First, determine the total connected load for general lighting and receptacles (3VA per sq ft) [Table 220.3(A)], two small-appliance circuits each at 1,500VA, and one laundry circuit at 1,500VA (220.16) (Fig.1).

2 Second, apply Table demand factors to the total connected general lighting and receptacle load. Calculate the first 3,000VA at 100% demand and the remaining VA at 35% demand. General lighting/receptacles: 1,500 sq ft 3VA=4,500VA Small-appliance circuits: 1,500VA 2 =3,000VA Laundry circuit: 1,500VA 1= 1,500VA Total connected load: 4,500VA+ 3,000VA+1,500VA=9,000VA First 3,000VA at 100%=3,000VA 1.00=3,000VA Remainder at 35%=(9,000VA- 3,000VA) 0.35=2,100VA Total demand load=5,100va Fig. 2. It should be obvious that the heating and cooling systems won t be generated at the same time. Therefore, your calculations should be based on the larger of the two loads. Air-conditioning versus heat. Because air-conditioning and heating loads aren't on simultaneously, you may omit the smaller of the two loads (220.21). Calculate each of these at 100% (220.15) (Fig. 2). Air conditioning: 5 hp, 230V VA=E I (Table ) 28 FL 230V=6,440 VA Heat: 3,000W 3 units=9,000w The air conditioning load is smaller than the heat load, therefore it can be omitted. Appliances. Per , you can use a 75% demand factor when four or more fastened in place appliances, such as a dishwasher or waste disposal, are on the same feeder. Don't include clothes dryers, cooking equipment, air conditioning, or heat in this category (Fig. 3). Waste disposal: 940VA Dishwasher: 1,250VA Trash compactor: 1,100VA Water heater: 4,500VA Total connected appliance load: 7,790VA 0.75=5,843VA

3 Fig. 3. When determining load for appliances, the Code allows you to use a 75% demand factor when four or more fastenedin-place appliances are on the same feeder. Fig. 4. Electric clothes dryer demand must be accounted for as a separate load item. Clothes dryer. Per , the feeder or service demand load for electric clothes dryers in a dwelling unit shall not be less than 5,000W. However, if the nameplate rating exceeds 5,000W, use that rating as the load. You can omit this calculation if the unit has no electric dryer provision. However, it's common to provide both gas and electric sources. If you see gas on the plans, verify electric will be omitted (Fig. 4). The service and feeder demand load for a 4kW dryer is 5,000W. Cooking equipment. For household-cooking appliances rated higher than 1.75kW, you can use the demand factors listed in , Table and Notes 1, 2, and 3. All three of the units in the example are rated higher than 1.75kW and not higher than 8.75kW, so follow the instructions in Note 3. The two ovens are rated less than 3.5kW, so Table Column A demand factor applies. The cooktop is 6kW, so Column B demand factor applies (Fig. 5). Column A demand: 3kW 2 units 0.75 demand factor=4.5kw Column B demand: 6kW 1 unit 0.8=4.8kW Demand load=4.5kw+4.8kw= 9.3kW=9,300W

4 Fig. 5. See Table to determine demand load for cooling equipment rated higher than 1.75kW. Feeder and service conductor size. 400A and less: For 3-wire, 120/240V, single-phase systems, size the feeder or service conductors according to Table (B)(6). For all others, use Table Size the grounded (neutral) conductor to the maximum unbalanced load (220.22) per Table Over 400A: Size the ungrounded and grounded (neutral) conductors per Table Now we can total up the demand loads from steps 1 through 5. Step 1: 5,100VA Step 2: 9,000VA Step 3: 5,843VA Step 4: 5,000VA Step 5: 9,300W Step 6: 34,243VA total demand load To determine the amperes need for the service use the formula: I5VA E. I=34,243VA 240V=143A We can use (B)(6) for a 120/240V single-phase dwelling service and feeder up to 400A. This Table allows a smaller conductor size than Table A 143A demand load means this house requires at least a 150A service with 1 AWG conductors. Optional method. You can use the easier optional method found in only when the total connected load is served by a single 3-wire, 120/240V or 208Y/120V set of service or feeder conductors with an ampacity of 100A or greater. Because this condition describes the typical residential service, the optional method is likely to apply. Using it can simplify the design process and save you time because you have so many fewer sets of calculations. General loads. The calculated load shall not be less than 100% for the first 10kW, plus 40% of the remainder of the following loads: Small-appliance and laundry branch circuits: 1,500VA for each 20A circuit. General lighting and receptacles: 3VA per sq ft Appliances: The nameplate VA rating of all appliances and motors fastened in place (permanently connected) or on a specific circuit. Be sure to use the range and dryer at nameplate rating. HVAC. Include the largest of the following: 100% of the nameplate rating of the air-conditioning equipment. 100% of the heat-pump compressors and supplemental heating, unless the controller prevents simultaneous operation of the compressor and supplemental heating.

5 100% of the nameplate ratings of electric thermal storage and other heating systems where you expect the usual load to be continuous at the full nameplate value. Don't configure such systems under any other selection in this table. 65% of the nameplate rating(s) of the central electric space heating, including integral supplemental heating in heat pumps where the controller prevents simultaneous operation of the compressor and supplemental heating. 65% of the nameplate rating(s) of electric space heating, if there are less than four separately controlled units. 40% of the nameplate rating(s) of electric space heating of four or more separately controlled units. Sizing service/feeder conductors. Now that we've seen how to determine residential loads, let's size the service/feeder conductors. We'll use the same specifications that we used for the standard method so we can compare apples to apples. Step 1: Determine general loads [230.30(B)]. Small appliance: 1,500VA 2 circuits = 3,000VA General lighting: 1,500 sq ft 3VA= 4,500VA Laundry circuit=1,500va Now add up the appliance ratings. Disposal (940VA) Dishwasher (1,250VA) Trash compactor (1,100VA) Water heater (4,500VA) Dryer (4,000VA) Ovens (3,000VA 2 units=6,000va) Cooktop (6,000VA) The total connected load=32,790va Calculate the first 10,000VA at 100%=10,000VA 1.00=10,000VA Calculate the remainder at 40%= 22,790VA 0.40= 9,116VA Demand load=10,000va+9,116va= 19,116VA Step 2: Compare air conditioner at 100% vs. heat at 65% [220.30(C)]. Air conditioner: 230V 28A=6,440VA Heat [220.30(C)(5)]: 9,000 W 0.65 = 5,850 W (omit) Step 3: Calculate service/feeder conductors per (B)(6). General loads=19,116va Air conditioning=6,440va Total demand load=25,556va I=VA E=25,556VA 240V = 106.5A (B)(6) requires at least a 110A service with 3 AWG conductors. As you can see, in this case the optional method permitted a smaller service than the standard method of calculating a service for a dwelling. Now that we've walked through the process of calculating residential services and feeders, you can see that doing so is fairly easy. You need to calculate the loads first, and then move on to the service and feeder size. The NEC provides the requirements in Art. 220 and 230. Doing these calculations correctly can save you money during design and construction, while providing safe homes for the families who occupy them.

6 Multifamily Dwelling Unit Service and Feeder Calculations The NEC defines a dwelling unit as a single unit that provides complete and independent living facilities for one or more persons that must include permanent provisions for living, sleeping, cooking, and sanitation (Fig. 1). A dwelling becomes "multifamily" when it contains three or more dwelling units [Art. 100 Definitions] (Fig. 2). Fig. 1. A dwelling unit is defined as a single unit that provides permanent provisions for living, sleeping, cooking, and sanitation. When you size the service for a single-family dwelling, you calculate the load and apply the appropriate demand factors. For a multifamily dwelling, you do the same thing, except you apply the appropriate demand factors to the sum of the individual dwelling units of that multifamily dwelling. You are allowed to use the standard method from Part III of Art. 220 or the optional method from Part IV of Art Standard method. The same method used for single dwellings can be applied to multifamily dwellings. The NEC allows some additional demand factors for multifamily dwellings, on the presumption that there will be diversity of usage between the various units. For example, it's very unlikely that four families will run their clothes dryers, ranges, and small appliances at exactly the same time. The following steps can be used to determine feeder and service sizes for a multifamily dwelling using the standard method contained in Art. 220, Part III: Step 1: General Lighting, Small Appliance, and Laundry Demand [Table ] 3VA per sq ft for general lighting and general-use receptacles [Table ]. 1,500VA for each small-appliance circuit (minimum of 2 circuits) [220.52(A)]. 1,500VA for each laundry circuit [220.52(B)]. Step 2: Air-Conditioning versus Heat [220.51] The larger of the air-conditioning load or the space-heating load. Step 3: Appliance Calculated Load [220.53] Fig. 2. A multifamily dwelling is defined as a building with three or more dwelling units. Examples include apartment buildings, condominiums, some hotels and motels.

7 Nameplate ratings of all appliances (except heating, air-conditioning, cooking equipment, and dryers) are taken times a 75% multiplier if there are four or more on the feeder. Step 4: Household Dryer Calculated Load [220.54] Dryers are allowed the demand factors of Table , but this table does not allow less than 100% demand until there are five units or more. The 5kW minimum per dryer applies to all dwelling units [220.54]. A laundry circuit isn't required for an individual dwelling unit if the multifamily unit has common laundry facilities. Step 5: Household Cooking Equipment Calculated Load [220.55] Perhaps one of the most confusing tables in the NEC is Table for household ranges. This table is confusing because the first two columns are percentage multipliers, while the third column is a final kva value. The notes to this table further complicate matters. Be sure you study this table carefully and pay close attention to how to properly apply each column. Step 6: Service Conductor Size [Table ] When sizing the service or feeder conductors for a single-family dwelling, you can use Table (B)(6), but that is not the case when sizing conductors for the service or feeder to a two-family or multifamily dwelling. For sizing those conductors, use Table instead. Use Table (B)(6) for the feeders to an individual dwelling unit within the building. Optional method. When should you use the optional method instead of the standard one? If you have the necessary information, you'll probably want to use the optional method, because it's faster and easier to calculate. Fig. 3. Sample problem of how to size the ungrounded conductors for a 12-unit multifamily building. The optional method for multifamily dwellings is different from the one for single-family dwellings. That's because with multifamily dwellings, you apply demand factors in recognition of the diversity of usage of all the loads in all the separate units. Let's make sure this is clear. In a single family unit, you have diversity among the various types of loads. Although you have that in multifamily units as well, you have diversity among the units that make up the multifamily dwelling all of the families in a multifamily dwelling aren't using identical loads at identical times. You can use the optional method [220.84] for multifamily dwelling unit feeder and service calculations only if each dwelling unit is equipped with electric cooking equipment and electric heating and/or air-conditioning, and is supplied by no more than one feeder. Follow these rules: 1. Use the demand factors of Table , based on the number of dwelling units. 2. Determine the feeder/service neutral calculated load per Calculate house loads for common areas per Art. 220, Part III and then add them to the Table calculated load. House loads are those not directly associated with the individual dwelling units of a multifamily dwelling. Some examples include landscape and parking lot lighting, hall and stairway lighting, common recreation areas, and common laundry facilities.

8 Follow these steps: 1. Determine total connected load. 2. Calculate the load. 3. Size feeder and service conductors. Let's look at these three steps in a bit more detail by walking through an example. In practice, you may see NEC-compliant variations of executing these steps. Step 1: Determine total connected load [220.84(C)]. Add the following loads (from all the dwelling units) together, then apply the Table demand factor: 3VA per sq ft for general lighting and general-use receptacles. 1,500VA for each small-appliance circuit (minimum of two circuits). 1,500VA for each laundry circuit. The nameplate rating of all appliances. The nameplate rating of all motors. The larger of the air-conditioning load or the space-heating load. A laundry circuit isn't required for an individual dwelling unit if the multifamily unit has common laundry facilities. Step 2: Calculate the load. Apply the demand factor from Table to the total connected load (Step 1). You can convert the calculated load (kva) to amperes by: Single-Phase Formula: I = VA E Three-Phase Formula: I = VA (1.732 x E) Step 3: Size feeder and service conductors. Size the ungrounded conductors per Table , based on the calculated load. Fig. 4. Sample calculation of how to determine service conductor size on a multifamily dwelling Apply the demand factor from Table to the total connected load (Step 1). You can convert the calculated load (kva) to amperes by: Single-Phase Formula: I = VA E Three-Phase Formula: I = VA (1.732 x E) Step 3: Size feeder and service conductors. Size the ungrounded conductors per Table , based on the calculated load.

9 Example Problem A 120/240V, single-phase system supplies a 12-unit multifamily building (Fig. 3). Each 1,500 sq ft unit contains: Dishwasher 1.5kVA Water Heater 4.0kVA Washing Machine 1.2kVA Dryer 4.5kVA Range 14.4kVA A/C (230V x 17A) 3.91kVA Electric Space Heating 5.0kVA Question: What size conductor is required if the service is rated 120/240V, single-phase and the conductors are installed in parallel in two separate raceways? Step 1: Total Connected Load Step 1a: Determine the General Lighting Load: General Lighting (1,500 sq ft x 3VA = 4,500VA) Small-Appliance Circuits (2 circuits x 1,500VA = 3,000VA) Laundry Circuit (1,500VA) 4, , ,500 = 9,000 9,000VA x 12 units = 108,000VA Step 1b: Determine the Appliance Calculated Load: Dishwasher (1,500VA) Water Heater (4,000VA) Dryer [nameplate] (4,500VA) Range [nameplate] (14,400VA) 1, ,000 +4, ,400 = 24,400 24,400VA x 12 units = 292,800VA Step 1c: Compare the Air-Conditioning versus Heat Load: A/C = 3,910VA (omit) Heat = 5,000VA x 12 units = 60,000VA Step 2: Total Connected Loads General Lighting, Receptacles (108,000VA) Appliances Connected Load (292,800VA) Heat (60,000VA) 108, , ,000 = 460,800 Total Connected Load = 460,800VA Total Calculated Load = Total Connected Load x Demand Factor [Table ] Total Calculated Load = 460,800VA x 0.41 [Table ] Total Calculated Load = 188,928VA Step 3: Service Conductor Size (Fig. 4 on page xx) I = VA E

10 I = 188,928VA 240V I = 787A Conductor size if paralleled in two raceways [240.4(B)]: 787A 2 raceways = 393A per conductor Feeder/Service Conductors: Parallel 600kcmil conductors rated 420A at 75ºC [Table ] would meet these load requirements. Grounding electrode conductor sizing. What size grounding electrode conductor is required if the service ungrounded conductors are 600kcmil with two conductors in parallel in two separate raceways? 600kcmil x 2 = 1,200kcmil (equivalent area of the ungrounded conductors) [Table , Note 1]. Over 1,100kcmil for ungrounded conductors requires a grounding electrode conductor of 3/0 AWG [Table ]. Feeder installation. When installing feeders, include an equipment grounding conductor in each raceway. Section lists allowable equipment grounding conductors. To size this conductor using a wire-type equipment grounding conductor, go to Table and select the equipment grounding conductor based on the overcurrent device protecting the conductors in the raceway [ (F)]. For instance, the equipment grounding conductor in each raceway of an 800A feeder, which is paralleled using two 600kcmil conductors per phase, will require a 1/0 AWG equipment grounding conductor in each raceway. Two more samples. Working these two additional sample problems will reinforce what we've learned thus far. Size the grounding electrode conductor. Question: What size grounding electrode conductor is required if the service ungrounded conductors are 300kcmil with three conductors in parallel in three separate raceways? 300kcmil x 3 = 900kcmil equivalent area of the ungrounded conductors [Table , note 1] 900kcmil for ungrounded conductors requires a grounding electrode conductor of 2/0 AWG [Table ] Size the parallel service conductor. Question: What size conductor is required if the service with a calculated load of 787A is rated 120/240V, single-phase and the conductors are installed in parallel in four separate raceways? 787A 4 raceways = A 3/0 AWG copper is rated 200A at 75ºC [Table ], so four 3/0 AWG conductors can be paralleled for this service. A word about two-family dwellings. The feeder for a two-family dwelling unit is calculated using the standard method in Part III of Art When that calculated load exceeds the calculation for three identical units using the optional method of , the lesser of the two calculations is permitted to be used [220.85]. Avoiding confusion. The sizing of branch circuits, feeders, and service conductors for multifamily dwellings is similar to the sizing for single-family dwellings. You size the feeders to individual dwelling units in the same manner, whether that dwelling unit is a single-family dwelling or an individual unit of an apartment building. The NEC allows the use of Table (B)(6) for sizing the feeders or service conductors to an individual dwelling unit. However, to size the conductors that provide the service to a two-family or multifamily dwelling you must use Table Whether calculating the service for a single-family or a multifamily dwelling, be sure to follow the Code rules for the specific calculation you are working on and do not intermix the standard method with the optional method. Follow the steps outlined in this article and apply the demand factors allowed for each method carefully, and you will be successful.

Graded Project. National Electrical Code

Graded Project. National Electrical Code Graded Project National Electrical Code National Electrical Code INTRODUCTION This next portion of your program is a project-based assignment designed for you to demonstrate your understanding of the

More information

Electrical Essentials corrected calculation slides only

Electrical Essentials corrected calculation slides only Electrical Essentials corrected calculation slides only IAEI Southern Nevada Chapter/Educode 2015 Electrical Theory 1 Feeders and OCP 5 NEC Structure 2 Service and Grounding 6 Print Reading 3 Fault Current

More information

WIRING AND PROTECTION

WIRING AND PROTECTION 5997ch02.qxd_mg_cc 4/6/05 12:42 PM Page 5 2 WIRING AND PROTECTION (Excerpts from Chapter 2) 210.1 Scope ARTICLE 210 BRANCH CIRCUITS I. General Provisions Article 210 applies to all branch circuits except

More information

Electrical Tech Note 107

Electrical Tech Note 107 Electrical Tech Note 107 Biosystems & Agricultural Engineering Department Michigan State University Understanding the Construction Code Rules, Part 8 1 Based on the 2014 NEC and the 2015 MRC The State

More information

ONE- AND TWO-FAMILY DWELLING ELECTRICAL CODE HANDOUT (2015 Michigan Residential Code Effective February 8, 2016)

ONE- AND TWO-FAMILY DWELLING ELECTRICAL CODE HANDOUT (2015 Michigan Residential Code Effective February 8, 2016) Cheboygan County Department of Building Safety 870 South Main Street P.O. Box 70 Cheboygan, Michigan 49721 TX: (231) 627-8813 FX: (231) 627-8454 www.cheboygancounty.net Service Entrance ONE- AND TWO-FAMILY

More information

NEC Study Guide CORRECT: C NEC (A)(1)

NEC Study Guide CORRECT: C NEC (A)(1) 1 According to the NEC, the maximum distance from the point of entrance to the building that the water pipe may be used as a grounding electrode interconnect is: A. 3' B. 4' C. 5' D. 6' CORRECT: C NEC

More information

2009 ELECTRICAL CODE REQUIREMENTS

2009 ELECTRICAL CODE REQUIREMENTS 2009 ELECTRICAL CODE REQUIREMENTS ANTRIM COUNTY BUILDING DEPARTMENT PO BOX 188 205 CAYUGA STREET BELLAIRE, MI 49615 (231) 533-8373 FAX (231) 533-6041 Inspection Request Line (231) 533-3510 Electrical requirements

More information

CHAPTER 15 PART IV NATIONAL ELECTRICAL CODE, 2017

CHAPTER 15 PART IV NATIONAL ELECTRICAL CODE, 2017 CHAPTER 15 PART IV NATIONAL ELECTRICAL CODE, 2017 The City of Portsmouth adopts the State Building Code, which adopts by reference The National Electrical Code, 2017(NEC), as Chapter 15, Part IV, of the

More information

AFCI. RECEPTACLEFAQs. What is an arc fault? What causes arc faults?

AFCI. RECEPTACLEFAQs. What is an arc fault? What causes arc faults? RECEPTACLEFAQs AFCI 1 What is an arc fault? UL provides a definition for an arc fault in UL 1699 (Standard for Safety Arc Fault Circuit Interrupters). It is an unintentional arcing condition in a circuit.

More information

RESIDENTIAL ELECTRICAL INSPECTIONS CHECKLISTS

RESIDENTIAL ELECTRICAL INSPECTIONS CHECKLISTS RESIDENTIAL ELECTRICAL INSPECTIONS CHECKLISTS Key Questions for Residential Inspections 1. What wiring methods will be used, and are the wiring methods suitable for the conditions? 2. Will multiwire branch

More information

Bulletin An application for inspection not required Rule 2-005

Bulletin An application for inspection not required Rule 2-005 Bulletin 2-3-16 An application for inspection not required Rule 2-005 Scope Issued May 2016 Supersedes Bulletin 2-3-15 (1) Rule 2-005 - An application for inspection not required (Basic exemption) (a)

More information

Informational Bulletin on Mobile office Units Prepared by Mark Hilbert May 17, 2017

Informational Bulletin on Mobile office Units Prepared by Mark Hilbert May 17, 2017 Informational Bulletin on Mobile office Units Prepared by Mark Hilbert May 17, 2017 It has come to the attention of the electrical authorities having jurisdiction (AHJs) at the DOE sites there is inconsistency

More information

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 8/10/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 8/10/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions MECKLENBURG COUNTY Land Use and Environmental Service Agency Code Enforcement 8/10/11 ELECTRICAL CONSISTENCY MEETING Code Consistency Questions 1. Is low voltage cable allowed to be run through drilled

More information

APPENDIX - L INTERNATIONAL RESIDENTIAL CODE ELECTRICAL

APPENDIX - L INTERNATIONAL RESIDENTIAL CODE ELECTRICAL This Appendix (2000 IRC Appendix-L) is produced, copyrighted, and maintained by the National Fire Protection Association Association, all rights reserved. Use of this Appendix is pursuant to license with

More information

IEC and NCCER Mapping for Year 1

IEC and NCCER Mapping for Year 1 Craft: 26102-14 Safety IEC and NCCER Mapping for Year 1 Perform a visual inspection on various types of ladders 102.4 STATE GENERAL SAFETY CONSIDERATIONS IN ELECTRICAL INSTALLATIONS (LADDER SAFETY, SLECTION

More information

Spring Test 6 due 04/26/2013

Spring Test 6 due 04/26/2013 Spring Test 6 due 04/26/2013 Multiple Choice Identify the letter of the choice that best completes the statement or answers the question. 1. The article that covers TV wiring installations in residences

More information

Kitchen south wall, living room north and south wall outlets 3. not working properly; no GFCI.

Kitchen south wall, living room north and south wall outlets 3. not working properly; no GFCI. UNIT # NOTES Receptacle in living room, south wall not working properly; 1 kitchen east, north, west wall receptacles have no power. Living room north wall outlet not working properly; kitchen 2 south

More information

ll. Consistency Questions

ll. Consistency Questions Our Goal is FOR ALL STAKEHOLDERS TO HAVE A SUCCESSFUL PROJECT with us and that together we keep people and structures safe and buildings economically viable to serve the needs of our community. We strive

More information

SOUTHERN NEVADA PROPOSED AMENDMENTS TO THE 2011 NATIONAL ELECTRICAL CODE

SOUTHERN NEVADA PROPOSED AMENDMENTS TO THE 2011 NATIONAL ELECTRICAL CODE SOUTHERN NEVADA PROPOSED AMENDMENTS TO THE 2011 NATIONAL ELECTRICAL CODE ELECTRICAL CODE COMMITTEE SEPTEMBER 12, 2012 PREFACE This document was developed by the Southern Nevada Building Officials Electrical

More information

NEC CODE QUESTIONS and ANSWERS Wisconsin Chapter IAEI Green Lake, Wisconsin May 16-18, 2012

NEC CODE QUESTIONS and ANSWERS Wisconsin Chapter IAEI Green Lake, Wisconsin May 16-18, 2012 NEC CODE QUESTIONS and ANSWERS Wisconsin Chapter IAEI Green Lake, Wisconsin May 16-18, 2012 1. Can we install 120 Volt conductors in the same space with 277 Volt conductors? If the answer is yes, are there

More information

TABLE LIGHTING POWER DENSITIES FOR BUILDING EXTERIORS ASHRAE Uncovered Parking Areas. Building Grounds. Walkways 10 feet wide or greater

TABLE LIGHTING POWER DENSITIES FOR BUILDING EXTERIORS ASHRAE Uncovered Parking Areas. Building Grounds. Walkways 10 feet wide or greater TABLE 9.4.5 LIGHTING POWER DENSITIES FOR BUILDING EXTERIORS ASHRAE 90.1 Uncovered Parking Areas Parking Lots and drives Building Grounds Walkways less that 10 feet wide Walkways 10 feet wide or greater

More information

Electrical Program. Electrical Laws & Rules. Electrical RCW WAC B. Permits Inspections Access Description Directions Comments.

Electrical Program. Electrical Laws & Rules. Electrical RCW WAC B. Permits Inspections Access Description Directions Comments. Electrical Laws & Rules Licensing Electrical Work Scope Administrator Duties Certification Supervision RCW 19.28 WAC 296-46B Permits Inspections Access Description Directions Comments Electrical Program

More information

ELECTRICAL INSTALLATION PERMIT HOMEOWNER

ELECTRICAL INSTALLATION PERMIT HOMEOWNER www.technicalsafetybc.ca contact@technicalsafetybc.ca Toll Free: 1 866 566 7233 ELECTRICAL INSTALLATION PERMIT HOMEOWNER Payment Card Industry Data Security Standards prevent the use of credit card information

More information

NZECP 19: 1994 ISSN COVER PAGE

NZECP 19: 1994 ISSN COVER PAGE NZECP 19: 1994 ISSN 0114-0663 COVER PAGE NZECP:19 1994 NEW ZEALAND ELECTRICAL CODE OF PRACTICE for DETERMINATION OF MAXIMUM DEMAND in ELECTRICAL INSTALLATIONS Issued by the Office of The Chief Electrical

More information

Instructor: L. Keith Lofland

Instructor: L. Keith Lofland One and Two Family Dwelling Electrical Systems 2014 NEC AFCIs, GFCIs, and Other Dwelling Unit Requirements Training Presentation by: International Association of Electrical Inspectors Instructor: L. Keith

More information

Rocky Mountain Chapter IAEI Annual Meeting Northglenn, CO March 18-19, 2004

Rocky Mountain Chapter IAEI Annual Meeting Northglenn, CO March 18-19, 2004 Rocky Mountain Chapter IAEI Annual Meeting Northglenn, CO March 18-19, 2004 1. A 2 PVC conduit was installed in the ground prior to setting a factory manufactured home on the foundation. The required service

More information

Residential Wiring (2017 NEC) (Homestudy)

Residential Wiring (2017 NEC) (Homestudy) Residential Wiring (2017 NEC) (Homestudy) Idaho Electrical License This course will cover the requirements in the 2017 NEC for installing electrical systems in dwelling units. Code sections for residential

More information

A. Connected to the equipment ground B. Bonded to the box C. Connected to nearest water pipe D. Connected to a ground rod

A. Connected to the equipment ground B. Bonded to the box C. Connected to nearest water pipe D. Connected to a ground rod Journeyman and Master Common Exam 2 1 The grounding terminal of a grounding-type receptacle installed in a metal box shall be? A. Connected to the equipment ground B. Bonded to the box C. Connected to

More information

Residential Wiring According to the 2011 NEC

Residential Wiring According to the 2011 NEC Residential Wiring According to the 2011 NEC Utah Electrical License This course will cover the requirements in the 2011 NEC for installing electrical systems in dwelling units. Code sections for residential

More information

Residential Wiring According to 2011 NEC (Homestudy)

Residential Wiring According to 2011 NEC (Homestudy) Residential Wiring According to 2011 NEC (Homestudy) Utah Electrical License This course will cover the requirements in the 2011 NEC for installing electrical systems in dwelling units. Code sections for

More information

Residential Wiring (2014 NEC) (Homestudy)

Residential Wiring (2014 NEC) (Homestudy) Residential Wiring (2014 NEC) (Homestudy) Oregon Electrical License This course will cover the requirements in the 2014 NEC for installing electrical systems in dwelling units. Code sections for residential

More information

Proposed Amendments To The 2008 National Electrical Code

Proposed Amendments To The 2008 National Electrical Code Southern Nevada Building Officials c/o City of Henderson Building & Fire Safety Dept 240 Water Street Henderson, NV 89015 Phone: 702-267-3611 Fax: 702-267-3605 Email: Michael.Bouse@ cityofhenderson.com

More information

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot. National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: NEC Code-Making Panel 17 From: Kimberly Shea, Project Administrator

More information

TABLE OF CONTENTS CHAPTER 2 WIRING AND PROTECTION CHAPTER 1 GENERAL RULES... 19

TABLE OF CONTENTS CHAPTER 2 WIRING AND PROTECTION CHAPTER 1 GENERAL RULES... 19 TABLE OF CONTENTS About This Textbook...xi How to Use the National Electrical Code... 1 Article 90 Introduction to the National Electrical Code... 7 90.1 Purpose of the NEC... 7 90.2 Scope of the NEC...

More information

PREFACE. Your comments or suggestions are welcome and appreciated. They should be sent to:

PREFACE. Your comments or suggestions are welcome and appreciated. They should be sent to: PREFACE Because of changes in installation codes, the increasing complexity of the equipment involved, and other factors, more and more markings are being used on electrical heating and cooling equipment.

More information

Understanding Your Options: AFCI Protection and the 2015 CE Code

Understanding Your Options: AFCI Protection and the 2015 CE Code Understanding Your Options: AFCI Protection and the 2015 CE Code November 25, 2014 Eaton 2008 Eaton Corporation. All rights reserved. Classifying An Arc Fault Operational Arcs - occur in a properly functioning

More information

White Paper: Installation Guidelines for Receptacles on Small Appliance Branch Circuits in the City of Chicago

White Paper: Installation Guidelines for Receptacles on Small Appliance Branch Circuits in the City of Chicago White Paper: Installation Guidelines for Receptacles on Small Appliance Branch Circuits in the City of Chicago Section 18-27-210.52 (b) of the City of Chicago Electrical Code requires that two or more

More information

SECTION ISOLATED POWER SYSTEMS

SECTION ISOLATED POWER SYSTEMS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 20 11 ISOLATED POWER SYSTEMS SPEC WRITER NOTE: Delete between //---// if not applicable to project. Also, delete any other item or paragraph not applicable to

More information

CONTINUING EDUCATION FOR OREGON ELECTRICIANS. AMERICAN ELECTRICAL INSTITUTE PO Box Spokane, WA

CONTINUING EDUCATION FOR OREGON ELECTRICIANS. AMERICAN ELECTRICAL INSTITUTE PO Box Spokane, WA American Electrical Institute 2014 PART 2 83 CONTINUING EDUCATION FOR OREGON ELECTRICIANS AMERICAN ELECTRICAL INSTITUTE PO Box 31131 Spokane, WA 99223 www.aeitraining.com 84 PART 3 American Electrical

More information

Building Division 201 SE 3 rd STREET (Second Floor) OCALA, FL Phone: (352) BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS

Building Division 201 SE 3 rd STREET (Second Floor) OCALA, FL Phone: (352) BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used

More information

Revisions for the 2011 National Electrical Code - Part 4

Revisions for the 2011 National Electrical Code - Part 4 PDHonline Course E358 (3 PDH) Revisions for the 2011 National Electrical Code - Part 4 Instructor: Patrick Ouillette 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone &

More information

Installation Instructions

Installation Instructions H5HK Series Installation Instructions 3 Phase Electric Heater Kits Light Commercial Package A/C and Heat Pump Systems Description Installation of 208/240V and 480V H5HK 3 Phase Heater Kits in 6, 7.5 and

More information

NATIONAL ELECTRICAL CODE (NEC) & NFPA 70E ARC FLASH ELECTRICAL SAFETY

NATIONAL ELECTRICAL CODE (NEC) & NFPA 70E ARC FLASH ELECTRICAL SAFETY A new twist on the National Electrical Code - a practical application workshop. If you sign up in this class, prepare to work! Day 1: Fundamentals of OSHA requirements for performing electrical work -

More information

2014 National Electrical Code & NFPA 70E/Arc Flash

2014 National Electrical Code & NFPA 70E/Arc Flash Gain an understanding of the 2014 NEC s latest additions, revisions and changes. Learn the precautions needed when working with and around electricity. People and property need to be safeguarded from the

More information

2011 and 2014 National Electrical Code Changes Residential Only

2011 and 2014 National Electrical Code Changes Residential Only 2011 and 2014 National Electrical Code Changes Residential Only Sponsored By: and.net Instructor: Fritz Gunther, Chief Electrical Inspector 585-436-4460 www.nyeia.com NEW YORK ELECTRICAL INSPECTION AGENCY

More information

30 BUILT-IN MICROWAVE OVEN COMBINATION

30 BUILT-IN MICROWAVE OVEN COMBINATION 30 BUILT-IN MICROWAVE OVEN COMBINATION IMPORTANT INSTALLER: LEAVE THESE INSTRUCTIONS WITH THE HOMEOWNER. HOMEOWNER: RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE. ave Ovens, Compactors, Room Air Conditioners,

More information

Troy's Home Inspection Services LLC

Troy's Home Inspection Services LLC Cover Page Property Inspection Report 33706 Inspection prepared for: Cord King & Patricia King Real Estate Agent: Jane Freel - RE/MA Date of Inspection: 3/4/2017 Time: 8:30 Age of Home: 2008 Size: 3279

More information

SDEC 2017 Questions, Group 1

SDEC 2017 Questions, Group 1 SDEC 2017 Questions, Group 1 1. Do the factory wings that many fluorescent troffers have designed to fold out over the grid meet the requirements for securely fastened to the framing? Answer: NEC 410.36(B)

More information

Data Bulletin. Determining the Cause of AFCI Tripping Class 760

Data Bulletin. Determining the Cause of AFCI Tripping Class 760 Data Bulletin 0760DB0204 06/2002 Cedar Rapids, IA, USA Determining the Cause of AFCI Tripping Class 760 Retain for future use. INTRODUCTION DANGER HAZARD OF ELECTRIC SHOCK, BURN, OR EXPLOSION This document

More information

ARTESIAN 220 & 340 Instantaneous Indirect Water Heater By Dunkirk Boilers INSTALLATION AND OPERATING INSTRUCTIONS ENGINEERING MANUAL

ARTESIAN 220 & 340 Instantaneous Indirect Water Heater By Dunkirk Boilers INSTALLATION AND OPERATING INSTRUCTIONS ENGINEERING MANUAL ARTESIAN 220 & 340 Instantaneous Indirect Water Heater By Dunkirk Boilers INSTALLATION AND OPERATING INSTRUCTIONS ENGINEERING MANUAL Manufacturer's Warning To reduce the possibility of injury due to scalding,

More information

The Power of Electricity

The Power of Electricity The Power of Electricity Textbook pages 320 329 Section 9.2 Summary Before You Read What does the word power mean to you? Write a sentence using this word on the lines below. As you read about the power

More information

(House Bill 849) Public Safety Rental Dwelling Units Carbon Monoxide Alarms

(House Bill 849) Public Safety Rental Dwelling Units Carbon Monoxide Alarms Chapter 175 (House Bill 849) AN ACT concerning Public Safety Rental Dwelling Units Carbon Monoxide Alarms FOR the purpose of altering certain requirements relating to carbon monoxide alarms as the requirements

More information

Second Revision No. 601 NFPA [ Section No [Excluding

Second Revision No. 601 NFPA [ Section No [Excluding Second Revision No. 601 NFPA 70 2015 [ Section No. 300.4 [Excluding any Sub Sections] ] Where subject to physical damage, conductors, raceways, and cables shall be protected. Informational Note: Minor

More information

CITY OF LOS ANGELES LARUCP ELECTRICAL PLAN CHECK LIST

CITY OF LOS ANGELES LARUCP ELECTRICAL PLAN CHECK LIST CITY OF LOS ANGELES LARUCP ELECTRICAL PLAN CHECK LIST Plan Check No. Plan Check Expiration Date Job Address: Square Footage Use Zone Fire Zone Occ. Group Type of Construction No. of Stories Applicant Phone

More information

District 1. 1 Tony Tadysak Craig Mulder

District 1. 1 Tony Tadysak Craig Mulder STATE OF WISCONSIN Department of Safety and Professional Services 1400 E Washington Ave. Madison WI 53703 Web: dsps.wi.gov Governor Scott Walker Secretary Dave Ross Electrical Program Web: Electrical Program

More information

This fee schedule is for Building Inspection Fees only.

This fee schedule is for Building Inspection Fees only. Building Permit Fees: Minimum Fee, all permits Residential, one- and two-family including additions and.35/total sq. ft. attached garages Residences, Apartments, Three Family and Over, Row.35/total sq.

More information

Chapter 1 General... 5

Chapter 1 General... 5 About This Textbook...xi About the National Electrical Code...xv About the Authors and Illustrator...xix About the Team...xxi Article 90 Introduction to the National Electrical Code... 1 90.1 Purpose of

More information

CODE PANEL QUESTIONS

CODE PANEL QUESTIONS NORTH CAROLINA ELECTRICAL INSTITUTE 89 th ANNUAL MEETING APRIL 3-4, 2018 HILTON NORTH RALEIGH RALEIGH, NORTH CAROLINA CODE PANEL QUESTIONS Opinions of the Code Panelist are NOT interpretations issued by

More information

Exhibit A. Mechnical, Plumbing, and Electrical Plan Check and Inspection Fees. Total Cost Per Unit FEE TYPES MECHANICAL PERMIT FEES

Exhibit A. Mechnical, Plumbing, and Electrical Plan Check and Inspection Fees. Total Cost Per Unit FEE TYPES MECHANICAL PERMIT FEES Mechnical, Plumbing, and Electrical Plan Check and Inspection Fees MECHANICAL PERMIT FEES FEE TYPES Total Cost Per Unit $ 180.36 Stand Alone Mechanical Plan Check (hourly rate) $ 180 UNIT FEES: Install/Relocate

More information

RESIDENTIAL OVER. 4. Would it be permissible to hard- wire the dishwasher in question 3? If so, under what conditions?

RESIDENTIAL OVER. 4. Would it be permissible to hard- wire the dishwasher in question 3? If so, under what conditions? WELCOME TO THE EASTERN SECTION CODE BREAKFAST CODE BREAKFAST QUESTIONS FOR THE EASTERN SECTION ANNUAL MEETING 93 rd ANNUAL EASTERN SECTION MEETING, KING OF PRUSSIA, PA RESIDENTIAL ALL QUESTIONS BASED ON

More information

Michigan Chapter IAEI Annual Meeting Ann Arbor, Michigan Code Panel Questions December 5 th and 6 th, 2013

Michigan Chapter IAEI Annual Meeting Ann Arbor, Michigan Code Panel Questions December 5 th and 6 th, 2013 Michigan Chapter IAEI Annual Meeting Ann Arbor, Michigan Code Panel Questions December 5 th and 6 th, 2013 1. Is a standard wire-nut approved for a wet location as in an outside j-box? Is there a listed

More information

EFCOG Best Practice #213

EFCOG Best Practice #213 EFCOG Best Practice #13 Facility: DOE Complex Best Practice Title: Adoption of NFPA 70 017 in place of NFPA 70 014 Point of Contact: Michael Hicks NE-ID, 08-56-374, hicksmd@id.doe.gov John McAlhaney SRS,

More information

TABLE OF CONTENTS CHAPTER 1 GENERAL RULES CHAPTER 2 WIRING AND PROTECTION... 51

TABLE OF CONTENTS CHAPTER 1 GENERAL RULES CHAPTER 2 WIRING AND PROTECTION... 51 TABLE OF CONTENTS About This Textbook...xi How to Use the National Electrical Code... 1 Article 90 Introduction to the National Electrical Code... 7 90.1 Purpose of the NEC... 7 90.2 Scope of the NEC...

More information

SW District 1. 1 Tony Tadysak Craig Mulder

SW District 1. 1 Tony Tadysak Craig Mulder STATE OF WISCONSIN Department of Safety and Professional Services 1400 E Washington Ave. Madison WI 53703 Web: dsps.wi.gov Governor Scott Walker Secretary Dave Ross Electrical Program Web: Electrical Program

More information

AN ORDINANCE TO AMEND CHAPTER 7-BUILDING REGULATIONS, ARTICLE 1-UNIFORM CONSTRUCTION CODE, SECTION 7-2 -FEES TO ESTABLISH A NEW FEE SCHEDULE

AN ORDINANCE TO AMEND CHAPTER 7-BUILDING REGULATIONS, ARTICLE 1-UNIFORM CONSTRUCTION CODE, SECTION 7-2 -FEES TO ESTABLISH A NEW FEE SCHEDULE 1. BUILDING FEES: 1 AN ORDINANCE TO AMEND CHAPTER 7-BUILDING REGULATIONS, ARTICLE 1-UNIFORM CONSTRUCTION CODE, SECTION 7-2 -FEES TO ESTABLISH A NEW FEE SCHEDULE ESTABLISHMENT OF FEES PURSUANT TO N.J.A.C.

More information

SECTION C. Section Cable Trays for Electrical Systems: Additional identification requirements for cable tray systems.

SECTION C. Section Cable Trays for Electrical Systems: Additional identification requirements for cable tray systems. SECTION 26 0553 PART 1 GENERAL 1.1 SECTION INCLUDES A. Electrical identification requirements. B. Identification nameplates and labels. C. Wire and cable markers. D. Voltage markers. E. Underground warning

More information

Cable Limiters Increase System Reliability Decrease Downtime

Cable Limiters Increase System Reliability Decrease Downtime Limiters Increase System Reliability Decrease Downtime Increase system reliability and versatility with Ferraz Shawmut Limiters. Limiters are designed for the protection of low voltage distribution networks,

More information

Installation Instructions 30 French Door Built-in Wall Ovens

Installation Instructions 30 French Door Built-in Wall Ovens Installation Instructions 30 French Door Built-in Wall Ovens Questions? Call 1.800.GE.CARES (1.800.432.2737) or visit www.geappliances.com In Canada, call 1.800.561.3344 or visit www.geappliances.ca DESIGN

More information

INSTALLATION, OPERATION AND MAINTENANCE MANUAL

INSTALLATION, OPERATION AND MAINTENANCE MANUAL GE Digital Energy Power Quality INSTALLATION, OPERATION AND MAINTENANCE MANUAL GE TRANQUELL Enhanced Thermal Protection (ETP) Series Integrally Mounted Medium and High Exposure Surge Protective Devices

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 26 0519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

WIRING FOR APPLIANCES

WIRING FOR APPLIANCES RESIDENTIAL ELECTRICAL WIRING WIRING FOR APPLIANCES TEACHER S GUIDE SHOPWARE INTRODUCTION This Teacher s Guide provides information to help you get the most out of Residential Electrical Wiring: Wiring

More information

Schedule of Approved Fees

Schedule of Approved Fees Schedule of BUILDINGMISCELLANEOUS Inspection not otherwise covered by a fee and is regulated by LA County Oridnance OCCUPANCY INSPECTIONS Group R or Group M Other Groups other than R or M (Floor Area)

More information

Solar Heat Pumps Domestic Range

Solar Heat Pumps Domestic Range Solar Heat Pumps Domestic Range Who are Quantum? Quantum are the experts in Heat Pump Water Heating technology. Since 1977 we have been developing our patented technology, our products have been tried

More information

Eve Ovens, Compactors, Room Air Conditioners, Dehumidifiers, Automatic Washers, Clothes Dryers, Freezers, Refrigerator-Freezers, Ice Makers,Oishwash

Eve Ovens, Compactors, Room Air Conditioners, Dehumidifiers, Automatic Washers, Clothes Dryers, Freezers, Refrigerator-Freezers, Ice Makers,Oishwash Eve Ovens, Compactors, Room Air Conditioners, Dehumidifiers, Automatic Washers, Clothes Dryers, Freezers, Refrigerator-Freezers, Ice Makers,Oishwash BEFORE YOU BEGIN: Read the following instructions completely

More information

Installation Instructions

Installation Instructions Installation Instructions 30 Electric - Radiant Excludes Down-Draft Models If you have questions, call 800.GE.CARES or visit our website at: GEAppliances.com. In Canada, call 800.561.3344 or visit our

More information

TABLE OF CONTENTS CHAPTER 5 SPECIAL OCCUPANCIES CHAPTER 1 GENERAL RULES... 19

TABLE OF CONTENTS CHAPTER 5 SPECIAL OCCUPANCIES CHAPTER 1 GENERAL RULES... 19 TABLE OF CONTENTS About This Textbook...xiii How to Use the National Electrical Code... 1 Article 90 Introduction to the National Electrical Code... 7 90.1 Purpose of the NEC... 7 90.2 Scope of the NEC...

More information

130"ElectricCooktop. nstructlons _,0, JP355, JP910, JP930, JP940, JP950. I Iinstallation. -&WARNING - This appliance must be properly grounded.

130ElectricCooktop. nstructlons _,0, JP355, JP910, JP930, JP940, JP950. I Iinstallation. -&WARNING - This appliance must be properly grounded. I Iinstallation 130"ElectricCooktop nstructlons _,0, JP355, JP910, JP930, JP940, JP950 I r_ www.geappliances.com",,if you have questions, call 800.GE.CARES or visit our website at: I BEFORE YOU BEGIN MATERIALS

More information

Installation Instructions

Installation Instructions Installation Instructions 30 Electric Cooktop JP340, JP350, JP930, JP93, JP938, JP939 If you have questions, call 800.GE.CARES or visit our website at: www.geappliances.com BEFORE YOU BEGIN Read these

More information

GE Industrial Solutions. Residential Electronic Circuit Interrupters

GE Industrial Solutions. Residential Electronic Circuit Interrupters GE Industrial Solutions Residential Electronic Circuit Interrupters Dual Function Circuit Interrupter (DFCI) Provides ground fault and arc fault circuit protection in one unit The 2014 National Electric

More information

Installation Instructions

Installation Instructions Installation Instructions 30 Electric Cooktop JP346, JP356, PP9, PP93, PP94, PP945, PP950 If you have questions, call 800.GE.CARES or visit our website at: ge.com BEFORE YOU BEGIN Read these instructions

More information

Photovoltaic (Solar) Array Installation Guide

Photovoltaic (Solar) Array Installation Guide Building & Safety Division Community Development Department 7351 Rosanna Street, Gilroy, CA 95020 Phone: 408 846-0451 Fax: 408 846-0429 Visit us: www.cityofgilroy.org Photovoltaic (Solar) Array Installation

More information

Installation Instructions

Installation Instructions Installation Instructions Electric Heater Packages KFAEH TE: Read the entire instruction manual before starting the installation. This symbol indicates a change since the last issue. SINGLE-CIRCUIT GROUND

More information

TOM BURNS, PLANNING DIRECTOR

TOM BURNS, PLANNING DIRECTOR ~~ 0 173 COUNTY OF SANTA CRUZ August 4,2005 PLANNING DEPARTMENT 701 OCEAN STREET, qth FLOOR, SANTA CRUZ, CA 95060 (831) 454-2580 FAX: (831) 454-2131 TDD: (831) 454-2123 TOM BURNS, PLANNING DIRECTOR Agenda:

More information

Subpanels. Bring Big Amps to Distant Spaces. A subpanel is a secondary breaker box BY CLIFFORD A. POPEJOY

Subpanels. Bring Big Amps to Distant Spaces. A subpanel is a secondary breaker box BY CLIFFORD A. POPEJOY Subpanels A subpanel is a secondary breaker box Instead of originating at the main service panel, electrical circuits can begin at a nearby subpanel that is powered from the main panel through one heavy-gauge

More information

Mechanical Systems Submittal Guide

Mechanical Systems Submittal Guide 5200 Dover Center Road 440-777-8000 North Olmsted, OH 44070 North-Olmsted.com Mechanical Systems Submittal Guide Residential Code of Ohio (RCO) n applicant is free to submit any mechanical systems description

More information

IMPORTANT NOTICE BUILDERS AND CONTRACTORS WORKING IN NORTH RICHLAND HILLS, TEXAS. June 17th, 2016

IMPORTANT NOTICE BUILDERS AND CONTRACTORS WORKING IN NORTH RICHLAND HILLS, TEXAS. June 17th, 2016 IMPORTANT NOTICE BUILDERS AND CONTRACTORS WORKING IN NORTH RICHLAND HILLS, TEXAS June 17th, 2016 RE: City Council Adopts 2014 National Electrical Code with Pool Alarm Requirements On April 25th, 2016 the

More information

For more information on the MARR program or any questions on the product list, please refer to or contact MARR at

For more information on the MARR program or any questions on the product list, please refer to   or contact MARR at Major Appliance Recycling Roundtable Updated Major Appliance Recycling Roundtable - and s Background: The following document provides a detailed list of products and relevant definitions captured by the

More information

SAN JOAQUIN COUNTY ELECTRICAL PLAN CHECK CORRECTION SHEET (209) FAX (209)

SAN JOAQUIN COUNTY ELECTRICAL PLAN CHECK CORRECTION SHEET (209) FAX (209) SAN JOAQUIN COUNTY ELECTRICAL PLAN CHECK CORRECTION SHEET (209) 468-2098 FAX (209) 468-9907 PERMIT NO: DATE: PROJECT: APPLICANT: OWNER: PHONE #: PHONE # JOBSITE ADDRESS: CHECKED BY: KERMIT L. DARROW, AIA-E

More information

136"ElectricCooktop. nstructlons. I Iinstallation. -&WARNING - This appliance must be properly grounded.

136ElectricCooktop. nstructlons. I Iinstallation. -&WARNING - This appliance must be properly grounded. nstructlons I Iinstallation 136"ElectricCooktop I =_ www.g If you have EAp plia questions, nces.co m" call 800.GE.CARES or visit our website at: BEFORE YOU BEGIN MATERIALS YOU WILL NEED Read these instructions

More information

ORDINANCE NO

ORDINANCE NO ORDINANCE NO. 2017-08-031 AN ORDINANCE OF THE CITY OF LANCASTER, TEXAS, REPEALING THE NATIONAL ELECTRICAL CODE 2014 EDITION IN ITS ENTIRETY AND REPLACING IT WITH THE ADOPTION OF THE NATIONAL ELECTRICAL

More information

136"ElectricCooktop. nstructlons _,00, JP961, JP968, JP969, ZEU769. I Iinstallation. -&WARNING - This appliance must be properly grounded.

136ElectricCooktop. nstructlons _,00, JP961, JP968, JP969, ZEU769. I Iinstallation. -&WARNING - This appliance must be properly grounded. I Iinstallation 136"ElectricCooktop nstructlons _,00, JP961, JP968, JP969, ZEU769 I "?-I www.g "If you have EAp plia questions, nces.co m" call 800.GE.CARES or visit our website at: BEFORE YOU BEGIN MATERIALS

More information

City of Calabasas Building and Safety Division Fee Schedule

City of Calabasas Building and Safety Division Fee Schedule City of Calabasas Building and Safety Division Fee Schedule Resolution History: [91-52 September 25, 1991], [94-282 July 7, 1994], [2009-1171 January 14, 2009], [2011-1304 August24, 2011] [2014-1430 August

More information

ELECTRIC COOKTOP INSTALLATION INSTRUCTIONS

ELECTRIC COOKTOP INSTALLATION INSTRUCTIONS INSTALLATION AND SERVICE MUST BE PERFORMED BY A QUALIFIED INSTALLER. IMPORTANT: SAVE FOR LOCAL ELECTRICAL INSPECTOR'S USE. READ AND SAVE THESE INSTRUCTIONS FOR FUTURE REFERENCE. U.S.A. WARNING FOR YOUR

More information

2016 Electrical Supplemental Plan Review List

2016 Electrical Supplemental Plan Review List A. GENERAL REQUIREMENTS Building Division 555 Santa Clara Street Vallejo CA 94590 707.648.4374 2016 Electrical Supplemental Plan Review List 1. The plans shall bear the signature and registration number

More information

IDENTIFYING TRAY CABLES FOR YOUR NEXT INSTALLATION A WHITE PAPER

IDENTIFYING TRAY CABLES FOR YOUR NEXT INSTALLATION A WHITE PAPER IDENTIFYING TRAY CABLES FOR YOUR NEXT INSTALLATION A WHITE PAPER Published 3/23/2012 T hough rapidly increasing in popularity, tray cables are still a point of confusion for many. While the term tray cable

More information

TABLE 1-E (2017) Effective July 1, 2017

TABLE 1-E (2017) Effective July 1, 2017 TABLE 1-E (2017) Effective July 1, 2017 Oregon Amendments to the 2017edition of the National Fire Protection Association (NFPA) 70, National Electrical Code (NEC) for the 2017 Oregon Electrical Specialty

More information

2010 Residential Ques. & Ans.

2010 Residential Ques. & Ans. 1.I am replacing several existing receptacles in an older apartment building because they no longer hold the plug securely. Do I need to install tamper resistant receptacles? Ans. No 406.11, 210.52, Comm.

More information

SECTION PANELBOARDS Painting Wire and Cable Overcurrent Protective Devices.

SECTION PANELBOARDS Painting Wire and Cable Overcurrent Protective Devices. SECTION 16470 PANELBOARDS PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 09900 - Painting. 2. 16120 - Wire and Cable. 3. 16475 - Overcurrent Protective Devices. 1.02 SYSTEM DESCRIPTION A. Performance

More information

2017 NEC Presented by: Russ LeBlanc

2017 NEC Presented by: Russ LeBlanc 2017 NEC Presented by: Russ LeBlanc 1. 90.2(A)-installation and removal 2. 90.3-code layout 3. 100-readily accessible 4. 100-field evaluation body (FEB) 5. 100-field labeled 6. 100-receptacle 7. 100-structure

More information

Fire Alarm Systems ARTICLE. Introduction to Article 760 Fire Alarm Systems. Part I. General

Fire Alarm Systems ARTICLE. Introduction to Article 760 Fire Alarm Systems. Part I. General ARTICLE 760 Fire Alarm Systems Introduction to Article 760 Fire Alarm Systems Article 760 covers the installation of wiring and equipment for fire alarm systems, including all circuits controlled and powered

More information