Retrofit of the Gwinnett County DWR Facility Using Low Impact Development Practices SESWA 2012 Annual Conference October 19, 2012

Size: px
Start display at page:

Download "Retrofit of the Gwinnett County DWR Facility Using Low Impact Development Practices SESWA 2012 Annual Conference October 19, 2012"

Transcription

1 Retrofit of the Gwinnett County DWR Facility Using Low Impact Development Practices SESWA 2012 Annual Conference October 19, 2012 Jeff Herr, P.E., D.WRE National Stormwater Leader

2 Acknowledgements Steve Leo, Director, Stormwater Management Division, Gwinnett County Department of Water Resources Pete Wright, Stormwater Management Division, Gwinnett County Department of Water Resources Chuck Graham, Stormwater Management Division, Gwinnett County Department of Water Resources Jill Stachura, Project Manager, Brown and Caldwell

3 Federal LID Requirements are Expected New EPA stormwater treatment requirements will likely include volume reduction (use of LID practices). Requires newly developed and redeveloped federal facilities (> 5000 sq ft) to provide MEP volume reduction (focus on LID practices) for the 95 th percentile storm, typically inches.

4 Project Objectives Determine if it is possible to infiltrate and store/reuse on-site the runoff from the 95 th percentile storm event Determine effectiveness of different LID practices Determine construction and operation and maintenance requirements for infiltration and storage/reuse facilities Determine capital, O&M and life cycle costs for different types of LID practices Use constructed project to educate developers, engineers, and the public on the use of LID practices Promote the use of viable LID practices in Gwinnett County

5 Project Site Aerial Photograph ~31 acres total, 18.5 acres impervious, 60% impervious. Decided only the immediate site would be used for treatment; no off-site treatment. Wanted to demonstrate LID can be used for any level of imperviousness allowed by County code; residential, commercial, or industrial.

6 Completed Project Site Drainage Sub-Basin Delineation

7 Developed Historical Annual Rainfall Probability Distribution for Atlanta 1.73 inch event = 95 th % Total average annual rainfall = 49.6 inches.

8 Performed Subsurface Testing and Evaluated Site Soil Types

9 Completed In-Situ Infiltration Testing at Proposed Bottom of Engineered Soils Measured infiltration rate = 1 to 6 inches per hour at 6-8 ft below existing grade; proposed bottom elevation of infiltration practices.

10 Goal to Include at Least One of Each of These LID Practices in the Design

11 Initially Evaluated Three Different LID BMPs per Sub- Basin Evaluated effectiveness for runoff volume reduction and cost.

12 Developed Three Alternative Overall Site Retrofit Plans- Alternative A

13 Unit Capital, O&M, and Life Cycle Costs Units Capital Cost ($) Annual O&M Cost ($) LID Practice Bioretention area $/sq.ft Rain garden $/sq.ft Green roof $/sq.ft Vegetated swale $/sq.ft Filter strip $/LF Planter boxes $/box 2,500 10, ,000 Cisterns HDPE $/gal Cisterns Concrete $/gal Permeable asphalt $/sq.ft Porous concrete $/sq.ft Grass pavers $/sq.ft Concrete paver blocks $/sq.ft Planting Trees/Urban forestry $/tree 200 1, Hydrodynamic devices $/device 10, ,000 2,000 8,000

14 Preliminary Plan LID Practices Utilized

15 Estimated Runoff Volumes and Load Reductions for Sub-Basins and Project Site

16 Final Preliminary Plan Met with all DWR Department Managers and incorporated comments.

17 Moving Forward Estimated Construction Cost = $1,000,000 Estimated Annual O&M cost = $90,000 Submitted 319 (h) grant application to GA EPD; Requested $600,000 with $400,000 local match Post construction monitoring proposed for each type of LID practice Construction of Phase I (bioretention area and roof rainwater harvesting system) completed in July 2011 using another 319 (h) grant

18 Rain Barrel and Garden

19 Phase I Construction Completed in one month, July 2011

20 Pre-Construction Site Area Drainage area = 1 ac Impervious area = 0.7 ac (parking area) Parking drains to one curb inlet. 0.3 acre raised grass area available. Curb inlet for parking area

21 Excavation and Underdrain Installation Excavated area for engineered soils (3-4 ft) and loosened soil to a depth 2 ft. below proposed bottom of engineered soils. Installed 6-inch HDPE underdrain and gravel trench with 15-inch risers.

22 Engineered Soils and Gravel Backfill Installed engineer soils in 1 ft lifts and watered to consolidate. Installed gravel trenches across area to aid in runoff distribution.

23 Backfill Completion and Final Grading Installed remaining engineered soils in 1 ft lifts and watered to consolidate. Final surface grading 3-5H:1V slopes.

24 Surface Treatment Cobble, mulch, plants and sod

25 Completed Project Frequent watering was initially required due to sandy soils. Installed a 5,000 gallon tank next to building and roof rainwater harvesting system in September for watering bioretention. (1-inch rain = 1,000 gallons of water)

26 Completed Project Rainwater Harvesting 5,000 Gallon Storage and Irrigation Reuse

27 Completed Project 3-inch tall curb around inlet; runoff overflows into curb inlet when pond is full. Underdrain and risers have closed valve; Installed to be used only if pond does not infiltrate naturally. Construction cost = $100,000 Primary cost was engineered soil purchase. New curb Existing Inlet New curb cuts

28 May 2012

29 Monitoring WERF LID Study

30 Plan Refinement and 319 Grant Application Submitted new 319 grant application for retrofit of remaining front portion of site $666,000 total/$400,000 grant Announcement March 2013 Contract awarded October 2013

31 Questions Jeff Herr, P.E., D.WRE

Green Infrastructure & Low Impact Development

Green Infrastructure & Low Impact Development Green Infrastructure & Low Impact Development CITY OF COVINGTON STORMWATER MANAGEMENT WHAT IS GREEN INFRASTRUCTURE? Green infrastructure uses vegetation, soils and natural processes to manage water and

More information

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook 67 67 General Terms Specific Terms 66 Low Impact Development Approaches Handbook The vocabulary of low impact development is evolving, and many terms are used interchangeably and to describe the same or

More information

NEORSD Green Infrastructure Grant (GIG) Program Opening Remarks

NEORSD Green Infrastructure Grant (GIG) Program Opening Remarks NEORSD Green Infrastructure Grant (GIG) Program Opening Remarks 2019 NEORSD GIG Eligibility and Technical Requirements Project must be located in the Sewer District s combined sewer area Location Applicant

More information

Green Infrastructure Overview

Green Infrastructure Overview Green Infrastructure Overview Christopher C. Obropta, Ph.D., P.E. obropta@envsci.rutgers.edu Jeremiah Bergstrom, LLA, ASLA jbergstrom@envsci.rutgers.edu February 26, 2016 Water Resources Program NJDEP

More information

Post-Construction BMPs

Post-Construction BMPs Overview of Post-Construction BMPs FOR COMMERCIAL LANDSCAPERS DAN BOGOEVSKI OHIO EPA NORTHEAST DISTRICT OFFICE OCTOBER 1, 2013 What Are Post-Construction BMPs? Permanent practices that reduce storm water

More information

Selecting Appropriate Stormwater Control Measures for Your Development Project

Selecting Appropriate Stormwater Control Measures for Your Development Project Phase II Post-Construction Stormwater Requirements Workshop - February 10, 2014 Selecting Appropriate Stormwater Control Measures for Your Development Project Jill Bicknell, P.E., EOA, Inc. Outline of

More information

Using Runoff Reduction Practices to Shrink the Water Quality Volume (WQv) September 18, 2018 Jay Dorsey

Using Runoff Reduction Practices to Shrink the Water Quality Volume (WQv) September 18, 2018 Jay Dorsey Using Runoff Reduction Practices to Shrink the Water Quality Volume (WQv) September 18, 2018 Jay Dorsey This Presentation Ohio EPA Post-Construction Criteria/Guidance Runoff Reduction Accounting Green

More information

Sustainable Stormwater Retrofit Best Practices

Sustainable Stormwater Retrofit Best Practices Sustainable Stormwater Retrofit Best Practices Presenter Zach Sample, PE Stormwater Products Manager XP Solutions XP Solutions has a long history of Providing original, high-performing software solutions

More information

GREEN ON THE HORIZON. Challenges of Integrating LID into New Development. Southeast Stormwater Association

GREEN ON THE HORIZON. Challenges of Integrating LID into New Development. Southeast Stormwater Association GREEN ON THE HORIZON Challenges of Integrating LID into New Development Southeast Stormwater Association Annual Seminar, Charleston SC October 9, 2014 JENNIFER A. NUNN, PE THE BALMORAL GROUP Acknowledgments

More information

Stormwater BMP and Stream Restoration in a City Park. Jeff Herr P.E., D.WRE Jill Stachura

Stormwater BMP and Stream Restoration in a City Park. Jeff Herr P.E., D.WRE Jill Stachura Stormwater BMP and Stream Restoration in a City Park Jeff Herr P.E., D.WRE Jill Stachura 770.673.3673 JHerr@BrwnCald.com Project Location Camp Creek in Metro Atlanta 7 sq. mile drainage area at project

More information

Types and Basic Design of Post-Construction BMPs

Types and Basic Design of Post-Construction BMPs Types and Basic Design of Post-Construction BMPs F O R R E S I D E N T I A L L A N D S C A P E R S D A N B O G O E V S K I O H I O E P A N O R T H E A S T D I S T R I C T O F F I C E J U L Y 9, 2 0 1 3

More information

C.3 STORMWATER TECHNICAL GUIDANCE. Table of Contents. Glossary... viii. Chapter 1 Introduction/How to Use this Handbook

C.3 STORMWATER TECHNICAL GUIDANCE. Table of Contents. Glossary... viii. Chapter 1 Introduction/How to Use this Handbook C.3 STORMWATER TECHNICAL GUIDANCE Table of Contents Glossary... viii Chapter 1 Introduction/How to Use this Handbook... 1-1 1.1 Purpose of this Handbook... 1-1 1.2 What is the Countywide Program?... 1-2

More information

Appendix D - Technical Design Criteria for BMPs

Appendix D - Technical Design Criteria for BMPs Appendix D - Technical Design Criteria for BMPs City of Wayzata Page 3 On-site infiltration features Definitions and Scope: Infiltration facilities are constructed basins or depressions located in permeable

More information

Stormwater Control Plan: Small (Tier 1) Land Development Project

Stormwater Control Plan: Small (Tier 1) Land Development Project Stormwater Control Plan: Small (Tier 1) Land Development Project Project ID for Tracking (for City Staff only): The California Regional Water Quality Control Board for the Central Coast Region (Water Board)

More information

Attachment 2: Permeable Pavement Design Guidelines

Attachment 2: Permeable Pavement Design Guidelines Attachment 2: Permeable Pavement Design Guidelines Design of permeable pavement systems is critical if they are to function properly and efficiently. The area and shape are dependent on the site design,

More information

Structural Stormwater Best Management Practices

Structural Stormwater Best Management Practices Structural Stormwater Best Management Practices for Small Commercial and Residential Applications Timothy Bruno Watershed Manager PA Department of Environmental Protection What are STRUCTURAL BMPs? Physical

More information

Post Construction BMP Inspection. Scott Taylor, P.E. Stormwater

Post Construction BMP Inspection. Scott Taylor, P.E. Stormwater Post Construction BMP Inspection Scott Taylor, P.E. Learning Objectives To Understand: Types of post construction BMPs Typical construction process of BMPs Construction errors that impact BMP operation

More information

Preparing a Stormwater Control Plan for a Small Land Development Project

Preparing a Stormwater Control Plan for a Small Land Development Project Preparing a Stormwater Control Plan for a Small Land Development Project Addendum to the Stormwater C.3 Guidebook December 1, 2012 Introduction As of December 1, 2012, development projects that create

More information

SMALL PROJECTS SIMPLIFIED APPROACH

SMALL PROJECTS SIMPLIFIED APPROACH SMALL PROJECT APPLICATION AND STORMWATER MANAGEMENT DESIGN ASSISTANCE MANUAL FOR SMALL PROJECTS IN FULTON TOWNSHIP LANCASTER COUNTY, PENNSYLVANIA SMALL PROJECTS SIMPLIFIED APPROACH Prepared By: Light-Heigel

More information

Time Value of Money and Optimization Process

Time Value of Money and Optimization Process Time Value of Money and Optimization Process Cost Definitions Inflation increase in cost of products over time, decrease of purchasing power Recurring cost a cost that happens multiple times at regular

More information

Page 19 L.L.C. (Previously the United Salad Co. Garage) 939 SE Alder St.

Page 19 L.L.C. (Previously the United Salad Co. Garage) 939 SE Alder St. Page 19 L.L.C. (Previously the United Salad Co. Garage) 939 SE Alder St. Project Summary Project Type: Technologies: Major Benefits: Light industrial retrofit (parking lot) - demonstration project Landscape

More information

Rain Gardens Water Quality the Way Mother Nature Intended

Rain Gardens Water Quality the Way Mother Nature Intended Rain Gardens Water Quality the Way Mother Nature Intended Maintenance Discussion Design Discussion Susan Morgan, Ph.D, PE Southern Illinois University Edwardsville smorgan@siue.edu (618) 650 5014 Michael

More information

Karen Wiggen, RLA PGM/Planning Bob Harrington, P.E. PGM/CPIS Michael Clar, P.E. - ECOSITE

Karen Wiggen, RLA PGM/Planning Bob Harrington, P.E. PGM/CPIS Michael Clar, P.E. - ECOSITE Karen Wiggen, RLA PGM/Planning Bob Harrington, P.E. PGM/CPIS Michael Clar, P.E. - ECOSITE Presentation Highlights Background of Grant Award What are the County s grant requirements? Maryland Stormwater

More information

NON-PRIORITY PROJECT WATER QUALITY PLAN (NPP)

NON-PRIORITY PROJECT WATER QUALITY PLAN (NPP) NON-PRIORITY PROJECT WATER QUALITY PLAN (NPP) For: (Insert Project Name) (Site Address or Tract/Lot Number) Prepared for: (Insert Owner/Developer Name) (Insert Address) (Insert City, State, ZIP) (Insert

More information

Green Infrastructure in the Greater Lansing Area

Green Infrastructure in the Greater Lansing Area Green Infrastructure in the Greater Lansing Area Friday May 9, 2014 David Christian, PE DC Engineering Lansing, MI Dan Christian, PE Tetra Tech Lansing, MI 1 2 Edgewood Village Center Cedar St School Harvesting

More information

4. CONCEPT PLAN DEVELOPMENT

4. CONCEPT PLAN DEVELOPMENT 4. CONCEPT PLAN DEVELOPMENT Concept Plan Step 1: Identify Site Constraints and Opportunities Review the existing site to identify constraints and opportunities for GI Practices to meet the RRv. Constraints

More information

12/31/2014 County of Mendocino s Low Impact Design Standards Manual v1.0 A P P E N D I X 8. Site Design Measures. 32 P a g e

12/31/2014 County of Mendocino s Low Impact Design Standards Manual v1.0 A P P E N D I X 8. Site Design Measures. 32 P a g e 12/31/2014 County of Mendocino s Low Impact Design Standards Manual v1.0 A P P E N D I X 8 Site Design Measures 32 P a g e Rooftop and Impervious Area Disconnection (Self-retaining areas) Description Disconnection

More information

6.1 Bioretention Areas

6.1 Bioretention Areas SAN MATEO COUNTYWIDE WATER POLLUTION PREVENTION PROGRAM 6.1 Bioretention Areas Figure 6-1. Bioretention Area. Source: City of Brisbane Bioretention areas 1, or rain gardens, are concave landscaped areas

More information

Green Infrastructure and Low-Impact Development Technologies

Green Infrastructure and Low-Impact Development Technologies Green Infrastructure and Low-Impact Development Technologies The guiding principles of these technologies is to manage stormwater at their sources using natural means, and establish conditions so that

More information

SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS

SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS Introduction As required by federal and state law, the Borough of Swarthmore has adopted regulations that affect stormwater runoff and surface

More information

Site Design for Protecting Water Quality 2013 Award Winning Projects

Site Design for Protecting Water Quality 2013 Award Winning Projects C.3. Workshop, May 29, 2013 Site Design for Protecting Water Quality 2013 Award Winning Projects Vishakha Atre Santa Clara Valley Urban Runoff Program Current New Development and Redevelopment Requirements

More information

Case Study: Dallas Green Infrastructure for Stormwater

Case Study: Dallas Green Infrastructure for Stormwater Case Study: Dallas Green Infrastructure for Stormwater Extension and Research Sandhya Mohan Fouad H. Jaber, PhD Biological and Agricultural Engineering Texas Agrilife, Texas A&M University System Urban

More information

WEFTEC.06. ** City of Caldwell, Idaho

WEFTEC.06. ** City of Caldwell, Idaho COST-BENEFIT ANALYSIS OF URBAN STORMWATER RETROFITS AND STREAM DAYLIGHTING USING LOW IMPACT DEVELOPMENT TECHNOLOGIES Sherrill Doran*, Dennis Cannon** * CH2M HILL, 322 East Front Street, Suite 200 Boise,

More information

County of Prince Edward. Stormwater Management Plan. Agreement in lieu of a Stormwater Management Plan

County of Prince Edward. Stormwater Management Plan. Agreement in lieu of a Stormwater Management Plan County of Prince Edward Stormwater Management Program Date: E-Permitting Number: This stormwater management plan (Agreement) is hereby submitted by the Owner to specify the methods that will be implemented

More information

6.2 Flow-Through Planter

6.2 Flow-Through Planter SAN MATEO COUNTYWIDE WATER POLLUTION PREVENTION PROGRAM 6.2 Flow-Through Planter Figure 6-8: At-grade flow-through planter. Source: City of Emeryville Best uses Treating roof runoff Next to buildings Dense

More information

Retrofitting Low Impact Development (LID) for Stormwater at Sacramento State. City of Sacramento Sacramento State Facilities Management

Retrofitting Low Impact Development (LID) for Stormwater at Sacramento State. City of Sacramento Sacramento State Facilities Management Retrofitting Low Impact Development (LID) for Stormwater at Sacramento State City of Sacramento Sacramento State Facilities Management Project Background Campus Storm Drain System Drain Inlet - Campus

More information

My Soil Won t Drain, Can I Still Use LID? Rob Buchert, John Knutson, Erik Pruneda

My Soil Won t Drain, Can I Still Use LID? Rob Buchert, John Knutson, Erik Pruneda My Soil Won t Drain, Can I Still Use LID? Rob Buchert, John Knutson, Erik Pruneda Presentation Topics Background information Designing LID for cold and snow prone conditions Applying LID in Pullman s low

More information

Highlights from WERF Stormwater Research and Future Opportunities

Highlights from WERF Stormwater Research and Future Opportunities Highlights from WERF Stormwater Research and Future Opportunities Jeff Moeller, P.E. Director of Water Technologies Water Environment Research Foundation jmoeller@werf.org WEFTEC 2013 Stormwater Pavilion

More information

Low Impact Development at Naval Facilities: Opportunities and Constraints

Low Impact Development at Naval Facilities: Opportunities and Constraints Low Impact Development at Naval Facilities: Opportunities and Constraints Jim Harris, PE and Khoi Nguyen, PhD, PE Naval Facility Engineering Command Atlantic Sustainability Track 8027 - May 7, 2009 Environment,

More information

Planning, Design, and Construction of Green Infrastructure.

Planning, Design, and Construction of Green Infrastructure. Planning, Design, and Construction of Green Infrastructure www.water.rutgers.edu What is Green Infrastructure? an approach to stormwater management that is costeffective, sustainable, and environmentally

More information

Slow it, Spread it, Sink it using Green Stormwater Infrastructure

Slow it, Spread it, Sink it using Green Stormwater Infrastructure Milly Archer Water Resources Coordinator Becky Tharp Green Infrastructure Collaborative Slow it, Spread it, Sink it using Green Stormwater Infrastructure Overview Defining LID and GSI Hydrology and impacts

More information

Retrofitting Commercial Shopping Centers

Retrofitting Commercial Shopping Centers Retrofitting Commercial Shopping Centers Making an impact with LID Overview Commercial Development LID Retrofit Issues Tips and techniques Costs and O&M issues Commercial Development LID Retrofit Issues

More information

Intentionally Left Blank

Intentionally Left Blank Intentionally Left Blank CITY OF LOS ANGELES LOW IMPACT DVELOPMENT BEST MANAGEMENT PRACTICES HANDBOOK LOW IMPACT DEVELOPMENT (LID) CHECKLIST SMALL SCALE RESIDENTIAL (4 UNITS OR LESS) WPD Project Plan Checker:

More information

State Water Board s Post Construction Stormwater Calculator. Instructions for El Centro

State Water Board s Post Construction Stormwater Calculator. Instructions for El Centro State Water Board s Post Construction Stormwater Calculator Instructions for El Centro Important: This workbook must be completed for each Drainage Management Area (DMA) in the project site. For example,

More information

Impervious Cover Assessment and Reduction Action Plan for Woodstown, New Jersey

Impervious Cover Assessment and Reduction Action Plan for Woodstown, New Jersey Impervious Cover Assessment and Reduction Action Plan for Woodstown, New Jersey Christopher C. Obropta, Ph.D., P.E. obropta@envsci.rutgers.edu www.water.rutgers.edu March 24, 2015 Rutgers Cooperative Extension

More information

J. Paul Guyer, P.E., R.A.

J. Paul Guyer, P.E., R.A. J. Paul Guyer, P.E., R.A. Paul Guyer is a registered civil engineer, mechanical engineer, fire protection engineer, and architect with over 35 years experience in the design of buildings and related infrastructure.

More information

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater) Applicability: Required for projects that create and/or replace 5,000 square feet or greater of impervious surface (i.e. asphalt roads, concrete structures, building area, sidewalks, etc.). Impervious

More information

2014 Southeast NY Stormwater Conference October 15, John Dunkle, PE, CPESC, CMS4S

2014 Southeast NY Stormwater Conference October 15, John Dunkle, PE, CPESC, CMS4S 2014 Southeast NY Stormwater Conference October 15, 2014 John Dunkle, PE, CPESC, CMS4S GI Practices Green Space Riparian Buffers/Grass Filter Strips Tree Planting/Preservation Rooftop Disconnect Porous

More information

Stormwater Technical Guide

Stormwater Technical Guide Stormwater Technical Guide Compliance with Stormwater Post-Construction Requirements in Santa Barbara County Dan Cloak, Principal Dan Cloak Environmental Consulting January 9, 2014 Introduce yourself Name

More information

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018 Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018 Potential Impacts of New Development Urban development can significantly increase stormwater runoff Water quality considerations

More information

Can Urban Redevelopment Restore Aquatic Resources

Can Urban Redevelopment Restore Aquatic Resources Can Urban Redevelopment Restore Aquatic Resources with Standards for Stormwater Retention and Landscape Performance? Rebecca C. Stack District of Columbia Department of the Environment Industry, Agriculture,

More information

Chapter 6. Green Streets

Chapter 6. Green Streets Chapter 6. Green Streets Description Green streets are designed in a holistic manner that minimizes impervious surfaces, emphasizes landscaped elements, includes measures for enhancing water quality, while

More information

Small Town Sustainable Stormwater Solutions

Small Town Sustainable Stormwater Solutions Small Town Sustainable Stormwater Solutions Kathryn Hamilton, RLA, ASLA Westmoreland Conservation District PA/DE ASLA Annual Meeting April 8-9, 8 2011 Urban, Industrial, Residential, Agricultural Flooding,

More information

Why and How to Evaluate the Feasibility of Infiltrating or Harvesting and Using Stormwater. Laura Prickett, EOA, Inc.

Why and How to Evaluate the Feasibility of Infiltrating or Harvesting and Using Stormwater. Laura Prickett, EOA, Inc. Why and How to Evaluate the Feasibility of Infiltrating or Harvesting and Using Stormwater Laura Prickett, EOA, Inc. November 17, 2011 Outline of Presentation Why prioritize infiltration and harvest/use

More information

CHAPTER 11 SITE DESIGN AND LOW IMPACT DEVELOPMENT

CHAPTER 11 SITE DESIGN AND LOW IMPACT DEVELOPMENT CHAPTER 11 SITE DESIGN AND LOW IMPACT DEVELOPMENT Source: City of Bend Chapter Organization 11.1 Purpose... 11-1 11.2 Applicability... 11-1 11.3 Low Impact Development Overview... 11-2 11.3.1 Key Strategies...

More information

Urban Rain Gardens: Capturing our local water. Martha Berthelsen The Watershed Project

Urban Rain Gardens: Capturing our local water. Martha Berthelsen The Watershed Project Urban Rain Gardens: Capturing our local water Martha Berthelsen The Watershed Project www.thewatershedproject.org The Watershed Project s mission is to inspire Bay Area communities to understand, appreciate,

More information

Bioretention cell schematic key

Bioretention cell schematic key Bioretention Cells Bioretention cell schematic key 1 3 Hardwood mulch 2 Curb cut 3 18-30 Modified soil 4 Stone aggregate choker layer 5 Stone aggregate base layer 6 Subdrain 7 Undisturbed soil 8 Overflow/Cleanout

More information

Going Green with the NYS Stormwater Design Standards

Going Green with the NYS Stormwater Design Standards Going Green with the NYS Stormwater Design Standards Shohreh Karimipour, P.E. NYSDEC History of Stormwater Management Ancient Greek Cisterns Water Cistern Systems in Greece from Minoan to Hellenistic Period,

More information

Introduction to Low Impact Development. Fred Milch. East Central Florida Regional Planning Council

Introduction to Low Impact Development. Fred Milch. East Central Florida Regional Planning Council Introduction to Low Impact Development Fred Milch East Central Florida Regional Planning Council Low Impact Development (LID) Low impact development (LID) is a term used to describe a land planning and

More information

Costs Design Construction Operation Maintenance

Costs Design Construction Operation Maintenance LID Considerations Costs Design Construction Operation Maintenance LID Design Manuals New Hanover County, NC San Diego, CA City of Salinas, CA Washington, Puget Sound Partnership San Mateo Conventional

More information

LID/GI and BMP Case Studies

LID/GI and BMP Case Studies LID/GI and BMP Case Studies Metro Atlanta Goal Reduction of runoff volume and pollutant load Aesthetic improvement/revitalization Opportunistic project implementation Policy, funding, and planning Partnering

More information

County of Fairfax, Virginia

County of Fairfax, Virginia County of Fairfax, Virginia To protect and enrich the quality of life for the people, neighborhoods, and diverse communities of Fairfax County DATE: July 16, 2007 TO: SUBJECT: All Architects, Attorneys,

More information

INTRODUCTION TO GREEN INFRASTRUCTURE HOW WE CAN PROTECT OUR COMMUNITIES AND OUR WATERS Maywood Public Library Bergen County, New Jersey

INTRODUCTION TO GREEN INFRASTRUCTURE HOW WE CAN PROTECT OUR COMMUNITIES AND OUR WATERS Maywood Public Library Bergen County, New Jersey INTRODUCTION TO GREEN INFRASTRUCTURE HOW WE CAN PROTECT OUR COMMUNITIES AND OUR WATERS Maywood Public Library Bergen County, New Jersey Jeremiah D. Bergstrom, LLA, ASLA Rutgers Cooperative Extension Water

More information

3. Are there any projects exempt from the definition of Regulated Projects?

3. Are there any projects exempt from the definition of Regulated Projects? STORMWATER REQUIREMENTS: OVERVIEW OF PROVISION C.3 Background: On October 14, 2009, the Regional Water Quality Control Board, San Francisco Bay Region, issued a municipal regional stormwater permit (MRP)

More information

Two Sides of the Green Infrastructure Coin. Jaren Hiller, PE, LEED AP Nathan Guequierre

Two Sides of the Green Infrastructure Coin. Jaren Hiller, PE, LEED AP Nathan Guequierre Two Sides of the Green Infrastructure Coin Jaren Hiller, PE, LEED AP Nathan Guequierre May 5, 2016 Background Citywide Stormwater Planning WinSLAMM Analysis No Control Existing Conditions Proposed Conditions

More information

Local Stormwater Retrofit Case Studies. Westmoreland County Conservation District Updated 11/2011

Local Stormwater Retrofit Case Studies. Westmoreland County Conservation District Updated 11/2011 Local Stormwater Retrofit Case Studies Westmoreland County Conservation District Updated 11/2011 WCD 2010 Why we do Sustainable Stormwater Management Retrofits To reduce flooding events and combined sewer

More information

Development of LID Design Guide in Edmonton

Development of LID Design Guide in Edmonton Development of LID Design Guide in Edmonton Xiangfei Li and Fayi Zhou, the City of Edmonton Dan Healy, AMEC Earth and Environmental Philadelphia LID Symposium September 26, 2011 Outline Why LID Why develop

More information

Charles County, MD Low Impact Development (LID)/ Environmental Site Design (ESD) Ordinance & Design Manual

Charles County, MD Low Impact Development (LID)/ Environmental Site Design (ESD) Ordinance & Design Manual Charles County, MD Low Impact Development (LID)/ Environmental Site Design (ESD) Ordinance & Design Manual Presentation Highlights Background What is LID / ESD? Why adopt LID/ESD MD SWM Act 2007 Planning

More information

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS 5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS Low Impact Development (LID) requires a shift in stormwater management away from conveying runoff to a small number of downstream points through hydraulically

More information

Ken Kortkamp, PE San Francisco Public Utilities Commission San Francisco, CA

Ken Kortkamp, PE San Francisco Public Utilities Commission San Francisco, CA Ken Kortkamp, PE San Francisco Public Utilities Commission San Francisco, CA Development Process of San Francisco s GI Typical Details SCVURPPP GI Workshop April 19, 2017 Outline How to develop GI details

More information

Green Infrastructure Stormwater Management Options in an Ultra-Urban Redevelopment. Sandy Doyle-Ahern

Green Infrastructure Stormwater Management Options in an Ultra-Urban Redevelopment. Sandy Doyle-Ahern Green Infrastructure Stormwater Management Options in an Ultra-Urban Redevelopment Sandy Doyle-Ahern sdoyleahern@emht.com + The City of Columbus Downtown Business Plan was developed in 2002 with the goal

More information

Inspection and Maintenance of Stormwater Best Management Practices

Inspection and Maintenance of Stormwater Best Management Practices FAC T S H E E T Inspection and Maintenance of Stormwater Best Management Practices is a general term that refers to vegetated stormwater best management practices (BMPs) that temporarily store rainwater

More information

Planning and Design: Applied LID Techniques Redevelopments, Housing, Mixed Use, Infrastructure

Planning and Design: Applied LID Techniques Redevelopments, Housing, Mixed Use, Infrastructure Civil Engineering Landscape Architecture Environmental Restoration Planning Planning and Design: Applied LID Techniques Redevelopments, Housing, Mixed Use, Infrastructure Peg Staeheli, ASLA, LEED AP March

More information

COMMUNITY DEVELOPMENT DEPARTMENT POLICY DRAINAGE FOR RESIDENTIAL PROJECTS WITH ONE OR TWO UNITS REVISED JANUARY 4, 2018

COMMUNITY DEVELOPMENT DEPARTMENT POLICY DRAINAGE FOR RESIDENTIAL PROJECTS WITH ONE OR TWO UNITS REVISED JANUARY 4, 2018 COMMUNITY DEVELOPMENT DEPARTMENT POLICY DRAINAGE FOR RESIDENTIAL PROJECTS WITH ONE OR TWO UNITS REVISED JANUARY 4, 2018 A. California Residential Code Requirement - Construction plans shall indicate how

More information

Impervious Cover Reduction Action Plan for City of Vineland, Cumberland County, New Jersey

Impervious Cover Reduction Action Plan for City of Vineland, Cumberland County, New Jersey Impervious Cover Reduction Action Plan for City of Vineland, Cumberland County, New Jersey Prepared for the City of Vineland by the Rutgers Cooperative Extension Water Resources Program May 23, 2016 Table

More information

Homeowners Guide to Stormwater BMP Maintenance

Homeowners Guide to Stormwater BMP Maintenance Homeowners Guide to Stormwater BMP Maintenance What You Need to Know to Take Care of Your Property Rain Barrel Dry Well Rain Garden Pervious Asphalt Porous Pavers City of El Monte Stormwater BMP Management

More information

Rebecca Dohn October 13, 2017

Rebecca Dohn October 13, 2017 Rebecca Dohn October 13, 2017 Why Green Infrastructure? Population Growth 46,000 45,000 44,000 43,000 42,000 41,000 40,000 39,000 38,000 37,000 36,000 Impervious Acres 2 Why Green Infrastructure? 3 Why

More information

Managing Stormwater within the Road Right-of-Way: An Urban NAI Approach

Managing Stormwater within the Road Right-of-Way: An Urban NAI Approach Turgay Dabak, Joni Calmbacher, Sara DeGroot, Andrea Ryon Managing Stormwater within the Road Right-of-Way: An Urban NAI Approach Presentation Outline Project Background Project Overview BMPs Evaluated

More information

Building Green: An Update on Atlanta's Green Infrastructure Approach

Building Green: An Update on Atlanta's Green Infrastructure Approach City of Atlanta Mayor Kasim Reed Department of Watershed Management Building Green: An Update on Atlanta's Green Infrastructure Approach Cory Rayburn, CPESC, CFM Environmental Program Manager SESWA Spring

More information

West Virginia Stormwater Management Manual: Methods.

West Virginia Stormwater Management Manual: Methods. West Virginia Stormwater Management Manual: Methods Created to deliver targeted training on new tools and practices to improve the quality of stormwater runoff. www.cbstp.org www.chesapeakestormwater.net

More information

Horsley Witten Group Sustainable Environmental Solutions. Rich Claytor, P.E. Janet Bernardo, P.E. horsleywitten.com

Horsley Witten Group Sustainable Environmental Solutions. Rich Claytor, P.E. Janet Bernardo, P.E. horsleywitten.com Horsley Witten Group Sustainable Environmental Solutions Rich Claytor, P.E. Janet Bernardo, P.E. horsleywitten.com 857-263-8193 Agenda Introduction & Grant Goals Stormwater & GI Overview Grant Work Completed

More information

Draft Impervious Cover Reduction Action Plan for Newark, Essex County, New Jersey Volume 3

Draft Impervious Cover Reduction Action Plan for Newark, Essex County, New Jersey Volume 3 Draft Impervious Cover Reduction Action Plan for Newark, Essex County, New Jersey Volume 3 Prepared for the City of Newark by the Rutgers Cooperative Extension Water Resources Program April 16, 2018 Table

More information

Stormwater Low Impact Development - A Natural Solution

Stormwater Low Impact Development - A Natural Solution Stormwater Low Impact Development - A Natural Solution Sarah U Ren Program Director The Watershed Center of Grand Traverse Bay 231-935-1514, suren@gtbay.org Our Mission: The Watershed Center advocates

More information

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE Codes analyses for each subcommittee were completed to assist participants of the Richland County Site Planning Roundtable.

More information

Draft Impervious Cover Reduction Action Plan for West New York, Hudson County, New Jersey

Draft Impervious Cover Reduction Action Plan for West New York, Hudson County, New Jersey Draft Impervious Cover Reduction Action Plan for West New York, Hudson County, New Jersey Prepared for the Town of West New York by the Rutgers Cooperative Extension Water Resources Program March 29, 2017

More information

Draft Impervious Cover Reduction Action Plan for West Long Branch Borough, Monmouth County, New Jersey

Draft Impervious Cover Reduction Action Plan for West Long Branch Borough, Monmouth County, New Jersey Draft Impervious Cover Reduction Action Plan for West Long Branch Borough, Monmouth County, New Jersey Prepared for West Long Branch Borough by the Rutgers Cooperative Extension Water Resources Program

More information

Jill Stachura STORMWATER BMP AND STREAM RESTORATION IN A CITY PARK. October 2013 Southeast Stormwater Association Annual Conference, Charlotte, NC

Jill Stachura STORMWATER BMP AND STREAM RESTORATION IN A CITY PARK. October 2013 Southeast Stormwater Association Annual Conference, Charlotte, NC Jill Stachura STORMWATER BMP AND STREAM RESTORATION IN A CITY PARK October 2013 Southeast Stormwater Association Annual Conference, Charlotte, NC Project Location Gwinnett County, GA: Population: 825,000

More information

Putting a LID on Stormwater Pollution. Michele Loudenback, RPES Stormwater Enforcement Water Quality Division

Putting a LID on Stormwater Pollution. Michele Loudenback, RPES Stormwater Enforcement Water Quality Division Putting a LID on Stormwater Pollution Michele Loudenback, RPES Stormwater Enforcement Water Quality Division Outline Brief Regulatory History Conventional vs. Green Practices LID/GI Controls in Use Clean

More information

Small Project Guidance Document

Small Project Guidance Document Small Project Guidance Document Introduction If you are considering a relatively small construction project on your property that creates new impervious area and you need to manage the stormwater that

More information

Proposed Credit Program

Proposed Credit Program Proposed Credit Program What is the credit program? The proposed credit program will provide property owners with the opportunity to reduce their annual Stormwater Utility bill by up to 40% by managing

More information

RETAINING RUNOFF AT ITS SOURCE

RETAINING RUNOFF AT ITS SOURCE RETAINING RUNOFF AT ITS SOURCE Atlantic Beach Case Study Jose Maria Guzman, PE, D.WRE Jacksonville Environmental Symposium August 2013 Outline Overview of stormwater issues in Atlantic Beach, FL City s

More information

New Tools/Resources for

New Tools/Resources for New Tools/Resources for C.3 Stormwater Compliance Laura Prickett, AICP, EOA, Inc. Santa Clara Valley Urban Runoff Pollution Prevention Program Outline of Presentation Updated C.3 Handbook Handbook outline

More information

Draft Impervious Cover Reduction Action Plan for Newark, Essex County, New Jersey Volume 2

Draft Impervious Cover Reduction Action Plan for Newark, Essex County, New Jersey Volume 2 Draft Impervious Cover Reduction Action Plan for Newark, Essex County, New Jersey Volume 2 Prepared for the City of Newark by the Rutgers Cooperative Extension Water Resources Program April 16, 2018 Table

More information

From and

From   and GREEN INFRASTRUCTURE IN PROVIDENCE, RI The Box Office From http://web.uri.edu/riss/the-box-office/ and http://www.morrisbeacon.com/media/portfolioprojects/implementation/box-office/box%20office.pdf: At

More information

Green Infrastructure Incentives. Abby Hall EPA Headquarters Office of Policy, Economics and Innovation

Green Infrastructure Incentives. Abby Hall EPA Headquarters Office of Policy, Economics and Innovation Green Infrastructure Incentives Abby Hall EPA Headquarters Office of Policy, Economics and Innovation Types of Incentives Fee Discount Development Incentives Rebates & Installation Financing Stormwater

More information

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT INTRODUCTION In recent years, the University of Cincinnati (University) has demonstrated a commitment to identifying and implementing sustainable goals and objectives throughout University s Uptown Campuses.

More information

Storm Water Managament at the University of Michigan

Storm Water Managament at the University of Michigan Storm Water Managament at the University of Michigan Standard Operating Procedure Date: 06/23/17 Revision #: 03 The green roof installed on top of the Mott Children s & Von Voigtlander Women s Hospital.

More information

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA. February 21, 2018

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA. February 21, 2018 Example Stormwater Control Plan For a Residential Subdivision Project Whispering Pines Lane Anytown, USA February 21, 2018 XYZ Corporation Jane Jones, 925-555-1212 This example prepared by Dan Cloak Environmental

More information

Monitoring Flow and Quality for Stormwater Control Measures

Monitoring Flow and Quality for Stormwater Control Measures Monitoring Flow and Quality for Stormwater Control Measures Robert Traver, Ph.D., PE, D.WRE. Andrea L. Welker, PhD, PE Bridget Wadzuk, PhD, John Komlos, PhD The mission of the Villanova Urban Stormwater

More information

LID Permit Requirements. Lisa Austin. Geosyntec Consultants

LID Permit Requirements. Lisa Austin. Geosyntec Consultants LID Permit Requirements Lisa Austin Geosyntec Consultants Presentation Outline Types of LID Permit Requirements Specified site design Specified LID BMPs LID performance metrics Specified Site Design (San

More information