Review Zone Application for D&R Canal Commission Decision

Size: px
Start display at page:

Download "Review Zone Application for D&R Canal Commission Decision"

Transcription

1 Review Zone Application for D&R Canal Commission Decision MEETING DATE: July 20, 2016 DRCC #: Latest Submission Received: June 13, 2016 Applicant: Robert McCarthy, PE PSE&G 4000 Hadley Road, 2 nd Floor South Plainfield, NJ Engineer: Steven Hansen, PE Burns & McDonnell 9400 Ward Parkway Kansas City, MO Project Location: Road Municipality County Block(s) Lot(s) Prospect Street Ewing Twp Mercer , 50 Jurisdictional Determination: Zone B Major Nongovernmental Subject to Review for: Drainage Visual Subdivision Stream Corridors X X THIS STAFF REPORT IS ISSUED AS A GUIDE TO APPLICANTS IN COMPLYING WITH DRCC REGULATIONS. IT IS NOT AN APPROVAL. NO CONSTRUCTION SHALL BEGIN UNTIL A CERTIFICATE OF APPROVAL HAS BEEN ISSUED. Documents Received: Letters from Robert McCarthy, PE (3 pages) dated March 17, 2016, and (5 pages) dated June 13, 2016; Existing Conditions Survey (1 sheet) dated February 19, 2016; DRCC Stream Corridor Exhibit (1 sheet) dated March 15, 2016, revised May 27, 2016; DRCC Existing Conditions Exhibit dated June 1, 2016; and Site Plan (1 sheet) dated February 19, 2016, last revised May 17, 2016; prepared by PSE&G Services Corporation; Acoustical Study dated December 30, 2015, prepared by Ostergaard Acoustical Associates; Site Plans (18 sheets) and Stormwater Management Plan dated December 31, 2015 (Sheets 6, 7, and 8 last revised May 3, 2016) prepared by Burns & McDonnell; Application Report dated March 2016, Landscaping Plan (1 sheet) dated February 19, 2016, revised May 17, 2016, and Application Amendment- Alternatives Analysis dated June 2016, prepared by DW Smith Associates. Mercer County Soil Conservation District Soil Erosion and Sediment Control Plan Certification dated May 5, 2016; Stormwater Management Measures Manual prepared by Steve Hansen, PE, dated May 17, PO BOX 539 STOCKTON, NJ FAX

2 2 The application is complete and shall be presented to the Commission for their action with a staff recommendation of approval at the July 20, 2016 meeting, based upon the following analysis: Existing Conditions: The project site is 2.20 acres in size and consists of two lots, Lot 50 and Lot 43, located on the west side of Prospect Street (CR 627) between North Olden Avenue and the West Branch of the Shabakunk Creek. The lots are located in Ewing Township, Mercer County, within Commission Review Zone B. Lot 50 is 0.68 acres in size and contains the PSE&G Ewing Substation which was constructed in It includes an existing 26 kilovolt (kv) substation that is fully enclosed by a seven-feet-high chain-linked barbed-wire security fence. The existing substation is located on a gravel lot with grassy areas on each side of the 14-feet-wide access drive, with a few mature trees along the frontage of Prospect Street. The station yard also includes a 36-inch to 42-inch high concrete flood wall, a small one-story masonry control house, as well as several concrete pads and footings. The substation equipment is near the end of its useful life and is prone to periodic flooding, causing power outages and other complications during flood events. The Ewing Substation provides electrical service to about 4,475 customers in Ewing Township and the City of Trenton. Adjacent Lot 43 is 1.52 acres in size and contains a two-story masonry building with an asphalt parking lot, sidewalks, overgrown vegetation, and wooded areas. The lot is bounded by Prospect Street to the east, a golf range to the south, undeveloped green space to the west and commercial properties to the north. Proposed Project: The applicant is proposing to disturb a majority of the site for a project including the conversion and expansion of an existing 26kV substation to a 69kV substation. The upgrade to the Ewing Substation is part of a larger regional effort known as the Fernwood Area 69kV Network Project to improve the overall capabilities and reliability of transmission systems throughout the area. More specifically, the proposed improvements will include the following: The demolition and removal of the existing gravel substation yard, including the 16,357-square-feet industrial use building and 162-square-feet control house, the approximate 46,900 square feet of impervious asphalt and concrete parking lots, a portion of the existing loose gravel substation yard, as well as a number of concrete footings and sidewalks, The installation of four new 69kV circuit breakers with associated disconnects, bus support structures, and open-air three phase aluminum buswork, The installation of two 69/4kV transformers on concrete pads, new 4kV sheltered aisle switchgear on an elevated platform, a 1,024-square-feet control house, and new underground cables, The construction of 140 concrete spread footings for the steel supports of the proposed process equipment, and

3 3 A decorative fence with a cantilever entrance gate, chain link fence along the rear of the property, about 38,250 square feet of new gravel access driveway and yard gravel surfacing, 150 square feet of concrete driveway apron. The project will result in a 0.23-acre net decrease in the amount of impervious surface area onsite after construction. The proposed project shall result in an area of disturbance of about 2.10 acres. Stream Corridor: The project site is located entirely within the 100-year floodplain of the West Branch of the Shabakunk Creek. The 100-year floodplain has been delineated by both FEMA and NJDEP. In consideration of the extent of the 100-year floodplain of the West Branch of the Shabakunk Creek, the entire project site is situated within the Commission stream corridor. Therefore, this project is subject to a stream corridor impact review. The applicant will be demolishing a building, creating new structures, creating internal drive areas, creating parking, removing plantings, landscaping, mowing and regrading within the stream corridor. These are prohibited uses within the stream corridor, N.J.A.C. 7: The applicant seeks a waiver of the stream corridor impact standards pursuant to N.J.A.C. 7: (a)1. N.J.A.C. 7: (a)1 states that a project may be waived from strict adherence to stream corridor impact standards if the applicant establishes that the project will not have an adverse impact upon the stream corridor s ability to function as a buffer for the water course s ecological health and as a natural area. First, staff notes that the applicant conducted an alternatives analysis to examine relocating the facility to a different site but was unable to relocate the facility. Second, the existing substation was built in 1953 and the neighboring building and parking were also built in the 1950s, prior to the Commission s jurisdiction and the stream corridor regulations. The project will reduce the existing impervious by approximately 0.23 acres. Third, the applicant notes other environmental benefits of the project at this site. The applicant will remove existing structures from inside the floodway and flood fringe areas. Systems will be upgraded and equipment will be raised above the highest flood elevation to ensure continued reliable operation in the future and the project has received approval from the DEP Flood Hazard program. Also, the project will eliminate vehicular traffic and the outside storage of vehicles. Specifically, Lot 43 contains a building which was used for cleaning cars, and parking which was used for the driving and storage of cars outside. With the new project, the travel surfaces between both lots will be reduced, with 0.53 acres of asphalt and concrete areas being eliminated. The substation will not be staffed and there will be approximately one visit per week for equipment and property maintenance. Lastly, stormwater treatment will be provided for the site where no treatment is presently provided.

4 4 The pervious area on the site will be approximately 42,793 square feet. PSEG will place the 42,793 square feet of pervious area on the project site in a Commission stream corridor conservation easement. PSEG has requested that the easement include permitted uses in the corridor including maintenance of the vegetated filter strip, planting with native plants along Prospect Street and a lawn area adjacent to the substation. The lawn area is for a zone of safety around the substation in keeping with policies at all substations and the planting beds and lawn in the front of the property, along Prospect Street, are required by the township for their designated redevelopment area. PSEG notes that the native plants in the front will replace lawn and that the overall lawn area will be reduced by 16,618 square feet and the naturally vegetated areas, which will not be maintained, will increase from 8,225 square feet to 20,292 square feet. The beds will contain native plantings consistent with the DEP and Commission native planting lists. The stream corridor easement will preserve the pervious areas on the site. The Commission s standard easement form allows for the listing of permitted uses, and similar uses and conditions have been allowed in past agreements. It is staff s opinion that the project meets the stream corridor waiver standards of N.J.A.C. 7: (a)1. Stormwater Runoff Quantity: The majority of the site drains to the south and east and enters the existing storm sewer collection system located in Prospect Street, which ultimately drains to the West Branch of the Shabakunk Creek. The applicant has evaluated changes in land use and the pre- and post-construction stormwater conditions at the project site at Point of Analysis #1, located at the westerly corner of the property. The submitted hydrologic and hydraulic calculations demonstrate that, for stormwater leaving the site off the eastern drainage area, post-construction runoff hydrographs for the two, 10, and 100-year storm events do not exceed, at any point in time, the preconstruction runoff hydrographs for the same storm events. As a note, because of the proposed project, impervious coverage areas onsite will be reduced from the existing condition. The submitted calculations utilized the Natural Resource Conservation Service (NRCS) Technical Release No. 55 (TR-55) hydrologic methodology, Standard unit hydrograph rainfall distribution and current New Jersey 24-hour rainfall frequency data for Mercer County to compute peak runoff flow rates and volumes. Based upon a review of the modeling results, the proposed project will result in a reduction in both the quantity of runoff flow and volume. Therefore, the proposed project will meet the specific runoff quantity standards of N.J.A.C. 7:45-8.6(a)2. Water Quality: The Commission requires that all proposed travel gravel surfaces and full depth pavement, including newly and reconstructed parking and access drives that are being renewed, must meet water quality standards in accordance with Commission regulations (N.J.A.C. 7:45-8.7). This includes reduction of the post-construction load of total suspended solids (TSS) in stormwater runoff generated from the water quality design storm by a rate of 80% of the anticipated load from the developed site, expressed as an annual average. Based upon the submitted application, new gravel access drives and a concrete driveway apron are being proposed onsite. The submitted stormwater report notes that the design proposes to treat for water quality by incorporating a combination of best management practice (BMP) measures in series, including a vegetative filter strip followed by a linear inflow grass swale. The proposed vegetative

5 5 filter strip will be planted with turf grass cover at an 85% minimum density of vegetation to achieve a 60% TSS removal rate. The linear inflow grass swale will exceed 200 linear feet and achieve a 50% TSS removal rate. In series as a treatment train, these BMP measures will achieve an 80% TSS removal rate for the project. It should also be noted that the proposed substation is expected to be a low pollutant area due to the minimal activity on the site during operation, with vehicular traffic at the substation consisting of intermittent maintenance vehicles with no full-time employee onsite. As such, stormwater quality measures have been designed in accordance with the requirements of N.J.A.C. 7: Groundwater Recharge: The Commission regulations require that stormwater management measures maintain 100% of the average annual preconstruction groundwater recharge volume for the site; or that any increase of stormwater runoff volume from preconstruction to post-construction for the 2-year storm is infiltrated. Based upon a review of the results of the stormwater calculations, there will not be any increase of stormwater runoff volume from preconstruction to post-construction for the 2- year storm. The main reason for this is that the impervious coverage areas onsite will be reduced from the existing conditions. Therefore, the groundwater recharge requirements of N.J.A.C. 7: have been addressed. Nonstructural Methods: To assist in determining that sufficient nonstructural stormwater management strategies have been incorporated into the project site design to the maximum extent practical, the Nonstructural Strategies Point System (NSPS) spreadsheet has been completed for this project. The results indicate that the ratio of proposed to existing site points (251%) is greater than the required site points ratio (69%). The project is therefore designed in accordance with N.J.A.C. 7: Stormwater Management Maintenance Plan: A stormwater management operation and maintenance plan document has been prepared and submitted for the best management practice (BMP) elements proposed for the PSEG Ewing Substation project. The plan includes maintenance details for the proposed vegetative filter strip and linear inflow grass swale. The plan has been prepared in accordance with the requirements of N.J.A.C. 7: Staff Recommendation: Staff recommends approval. Sincerely, Marlene Dooley Executive Director c: Ewing Township Planning Board Mercer County Planning Board

Review Zone Application for D&R Canal Commission Decision

Review Zone Application for D&R Canal Commission Decision Review Zone Application for D&R Canal Commission Decision MEETING DATE: November 15, 2017 DRCC #: 16-4952 Latest Submission Received: October 30, 2017 Applicant: 1872 River Road, LLC 71 South Orange Avenue

More information

Draft Rhode Island Stormwater Design and Installation Standards Manual

Draft Rhode Island Stormwater Design and Installation Standards Manual Draft Rhode Island Stormwater Design and Installation Standards Manual Summary The May 2009 Public Review Draft version of the RI Stormwater Design and Installation Standards Manual consists of approximately

More information

Municipal Stormwater Management: Does Your Town Need More than the Minimum?

Municipal Stormwater Management: Does Your Town Need More than the Minimum? Municipal Stormwater Management: Does Your Town Need More than the Minimum? ANJEC Congress Friday, October 9, 2015 www.anjec.org 973 539 7547 The existence of a regulation indicates a failure of design.

More information

Appendix I. Checklists

Appendix I. Checklists Appendix I Checklists Town of Greenwich Drainage Manual Department of Public Works - Engineering Division Town Hall - 101 Field Point Road, Greenwich, CT 06836-2540 Phone 203-622-7767 - Fax 203-622-7747

More information

Lesson 2: Stormwater Best Management Practices (BMPs)

Lesson 2: Stormwater Best Management Practices (BMPs) Lesson 2: Stormwater Best Management Practices (BMPs) Environmental Stewards Class Christopher C. Obropta, Ph.D., P.E. Extension Specialist in Water Resources 732-932-9800 ext. 6209 obropta@envsci.rutgers.edu

More information

SITE PLAN REVIEW APPLICATION AND CHECKLIST

SITE PLAN REVIEW APPLICATION AND CHECKLIST SITE PLAN REVIEW APPLICATION AND CHECKLIST PROJECT SUMMARY: Project Name: City/ETA Location: City ETA (Application fee & number of copies needed are based on location) Property Location (Legal Description

More information

DRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK

DRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK DRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK A. Authority As set forth in the Overland Park Municipal Code (OPMC), Chapter 16.210, the Director of Planning and Development

More information

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE Codes analyses for each subcommittee were completed to assist participants of the Richland County Site Planning Roundtable.

More information

Use of Best Management Practices

Use of Best Management Practices Use of Best Management Practices Presented at the ANJEC Flood Hazard Workshop Bordentown, NJ March 13, 2008 Stormwater BMPs "a technique, measure or structural control that is used for a given set of conditions

More information

Chapter 2 - Post-Construction Stormwater Management in New Development and Redevelopment

Chapter 2 - Post-Construction Stormwater Management in New Development and Redevelopment Chapter 2 - Post-Construction Stormwater Management in New Development and Redevelopment The Post-Construction Stormwater Management in New Development and Redevelopment SBR requires the Tier B Municipality

More information

Huntington Stormwater Utility

Huntington Stormwater Utility Huntington Stormwater Utility Stormwater Management & Sediment and Erosion Control Requirements for Construction Sites Authorized by Huntington City Code Articles: 971, 970, 930, 935, 955, Revised April

More information

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA. February 21, 2018

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA. February 21, 2018 Example Stormwater Control Plan For a Residential Subdivision Project Whispering Pines Lane Anytown, USA February 21, 2018 XYZ Corporation Jane Jones, 925-555-1212 This example prepared by Dan Cloak Environmental

More information

Town of Windham. Planning Department 8 School Road Windham, ME voice fax

Town of Windham. Planning Department 8 School Road Windham, ME voice fax Town of Windham Planning Department 8 School Road Windham, ME 04062 voice 207.864-5960 fax 207.892.1916 MEMO DATE: TO: Staff Review Committee FROM: Amanda Lessard, Planner Cc: Ellen Rathbone, St. Germain

More information

STORMWATER GREEN INFRASTRUCTURE AND PLANNING/ZONING BOARDS

STORMWATER GREEN INFRASTRUCTURE AND PLANNING/ZONING BOARDS STORMWATER GREEN INFRASTRUCTURE AND PLANNING/ZONING BOARDS Source: Center for Watershed Protection, 2007 Southern Tier Central Regional Planning & Development Board Chemung County Stormwater Team OUTLINE

More information

Homeowners Guide to Stormwater BMP Maintenance

Homeowners Guide to Stormwater BMP Maintenance Homeowners Guide to Stormwater BMP Maintenance What You Need to Know to Take Care of Your Property Rain Barrel Dry Well Rain Garden Pervious Asphalt Porous Pavers City of El Monte Stormwater BMP Management

More information

Chapter 3 Site Planning and Low Impact Development

Chapter 3 Site Planning and Low Impact Development CHAPTER 3 Site Planning and Low Impact Development Chapter 3 Site Planning and Low Impact Development 3.0 Introduction The City of Charleston requires that major residential, large commercial (>1 acre),

More information

Net Land Area (NLA): Area within zoning lot boundaries NLA= sq. ft. a) Credited Street Area (total adjacent frontage) x ½ width of public rightof-way

Net Land Area (NLA): Area within zoning lot boundaries NLA= sq. ft. a) Credited Street Area (total adjacent frontage) x ½ width of public rightof-way PROJECT FACT SHEET Section A: Project Information Application type: Date: Project Name: Use Type: (check/list all that apply) Office/Institutional Residential Mixed-Use Other: Overlay District: (check

More information

City of Waco Stormwater Management Regulations

City of Waco Stormwater Management Regulations 1.0 Applicability: City of Waco Stormwater Management Regulations These regulations apply to all development within the limits of the City of Waco as well as to any subdivisions within the extra territorial

More information

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX) CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA 98501 (360) 754-4180 (360) 754-4126 (FAX) Email: cdd@ci.tumwater.wa.us APPENDIX II-C SHORT FORM CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN (SWPPP)

More information

Zoning Regulation Amendments Adopted December 19, 2018 effective date January 7, 2019

Zoning Regulation Amendments Adopted December 19, 2018 effective date January 7, 2019 Zoning Regulation Amendments Adopted December 19, 2018 effective date January 7, 2019 Article 2 General Provisions Section 2.2 Definitions Definitions- FIRE LANE The aisle immediately adjacent to a building

More information

CITY OF PORTSMOUTH PLANNING DEPARTMENT. MEMORANDUM To: From:

CITY OF PORTSMOUTH PLANNING DEPARTMENT. MEMORANDUM To: From: CITY OF PORTSMOUTH PLANNING DEPARTMENT MEMORANDUM To: From: Subject: Date: Planning Board Juliet T.H. Walker, Planning Director Jillian Harris, Planner 1 Staff Recommendations for the August 23, 2018 Planning

More information

Low Impact Development Techniques

Low Impact Development Techniques New Jersey Stormwater Best Management Practices Manual February 2004 C H A P T E R 2 Low Impact Development Techniques As described in Chapter 1, land development can have severe adverse stormwater impacts,

More information

ZONING COMPLIANCE PERMIT APPLICATION

ZONING COMPLIANCE PERMIT APPLICATION ZONING COMPLIANCE PERMIT APPLICATION 405 Martin Luther King Jr. Blvd phone (919) 968-2728 fax (919) 969-2014 www.townofchapelhill.org Parcel Identifier Number (PIN): Date: Section A: Project Information

More information

Lincoln 270. City of Lincoln. Stormwater Management Plan. April 2, 2013

Lincoln 270. City of Lincoln. Stormwater Management Plan. April 2, 2013 Lincoln 270 City of Lincoln Stormwater Management Plan April 2, 2013 # 2005.48 Prepared By: Civil Engineering Solutions, Inc. 590 E Street Lincoln, Ca 95648 (916) 645 5700 1.0 Background: The project site

More information

Appendix D - Technical Design Criteria for BMPs

Appendix D - Technical Design Criteria for BMPs Appendix D - Technical Design Criteria for BMPs City of Wayzata Page 3 On-site infiltration features Definitions and Scope: Infiltration facilities are constructed basins or depressions located in permeable

More information

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA Example Stormwater Control Plan For a Residential Subdivision Project Whispering Pines Lane Anytown, USA December 2, 2015 XYZ Corporation Jane Jones, 707-555-1212 This example prepared by Dan Cloak Environmental

More information

3. Are there any projects exempt from the definition of Regulated Projects?

3. Are there any projects exempt from the definition of Regulated Projects? STORMWATER REQUIREMENTS: OVERVIEW OF PROVISION C.3 Background: On October 14, 2009, the Regional Water Quality Control Board, San Francisco Bay Region, issued a municipal regional stormwater permit (MRP)

More information

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS May 2007 SECTION 1 Responsibility of Applicant TABLE OF CONTENTS A. Stormwater Management Plan Required Information

More information

Draft Impervious Cover Reduction Action Plan for West Long Branch Borough, Monmouth County, New Jersey

Draft Impervious Cover Reduction Action Plan for West Long Branch Borough, Monmouth County, New Jersey Draft Impervious Cover Reduction Action Plan for West Long Branch Borough, Monmouth County, New Jersey Prepared for West Long Branch Borough by the Rutgers Cooperative Extension Water Resources Program

More information

New Development Stormwater Guidelines

New Development Stormwater Guidelines New Development Stormwater Guidelines CITY OF MOUNTLAKE TERRACE Table of Contents Introduction... 2 Ecology s Minimum Requirements for stormwater management... 2 Description of the 9 Minimum Requirements...

More information

APPENDIX A. Proposed Guidance and LID checklists for UConn and Town of Mansfield

APPENDIX A. Proposed Guidance and LID checklists for UConn and Town of Mansfield APPENDIX A. Proposed Guidance and LID checklists for UConn and Town of Mansfield 22 Guidance Document for Low Impact Development Best Management Practices for UConn June, 2011 In 2007, the Connecticut

More information

When planning stormwater management facilities, the following principles shall be applied where possible.

When planning stormwater management facilities, the following principles shall be applied where possible. 2.0 Principles When planning stormwater management facilities, the following principles shall be applied where possible. 2.0.1 Drainage is a regional phenomenon that does not respect the boundaries between

More information

STREAM BUFFERS

STREAM BUFFERS 88-415 STREAM BUFFERS 88-415-01 PURPOSE In the Kansas City region and throughout the nation, vegetated stream buffers have been clearly shown to protect stream stability and related infrastructure, improve

More information

October 7, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report

October 7, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report October 7, 2016 City of Thornton 9500 Civic Center Drive Thornton, CO 80229 (303) 538-7295 RE: Maverik Thornton, CO - Drainage Report As per your request, we are submitting to you the drainage report and

More information

Planning & Development. Background. Subject Lands

Planning & Development. Background. Subject Lands Planning & Development APPLICATION BRIEFING Prepared For: Planning Advisory Committee Submitted by: Jason Fox, Director of Planning & Development Date: Subject: Development Agreement Application by Brentwood

More information

IMPLEMENTING STORMWATER MANAGEMENT REQUIREMENTS FOR DEVELOPMENT

IMPLEMENTING STORMWATER MANAGEMENT REQUIREMENTS FOR DEVELOPMENT IMPLEMENTING STORMWATER MANAGEMENT REQUIREMENTS FOR DEVELOPMENT 4.1 Overview Description: Requirements and standards for controlling runoff from development are critical to addressing water quantity and

More information

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE Please complete this narrative form and submit with your SWPPP drawings. Refer to Kitsap County Stormwater Design Manual Vol.

More information

County of Fairfax, Virginia

County of Fairfax, Virginia County of Fairfax, Virginia To protect and enrich the quality of life for the people, neighborhoods, and diverse communities of Fairfax County DATE: July 16, 2007 TO: SUBJECT: All Architects, Attorneys,

More information

Draft. Impervious Cover Reduction Action Plan for Dunellen Borough, Middlesex County, New Jersey

Draft. Impervious Cover Reduction Action Plan for Dunellen Borough, Middlesex County, New Jersey Draft Impervious Cover Reduction Action Plan for Dunellen Borough, Middlesex County, New Jersey Prepared for Dunellen Borough by the Rutgers Cooperative Extension Water Resources Program September 22,

More information

PLANNED UNIT DEVELOPMENT STAFF REPORT Date: June 2, 2016

PLANNED UNIT DEVELOPMENT STAFF REPORT Date: June 2, 2016 # 9 ZON2016-01032 PLANNED UNIT DEVELOPMENT STAFF REPORT Date: June 2, 2016 DEVELOPMENT NAME JJT Properties LLC LOCATION 1147 & 1151 East I-65 Service Road South and 1180 Sledge Drive (Southeast corner

More information

Green Infrastructure Recommendations For Parks and Public Spaces

Green Infrastructure Recommendations For Parks and Public Spaces Green Infrastructure Recommendations For Parks and Public Spaces Issued by the Jersey Water Works Green Infrastructure Committee And Prepared by Meliora Design This document recommends ways to integrate

More information

STORMWATER REPORT FOR WALMART SUPERCENTER STORE # SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO

STORMWATER REPORT FOR WALMART SUPERCENTER STORE # SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO STORMWATER REPORT FOR WALMART SUPERCENTER STORE # 2443-00 SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO. 3286 March 1, 2012 I hereby certify that this engineering document was prepared by me

More information

Draft Impervious Cover Reduction Action Plan for West New York, Hudson County, New Jersey

Draft Impervious Cover Reduction Action Plan for West New York, Hudson County, New Jersey Draft Impervious Cover Reduction Action Plan for West New York, Hudson County, New Jersey Prepared for the Town of West New York by the Rutgers Cooperative Extension Water Resources Program March 29, 2017

More information

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS In West Sadsbury Township, Chester County, Pennsylvania TABLE OF CONTENTS I. Introduction 3 II. Importance of Stormwater Management

More information

Going Green with the NYS Stormwater Design Standards

Going Green with the NYS Stormwater Design Standards Going Green with the NYS Stormwater Design Standards Shohreh Karimipour, P.E. NYSDEC History of Stormwater Management Ancient Greek Cisterns Water Cistern Systems in Greece from Minoan to Hellenistic Period,

More information

26 Attachment 2. Township of New Britain APPENDIX B STORMWATER MANAGEMENT DESIGN CRITERIA

26 Attachment 2. Township of New Britain APPENDIX B STORMWATER MANAGEMENT DESIGN CRITERIA (26, APPENDIX B) 26 Attachment 2 Township of New Britain APPENDIX B STORMWATER MANAGEMENT DESIGN CRITERIA TABLE B-1 DESIGN STORM RAINFALL AMOUNT Source: Field Manual of Pennsylvania Department of Transportation

More information

STORMWATER CREDITS AND BETTER SITE DESIGN PRACTICES

STORMWATER CREDITS AND BETTER SITE DESIGN PRACTICES ..CHAPTER.. STORMWATER CREDITS AND BETTER SITE DESIGN PRACTICES 5.1 Introduction Stormwater management begins with the site planning and design process. Development projects can be designed to reduce their

More information

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA. February 21, 2018

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA. February 21, 2018 Example Stormwater Control Plan For a Residential Subdivision Project Whispering Pines Lane Anytown, USA February 21, 2018 XYZ Corporation Jane Jones, 925-555-1212 This example prepared by Dan Cloak Environmental

More information

BUFFERS, TREE PROTECTION AND LANDSCAPING. Sec Purpose and Intent.

BUFFERS, TREE PROTECTION AND LANDSCAPING. Sec Purpose and Intent. ARTICLE 20 BUFFERS, TREE PROTECTION AND LANDSCAPING Sec. 20.1. Purpose and Intent. Trees improve air and water quality, reduce soil erosion, reduce noise and glare, provide habitat for desirable wildlife,

More information

RETAINING RUNOFF AT ITS SOURCE

RETAINING RUNOFF AT ITS SOURCE RETAINING RUNOFF AT ITS SOURCE Atlantic Beach Case Study Jose Maria Guzman, PE, D.WRE Jacksonville Environmental Symposium August 2013 Outline Overview of stormwater issues in Atlantic Beach, FL City s

More information

Low Impact Development Guidance Manual

Low Impact Development Guidance Manual May 2009 TABLE OF CONTENTS Section 1 Introduction 1 Overview 2 Definitions 4 2 Conservation Design Practices 5 Cluster Development 6 Minimize Pavement Widths 8 Minimize Setbacks & Frontages 10 Open Space

More information

PLANNED UNIT DEVELOPMENT Date: April 5, 2018

PLANNED UNIT DEVELOPMENT Date: April 5, 2018 PLANNED UNIT DEVELOPMENT Date: April 5, 2018 DEVELOPMENT NAME SUBDIVISION NAME LOCATION Robert Myers Robert Myers 2955 and 2989 Dauphin Street (Southeast corner of Dauphin Street and Sage Avenue) CITY

More information

Northern Branch Corridor SDEIS March 2017

Northern Branch Corridor SDEIS March 2017 14. Water Quality 14.1. Chapter Overview 14.1.1. Introduction This section discusses changes to the potential for activities associated with the development and operation of the Preferred Alternative to

More information

ZONING AMENDMENT & PLANNED UNIT DEVELOPMENT STAFF REPORT Date: April 4, 2013

ZONING AMENDMENT & PLANNED UNIT DEVELOPMENT STAFF REPORT Date: April 4, 2013 ZONING AMENDMENT & PLANNED UNIT DEVELOPMENT STAFF REPORT Date: April 4, 2013 NAME DEVELOPMENT NAME LOCATION DIP Exchange, LLC DIP Exchange, LLC 93 Sidney Phillips Drive (West side of Sidney Phillips Drive,

More information

PRELIMINARY DRAINAGE REPORT LATHAM 200 MMSCFD GAS PROCESSING PLANT

PRELIMINARY DRAINAGE REPORT LATHAM 200 MMSCFD GAS PROCESSING PLANT PRELIMINARY DRAINAGE REPORT LATHAM 200 MMSCFD GAS PROCESSING PLANT LOTS B, RECORDED EXEMPTION 1211-2-1, RECX13-0096 LOCATED IN THE NORTH 1/2 OF SECTION 2, TOWNSHIP 3 NORTH, RANGE 66 WEST, 6 TH PRINCIPAL

More information

Soil Erosion & Sediment Control Plan Requirements for Submittal to the Cape Atlantic Conservation District

Soil Erosion & Sediment Control Plan Requirements for Submittal to the Cape Atlantic Conservation District Soil Erosion & Sediment Control Plan Requirements for Submittal to the Cape Atlantic Conservation District The following is a list of the minimum requirements required on Soil Erosion and Sediment Control

More information

ARTICLE 17 SITE PLAN REVIEW

ARTICLE 17 SITE PLAN REVIEW ARTICLE 17 SITE PLAN REVIEW 17.01 INTENT AND PURPOSE The intent of this section is to provide for consultation and cooperation between the applicant and the township planning commission so that the applicant

More information

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018 Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018 Potential Impacts of New Development Urban development can significantly increase stormwater runoff Water quality considerations

More information

Article 20 Stormwater Management

Article 20 Stormwater Management Article 20 Section 20.01 Intent Article 20 The purpose of this Article is to protect the health, safety, and general welfare of the citizens by requiring compliance with accepted standards and practices

More information

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM I. PROJECT DATA Project Name Bay Meadows Development Phase II Project Address 2600

More information

COMMUNITY DESIGN. GOAL: Create livable and attractive communities. Intent

COMMUNITY DESIGN. GOAL: Create livable and attractive communities. Intent COMMUNITY DESIGN Intent An attractive, well-designed County will attract quality development, instill civic pride, improve the visual character of the community, and create a strong, positive image for

More information

Impervious Cover Reduction Action Plan for Hampton Township, Sussex County, New Jersey

Impervious Cover Reduction Action Plan for Hampton Township, Sussex County, New Jersey Impervious Cover Reduction Action Plan for Hampton Township, Sussex County, New Jersey Prepared for Hampton Township by the Rutgers Cooperative Extension Water Resources Program November 8, 2016 Table

More information

State Water Board s Post Construction Stormwater Calculator. Instructions for El Centro

State Water Board s Post Construction Stormwater Calculator. Instructions for El Centro State Water Board s Post Construction Stormwater Calculator Instructions for El Centro Important: This workbook must be completed for each Drainage Management Area (DMA) in the project site. For example,

More information

The Benefits and Challenges Associated with Green Infrastructure Practices

The Benefits and Challenges Associated with Green Infrastructure Practices The Benefits and Challenges Associated with Green Infrastructure Practices Thomas M. Evans ASLA, LEED AP Regional Green Infrastructure Design Services Director OWEA Technical Conference, June 20, 2013

More information

Re: Application Type: Proposed Highlands Redevelopment Area Designation

Re: Application Type: Proposed Highlands Redevelopment Area Designation CHRIS CHRISTIE Governor KIM GUADAGNO Lt. Governor State of New Jersey Highlands Water Protection and Planning Council 100 North Road (Route 513) Chester, New Jersey 07930-2322 (908) 879-6737 (908) 879-4205

More information

City of Sun Prairie Wetland Buffer Reduction Request

City of Sun Prairie Wetland Buffer Reduction Request City of Sun Prairie Wetland Buffer Reduction Request Westside Development Area January 9, 2017 Prepared by: City of Sun Prairie 300 E. Main Street Sun Prairie, WI 53590 BACKGROUND The City of Sun Prairie

More information

Net Land Area (NLA): Area within zoning lot boundaries NLA= 1,076,181 sq. ft.

Net Land Area (NLA): Area within zoning lot boundaries NLA= 1,076,181 sq. ft. PROJECT FACT SHEET Section A: Project Information Application type: Project Name: Special Use Permit Date: June 29, 215 Merin Road Community Use Type: (check/list all that apply) Office/Institutional x

More information

Impervious Cover Reduction Action Plan for City of Vineland, Cumberland County, New Jersey

Impervious Cover Reduction Action Plan for City of Vineland, Cumberland County, New Jersey Impervious Cover Reduction Action Plan for City of Vineland, Cumberland County, New Jersey Prepared for the City of Vineland by the Rutgers Cooperative Extension Water Resources Program May 23, 2016 Table

More information

BE WATER WISE. Managing Your Onlot Stormwater. Sept. 23, 2006 Watershed Weekend

BE WATER WISE. Managing Your Onlot Stormwater. Sept. 23, 2006 Watershed Weekend BE WATER WISE Managing Your Onlot Stormwater Sept. 23, 2006 Watershed Weekend 2006 1 All water resources are interrelated through the Hydrologic Cycle Sept. 23, 2006 Watershed Weekend 2006 2 What is Storm

More information

Chapter 131 GENERAL REFERENCES

Chapter 131 GENERAL REFERENCES Chapter 131 STREAM CORRIDOR PROTECTION ZONE 131-1. Objectives. 131-2. Definitions. 131-3. Establishment of the Stream Corridor Protection Zone. 131-4. Uses permitted. 131-5. Uses expressly prohibited.

More information

PLANNED UNIT DEVELOPMENT & PLANNING APPROVAL STAFF REPORT Date: April 4, 2013

PLANNED UNIT DEVELOPMENT & PLANNING APPROVAL STAFF REPORT Date: April 4, 2013 PLANNED UNIT DEVELOPMENT & PLANNING APPROVAL STAFF REPORT Date: April 4, 2013 NAME LOCATION The North American Islamic Trust, Inc. 63 East Drive (East side of East Drive, 400 South of Old Shell Road, and

More information

County of Prince Edward. Stormwater Management Plan. Agreement in lieu of a Stormwater Management Plan

County of Prince Edward. Stormwater Management Plan. Agreement in lieu of a Stormwater Management Plan County of Prince Edward Stormwater Management Program Date: E-Permitting Number: This stormwater management plan (Agreement) is hereby submitted by the Owner to specify the methods that will be implemented

More information

understanding Green Infrastructure In Zoning

understanding Green Infrastructure In Zoning understanding Green Infrastructure In Zoning Purpose Measurable standards can be adopted within municipal zoning codes, and subdivision and stormwater regulations, to promote a comprehensive approach to

More information

PLANNING APPROVAL & PLANNED UNIT DEVELOPMENT Date: November 2, 2017

PLANNING APPROVAL & PLANNED UNIT DEVELOPMENT Date: November 2, 2017 PLANNING APPROVAL & PLANNED UNIT DEVELOPMENT Date: November 2, 2017 DEVELOPMENT NAME LOCATION Mobile Christian School 5900 Cottage Hill Road (North side of Cottage Hill Road, 230 ± West of Freemont Drive

More information

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST Applications: 5 copies of application - Applicant will reproduce the copies at his/her costs. The Township Clerk

More information

Neighborhood Drainage Infrastructure Improvements Using Green Initiatives. Village of Hinsdale, IL

Neighborhood Drainage Infrastructure Improvements Using Green Initiatives. Village of Hinsdale, IL Neighborhood Drainage Infrastructure Improvements Using Green Initiatives Village of Hinsdale, IL Presentation Agenda Project Overview Goals and Objectives Design Approach Public Coordination Recap Questions

More information

R E S O L U T I O N. Single-Family Residence/ Church. 2,488 sq. ft. 2,488 sq. ft. Area Parking Required: Church

R E S O L U T I O N. Single-Family Residence/ Church. 2,488 sq. ft. 2,488 sq. ft. Area Parking Required: Church R E S O L U T I O N WHEREAS, the Prince George s County Planning Board is charged with the approval of Detailed Site Plans pursuant to Part 3, Division 9 of the Zoning Ordinance of the Prince George s

More information

County Council Of Howard County, Maryland

County Council Of Howard County, Maryland County Council Of Howard County, Maryland 2010 Legislative Session Legislative Day No. 4 Resolution No. 38-2010 Introduced by: The Chairperson at the request of the County Executive A RESOLUTION revising

More information

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment CHAPTER 9 STORM DRAINAGE 9.01 General The standards established by this chapter are intended to represent the minimum standards for the design and construction of storm drainage facilities. 9.02 Design

More information

NEWPORT NEWS/WILLIAMSBURG INTERNATIONAL AIRPORT DESIGN AND SUSTAINABILTY GUIDELINES

NEWPORT NEWS/WILLIAMSBURG INTERNATIONAL AIRPORT DESIGN AND SUSTAINABILTY GUIDELINES NEWPORT NEWS/WILLIAMSBURG INTERNATIONAL AIRPORT DESIGN AND SUSTAINABILTY GUIDELINES VERSION 1.6 August 2011 PREPARED BY: 900 Bland Boulevard Suite G Newport News, Virginia 23602 DESIGN AND SUSTAINABILITY

More information

Conservation in South Jersey Being Creative with Restoration

Conservation in South Jersey Being Creative with Restoration Conservation in South Jersey Being Creative with Restoration Stewardship on a Shoestring: Public Land Management in Fiscally Constrained Times November, 30, 2011 Conservation and Restoration for Open Space

More information

Metropolitan Area Planning Council 60 Temple Place, Boston, Massachusetts fax

Metropolitan Area Planning Council 60 Temple Place, Boston, Massachusetts fax Metropolitan Area Planning Council 60 Temple Place, Boston, Massachusetts 02111 617-451-2770 fax 614-482-7185 www.mapc.org Serving the 101 Cities Towns in the Metropolitan Boston Region MEMORANDUM TO:

More information

THE CITY OF MOBILE, ALABAMA

THE CITY OF MOBILE, ALABAMA THE CITY OF MOBILE, ALABAMA LETTER OF DECISION Ark of Safety, Inc. Mobile, AL 36617 Re: (Northwest corner of Main Street and First Avenue, extending to the Southwest corner of Esau Avenue and Main Street.)

More information

NPDES - PCSM. Permit Preparation

NPDES - PCSM. Permit Preparation NPDES - PCSM National Pollutant Discharge Elimination System Post Construction Stormwater Management Permit Preparation Jim Pillsbury, PE Engineer s Workshop - March 4 and 5, 2010 Who needs NPDES? Earth

More information

The following specific definitions shall apply to the landscaping and screening regulations contained in this article:

The following specific definitions shall apply to the landscaping and screening regulations contained in this article: ARTICLE XII. LANDSCAPING Sec. 5-421. Purpose. The purpose of landscaping and screening requirements is to improve certain setback and yard areas, including off-street vehicular parking and open-lot sales

More information

Pennsylvania Stormwater Best Management Practices Manual. Chapter 4. Integrating Site Design and Stormwater Management

Pennsylvania Stormwater Best Management Practices Manual. Chapter 4. Integrating Site Design and Stormwater Management Pennsylvania Stormwater Best Management Practices Manual Chapter 4 Integrating Site Design and Stormwater Management 363-0300-002 / December 30, 2006 Chapter 4 Integrating Site Design and Stormwater Management

More information

Environmental Protection Ordinances (Performance Zoning) Bedminster Township, Bucks County

Environmental Protection Ordinances (Performance Zoning) Bedminster Township, Bucks County Environmental Protection Ordinances (Performance Zoning) Bedminster Township, Bucks County ARTICLE VI. PERFORMANCE STANDARDS Section 600 Compliance All uses, activities, subdivisions and/or land developments

More information

Green Infrastructure and Low-Impact Development Technologies

Green Infrastructure and Low-Impact Development Technologies Green Infrastructure and Low-Impact Development Technologies The guiding principles of these technologies is to manage stormwater at their sources using natural means, and establish conditions so that

More information

LANDSCAPING. Design. Development of the site shall not unreasonably impair the ability of adjoining properties to utilize solar energy.

LANDSCAPING. Design. Development of the site shall not unreasonably impair the ability of adjoining properties to utilize solar energy. Landscape design is an integral component of Site Planning and Building. The current pattern of walkways, driveways and landscape elements such as fences, hedges, and retaining walls in the neighborhood

More information

Green Infrastructure Overview

Green Infrastructure Overview Green Infrastructure Overview Christopher C. Obropta, Ph.D., P.E. obropta@envsci.rutgers.edu Jeremiah Bergstrom, LLA, ASLA jbergstrom@envsci.rutgers.edu February 26, 2016 Water Resources Program NJDEP

More information

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST St. Mary s Soil Conservation District 26737 Radio Station Way, Suite B Leonardtown, MD 20650 Phone: 301-475-8402 ext. 3 Fax: 301-475-8391 www.stmarysscd.com St. Mary s County Government Department of Public

More information

Project: Mooney Lake Preserve Received: Location: 300 Sixth Ave. N., Orono Complete: Noticed:

Project: Mooney Lake Preserve Received: Location: 300 Sixth Ave. N., Orono Complete: Noticed: Permit Application No.: 15-445 Rules: Erosion Control, Wetland Protection, & Stormwater Management Applicant: BPS Properties, LLC Project: Mooney Lake Preserve Received: 8-24-15 Location: 300 Sixth Ave.

More information

APPENDIX APPENDIX 6 STORMWATER MANAGEMENT REPORT

APPENDIX APPENDIX 6 STORMWATER MANAGEMENT REPORT APPENDIX APPENDIX 6 STORMWATER MANAGEMENT REPORT ECHO BAY NEW ROCHELLE, NEW YORK STORMWATER MANAGEMENT REPORT Prepared for: Forest City Residential Group 1 Metro Tech Center North Brooklyn, NY 11201 Prepared

More information

Pennsylvania Stormwater Best Management Practices Manual. Chapter 1. Introduction and Purpose

Pennsylvania Stormwater Best Management Practices Manual. Chapter 1. Introduction and Purpose Pennsylvania Stormwater Best Management Practices Manual Chapter 1 Introduction and Purpose Chapter 1 Introduction and Purpose 1.1 Purpose of this Manual 1 1.2 How to Use this Manual...1 1.3 Overview

More information

The Engineer/Developer s Perspective on Storm Water Management

The Engineer/Developer s Perspective on Storm Water Management The Engineer/Developer s Perspective on Storm Water Management CASE STUDY: An Innovative Approach to Storm Water Management for Small Parcel Site Development Presented by: James B. Leedom, P.E. The Sigma

More information

A. INTRODUCTION AND SUMMARY OF FINDINGS B. EXISTING CONDITIONS. Table 10-1 Adjacent Storm Drains

A. INTRODUCTION AND SUMMARY OF FINDINGS B. EXISTING CONDITIONS. Table 10-1 Adjacent Storm Drains Chapter 10: Stormwater Management A. INTRODUCTION AND SUMMARY OF FINDINGS This chapter describes existing and proposed stormwater management on the Site. Potential impacts to stormwater infrastructure

More information

Creating Tools for Urban and Suburban Communities to Reduce Flooding and Improve Water Quality in New Jersey

Creating Tools for Urban and Suburban Communities to Reduce Flooding and Improve Water Quality in New Jersey Creating Tools for Urban and Suburban Communities to Reduce Flooding and Improve Water Quality in New Jersey Christopher C. Obropta, Ph.D., P.E. obropta@envsci.rutgers.edu www.water.rutgers.edu October

More information

PLANNING APPROVAL STAFF REPORT Date: November 17, 2011

PLANNING APPROVAL STAFF REPORT Date: November 17, 2011 # 11 ZON2011-02680 PLANNING APPROVAL STAFF REPORT Date: November 17, 2011 NAME LOCATION Alabama Power Company East side of Navco Road 130 ± South of Columbus Avenue CITY COUNCIL DISTRICT District 4 PRESENT

More information

Pennsylvania Stormwater Best Management Practices Manual

Pennsylvania Stormwater Best Management Practices Manual Pennsylvania Stormwater Best Management Practices Manual DRAFT - JANUARY 2005 Section 4 Comprehensive Stormwater Management: Integrating Site Design, Non-Structural, and Structural BMP's This page intentionally

More information

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance. The language provided in these specifications is meant to serve as a reminder and provide a generic example of the type of language that should be provided in final construction documents. This language

More information