Florida Stormwater Association 2015 Annual Conference June 17 19, 2015
|
|
- Dwayne Miles
- 5 years ago
- Views:
Transcription
1 Presented by: Patricia Gertenbach, P.G. E Sciences Ryan Mitchell, P.E. E Sciences Danielle Straub, P.E. City of Melbourne Florida Stormwater Association 2015 Annual Conference June 17 19, 2015
2 Presentation will be three parts: 1. Introduction to Topic and Why it s Important Pattie 2. Example of Stormwater Facilities that are NOT Ponds Ryan 3. More Example Projects and Lessons Learned - Dani Welcome
3 Ponds Ponds are a vital tool in managing stormwater storage and treatment Ponds have traditionally been the focus of the Stormwater Management
4 Ponds Require Land Land can be expensive Many areas of Florida are already built out and land available for ponds is scarce. Marco Island, FL Miami, FL Where will you store and treat the water?
5 Stormwater Dynamics are Changing As you have heard and will hear from several presenters at this conference, parts of Florida are experiencing flooding as a result of higher tides. We have noticed mangroves growing at outfalls that never had them before. In addition to sea level rise, stormwater managers may have to address more frequent severe storms, such as happened just a few weeks ago in the Midwest: May is already the wettest on record for several cities in the southern Plains states. So far this year, Oklahoma City has recorded inches of rain. Last year the state's capital got only 4.29 inches.
6 Stormwater Dynamics are Changing The storage capacity in some areas is shrinking due to higher groundwater table levels. E Sciences was contracted by the City of Miami Beach to develop a plan to evaluate the correlation between the City s groundwater table elevation and sea level. To save money, we used existing wells, not as evenly distributed or as representative of different scenarios, but provided sufficient information.
7 Result: Higher Groundwater Table Very good correlation. City revised their Stormwater Master Plan to design to higher groundwater table elevation. Future Studies: You need at least one year of data You can start with existing wells, but be sure to identify the data gaps, in case you want to expand the study.
8 Where Will You Put the Water? There is speculation that maybe the 100-year storm is becoming the 25-year storm. That systems designed 30 or even 20 years ago, using gravity flow to surface or marine waters may not drain. Adaptation Plans may need to be tied to surface water and ground water levels, rather than years in operation. Flooded street in older neighborhood. Residents report that flooding here now occurs several times per year, whereas in the past, this street rarely flooded.
9 Where Will You Put the Water? New designs and technologies give stormwater managers more options not just ponds. Work with manufacturers - they are staying ahead of the curve and getting better all the time Now Ryan is going to talk about projects he s done using these and other products and ideas.
10 Highlands Avenue Parking Lot 1.4 Acre Drainage Basin Site Characteristics Gravel parking lot Type A soils Commercial Shopping Area Poor Drainage Minor flooding No water quality treatment
11 Highlands Avenue Parking Lot Project Goals Alleviate Flooding Provide Water Quality Treatment Improve Aesthetics
12 Highlands Avenue Parking Lot Project Design Install inlets in east alley Convert parking lot into a retention basin using PaveDrain pavers Construction emergency outfall to existing storm inlets
13 Project Design Installed inlets in alleyway 4 feet of aggregate under pavers Exfiltration pipe runs through aggregate Added ADA sidewalk, existing sidewalk was not on City property or ADA. Low maintenance landscape
14 Construction Sequence
15
16
17 Croton Road Treatment Swale Sheet Flow
18 Croton Road Treatment Swale
19 Stormwater Master Plan Completed November Projects 9,735 lb/year of TN estimated 2,716 lb/year of TP estimated Estimated $18,521, to complete land cost estimated Project Ranking Project Type
20 Stormwater Master Plan
21 Stormwater Master Plan
22 Stormwater Master Plan Great Resource for Staff Teaching Tool for Elected Officials and Upper Management Rate Increase Identify Properties that Need to be Acquired Justifies WQ projects Used as Reference for non-master Plan Projects CIP Budgeting
23 Lime Street Project Project #1 in Master Plan ac Basin North Side Eau Gallie Boulevard, east of Croton Road Dry Retention Pond Estimated 4 ac-ft storage 1 treatment over basin Free Land Estimated Reduction of 738 lb/yr TN and 188 lb/yr TP Grant Funding!!
24 Lime Street Project GREAT NOT!!! Problems High Groundwater Free flowing artisian well Wetlands PROJECT!! FDOT Pond Not Functioning Correctly Elevation change
25 Lime Street Project Options 1. Upsize outfall pipe and impact wetlands 2. Connection to FDOT outfall pipe 3. Acquire FDOT pond and combine systems 4. 2 nd Generation Nutrient Removal Baffle Box 64 acre basin 192 lbs/yr TN Reductions 39 lbs/yr TP Reductions
26 Garfield and Bell Street Baffle Box Master Plan Projects Exfiltration Projects and Dry Retention Cost Prohibitive Unable to buy land New Project Three 2 nd GNSBB One 2 nd GNSBB Ability to monitor two types of baffle boxes Estimated Reduction of 579 lbs/yr TN and 116 lbs/yr TP
27 Southwest Park Drainage Improvements at Florida Avenue Flooding problem Failing 36 CMP Undersized Pipe 60 Required Adding 2 nd GNSBB NOT IN THE MASTER PLAN Estimated Reduction of 66 lb/yr TN and 9 lb/yr TP
28 Southwest Park Drainage Improvements at Florida Avenue
29 Baffle Box Upgrades Paradise Boulevard ±125 ac Melbourne Avenue ± 13 ac Young Street ± 7 ac 1 st Generation Existing Baffle Boxes Estimated Reduction Paradise 186 lbs/yr TN and 29 lbs/yr TP Melbourne Ave - 37 lbs/yr TN and 8 lbs/yr TP Young Street - 8 lbs/yr TN and 1 lbs/yr TP $220/lbs TN $1,342/lbs TP
30 Street Sweeping and BMP Cleanout Street Sweeping Study City Staff and Contracted Identified HOT Spots O&M BMP Manual Debris Handling Weight vs. Volume Schedule Educated Staff
31 Lessons Learned Master Plan is a 10,000 foot suggestion "Ground Truthing" needed Don t expect all the projects to work as anticipated Forces Staff to think Water Quality not just maintenance GREAT TOOL!!
32 Thank you!
RFP DRAINAGE OUTFALL DESIGN AND PERMITTING. Mandatory Meeting for Proposers August 15, 2015
RFP 2018-02 DRAINAGE OUTFALL DESIGN AND PERMITTING Mandatory Meeting for Proposers August 15, 2015 IMPORTANT DATES August 15 th, 2:00pm August 17 th, 5:00pm August 22 nd, 5:00pm September 5 th, 2:00pm
More information2016 WORKSHOP LVR Field Trip
2016 WORKSHOP LVR Field Trip ***Note*** Many of the sites on this tour were NOT related to, or funded by, the DGLVR program. They are being shown to encourage discussion about the kinds of projects that
More informationThe City of Boynton Beach
The City of Boynton Beach presents Kinder-Gentler Stormwater Management Today s Presenters James A. Cherof, City Attorney Paul M. Fleming, Senior Project Manager Dale S. Sugerman, Assistant City Manager
More informationAdaptation and Resilience at the City of Fort Lauderdale
Adaptation and Resilience at the City of Fort Lauderdale Carlos Acosta, P.E. Assistant City Engineer City of Fort Lauderdale Overview Climate challenges and limitations Sea Level Rise Projections King
More informationcontinues in the watershed, additional flood control and water quality / natural system improvements may be required in the future.
The Duck Pond Watershed is located in northern Hillsborough County in an area in which a number of land and water management issues are currently being addressed by citizen's action groups and state, regional
More informationRETAINING RUNOFF AT ITS SOURCE
RETAINING RUNOFF AT ITS SOURCE Atlantic Beach Case Study Jose Maria Guzman, PE, D.WRE Jacksonville Environmental Symposium August 2013 Outline Overview of stormwater issues in Atlantic Beach, FL City s
More informationGREEN ON THE HORIZON. Challenges of Integrating LID into New Development. Southeast Stormwater Association
GREEN ON THE HORIZON Challenges of Integrating LID into New Development Southeast Stormwater Association Annual Seminar, Charleston SC October 9, 2014 JENNIFER A. NUNN, PE THE BALMORAL GROUP Acknowledgments
More informationStreet Flooding Mitigation Plan KYOVA Interstate Planning Commission. Presented to AMPO National Conference October 18, 2017
Street Flooding Mitigation Plan KYOVA Interstate Planning Commission Presented to AMPO National Conference October 18, 2017 Saleem Salameh, Ph.D., P.E., M.ASCE Chet Parsons, AICP CTP Agenda: Background
More informationIncorporating Sustainable Practices and Water Quality into Roadway Design. May 24, 2017
Incorporating Sustainable Practices and Water Quality into Roadway Design May 24, 2017 Justin Oswald, P.E., CFM Freese and Nichols, Inc. Presenters Todd Buckingham, P.E., ENV SP Freese and Nichols, Inc.
More informationCITY OF VALPARAISO STORMWATER MASTER PLAN
CITY OF VALPARAISO STORMWATER MASTER PLAN APPROVED BY THE VALPARAISO CITY UTILITIES BOARD OCTOBER, 2016 Prepared by the City of Valparaiso Engineering Department PLAN SUMMARY Major flash flooding in August
More informationPasco County Watershed Meeting for Flood Impacted Areas Port Richey Watershed
Pasco County Watershed Meeting for Flood Impacted Areas March 15, 2017 Regency Park Library, 9701 Little Road, New Port Richey, Pasco County The following is a summary of the meeting held on March 15,
More informationPlanning and Design: Applied LID Techniques Redevelopments, Housing, Mixed Use, Infrastructure
Civil Engineering Landscape Architecture Environmental Restoration Planning Planning and Design: Applied LID Techniques Redevelopments, Housing, Mixed Use, Infrastructure Peg Staeheli, ASLA, LEED AP March
More informationTwo Sides of the Green Infrastructure Coin. Jaren Hiller, PE, LEED AP Nathan Guequierre
Two Sides of the Green Infrastructure Coin Jaren Hiller, PE, LEED AP Nathan Guequierre May 5, 2016 Background Citywide Stormwater Planning WinSLAMM Analysis No Control Existing Conditions Proposed Conditions
More informationLesson 2: Stormwater Best Management Practices (BMPs)
Lesson 2: Stormwater Best Management Practices (BMPs) Environmental Stewards Class Christopher C. Obropta, Ph.D., P.E. Extension Specialist in Water Resources 732-932-9800 ext. 6209 obropta@envsci.rutgers.edu
More informationReducing New York City s CSOs Using Green Infrastructure
Reducing New York City s CSOs Using Green Infrastructure Think Blue Maine Conference November 21-22, 2013 Portland, ME Anne Kitchell, LEED AP, Horsley Witten Group John McLaughlin, NYCDEP Matthew Jones,
More informationQUESTIONS AND ANSWERS Windsor Woods, Princess Anne Plaza & The Lakes Combined Drainage Project
QUESTIONS AND ANSWERS Windsor Woods, Princess Anne Plaza & The Lakes Combined Drainage Project PROJECT OVERVIEW Windsor Woods, Princess Anne Plaza and The Lakes are neighborhoods located in what was once
More informationBANYAN BOULEVARD (325-365) SITE DEVELOPMENT PLANS LEGAL DESCRIPTION SECTION 33 TOWNSHIP 49 SOUTH, RANGE 25 EAST COLLIER COUNTY, FLORIDA PREPARED FOR: REDEVELOPMENT 990 1ST AVENUE SOUTH SUITE 202, FL 34102
More informationThe use of low head weirs to. perennial streams with their floodplains:
The use of low head weirs to reconnect severely entrenched perennial streams with their floodplains: An Anne Arundel County TMDL Watershed Implementation Plan Strategy presented by Hala Flores, P.E Mid
More informationSevern River Sub-Watershed: BMP 09-Retrofit
Project ID: BMP_09 Total Treated Drainage Area: 4.57 acres Total Treated Impervious Area: 2.9 acres Total Water Quality Volume (WQv): ~10,300 cubic feet; 0.236 acre-foot Rainfall Depth Treated (Pe): 1
More informationKearney Post-Construction Stormwater Program
Kearney Post-Construction Stormwater Program Stormwater Treatment Facilities (STFs) Kearney Public Works Office August 10 and 17, 2017 Stormwater Treatment Facility (STF) Session Goals Understand STF Function
More informationEvaluating Urban Stormwater Retrofits in the SE US Coastal Plain
Evaluating Urban Stormwater Retrofits in the SE US Coastal Plain 2017 Florida Stormwater Association June 14-17, 2017 Eban Z. Bean, PhD, PE Assistant Professor & Extension Specialist Agricultural and Biological
More informationPlay areas overlooking climbing hill. School & playgrounds overlooking pond bottom ballfields. Project experience while at Loris and Associates, Inc.
City of Thornton Parks & Open Space Cherrywood Park Thornton, CO Architect: Design Concepts Construction of this seven-acre City park, located adjacent to Adams Twelve Five Star Prairie Hills Elementary
More informationCatherine Bray John Buss Manager City of Tallahassee/Stormwater Management
Florida Stormwater Association EXCELLENCE AWARD for STORMWATER PROGRAMS and PROJECTS NOMINATION FORM I. Nomination Information Nomination Category (please check only one box): Program (Department/Division)
More informationMichael Clark, P.E. & Michael Moonan, RLA Weston and Sampson Engineers & David Lachance Woodbury Ridge Developer
Michael Clark, P.E. & Michael Moonan, RLA Weston and Sampson Engineers & David Lachance Woodbury Ridge Developer Woodbury Ridge An LID Conservation Subdivision Presentation to: Low Impact Development
More informationMoving from Pilots to a Program: Seattle s Green Infrastructure Program: September 20, 2012
Moving from Pilots to a Program: Seattle s Green Infrastructure Program: September 20, 2012 Overview Brief History: Getting Started to Now GSI Program: What s Working? GSI Program: What needs Improvement?
More information2019 Capital Improvement Plan 2018 Adopted vs 2019 Request Agency Request CIP 2018 Adopted CIP
Stormwater Utility Capital Improvement Plan Project Summary Agency Priority # Citywide Flood Mitigation 5 900,000 2,800,000 525,000 530,000 675,000 650,000 # Starkweather Coagulant Treatment 2 2,700,000
More informationCITY OF SATELLITE BEACH, FLORIDA
CITY OF SATELLITE BEACH, FLORIDA 565 Cassia Boulevard Satellite Beach, FL 32937 (321) 773-4407 FAX: (321) 779-1388 INCORPORATED 1957 May 19, 2017 Mr. Frank Sakuma, COO IRL Council Via Email Dear IRL Council,
More information2012 Saginaw Bay Watershed Conference
2012 Saginaw Bay Watershed Conference March 16, 2012 Russ Beaubien, P.E., CFM Low Impact Development Fundamentals Summary LID overview Education on LID Fundamentals of LID Examples of LID practices Other
More informationWhat is YOUR biggest challenge in stormwater control measure accounting/planning?
Introduction Name Affiliation What is YOUR biggest challenge in stormwater control measure accounting/planning? 1 Opti-Tool Outreach Workshop Part 1 Research Based Stormwater System Accounting November,
More informationGOING GREEN! NEWBURYPORT S PLAN FOR THE FUTURE
GOING GREEN! NEWBURYPORT S PLAN FOR THE FUTURE Jennifer K. Lachmayr, PE, BCEE Kathryn B. Edwards, PE November 2015 Agenda Background Little River Flood Study Little River Pilot Program Vision for Implementation
More informationSTORM WATER UTILITY FREQUENTLY ASKED QUESTIONS
STORM WATER UTILITY FREQUENTLY ASKED QUESTIONS In 2007, the City Council adopted Ordinance No. 1155 establishing a storm water utility in the City. No fee structure was adopted at that time. The idea of
More informationOctober 26, :00 pm
October 26, 2016 6:00 pm 1 Increase knowledge of the Pinellas- Anclote (West) Watershed Work together to improve drainage systems in the watershed Involve residents in developing potential solutions Provide
More informationCity of Miami MIAMI RIVER BASIN WATER QUALITY IMPROVEMENT REPORT FOR FIRST AND SECOND QUARTER 2010
Action Items 1. Storm water* a. Retrofit drainage in remaining areas of Miami River starting with Pinehurst neighborhoods This project included drainage work that consist of French drains, solid piping,
More informationTOWN OF OCEAN RIDGE 6450 NORTH OCEAN BOULEVARD OCEAN RIDGE, FLORIDA (561) FAX (561)
TOWN OF OCEAN RIDGE 6450 NORTH OCEAN BOULEVARD OCEAN RIDGE, FLORIDA 33435 www.oceanridgeflorida.com (561) 732-2635 FAX (561) 737-8359 JAMES A. BONFIGLIO MAYOR, CHAIRMAN OF COMMISSION JAMES S. TITCOMB TOWN
More informationGreen Infrastructure Implementation Planning for Multiple Objectives
Green Infrastructure Implementation Planning for Multiple Objectives Hazem Gheith, ARCADIS September 10, 2014 Imagine the result Integrated Plan for Stormwater Control Integrated Plan Objective Sanitary
More informationKen Kortkamp, PE San Francisco Public Utilities Commission San Francisco, CA
Ken Kortkamp, PE San Francisco Public Utilities Commission San Francisco, CA Development Process of San Francisco s GI Typical Details SCVURPPP GI Workshop April 19, 2017 Outline How to develop GI details
More informationBenefits of Native Vegetation. Presented by: Mary Beth Falsey DuPage County Senior Wetland Technician
Benefits of Native Vegetation Presented by: Mary Beth Falsey DuPage County Senior Wetland Technician Turf to Prairie-why would I do that? Improved water quality Soil stabilization and absorption Goose
More informationCity of Elmhurst. City of Elmhurst. Storm Sewer System Workshop November 22, 2010
City of Elmhurst City of Elmhurst Storm Sewer System Workshop November 22, 2010 1 City of Elmhurst Watershed divide (green dashed line) through Elmhurst Area east of divide drains to Addison Creek Area
More informationAGENDA 2015 Community Stormwater Event
AGENDA 2015 Community Stormwater Event Sponsors: 2015 Community Stormwater Event AGENDA 2015 Community Stormwater Event Welcome 6:00 1 st prize drawing 6:15 Stormwater Video final destination Stormwater
More informationImpervious Cover Assessment and Reduction Action Plan for Woodstown, New Jersey
Impervious Cover Assessment and Reduction Action Plan for Woodstown, New Jersey Christopher C. Obropta, Ph.D., P.E. obropta@envsci.rutgers.edu www.water.rutgers.edu March 24, 2015 Rutgers Cooperative Extension
More informationLID CASE STUDY DESIGN WORKSHOP HSG B/D SOIL EXAMPLE SINGLE FAMILY SUBDIVISION WITH OUTPARCEL
LID CASE STUDY DESIGN WORKSHOP HSG B/D SOIL EXAMPLE SINGLE FAMILY SUBDIVISION WITH OUTPARCEL B Y : M A R T Y W A N I E L I S T A A N D E R I C L I V I N G S T O N August, 2016 ACKNOWLEDGEMENTS The Low
More informationTown of Millbury Department of Public Works
Town of Millbury Department of Public Works Agenda Items Credit for irrigation meters Stormwater compliance Project Updates Irrigation Meters Current policy: abatement/credit for documented water use not
More informationLOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX G - Stormwater Study Findings & Stormwater Solutions
LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN APPENDIX G - Stormwater Study Findings & Stormwater Solutions LSU: MP Narrative July 2017 3.5 Open Space Existing Conditions The
More informationStormwater Low Impact Development - A Natural Solution
Stormwater Low Impact Development - A Natural Solution Sarah U Ren Program Director The Watershed Center of Grand Traverse Bay 231-935-1514, suren@gtbay.org Our Mission: The Watershed Center advocates
More informationFixer Upper. MS4 Post-Construction and Redevelopment. Anthony Betters, CSI City of Waco Environmental Storm Water Compliance
Fixer Upper MS4 Post-Construction and Redevelopment Anthony Betters, CSI City of Waco Environmental Storm Water Compliance Polly Porter TCEQ Small Business and Local Government Assistance Curtis Beitel,
More informationStormwater Retrofits Made Practical City of Eugene Oregon. Doug Singer, P.E., CSM Principal Civil Engineer City of Eugene Public Works
Stormwater Retrofits Made Practical City of Eugene Oregon Doug Singer, P.E., CSM Principal Civil Engineer City of Eugene Public Works Doug Singer Introduction BS Civil Engineering from Oregon State University
More informationImpervious Cover Reduction Action Plan for City of Vineland, Cumberland County, New Jersey
Impervious Cover Reduction Action Plan for City of Vineland, Cumberland County, New Jersey Prepared for the City of Vineland by the Rutgers Cooperative Extension Water Resources Program May 23, 2016 Table
More informationHorsley Witten Group Sustainable Environmental Solutions. Rich Claytor, P.E. Janet Bernardo, P.E. horsleywitten.com
Horsley Witten Group Sustainable Environmental Solutions Rich Claytor, P.E. Janet Bernardo, P.E. horsleywitten.com 857-263-8193 Agenda Introduction & Grant Goals Stormwater & GI Overview Grant Work Completed
More informationRetrofit of the Gwinnett County DWR Facility Using Low Impact Development Practices SESWA 2012 Annual Conference October 19, 2012
Retrofit of the Gwinnett County DWR Facility Using Low Impact Development Practices SESWA 2012 Annual Conference October 19, 2012 Jeff Herr, P.E., D.WRE National Stormwater Leader jherr@brwncald.com Acknowledgements
More information30% Design Technical Report
NAPLES BEACH RESTORATION AND WATER QUALITY IMPROVEMENT PROJECT Outfalls 3, 4, 5 & 6 May 2016 Erickson Consulting Engineers, Inc. www.ericksonconsultingengineers.com Outfall 6 www.stantec.com Naples Beach
More informationUse of Best Management Practices
Use of Best Management Practices Presented at the ANJEC Flood Hazard Workshop Bordentown, NJ March 13, 2008 Stormwater BMPs "a technique, measure or structural control that is used for a given set of conditions
More informationStorm Water Quality and Shoreline Restoration Improvements - Grant Funding Request City of Mound Carlson Park Bolton & Menk Project No.
September 15, 2016 Brett Eidem Cost Share Grant Administrator Minnehaha Creek Watershed District 15320 Minnetonka Boulevard Minnetonka, MN 55345 RE: Storm Water Quality and Shoreline Restoration Improvements
More informationPatrick E. Lindemann INGHAM COUNTY DRAIN COMMISSIONER. Towar Rain Garden Drains A Low-Impact Urban Retrofit
: A Michigan Urban Retrofit Low Impact Stormwater Management System What Color is Your Infrastructure? 2011 LID Symposium Philadelphia September 28, 2011 Twenty percent of the world s available fresh water
More informationMisunderestimating Maintenance: An empirical approach to quantify maintenance expectations for BMPs
Misunderestimating Maintenance: An empirical approach to quantify maintenance expectations for BMPs James Houle, CPSWQ, UNH Stormwater Center University of New Hampshire, Durham, NH Imagine the Ultimate
More informationMarch 30, 2017
March 30, 2017 2 municipal examples of GI installments: Lancaster, PA (population: 60,000) Dover, NH (population 31,000) The City of Lancaster: Overview Incorporated in 1742 as a borough and in 1818
More informationSTORMWATER UTILITY PRESENTATION November 18, 2014
STORMWATER UTILITY PRESENTATION November 18, 2014 AGENDA 1. Introduction 2. What is Stormwater 3. What is the problem with polluted runoff? 4. Local Environmental Initiatives 5. Current status to fund,
More informationFACT SHEET: Pervious Pavement with Infiltration
FACT SHEET: Pervious Pavement with Infiltration DESCRIPTION Pervious pavement is a Green Infrastructure (GI) technique that combines stormwater infiltration, storage, and structural pavement consisting
More informationRainwater Management
Rainwater Management Treatment / Detention Options An evening with EMCO Presented by: Rick Lloyd, P.Eng RCL Consulting Ltd June 8, 2006 Confucius said: Balance is the perfect state of still water. Let
More informationSwatara Township Stormwater Program. 1. There are no storm sewers on or near my property. Why should I pay a fee?
1. There are no storm sewers on or near my property. Why should I pay a fee? All properties produce stormwater runoff that must be managed by the Township. Even if your property has never flooded and there
More informationA Review of Green Infrastructure Projects Implemented in the Grand Traverse Region
A Review of Green Infrastructure Projects Implemented in the Grand Traverse Region Sarah U Ren Program Director The Watershed Center of Grand Traverse Bay 231-935-1514, suren@gtbay.org Our Mission: The
More informationNeighborhood-Scale Water Quality Improvements The Broadway Neighborhood Stormwater Greenway Project
Neighborhood-Scale Water Quality Improvements The Broadway Neighborhood Stormwater Greenway Project Presenter: Stacy Luell, Geosyntec Consultants Co-Authors: R. Batchelder, W. Tam, M. Hanna, M. Sadeghi
More informationFigure 1 Cypress Street Study Area Location Map
July 20, 2016 TO: FROM: Jim Massarelli Director of Engineering Jeff Julkowski, PE Michael Burke, PE SUBJECT: Cypress Street Study Area Stormwater Analysis (CBBEL Project No. 16-0058) At the request of
More informationQUESTIONS AND ANSWERS Windsor Woods, Princess Anne Plaza & The Lakes Combined Drainage Project
QUESTIONS AND ANSWERS Windsor Woods, Princess Anne Plaza & The Lakes Combined Drainage Project Project Overview... 2 Thalia Creek (Windsor Woods) Tide Gate... 6 Club House Road Drainage Project... 9 Updated
More informationSouth Bismarck Watershed Model Update and Stormwater Improvement Project
Preliminary Engineering Report Bismarck Tribune South Bismarck Watershed Model Update and Stormwater Improvement Project City of Bismarck, ND January 2017 14.105.0046 1.0 Executive Summary The focus of
More informationSTORMWATER - GENERAL NOTES
STORM DRAINAGE CONSTRUCTION NOTES. All storm sewer pipe shall be reinforced concrete. 2. Storm drainage pipes shall be a minimum of fifteen (5) inch diameter (5" for short lateral runs only - up to 75
More informationNYC Green Infrastructure Program
NYC Green Infrastructure Program Parks Without Borders May 24, 2016 NYC Water Quality Improvement Program $10B investment since the early 2000s has yielded the highest water quality observed in the NYC
More informationFairfax County s Stormwater Learning Experiences
Fairfax County s Stormwater Learning Experiences Green Stormwater Facilities - Cheap and Simple Loved by All? Department of Public Works and Environmental Services Working for You! A Fairfax County, VA,
More informationDC Clean Rivers Project Green Infrastructure Program
District of Columbia Water and Sewer Authority George S. Hawkins, General Manager Briefing on: DC Clean Rivers Project Green Infrastructure Program Briefing for: American Water Resources Association National
More informationMisunderestimating Maintenance: An. maintenace expectaions for SMCs
Misunderestimating Maintenance: An empirical approach to quantify maintenace expectaions for SMCs James Houle, CPSWQ, Robert Roseen, PE, PhD, Thomas Ballestero, PE, PhD, PH, CGWP, PG, PhD, Tim Puls Environmental
More informationSOUTH FOX MEADOW STORMWATER IMPROVEMENT PROJECT
VILLAGE OF SCARSDALE WESTCHESTER COUNTY, NEW YORK COMPREHENSIVE STORM WATER MANAGEMENT SOUTH FOX MEADOW STORMWATER IMPROVEMENT PROJECT In association with WESTCHESTER COUNTY FLOOD MITIGATION PROGRAM Rob
More informationNORTH KINGSTOWN PILOT PROJECT May 9, 2016 North Kingstown Town Council
Engaging RI Local Governments in Hazard Mitigation and Coastal Resilience NORTH KINGSTOWN PILOT PROJECT May 9, 2016 North Kingstown Town Council Teresa A. Crean, AICP University of Rhode Island Coastal
More informationDoes Green Infrastructure Pay? WASHOE COUNTY COMMISSION CHAMBERS RENO, NEVADA
Does Green Infrastructure Pay? WASHOE COUNTY COMMISSION CHAMBERS RENO, NEVADA JANE KULIK, ASLA WENK ASSOCIATES, INC MARCH 30, 2006 the dollars and sense of green infrastructure: examining costs and benefits
More informationProject Descriptions for FY 15
Department of Transportation and Stormwater Services Stormwater Engineering and Design Division Project Descriptions for FY 15 43 rd Street Outfall PH II Pond Regional Drainage Improvement Flooding Relief
More informationRequest for an Exception to the Napa County Road and Street Standards
F Request for an Exception to the Napa County Road and Street Standards Shed Creek Winery Use Permit P16-327 and Use Permit Exception to the Conservation Regulations P17-178 Planning Commission Hearing
More informationPublic Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m.
Public Hearing Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, 2019 open house at 4 p.m., formal presentation at 5 p.m. Welcome to the Public Hearing for the Harborview Road (CR 776)
More informationStormwater Master Plan Update. City Council Briefing January 8, 2019
Stormwater Master Plan Update City Council Briefing January 8, 2019 1 Stormwater Master Plan Update January 8, 2019 Agenda Background for Update Stormwater Modeling and Calibration Visualizations of Results
More informationGreen Infrastructure Program Updates
Metropolitan Water Reclamation District of Greater Chicago Green Infrastructure Program Updates Calumet Stormwater Collaborative June 1, 2018 - Chicago Stormwater Management Programs Flooding remains our
More informationPLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017
& PUD-0000102-2017 PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017 NAME SUBDIVISION NAME Dauphin Creek Estates Subdivision Dauphin Creek Estates Subdivision LOCATION CITY COUNCIL
More informationGREEN COLLECTION E C O - F R I E N D LY P E R M E A B L E P A V E R S T R E M R O N. C O M
GREEN COLLECTION E C O - F R I E N D LY P E R M E A B L E P A V E R S T R E M R O N. C O M MANAGE STORMWATER RUNOFF 4 x8 : 96 specially designed pavers will reduce or eliminate storm water run-off and
More informationVALLEY VIEW POND Q&A. This item will be discussed under the First Reading portion of the agenda at the July 17, 2012 Village Council meeting.
VALLEY VIEW POND Q&A This item will be discussed under the First Reading portion of the agenda at the July 17, 2012 Village Council meeting. 1. Please provide a history of the pond including Village maintenance
More informationCoco Palms Community Development District. Engineer s Report Infrastructure Improvements
Coco Palms Community Development District Engineer s Report Infrastructure Improvements Prepared for Coco Palms Community Development District Board of Supervisors Miami-Dade County, Florida Prepared by
More informationCost Effective Low Impact Development
Cost Effective Low Impact Development An Introductory Guide to Conserve Land, Restore Resources, Protect Water, and Save Money in Massachusetts Stefanie Covino Shaping the Future of Your Community Program
More informationStormwater Management at The University of New Orleans
University of New Orleans ScholarWorks@UNO DRU Workshop 2013 Presentations Disaster Resistant University Workshop: Linking Mitigation and Resilience Conferences and Workshops 3-1-2013 Stormwater Management
More informationMUNICIPAL SEPARATE STORM SEWER SYSTEM 2009 ANNUAL REPORT
MUNICIPAL SEPARATE STORM SEWER SYSTEM 2009 ANNUAL REPORT Permit Number 85 03 0 04 March 2010 Prepared by: Iowa State University Department of Environmental Health and Safety 2809 Daley Drive Ames, Iowa
More informationions nts July 1, 2019 The utility answers to some increase: Q: A: rainwater Q: A: areas any the total by
Frequently Asked Quest ions Stormwater Rate Adjustmen nts The Fort Wayne Board of Stormwater Management and Fort Wayne City Council have approved an increasee stormwaterr utility fees to address neighborhood
More informationPart 4: CRS Stormwater Management Activity (450) and Urban Flooding Best Practices
Coastal Resilience through Community Engagement Webinar Series Part 4: CRS Stormwater Management Activity (450) and Urban Flooding Best Practices 1:00 2:30pm CT 8 Today s Moderator Chad Berginnis, CFM
More informationTHREE-YEAR CAPITAL IMPROVEMENT PLAN FY
THREE-YEAR CAPITAL IMPROVEMENT PLAN FY2016 2018 Annual CIP Development Process Public Works & Engineering Divisions Prepare List of Capital Needs and Recommended Deferred Maintenance Public Works & Engineering
More informationManaging Stormwater within the Road Right-of-Way: An Urban NAI Approach
Turgay Dabak, Joni Calmbacher, Sara DeGroot, Andrea Ryon Managing Stormwater within the Road Right-of-Way: An Urban NAI Approach Presentation Outline Project Background Project Overview BMPs Evaluated
More information6.5 Lakewood Gulch. Basin Snapshot
6.5 Lakewood Gulch The Lakewood Gulch Map Unit is comprised of both Lakewood Gulch and Dry Gulch (4800-01 and 4801-01) from the Denver Storm Drainage Master Plan (SDMP) and has a total drainage area of
More informationStormwater Retrofitting: The Art of Opportunity. Presented by the Center for Watershed Protection
Stormwater Retrofitting: The Art of Opportunity Presented by the Center for Watershed Protection What Are Stormwater Retrofits? Retrofits are stormwater management measures inserted in an urban or ultra-urban
More informationMarion Street Green Infrastructure Project. Whittier Neighborhood Community Meeting April 18, 2018
Marion Street Green Infrastructure Project Whittier Neighborhood Community Meeting April 18, 2018 Agenda Water quality and green infrastructure Overview: Marion Street stormwater project Green infrastructure
More information4. UTILITIES ELEMENT.
4. UTILITIES ELEMENT. The purpose of this element is to provide for necessary public facilities and services correlated to future land use projections and population demand. Utilities Sub-Elements (A)
More informationRESILIENCY, ADAPTATION, & SUSTAINABILITY AT THE CITY OF ST. AUGUSTINE
RESILIENCY, ADAPTATION, & SUSTAINABILITY AT THE CITY OF ST. AUGUSTINE PROGRAM UPDATE JANUARY 14, 2019 MICHAEL G. CULLUM, P.E. DIRECTOR, PUBLIC WORKS PROGRESSION OF PLANNING FOR RESILIENCY / ADAPTATION
More informationEXISTING PLANS Harriet Festing Center for Neighborhood Technology Midlothian Community Meeting March 12, 2015
EXISTING PLANS Harriet Festing Center for Neighborhood Technology Midlothian Community Meeting March 12, 2015 BENEFITS Bring economic, community + environmental benefits Enhance property values Use
More informationConst. ROADS - Description
Road Projects make up the bulk of the capital expenditures for the township. For the term of this CIP, road projects total $9,843,000 or 72.0% of the total capital expenditures for all capital projects
More informationRain Garden Site Selection and Design. Andrew Anderson, E.I.T. Extension Associate Engineer Biological & Agricultural Engineering NCSU
Rain Garden Site Selection and Design Andrew Anderson, E.I.T. Extension Associate Engineer Biological & Agricultural Engineering NCSU Outline What to look for around your property How do the soils drain?
More informationUnderstanding Stormwater Drainage Maintenance
WARREN COUNTY STORMWATER DISTRICT Understanding Stormwater Drainage Maintenance Home Owner s Association Guide Introduction Our goal is to help property owners and Home Owner s Associations (HOA) understand
More informationStormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018
Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018 Potential Impacts of New Development Urban development can significantly increase stormwater runoff Water quality considerations
More informationDavis Shores Tide Check Valve Program Project Status Update. Presented to: SANDS February 13, Presented by: Jessica L. Beach, P.E.
Davis Shores Tide Check Valve Program Project Status Update Presented to: SANDS February 13, 2018 Presented by: Jessica L. Beach, P.E. Existing Stormwater Outfall Map for Davis Shores 21 total outfalls
More informationDraft Rhode Island Stormwater Design and Installation Standards Manual
Draft Rhode Island Stormwater Design and Installation Standards Manual Summary The May 2009 Public Review Draft version of the RI Stormwater Design and Installation Standards Manual consists of approximately
More information