1 CITY OF SATELLITE BEACH, FLORIDA 565 Cassia Boulevard Satellite Beach, FL (321) FAX: (321) INCORPORATED 1957 May 19, 2017 Mr. Frank Sakuma, COO IRL Council Via Dear IRL Council, Please accept this letter as my endorsement of the City of Satellite Beach s application for the Desoto Parkway Drainage Basin Enhancement Project. The associated funding request of committing to matching funds is financially acceptable and the calculations used to determine these figures have been thoroughly reviewed by City staff. This project falls in line with the current direction and forward focus of the City of Satellite Beach sustainability initiatives, focusing on climate change and, more specifically, the impacts of sea level rise. The City has created a Sustainability Action Plan outlining the City s future sustainability-based endeavors for both residents and the municipality itself over the next 25 years. This project will help the City to achieve parts of this action plan, mainly by supporting the plan s Complete Streets initiative while also addressing the impacts of sea level rise. In addition, the project will also allow City staff to collect data about the absorption rate of nutrients in bio retention swales. This data will in turn help to create a measurable impact from planting and revegetating public and private areas in the City in the future. Work to be completed for this project will be led by the City s Environmental Programs Coordinator, Nicholas F. Sanzone. He will design and implement the project via the direction of Allen Potter, Director of Public Works with assistance from their staff and David King, the City s Engineer. Mr. Sanzone will create and conduct workshops and community outreach programs to recruit volunteers for the turn dirt portion of the project where volunteers and staff will create and plant bio retention swales and plant vegetation along the shorelines of retention ponds in the Desoto Parkway drainage basin. Sustainability is a key focus for the City of Satellite Beach. We as a City take pride in protecting our natural environment. Environmental integrity is vital to the success of our City as a whole and our residents. We look to protect our future while optimizing our present to secure a sustainable social, economic, and environmental future for our island city. We are committed to proactive action and we hope this project could one day be a part of that necessary and vital action. Sincerely, Courtney H. Barker, City Manager

2 Executive summary: IRLNEP Proposal, May 2017 Project Title: Desoto Parkway Drainage Basin Stormwater Enhancement Project Project Applicant: City of Satellite Beach, Nicholas Sanzone, Environmental Programs Coordinator Partners: Dr. John Trefry/F.I.T; Balance for Earth Amount of Request: $33,000 ($35,000 match) Other Funding Sources and Amount of Total Match: Project Description Narrative: The goal of this project is to increase the effectiveness of the City s current stormwater system by implementing a Water Quality Restoration and Habitat Restoration Project to protect the Indian River Lagoon (IRL) from stormwater. This will be accomplished by installing vegetated stormwater bio retention swales and planting vegetation along the shorelines of retention ponds. The residence time of stormwater will be increased, allowing stormwater and nutrients to be absorbed by the soil and vegetation. This would help to reduce nutrient content by allowing stormwater to slowly percolate into the soil profile and into existing City stormwater infrastructure that is already in place. The four primary pieces stormwater infrastructure already in place in the City are ponds, weirs, ditches, and exfiltration pipes. Project Location: (Latitude and Longitude): near N and W CCMP Action Plans addressed by project: FSD-1, FSD- 2,FSD-4,FSD-6,FSD-9,FSD-10,FSD-11,W-6,W-7 Project Outputs (Deliverables) and Outcomes: Project Boundary Map: Figure 1. City of Satellite Beach Desoto Parkway Drainage Basin, N and W 11,500 sqft planted 10,000 spartina grasses planted 500 mangroves planted Increase in the residency time of stormwater Significant decrease in the nutrient content and total suspended solids entering the IRL Water quality monitoring pre/post 3 educational videos Construct 3 educational signs about the project 10,000 educational door hangers Conduct 6 work days Promote at 4 city events Conduct 3 workshops Create online links to existing material IRL Location Map: NEP Core Elements addressed by proposal (list): Outreach and public involvement Assessment and reporting All Ecosystem Restoration and Protection Projects Core Elements

3 Section 1 Title Page 1. Project Title: Desoto Parkway Drainage Basin Stormwater Enhancement Project 2. CCMP Action Plans implemented by this project include the following: FSD-1, FSD-2,FSD- 4,FSD-6,FSD-9,FSD-10,FSD-11,W-6,W-7 3. Applicants: Nicholas Frank Sanzone, Environmental Programs Coordinator, The City of Satellite Beach Florida, 565 Cassia Boulevard Satellite Beach, FL Tel: Fax: Website: nsanzone@satellitebeach.org Section 2 Project Specifics A. Project Goals and Objectives The current stormwater infrastructure of ditches, ponds and weirs in the 296-acre Desoto Parkway drainage basin filters approximately 389 million gallons of water per year. During large rain events stormwater flows into ditches, weirs and ponds through exfiltration pipes that lead into the lagoon. By installing vegetated stormwater bio retention swales and planting vegetation along the shorelines of the retention ponds, the residence time of stormwater will increase, allowing stormwater and nutrients to be absorbed by the soil and vegetation. This will reduce nutrient content by allowing stormwater to slowly percolate into the soil profile and into existing stormwater infrastructure. The goal of this project is to increase the effectiveness of the City s current stormwater system by implementing a Water Quality Restoration and Habitat Restoration Project to protect the IRL from stormwater. This long-term project goal will be reached by completing 3 main deliverables. 1. Short-term (1-3 year): Reduce sediments and excess nutrients that enter the IRL. This will be done by creating 8,500 sqft of vegetated bio swales and planting 3,000 sqft of pond shoreline to manage runoff using the Department of Environmental Protections (DEP) design, found at The swales will be planted with a minimum of 10 different species of native plants including a minimum of 10,000 Spartina grasses to help achieve the desired effect. The planting of the swales along the ditches will include a minimum of 500 mangroves, in addition to other native plants. An example of plants and plant costs can be seen in Table 1. Planting will take place in March and April of This will ensure that the plants are established and rooted by the rainy season in May and June, reducing the potential for washout, increasing the likelihood of success. 2. Short-term (1-3 year)/long-term (5+ years): Slow the flow and reduce the volume of water entering the lagoon during storm events. This will be done by enacting the enhancements previously discussed. This best management practice (BMP) increases the residency time of stormwater before it enters the lagoon. This 296-acre area receives an annual rainfall of inches per year, accommodating approximately 389 million gallons of water per year that enters into the City s stormwater system. The swales will be dug between.5-1 feet deep and 3-6 feet wide when possible. They will be able to accommodate a minimum of 21,563 gallons of water. Removing that amount from the stormwater system will increase the amount of water that percolates down into the ground instead of running off into the IRL, accomplishing this objective. Water quality data will be collected to determine the effectiveness of the planting. 3. Short-term (1-3 year)/long-term (5+ years): Educational components that engage the public include: City meetings, educational workshops, work days, three produced videos and online material. Educational outreach will also be conducted with signage at three locations that explain the project. Each sign will have links to related information posted on the City s website,

4 including a page devoted to stormwater education and specifically this projects components (i.e. swales and shorelines). The three videos, created by the nonprofit Balance For Earth, will engage the public to recruit volunteers, showcase the project, summarize important components of the project, inform residents on how they can create stormwater swales on their property, and will finally help to communicate data collected by the project. Lastly, 10,000 informational door hangers will be created and distributed to the public at City events, workshops, and at City Hall. 4. Upon completion maintenance of the project sites will fall to City public works crews. The plants used to vegetate the stormwater swales will become a living resource as an additional seed source for the City that can be used to propagate additional plants that would be used to replace any plants if necessary used initially in the project and to vegetate other areas within the City. This will increase the longevity of the project by utilizing the plants in the stormwater swales as effective tools to propagate future vegetation to be used as replacement plants, which is the fourth and final objective. This project has a high likelihood for success because of its simplistic design and the proven fact that swales with native plants absorb and retain more nutrients and water than areas without them. B. Technical Merit/Justification The project area, located near N and W, is 296 acres and currently vegetated with large trees and grass. This area was selected for improvements to the stormwater system because of the high volume of water that enters into the stormwater system at this location. This location has room for improvement around stormwater entry points and along the two main ditches, weirs, culverts, exfiltration pipes and three ponds that feed water into the stormwater system. The 296-acre Desoto Parkway drainage basin filters approximately 389 million gallons of water per year into the IRL. When large amounts of water flood into an area, the velocity of water increases, carrying sediment and nutrients with it as it moves into the stormwater system, which is designed to remove water from roadways. The creation of a vegetative buffer in the form of swales would enhance the existing stormwater infrastructure. The areas inside of the swales will allow for a minimum of 21,563 gallons of stormwater retention, where sediments can fall out of suspension from the stormwater and excess nutrients (specifically nitrogen and phosphorous that contribute to nutrient loading and algae blooms in the IRL) can be absorbed by the soil and vegetation. The locations shown in Figure 1 in the Executive Summary will be where the stormwater swales will be created to enhance the existing stormwater infrastructure. Current estimations of nutrient loading are from the City of Satellite Beach s South Patrick Drive TMDL study, modified in 2013, as shown in Table 2. Water quality sampling before and after the installation of the swales and vegetated shoreline will determine project effectiveness. This project will be led by the City s Environmental Programs Coordinator in coordination with Public Works who have an excellent record when completing projects of this nature on time and on or under budget. To better ensure this, a project timeline has been created and is available in Table 3. C. Benefit(s) to the IRL Benefits to the IRL will be immediate and long-term, focusing on BMP`s of reducing the residency time of stormwater entering the lagoon and absorbing and reducing nutrients by increasing the vegetative biomass available by planting swales. Additional components include: creating habitat for wildlife and educating Satellite Beach residents and others about the project via the City s website. With DEP approval, the City will post a link to the City`s website that connects to existing stormwater education and specifically the benefits of swales that is available as a PDF on the DEP website. The estimated reduction in excess nutrients and total suspended solids is 1-5%. This will be determined by water quality sampling. To measure the success of this process two pre and four post project

5 water quality sampling days will be conducted at two out flow sites, at least half of the sampling days will take place after a rain event. Sampling will be conducted by Dr. John Trefry of the Florida Institute of Technology (FIT). Dr. Trefry and his team will collect measurements for: conductivity, temperature, ph, and dissolved oxygen. Discrete samples will also be taken for: alkalinity, turbidity, total suspended solids (TSS in mg/l), dissolved NO 3 - -NO 2 -, NH 4 +, HPO 4 3-, organic C (DOC), TN, TP, Fe, Cl -, SO 4 2-, and Ca 2+ as well as particulate Fe, Al, Si, N, P, Ca, and C (POC). D. Local Commitment This project is an extension and enhancement to the existing Stormwater Master Plan 2001 and the Stormwater Quality Master Plan 2011 that is available online at the City s website at E. Project Readiness This project can be classified as a simple turn dirt project. It requires no permitting and the basic design outline is complete. There are also no contracts to bid/award. The project will begin in February 2018 following approval and will be completed in April Tentative milestone dates for this project include: promoting the project online via the City s website and Facebook page as well as in print in the bimonthly City newsletter and conducting outreach to schools and other groups through the first week of February, organizing volunteers and conducting a workshop for potential volunteers by the second week February, ordering plants in the first week of March, mapping, flagging, and outlining the locations of where each plant will be planted by the second week of March, promoting the project again online via the City s website and Facebook page as well as in print in the bimonthly City newsletter through the third week of March, and finally planting the plants with City staff and volunteers through the last week of March and into the first week of April at planting events. F. Project Monitoring/Evaluation and Maintenance Plans The water quality aspect of this project will be monitored by Dr. John Trefry. To measure the success of this process, two pre and four post project water quality sampling days will be conducted at two out flow sites. At least half of the sampling days will take place after a rain event. The sampling will be conducted by Dr. John Trefry under benefits. This project will also be monitored by the Environmental Programs Coordinator on a weekly basis. Annually, plant survival will be measured with a goal of having a 75% or better survival rate for all planted vegetation. The City s Public Works crews will water the newly planted plants twice weekly unless excess rains make watering unnecessary. Once planted, the plants will be allowed to go to seed. The seeds will be collected and propagated at the City s shade house. Additional plants propagated will be used to replace the plants initially planted for the project. This will allow the project to become sustainable beyond grant funding. G. Citizen/Volunteer Engagement and Outreach Components As part of this project, the City will create a new volunteer program called Satellite Stewards, where citizens will be engaged and volunteers will be gathered to promote sustainability and stewardship. The project will use the following outreach components: online media through the City s website, on Facebook, in print in the City s bimonthly newsletter, through outreach to local schools and other environmental groups, and through public workshops. Volunteers will be directly engaged through in the planting of native plants that will be used for the project. There will be a brief synopsis of how and where to plant the plants before each of the planting event days. Through the afore mentioned types of promotion and via educational signage about stormwater that will be installed onsite at three

6 separate locations, the public will be made aware of the benefits of the project and how they as individuals can expand upon it by implementing similar practices on their own properties. To determine the outcome of this change in behavior and to show who has made changes that will benefit the IRL, the City will track the anticipated percent increase in residential properties within Satellite Beach that are able to be selected for the Lagoon Friendly Lawns Program that currently exists as a partnership between the City and Keep Brevard Beautiful, using the current number of Lagoon Friendly Lawns as a baseline. In addition to these engagement components 10,000 door hangers will be created to be distributed at public events, workshops, and at City Hall. The door hangers will have information pertaining to the project and stormwater impacts and how swales are beneficial to the environment. Three videos created by Balance For Earth will be used to engage the public about the project, recruit volunteers, showcase the project and educate on swales, and communicate project results after project completion. The success of this educational component will be measured by the number of online views. H. Experience and Past Performance I, the City of Satellite Beach Environmental Programs Coordinator, Nicholas F. Sanzone, have 5 years of experience coordinating restoration projects and leading volunteers along the IRL. I have planted thousands of mangroves and Spartina grasses with groups of up to 100 volunteers, both at the Blowing Rocks Preserve for the Nature Conservancy and at the Port Canaveral for the Marine Resources Council. Using the Port Canaveral project as an example, I coordinated with local schools and have held workshops to educate volunteers about the techniques to be used during planting events. The projects I have implemented did not receive funding from the NEP or IRL License plate fund. All projects were privately funded. This project is for TMDL enhancement of existing stormwater infrastructure that addresses sea level rise by reducing the impacts of stormwater, specifically from large storm events. Project Funding A. Partnership and Cost Sharing This project will be undertaken by the City of Satellite Beach. At this time project partners include Dr. John Trefry and his team from FIT, who will be collecting the water quality monitoring data. During the volunteer recruiting stage of the project, outreach will be conducted to entities and organizations that have partnered to provide volunteers in the past. The list of organizations includes: Keep Brevard Beautiful, Surfrider, and the Marine Resources Council. Sources of matching $15,000 worth of funds will be obtained from 200 volunteers working in support of the project. Documentation will include: volunteer waivers and sign in sheets that will document the total number of volunteer hours. $6,000 will be obtained from the water quality work conducted by Dr. John Trefry and his team from FIT. Lastly, Balance For Earth will donate one of their three educational videos as match, valued at $600. The reminder of the match will be a direct cost paid for by the City in the form equipment use and maintenance and a total of over 400 City staff hours spent on creating and implementing all aspects the project. $33,000 Requested Grant Funds $35,000 Match Funds $15,000 Value of In-kind Match (volunteer labor time is $22.14/hr.) Match as percentage of Total Project Costs = 51.5%

7 B. Project budget including in-kind and cash match amounts and source of all funds. Task Line Item Task Description IRL Funding Amount Cost Share Funding Amount Cost Share Funding Source (cash or inkind) 1 Project Design $0 $2,000 Satellite Beach 2 Plants $0 $2,000 Satellite Beach 3 Plants $30,000 $0 NEP 4 Installation $0 $2,200 Satellite Beach 5 Maintenance $0 $3,000 Satellite Beach 6 Volunteer hrs/ coordination $0 $15,000 Satellite Beach 7 Education $3,000 $1,800 Satellite Beach/Balance For Earth/NEP 8 Monitoring $0 $8,000 F.I.T./Satellite Beach 9 Reporting $1,000 Satellite Beach Summary Cost $33,000 $35,000 Project Costs $68,000 B. Funding for projects under this RFP do not consist of IRL Council Member contributions.

8 Appendix Table 1. Plant List Plants Type Size Cost Number Total Cost Dune sunflower (Helianthus debilis) ln $18.40 Red Mangrove 7g 45 1 $45.00 Coontie Palm (Zamia pumila) 1g $13.56 Railroad vine (Ipomoea pes-caprae) ln $4.40 Horsemint Spotted Beebalm (Monarda punctata) 1g $16.80 Blanket Flower (Gaillardia pulchella) ln $35.20 Marsh Hay Cordgrass (Spartina patens) 1g $6.60 Purple Lovegrass (Eragrostis spectabilis) 1g $7.20 Salt Grass (Distichlis spicata) ln $5.00 Table 2. South Patrick Drive Treatment Calculations BMP Existing TP Load (lb/yr) Existing TN Load (lb/yr) Existing TSS Load (lb/yr) Baffle Box # Baffle Box # Total Tasks 1.Project design Jan- Feb 2. Pre-planting sampling X 3. Volunteer outreach / project promotion X X Table 3: Timeline 4. Educational materials created X 5.Planting of swales and shorelines March- August- Jan- Mar- July Dec Mar July X 6.Sampling and analysis X X X X 7.Educational videos and online material 8.Data interpretation, report preparation X X X August- Dec 9.Maintenance X X X X

Executive Summary. Project Applicant and Partners: Brevard County Natural Resources Management Department and Brevard County Schools

Executive Summary. Project Applicant and Partners: Brevard County Natural Resources Management Department and Brevard County Schools Executive Summary Project Title: Countywide Rain Bench Construction and Installation Project Applicant and Partners: Brevard County Natural Resources Management Department and Brevard County Schools Amount

More information

Stormwater treatment and public education. Jennifer Nicholson

Stormwater treatment and public education. Jennifer Nicholson Florida Stormwater Association EXCELLENCE AWARD for STORMWATER PROGRAMS and PROJECTS NOMINATION FORM I. Nomination Information Nomination Category (please check only one box): Program (Department/Division)

More information

2008 Combined Clean Water Legacy Grant Application Id#: Use TAB key to move from field to field

2008 Combined Clean Water Legacy Grant Application Id#: Use TAB key to move from field to field cwl funds - CWL_FY08Application.doc Page 1 2008 Combined Clean Water Legacy Grant Application Id#: Use TAB key to move from field to field 1. Applicant Organization Applicant Organization:THREE RIVERS

More information

Storm Water Quality and Shoreline Restoration Improvements - Grant Funding Request City of Mound Carlson Park Bolton & Menk Project No.

Storm Water Quality and Shoreline Restoration Improvements - Grant Funding Request City of Mound Carlson Park Bolton & Menk Project No. September 15, 2016 Brett Eidem Cost Share Grant Administrator Minnehaha Creek Watershed District 15320 Minnetonka Boulevard Minnetonka, MN 55345 RE: Storm Water Quality and Shoreline Restoration Improvements

More information

Florida Stormwater Association 2015 Annual Conference June 17 19, 2015

Florida Stormwater Association 2015 Annual Conference June 17 19, 2015 Presented by: Patricia Gertenbach, P.G. E Sciences Ryan Mitchell, P.E. E Sciences Danielle Straub, P.E. City of Melbourne Florida Stormwater Association 2015 Annual Conference June 17 19, 2015 Presentation

More information

Western Pennsylvania Conservancy Clairton & Harrison Community Greening Assessment Projects Request for Proposals July 2018

Western Pennsylvania Conservancy Clairton & Harrison Community Greening Assessment Projects Request for Proposals July 2018 Western Pennsylvania Conservancy Clairton & Harrison Community Greening Assessment Projects Request for Proposals July 2018 Proposal Information The Western Pennsylvania Conservancy (WPC) is seeking proposals

More information

Chesapeake Bay Landscape Professional

Chesapeake Bay Landscape Professional Chesapeake Bay Landscape Professional Certification Initiative Suzanne Etgen, CCLC Board Member July 10, 2014 Chesapeake Conservation Landscaping Council Who is CCLC? Local Government Stormwater Programs

More information

Summer Public Education and Outreach Campaign Toolkit

Summer Public Education and Outreach Campaign Toolkit Summer Public Education and Outreach Campaign Toolkit ABOUT THIS TOOLKIT The communications tools and messages included in this toolkit were developed by Bluestem Communications for the Lower DuPage River

More information

West Little Pimmit Storm Sewer & John Marshall Green Street Projects. July 7, 2015 Nottingham Elementary School

West Little Pimmit Storm Sewer & John Marshall Green Street Projects. July 7, 2015 Nottingham Elementary School West Little Pimmit Storm Sewer & John Marshall Green Street Projects July 7, 2015 Nottingham Elementary School Project Timeline February 2015: Archeological study of island, including historic spring location,

More information

Potomac Headwaters Leaders of Watersheds Spring 2019 Application

Potomac Headwaters Leaders of Watersheds Spring 2019 Application Potomac Headwaters Leaders of Watersheds Spring 2019 Application Educating future generations of environmental stewards through classroom education and on the ground conservation practices at schools.

More information

LOW IMPACT DEVELOPMENT GUIDANCE MANUAL AND LID WORKING GROUP ACTIVITIES. Powerpoint Templates. MS4 Statewide Stormwater Summit June 18, 2013

LOW IMPACT DEVELOPMENT GUIDANCE MANUAL AND LID WORKING GROUP ACTIVITIES. Powerpoint Templates. MS4 Statewide Stormwater Summit June 18, 2013 LOW IMPACT DEVELOPMENT GUIDANCE MANUAL AND LID WORKING GROUP ACTIVITIES MS4 Statewide Stormwater Summit June 18, 2013 Powerpoint Templates Evan Canfield, Ph.D, P.E. Pima County Regional Flood Control Outline

More information

Evaluating Urban Stormwater Retrofits in the SE US Coastal Plain

Evaluating Urban Stormwater Retrofits in the SE US Coastal Plain Evaluating Urban Stormwater Retrofits in the SE US Coastal Plain 2017 Florida Stormwater Association June 14-17, 2017 Eban Z. Bean, PhD, PE Assistant Professor & Extension Specialist Agricultural and Biological

More information

A TWENTY YEAR PLAN TO RESTORE NAPLES BAY. Natural Resources Manager

A TWENTY YEAR PLAN TO RESTORE NAPLES BAY. Natural Resources Manager A TWENTY YEAR PLAN (and visionary guide) TO RESTORE NAPLES BAY Michael R. Bauer, Ph.D. Natural Resources Manager City of Naples City of Naples Natural Resources Division Management Science Restoration

More information

HOA & Church Conservation Workshop and Bus Tour August 26, Special thanks to Mark O Brien from Cardno Native Plant Nursery

HOA & Church Conservation Workshop and Bus Tour August 26, Special thanks to Mark O Brien from Cardno Native Plant Nursery HOA & Church Conservation Workshop and Bus Tour August 26, 2017 Special thanks to Mark O Brien from Cardno Native Plant Nursery Welcome Claire Lane Mac Williams Nick Steadman Sue Fisher Agenda Presentation

More information

Construction Management & Engineering Division. Understanding Swales

Construction Management & Engineering Division. Understanding Swales Construction Management & Engineering Division Understanding Swales The Florida hydrological cycle it all starts and ends here. Rainfall becomes stormwater when it can no longer soak into the ground and

More information

Green Infrastructure Recommendations For Parks and Public Spaces

Green Infrastructure Recommendations For Parks and Public Spaces Green Infrastructure Recommendations For Parks and Public Spaces Issued by the Jersey Water Works Green Infrastructure Committee And Prepared by Meliora Design This document recommends ways to integrate

More information

UNIVERSITY OF NORTHERN IOWA

UNIVERSITY OF NORTHERN IOWA UNIVERSITY OF NORTHERN IOWA Municipal Separate Storm Sewer System September 2008 Report Permit Number 07-09-0-04 August 2008 Prepared by: University of Northern Iowa Environmental Health and Safety Office

More information

GVSU Sustainable Storm Water Initiative

GVSU Sustainable Storm Water Initiative GVSU Sustainable Storm Water Initiative MWEA Watershed Seminar Bath, MI December 5, 2013 Dr. Peter J. Wampler Talk Road Map Brief Geomorphic History of the Grand River and Grand River Ravines Historic

More information

Client #: Dawson /91. NRCS Tract #(s): Location: Fleming Memorial Park Field #(s): Program(s): Urban Project Name: Date:

Client #: Dawson /91. NRCS Tract #(s): Location: Fleming Memorial Park Field #(s): Program(s): Urban Project Name: Date: Natural Resource Stewardship Plan Jackson Soil and Water Conservation District 89 Alder Street Central Point, Oregon 97502 Ph. (541) 664-1070 www.jswcd.org Client Name: Elisa Dawson, City of Rogue River

More information

Gaining Consensus for Green Infrastructure Rain to Recreation

Gaining Consensus for Green Infrastructure Rain to Recreation Gaining Consensus for Green Infrastructure Rain to Recreation May 2nd, 2017 Tom Jacobs, PE, CFM Stormwater Engineer City of Lenexa Ronald L Norris, PE, PWLF Affiliated with Shockey Consulting Rain to Recreation:

More information

No updates. NEON s work completed throughout July Notify MPRB for tree marking/stump removal

No updates. NEON s work completed throughout July Notify MPRB for tree marking/stump removal Project Report: July December 2017 (with Jan June 2017 activities for reference) Northside Neighborhood Engagement & Opportunities in Clean Water Initiatives Goal 1: Improve water quality in Bassett Creek

More information

Draft Rhode Island Stormwater Design and Installation Standards Manual

Draft Rhode Island Stormwater Design and Installation Standards Manual Draft Rhode Island Stormwater Design and Installation Standards Manual Summary The May 2009 Public Review Draft version of the RI Stormwater Design and Installation Standards Manual consists of approximately

More information

Pat Rector, Environmental & Resource Management Agent Morris and Somerset Counties

Pat Rector, Environmental & Resource Management Agent Morris and Somerset Counties Morris County Presented to Bayer August 26, 2014 Pat Rector, Environmental & Resource Management Agent Morris and Somerset Counties rector@njaes.rutgers.edu Goal of the program Program Goal: The goal of

More information

Benefits of Native Vegetation. Presented by: Mary Beth Falsey DuPage County Senior Wetland Technician

Benefits of Native Vegetation. Presented by: Mary Beth Falsey DuPage County Senior Wetland Technician Benefits of Native Vegetation Presented by: Mary Beth Falsey DuPage County Senior Wetland Technician Turf to Prairie-why would I do that? Improved water quality Soil stabilization and absorption Goose

More information

Parks for Produce Community Gardens Program 2018

Parks for Produce Community Gardens Program 2018 Parks for Produce Community Gardens Program 2018 Request for Applications As part of the Salt Lake County Urban Farming program, underutilized County park land will be considered for community gardens.

More information

UNIVERSITY OF NORTHERN IOWA

UNIVERSITY OF NORTHERN IOWA UNIVERSITY OF NORTHERN IOWA Municipal Separate Storm Sewer System 2015/2016 Report Permit Number 07-09-0-04 August 2016 Prepared by: Environmental Health and Safety Office University of Northern Iowa 8628

More information

What s Your First Thought When You See Landscapers Blowing Grass Clippings into the MS4?

What s Your First Thought When You See Landscapers Blowing Grass Clippings into the MS4? What s Your First Thought When You See Landscapers Blowing Grass Clippings into the MS4? Landscape BMP certification required! Anamarie Rivera Senior Environmental Specialist Division of Environmental

More information

EEA Capital Investment in Green Infrastructure

EEA Capital Investment in Green Infrastructure EEA Capital Investment in Green Infrastructure Goal: Advance local efforts to implement measures to increase natural storm damage protection, flood control, and community resilience State capital funding

More information

NEORSD Green Infrastructure Grant (GIG) Program Opening Remarks

NEORSD Green Infrastructure Grant (GIG) Program Opening Remarks NEORSD Green Infrastructure Grant (GIG) Program Opening Remarks 2019 NEORSD GIG Eligibility and Technical Requirements Project must be located in the Sewer District s combined sewer area Location Applicant

More information

Rocky Areas Project Guidance HABITAT

Rocky Areas Project Guidance HABITAT Rocky Areas Project Guidance HABITAT Introduction Rocky habitats are surface areas dominated by exposed rock, such as mountain peaks, inland cliffs, buttes and rocky outcrops. In many cases, rocky areas

More information

A Review of Green Infrastructure Projects Implemented in the Grand Traverse Region

A Review of Green Infrastructure Projects Implemented in the Grand Traverse Region A Review of Green Infrastructure Projects Implemented in the Grand Traverse Region Sarah U Ren Program Director The Watershed Center of Grand Traverse Bay 231-935-1514, suren@gtbay.org Our Mission: The

More information

STORMWATER STRATEGY PROJECTS IN ACTION

STORMWATER STRATEGY PROJECTS IN ACTION STORMWATER STRATEGY PROJECTS IN ACTION NEW JERSEY DEPARTMENT OF ENVIRONMENTAL PROTECTION 2018 WATER QUALITY RESTORATION GRANTS FOR NONPOINT SOURCE POLLUTION PUBLIC INFORMATION SESSION JUNE 2018 319(H)

More information

Rain Gardens. A Welcome Addition to Your Landscape

Rain Gardens. A Welcome Addition to Your Landscape Rain Gardens A Welcome Addition to Your Landscape Where Does The Rainwater Go? Naturally, forests provide a way for rainwater to percolate into the soil, filtering pollutants while trees are allowed to

More information

Outline. Tampa Bay. Using Social Marketing Research to Foster Behavior Change Among Residents on Stormwater Ponds

Outline. Tampa Bay. Using Social Marketing Research to Foster Behavior Change Among Residents on Stormwater Ponds Using Social Marketing Research to Foster Behavior Change Among Residents on Stormwater Ponds Paul Monaghan Emily Ott Maria Morera UF/IFAS Urban Landscape Summit Outline 1. Urban stormwater and water quality

More information

South Carolina NPDES Permit # SCR Small Municipal Separate Storm Sewer System (SMS4) Annual Report Template

South Carolina NPDES Permit # SCR Small Municipal Separate Storm Sewer System (SMS4) Annual Report Template South Carolina NPDES Permit # SCR030000 Small Municipal Separate Storm Sewer System (SMS4) Annual Report Template III. Minimum Control Measures (MCM) B. Minimum Control Measure 1: Public Education and

More information

Rainscaping. Rainscaping includes rain gardens, bioswales, combinations of. A guide to local projects in St. Louis

Rainscaping. Rainscaping includes rain gardens, bioswales, combinations of. A guide to local projects in St. Louis Rainscaping A guide to local projects in St. Louis Rain garden on South Grand Boulevard in the city of St. Louis. Rainscaping includes rain gardens, bioswales, combinations of plantings, water features,

More information

COMMUNITY GARDEN 2020 PROPOSAL Proposed by ERIANA KONCELIK

COMMUNITY GARDEN 2020 PROPOSAL Proposed by ERIANA KONCELIK COMMUNITY GARDEN 2020 PROPOSAL Proposed by ERIANA KONCELIK Fall 2017 An application for a 2020 grant through Stockton University to continue to beatify the campus and promote student engagement Table of

More information

Weston s Wetlands, Stormwater, & Open Space

Weston s Wetlands, Stormwater, & Open Space Weston s Wetlands, Stormwater, & Open Space Weston s Wetlands, Stormwater, & Open Space Conservation Commission Role and Responsibilities Laws that protect wetlands What residents can do to protect wetlands

More information

Greener Nebraska Towns Small-Scale Project Application

Greener Nebraska Towns Small-Scale Project Application Greener Nebraska Towns Small-Scale Project Application October 2016 A program of the Nebraska Statewide Arboretum, funded by the Nebraska Environmental Trust. Biodiversity is the greatest treasure we have.

More information

Reducing the Storm Water Footprint of GVSU through BMP s

Reducing the Storm Water Footprint of GVSU through BMP s Reducing the Storm Water Footprint of GVSU through BMP s Association of State Floodplain Managers Grand Rapids, MI June 22, 2016 Dr. Peter J. Wampler 1 Talk Road Map Brief Geomorphic History of the Grand

More information

What is stormwater runoff? Why is it a problem? Available Financial Incentives for Stormwater BMP s Downspout Disconnection - up to $20

What is stormwater runoff? Why is it a problem? Available Financial Incentives for Stormwater BMP s Downspout Disconnection - up to $20 What is stormwater runoff? Stormwater is any form of natural precipitation (including ice and snow melt) that flows across undeveloped or developed land. In a natural setting, a majority of the water seeps

More information

USF System Campus Master Plan Updates Goals, Objectives and Policies

USF System Campus Master Plan Updates Goals, Objectives and Policies 2015-2025 USF System Campus Master Plan Updates Goals, Objectives and Policies Tampa Goals, Objectives, and Policies Table of Contents Executive Summary 2015 2025 USF Campus Master Plan Update Introduction

More information

SUSTAINABILITY PLAN OTTAWA COUNTY PARKS AND RECREATION COMMISSION FALL 2017

SUSTAINABILITY PLAN OTTAWA COUNTY PARKS AND RECREATION COMMISSION FALL 2017 SUSTAINABILITY PLAN OTTAWA COUNTY PARKS AND RECREATION COMMISSION FALL 2017 Table of Contents Introduction Natural Resources Quality of Life Community Continuing the Mission Sustainability Measuring Sustainability

More information

Sustainable Storm Water Management

Sustainable Storm Water Management Incorporating Water Management into the Community Planning Process August 16, 2012 Sustainable Storm Water Management Samantha Brown Environmental Engineer SD1 SD1 s Service Area CVG Airport SD1 Service

More information

Low Impact Development a great program that helps make the best use of something we re all familiar with - rainwater. practices.

Low Impact Development a great program that helps make the best use of something we re all familiar with - rainwater. practices. Management practices best Low Impact Development a great program that helps make the best use of something we re all familiar with - rainwater. Long Beach Development Services Building a Better Long Beach

More information

Post Construction BMPs

Post Construction BMPs Post Construction BMPs Why are Post Construction BMPs important? With increased development brings the increase of impervious cover Parking lots, rooftops, driveways Storm water runoff volume increases

More information

Bay County RESTORE Act Direct Component Proposals The project will encompass all of Unincorporated Bay County as a whole.

Bay County RESTORE Act Direct Component Proposals The project will encompass all of Unincorporated Bay County as a whole. Proj # Bay PRP 2014-016 Project Name Bay County Master Plan and Capital Improvement Strategic Plan Update Project Proposer, affiliation, web site Project Description Proj. Size (acres) Economic Environmental

More information

Maintenance Plan for Vegetated Portions of the MS4

Maintenance Plan for Vegetated Portions of the MS4 Maintenance Plan for Vegetated Portions of the MS4 Hawaii State Department of Transportation Highways Division, Oahu District Storm Water Management Program NPDES Permit No. HI S000001 April 2015 This

More information

Bioswales: A Guide to Low-Impact Development Design and Maintenance. Introduction and Compilation by: Leslie D. Bartsch And Jennifer S.

Bioswales: A Guide to Low-Impact Development Design and Maintenance. Introduction and Compilation by: Leslie D. Bartsch And Jennifer S. Bioswales: A Guide to Low-Impact Development Design and Maintenance Introduction and Compilation by: Leslie D. Bartsch And Jennifer S. Raible Biological Engineering University of Arkansas Fayetteville,

More information

UNIVERSITY OF NORTHERN IOWA

UNIVERSITY OF NORTHERN IOWA UNIVERSITY OF NORTHERN IOWA Municipal Separate Storm Sewer System September 2011 Report Permit Number 07-09-0-04 August 2011 Prepared by: Environmental Health and Safety Office and Facilities Services

More information

Impervious Cover Reduction Action Plan for City of Vineland, Cumberland County, New Jersey

Impervious Cover Reduction Action Plan for City of Vineland, Cumberland County, New Jersey Impervious Cover Reduction Action Plan for City of Vineland, Cumberland County, New Jersey Prepared for the City of Vineland by the Rutgers Cooperative Extension Water Resources Program May 23, 2016 Table

More information

Mullock Creek Basin Restoration - Homeowner Florida Friendly Yards

Mullock Creek Basin Restoration - Homeowner Florida Friendly Yards Mullock Creek Basin Restoration - Homeowner Florida Friendly Yards Initiative Category: Applicant: Contact person: Project Manager: Community Stewardship Charlotte Harbor National Estuary Program Elizabeth

More information

Saturating the Message of Water Conservation

Saturating the Message of Water Conservation Saturating the Message of Water Conservation Pam Lancaster, B.Sc., Stewardship Technician Ganaraska Region Conservation Authority 20 th Annual A.D. Latornell Conservation Symposium November 20, 2013 Ganaraska

More information

Title: Project Lead: Abstract: Promoting Landscape Stewardship Through Interactive Interpretation.

Title: Project Lead: Abstract: Promoting Landscape Stewardship Through Interactive Interpretation. Title: Promoting Landscape Stewardship Through Interactive Interpretation. Project Lead: Tanya M. Quist, Asst. Professor, School of Plant Sciences and UA Campus Arboretum Director. Contact information:

More information

Understanding Stormwater Drainage Maintenance

Understanding Stormwater Drainage Maintenance WARREN COUNTY STORMWATER DISTRICT Understanding Stormwater Drainage Maintenance Home Owner s Association Guide Introduction Our goal is to help property owners and Home Owner s Associations (HOA) understand

More information

Green Infrastructure

Green Infrastructure New York State Water Resources Institute Green Infrastructure in the Hudson Valley May 17, 2011 Emily Vail Hudson River Estuary Program New York State Department of Environmental Conservation In cooperation

More information

319 Grant: Baker Creek & Centenary Creek Restoration Initiative

319 Grant: Baker Creek & Centenary Creek Restoration Initiative 319 Grant: Baker Creek & Centenary Creek Restoration Initiative Objectives: Overview of Watershed Characteristics: Discussion of Project Tasks: Discussion of Watershed Management Plan: Presented by: Erich

More information

Case Study: Parsippany-Troy Hills

Case Study: Parsippany-Troy Hills Case Study: Parsippany-Troy Hills February 26, 2016 Pat Rector Rutgers Cooperative Extension Environmental & Resource Management Agent Morris and Somerset Counties rector@njaes.rutgers.edu Karl Kuber Supervisor

More information

Member Service Plan Sierra Nevada AmeriCorps Partnership

Member Service Plan Sierra Nevada AmeriCorps Partnership Member Service Plan Sierra Nevada AmeriCorps Partnership Service plans lay the framework for what each Member will be doing during their service. Service plans detail the major projects and expected results

More information

Low Impact Development for your homes, businesses & streets

Low Impact Development for your homes, businesses & streets Low Impact Development for your homes, businesses & streets What s the problem anyways? - Development Impacts the Water Cycle In the past, our main pollution concern was Point Source Pollution Our current

More information

The scope of the plan will focus on the Prospect Heights Slough and Hillcrest Lake as one entity.

The scope of the plan will focus on the Prospect Heights Slough and Hillcrest Lake as one entity. Plan for Prospect Heights Natural Resources Commission Plan for Improved Public Access and Enjoyment of the Prospect Heights Slough and Hillcrest Lake July 23, 2018 The City Council has requested the Natural

More information

April 11, 2016 Park Board Chair and Commissioners General Manager Vancouver Board of Parks and Recreation New Brighton Salt Marsh - Preferred Concept

April 11, 2016 Park Board Chair and Commissioners General Manager Vancouver Board of Parks and Recreation New Brighton Salt Marsh - Preferred Concept TO: FROM: SUBJECT: April 11, 2016 Park Board Chair and Commissioners General Manager Vancouver Board of Parks and Recreation New Brighton Salt Marsh - Preferred Concept RECOMMENDATION A. THAT the Vancouver

More information

AGENDA 2015 Community Stormwater Event

AGENDA 2015 Community Stormwater Event AGENDA 2015 Community Stormwater Event Sponsors: 2015 Community Stormwater Event AGENDA 2015 Community Stormwater Event Welcome 6:00 1 st prize drawing 6:15 Stormwater Video final destination Stormwater

More information

Draft Impervious Cover Reduction Action Plan for West Long Branch Borough, Monmouth County, New Jersey

Draft Impervious Cover Reduction Action Plan for West Long Branch Borough, Monmouth County, New Jersey Draft Impervious Cover Reduction Action Plan for West Long Branch Borough, Monmouth County, New Jersey Prepared for West Long Branch Borough by the Rutgers Cooperative Extension Water Resources Program

More information

6.5 Lakewood Gulch. Basin Snapshot

6.5 Lakewood Gulch. Basin Snapshot 6.5 Lakewood Gulch The Lakewood Gulch Map Unit is comprised of both Lakewood Gulch and Dry Gulch (4800-01 and 4801-01) from the Denver Storm Drainage Master Plan (SDMP) and has a total drainage area of

More information

The Flow. Green Infrastructure Taking Root in Cities 3/23/2015. Green Infrastructure Evolution City Plans/Projects Measureable and Holistic Benefits

The Flow. Green Infrastructure Taking Root in Cities 3/23/2015. Green Infrastructure Evolution City Plans/Projects Measureable and Holistic Benefits Green Infrastructure Taking Root in Cities Robert Hopper, P.E. CDM Smith The Flow Green Infrastructure Evolution City Plans/Projects Measureable and Holistic Benefits 2 1 Parts, Systems, Whole The first

More information

City of Tacoma Planning and Development Services

City of Tacoma Planning and Development Services Agenda Item D-1 City of Tacoma Planning and Development Services To: Planning Commission From: Elliott Barnett, Planning Services Division Subject: Application #2014-08 Open Space Element Update Meeting

More information

Use of Best Management Practices

Use of Best Management Practices Use of Best Management Practices Presented at the ANJEC Flood Hazard Workshop Bordentown, NJ March 13, 2008 Stormwater BMPs "a technique, measure or structural control that is used for a given set of conditions

More information

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX G - Stormwater Study Findings & Stormwater Solutions

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX G - Stormwater Study Findings & Stormwater Solutions LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN APPENDIX G - Stormwater Study Findings & Stormwater Solutions LSU: MP Narrative July 2017 3.5 Open Space Existing Conditions The

More information

Work Plan. Introduction:

Work Plan. Introduction: Work Plan Introduction: The original construction of Santa Rosa s City Hall was done in an era when storm water was collected and conveyed as quickly as possible, where water intensive lawns were the norm,

More information

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN 2.1 Requirements The City of Shelbyville, KY will require an Erosion Prevention and Sediment Control (EPSC) Plan for most types of development construction.

More information

Best Management Practices

Best Management Practices Best Management Practices Urban Areas Aquatic Areas Natural Areas Best Management Practices Urban Areas Green Industry Best Management Practices Fertilizer Label Nitrogen Applications Phosphorous Applications

More information

Conservation in South Jersey Being Creative with Restoration

Conservation in South Jersey Being Creative with Restoration Conservation in South Jersey Being Creative with Restoration Stewardship on a Shoestring: Public Land Management in Fiscally Constrained Times November, 30, 2011 Conservation and Restoration for Open Space

More information

Two Sides of the Green Infrastructure Coin. Jaren Hiller, PE, LEED AP Nathan Guequierre

Two Sides of the Green Infrastructure Coin. Jaren Hiller, PE, LEED AP Nathan Guequierre Two Sides of the Green Infrastructure Coin Jaren Hiller, PE, LEED AP Nathan Guequierre May 5, 2016 Background Citywide Stormwater Planning WinSLAMM Analysis No Control Existing Conditions Proposed Conditions

More information

Integrated Pest Management Grant Program Final Report 2007

Integrated Pest Management Grant Program Final Report 2007 Florida-Friendly Living: On the Waterfront Integrated Pest Management Grant Program Final Report 2007 Dr. Joan Bradshaw Specialized Regional Programs for Natural Resources Citrus, Hernando, Pasco and Sumter

More information

Stormwater Management Plan (SWMP) Revision Date: 11/05

Stormwater Management Plan (SWMP) Revision Date: 11/05 Stormwater Management Plan (SWMP) Revision Date: 11/05 SWMP Purpose: Sustainable stormwater management principles are adopted as Portland State University s (PSU) preferred approach for the management

More information

Action Plan for Retrofitting Structural BMPs

Action Plan for Retrofitting Structural BMPs Action Plan for Retrofitting Structural BMPs Hawaii State Department of Transportation Highways Division, Oahu District Storm Water Management Program NPDES Permit No. HI S000001 August 2014 Action Plan

More information

Pinellas County Fertilizer Ordinance Landscape and Fertilizer BMPs and Education Campaigns Pinellas County Water Quality and Ordinance # 10-06

Pinellas County Fertilizer Ordinance Landscape and Fertilizer BMPs and Education Campaigns Pinellas County Water Quality and Ordinance # 10-06 Pinellas County Fertilizer Ordinance Landscape and Fertilizer BMPs and Education Campaigns Pinellas County Water Quality and Ordinance # 10-06 Ryan Ryczek Environmental Specialist II Pinellas County Watershed

More information

Phase II Storm Water Permit Program MS4 Permit

Phase II Storm Water Permit Program MS4 Permit Phase II Storm Water Permit Program MS4 Permit Karen Katamay Environmental Protection Engineer/CPESC Illinois EPA Des Plaines Regional Office karen.katamay@illinois.gov 847-294-4043 Types of Storm Water

More information

Stream Restoration: Working with Nature?

Stream Restoration: Working with Nature? Stream Restoration: Working with Nature? Greg Jennings, PhD, PE jenningsenv@gmail.com Ecosystem Restoration activities that initiate or accelerate the recovery of ecosystem health, integrity, and sustainability

More information

Stream Restoration: Working with Nature? Greg Jennings, PhD, PE

Stream Restoration: Working with Nature? Greg Jennings, PhD, PE Stream Restoration: Working with Nature? Greg Jennings, PhD, PE jenningsenv@gmail.com Ecosystem Restoration activities that initiate or accelerate the recovery of ecosystem health, integrity, and sustainability

More information

B. Contact Information: Hannah K. Morgan Sustainability Coordinator 202 Netzer Administration Building

B. Contact Information: Hannah K. Morgan Sustainability Coordinator 202 Netzer Administration Building A. Proposal Title: Storm Water Initiative Project (SIP): An Interdisciplinary Initiative and Experiential Learning Opportunity to Promote the Campus as a Living Laboratory B. Contact Information: Hannah

More information

Figure 1. Bioswale along roadside. Photo courtesy of CalTrans. Figure 2. Diagram of typical bioswale (adapted from UDFCD 1999)

Figure 1. Bioswale along roadside. Photo courtesy of CalTrans. Figure 2. Diagram of typical bioswale (adapted from UDFCD 1999) Design Manual: Biological Filtration Canal (Bioswale) Dayna Yocum, Bren School of Environmental Science and Management, University of California, Santa Barbara Figure 1. Bioswale along roadside. Photo

More information

BRADENTON RIVERWALK EXPANSION MASTER PLAN

BRADENTON RIVERWALK EXPANSION MASTER PLAN BRADENTON RIVERWALK EXPANSION MASTER PLAN INTRODUCTION & AGENDA Process Update Community Engagement Summary Center for Active Design (CfAD) Recommendations Context and Existing Conditions Master Plan Alternatives

More information

continues in the watershed, additional flood control and water quality / natural system improvements may be required in the future.

continues in the watershed, additional flood control and water quality / natural system improvements may be required in the future. The Duck Pond Watershed is located in northern Hillsborough County in an area in which a number of land and water management issues are currently being addressed by citizen's action groups and state, regional

More information

LID CASE STUDY DESIGN WORKSHOP HSG B/D SOIL EXAMPLE SINGLE FAMILY SUBDIVISION WITH OUTPARCEL

LID CASE STUDY DESIGN WORKSHOP HSG B/D SOIL EXAMPLE SINGLE FAMILY SUBDIVISION WITH OUTPARCEL LID CASE STUDY DESIGN WORKSHOP HSG B/D SOIL EXAMPLE SINGLE FAMILY SUBDIVISION WITH OUTPARCEL B Y : M A R T Y W A N I E L I S T A A N D E R I C L I V I N G S T O N August, 2016 ACKNOWLEDGEMENTS The Low

More information

WESTERN ILLINOIS UNIVERSITY

WESTERN ILLINOIS UNIVERSITY WESTERN ILLINOIS UNIVERSITY Quad Cities Riverfront Campus Preliminary Master Plan Presentation 2 February 1, 2006 Achieving Future Flexibility 1. Monitor space needs as the new buildings come on line and

More information

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT INTRODUCTION In recent years, the University of Cincinnati (University) has demonstrated a commitment to identifying and implementing sustainable goals and objectives throughout University s Uptown Campuses.

More information

SUSTAINABILITY FUND SMALL GRANTS FOR IDEAS THAT MIGHT FURTHER THE POWER OF SUNY

SUSTAINABILITY FUND SMALL GRANTS FOR IDEAS THAT MIGHT FURTHER THE POWER OF SUNY SUSTAINABILITY FUND SMALL GRANTS FOR IDEAS THAT MIGHT FURTHER THE POWER OF SUNY Jamie Adams Sustainability Program Coordinator SUNY Oswego 165 Wilber Hall Oswego, NY 13126 (315) 312-2873 jamie.adams@oswego.edu

More information

Leduc Industrial Outline Plan SE W4

Leduc Industrial Outline Plan SE W4 Leduc Industrial Outline Plan SE 1-50-25-W4 Within the North Leduc Industrial ASP Prepared for: Leduc Energy Park Ltd. Prepared by: Stantec Consulting Ltd. File No. 1161 104655 V5 Table of Contents 1.0

More information

Green Infrastructure Overview

Green Infrastructure Overview Green Infrastructure Overview Christopher C. Obropta, Ph.D., P.E. obropta@envsci.rutgers.edu Jeremiah Bergstrom, LLA, ASLA jbergstrom@envsci.rutgers.edu February 26, 2016 Water Resources Program NJDEP

More information

Northeast Florida Estuary Restoration Initiative: A District Perspective. Ron Brockmeyer, SJRWMD And a cast of thousands!!

Northeast Florida Estuary Restoration Initiative: A District Perspective. Ron Brockmeyer, SJRWMD And a cast of thousands!! Northeast Florida Estuary Restoration Initiative: A District Perspective Ron Brockmeyer, SJRWMD And a cast of thousands!! Success and Local Partners Impoundment Reconnection / Restoration (Merritt Island

More information

APPENDIX A. Proposed Guidance and LID checklists for UConn and Town of Mansfield

APPENDIX A. Proposed Guidance and LID checklists for UConn and Town of Mansfield APPENDIX A. Proposed Guidance and LID checklists for UConn and Town of Mansfield 22 Guidance Document for Low Impact Development Best Management Practices for UConn June, 2011 In 2007, the Connecticut

More information

Case Study: Dallas Green Infrastructure for Stormwater

Case Study: Dallas Green Infrastructure for Stormwater Case Study: Dallas Green Infrastructure for Stormwater Extension and Research Sandhya Mohan Fouad H. Jaber, PhD Biological and Agricultural Engineering Texas Agrilife, Texas A&M University System Urban

More information

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX) CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA 98501 (360) 754-4180 (360) 754-4126 (FAX) Email: cdd@ci.tumwater.wa.us APPENDIX II-C SHORT FORM CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN (SWPPP)

More information

Maryland Association of Floodplain and Stormwater Managers. State of the State - Stormwater Management October 12, 2017

Maryland Association of Floodplain and Stormwater Managers. State of the State - Stormwater Management October 12, 2017 Maryland Association of Floodplain and Stormwater Managers State of the State - Stormwater Management October 12, 2017 Sediment, Stormwater, & Dam Safety Program Sediment and Stormwater Program Review

More information

SOIL EROSION AND SEDIMENT CONTROL

SOIL EROSION AND SEDIMENT CONTROL SOIL EROSION AND SEDIMENT CONTROL SECTION 1: AUTHORITY, TITLE AND PURPOSE 11. STATUTORY AUTHORIZATION This ordinance is adopted pursuant to the provisions of the Federal Water Pollution Control Act 86

More information

RETAINING RUNOFF AT ITS SOURCE

RETAINING RUNOFF AT ITS SOURCE RETAINING RUNOFF AT ITS SOURCE Atlantic Beach Case Study Jose Maria Guzman, PE, D.WRE Jacksonville Environmental Symposium August 2013 Outline Overview of stormwater issues in Atlantic Beach, FL City s

More information

University of Minnesota Duluth Duluth, Minnesota Farming/Garden

University of Minnesota Duluth Duluth, Minnesota Farming/Garden University of Minnesota Duluth Duluth, Minnesota Farming/Garden SCHOOL University of Minnesota Duluth, public, 4-year, fall 2011 enrollment of 11,806, Duluth, Minnesota. ABSTRACT Edible landscaping can

More information

The Conservation Foundation

The Conservation Foundation Downers Grove Stormwater Education Workshop Presented by the Village of Downers Grove in Cooperation with The Conservation Foundation The Conservation Foundation Founded 1972 A private, member supported,

More information