1 KDC West - Ya Rona (4) Shaft 25 July 2012
2 KDC West Introduction On 30 June 2012, it transpired that an underground fire had started approximately 2855m below surface at the Ya Rona (4) Shaft of KDC At that time, a number of persons were working underground at the shaft and emergency operations immediately commenced to recover such person and bring them to surface All such persons were subsequently recovered and brought to surface by Mines Rescue Services (MRS) proto teams. Unfortunately, five of these persons were fatally injured (also referred to as the deceased persons ) Mlungiselwa Madevana Colekele John Bankane Josiah Musa Driefontein Dlamini -Bambisanani Mziwakhe Seagent Mankunzi Bavuyise Mbola 2
3 KDC West Sequence of Events Ya Rona (4) Shaft Date Time Sequence of events 30 June h45 Central control fire detection heads alarming 30 June h00 Tramming crew proceeded underground to do mud loading on 39 Level on an overtime shift 30 June h36 Reports received that persons collapsed on 39 Level 30 June h43 F Vermaak and J Storm called out 1 July h35 Two proto teams called out 1 July h55 Instructions given regarding beacon heads and critical fans 1 July h08 Proto teams arrived in control room 1 July h38 Reports received from 38/31 - need assistance 1 July h00 Production Supervisors underground to assist 1 July h16 Proto team on 38 Level 1 July h47 Reports to various managerial personnel that beacon heads alarm and observations underground 1 July h12 Report from proto teams on rescue of 15 persons 1 July h20 Proto team on 39 Level established a fresh air base 1 team to proceed in to search for missing persons 1 July h28 Two additional proto teams and MRS personnel called out 1 July h00 Proto team reported that they located the 5 missing personnel and report on their status further the following readings was taken: CO 25000ppm, CO ppm 3
4 KDC West Sequence of Events Date Time Sequence of events 1 July h50 Additional Proto teams arrived and proceeded underground to assist with the recovery of the deceased persons. DMR notified telephonically of fatalities. 1 July h25 07h59 DMR Inspectors arrived and briefed 1 July h38 Bodies of deceased persons retrieved at the bottom of the material raise on 39 level 1 July h01 All bodies arrived on 38 level being transported to the station 1 July h00 Additional proto teams proceeded underground to locate the fire on 39 Level 1 July h05 Proto teams arrived on 38 level station being transported out 1 July h07 Bodies of deceased persons arrived on surface bank 1 July 2012 Ongoing (see update presentation) Proto teams in various aspects of searching for fire, building seals and taking readings 4
5 KDC West Refuge bays and personal protective equipment The deceased persons were found in close proximity to a refuge bay All of the deceased persons were found with self-contained self-rescuers (also referred to as SCSR s ). None of the deceased persons donned (engaged) their SCSR s. Four of the deceased persons had gas detection instruments (also referred to as GDI s ) with them at the time of the accident. The purpose of GDI s is to detect increased levels of, amongst others, Carbon Monoxide and Carbon Dioxide, and provide early warning in this regard 5
6 KDC West Remedial Action All operations at KDC immediately stopped by Management and Gold Fields SHSD Board notified KDC East operations resumed on Tuesday, 03 July 2012 after consultation with DMR KDC West operations resumed on Monday, 09 July 2012 after presentation to DMR Ya Rona (4) Shaft operations remained suspended, excluding the ongoing fire containment and extinguishing work Conducted risk assessments and declared area safe for essential services employees Multi-disciplinary task teams established to conduct audits and cross-audits in respect of the following categories:- Reporting systems Ventilation systems Accumulations of gasses Common central control room Re-entry conditions Personal Protective Equipment Emergency preparedness - underground 6
7 Remedial Actions with the approval and assistance of the DMR Control Rooms Action Dedicated Fire Detection Operator for Central Control Room Responsible Person WJ Oosthuysen Completion Date With immediate effect Further remote fire detection view points established at:- Khomanane (8) Shaft Masakhane (1) Shaft Pitseng (2) Shaft Control Room Register implemented Engineering Register Fire Detection Register Environmental Engineering Register Blasting Register 07 July July 2012 Re-training and additional training In-house re-training to be formalized on shaft Pitseng (2), Ya Rona (4) and Khomanane (8) Shafts Additional OEM Training for Technicians and Environmental Engineering Superintendents and Supervisors 08 July 2012 September
8 Remedial Actions with the approval and assistance of the DMR Structures Action Responsible Person Completion Date Review of fire alarm reporting structure Central Control Room Duty Environmental Engineering Superintendent Dedicated Fire Detection Operator Shaft Control Room Duty Mine Overseer Control Room Operator SMO s 05 July 2012 Shaft Entry Authorisation Sign-off authorisation from the Duty Mine Overseer Fail to safe system Time and attendance Systems/environment Fire detection system Compressed Air Water SMO s 06 July
9 Remedial Actions with the approval and assistance of the DMR Systems Action Responsible Person Completion Date Standards to be reviewed/updated Issue and controls of gas measuring instruments PJ Kelly 13 July 2012 OEM audits July 2012 Ongoing Risk assessment to be conducted to introduce blasting mode on the current system August 2012 Implementation of intelligent lamp room Interface with time and attendance Monthly Systems Compliance Audit by Safety Officer Control Room Operator Procedures 21-Day Audit Cycle SJM Lancaster PJ Kelly To be confirmed July 2012 Ongoing 9
10 Remedial Actions with the approval and assistance of the DMR Instrumentation and Ventilation Appliances Action Refuge chambers life sustainable Continued Monthly and Quarterly audits Responsible Person SMO s Completion Date In place Implementation ongoing Sufficient compressed air at refuge chambers at all times In place Implementation ongoing Ventilation Systems Reinforce correct operation of ventilation control systems Audit non-return flaps on fan installations in tight circuits SMO s 07 July 2012 SCSR s In process of replacing Afrox 35 SCSR s with Roxy 40 s Masakhane (1) and Ya Rona (4) Shafts September
SIMRAC A MANUAL FOR BEST PRACTICE FOR EMERGENCY RESPONSE PROCEDURES PART 4
SIMRAC A MANUAL FOR BEST PRACTICE FOR EMERGENCY RESPONSE PROCEDURES PART 4 A CHECKLIST OF BEST PRACTICE REQUIREMENTS FOR THE PREVENTION AND MANAGEMENT OF INRUSHES, FIRES, EXPLOSIONS AND OTHER EMERGENCIES
More informationUNITED STATES DEPARTMENT OF LABOR MINE SAFETY AND HEALTH ADMINISTRATION METAL AND NONMETAL MINE SAFETY AND HEALTH REPORT OF INVESTIGATION
MAI-2012-13 UNITED STATES DEPARTMENT OF LABOR MINE SAFETY AND HEALTH ADMINISTRATION METAL AND NONMETAL MINE SAFETY AND HEALTH REPORT OF INVESTIGATION Surface Metal Mine (Copper) Fatal Fall of Person Accident
More informationELEVATOR RESCUE PROCEDURE
ELEVATOR RESCUE PROCEDURE Office of Environmental Health & Safety December 2013 Table of Contents I. Purpose:... 3 II. Scope:... 3 III. Responsibility:... 3 IV. Types of Emergencies:... 3 V. Definitions:...
More informationEmergency Action Plan
Emergency Action Plan Company Name Current as of Company Address Phone Number Contents EMERGENCY ACTION PLAN 2 SCOPE OF THE PLAN 2 Emergency Plan Coordinators 2 First Aid and CPR certified employees 2
More informationContingency/Emergency Plan for all Hazards Page 1 of 9
Contingency/Emergency Plan for all Hazards Page 1 of 9 1. OBJECTIVE To ensure that through providing emergency procedures and guidelines that in the case of an emergency, personnel will be able to act
More informationEmergency Procedures for Persons Requiring Assistance in Evacuation
Emergency Procedures for Persons Requiring Assistance in Evacuation This document is available in an alternate format, upon request. Developed by Health and Safety and the Office of Human Rights, Equity
More informationEMERGENCY EVACUATION POLICY FOR 100 CHEROKEE STREET BUILDING
EMERGENCY EVACUATION POLICY FOR 100 CHEROKEE STREET BUILDING In the event of a fire or other emergency, seconds count. The safe, orderly and prompt evacuation of building occupants depends on having the
More informationInformation: The Achilles Heel of Emergency Response
Information: The Achilles Heel of Emergency Response David Cliff 1 Typical Mine Information System 2 Control Room 3 Modern Chinese Control Room 4 Control Room inputs Data collection/alarm system Multiple
More informationFIRE SAFETY POLICY. 2.0 Under national, provincial and municipal fire regulations, the Board will ensure compliance with:
FIRE SAFETY POLICY 1.0 The Halifax Regional School Board recognizes the need for a planned program of fire safety to ensure a safe environment for all personnel and pupils. 2.0 Under national, provincial
More informationEMERGENCY ACTION PLAN GOLDEN CITY CASINO HIGHWAY 162 OROVILLE, CALIFORNIA
EMERGENCY ACTION PLAN GOLDEN CITY CASINO HIGHWAY 162 OROVILLE, CALIFORNIA ESHI Tribe TABLE OF CONTENTS TAB A B C D E F G H I TITLE Purpose and Scope Emergency Services Notification of Emergency Services
More informationPOLICY. Carbon Monoxide (CO) is an odorless, colorless gas that can cause sudden illness and death. 1
POLICY Number: 7311-20-020 Title: Carbon Monoxide Monitoring and Reporting Overnight Stay Facilities Authorization [ ] President and CEO [X] Vice President, Finance and Corporate Services Source: Director,
More informationSchool EMERGENCY PLAN
School EMERGENCY PLAN The following outline covers the main criteria for emergency guidelines for this facility and its operations. The outline will be under review with local officials and details are
More informationH&S Forum. Fire Safety Policy Glascote Academy
Fierte Multi Academy Trust Health and Safety Policy Handbook Reference Number HR 103 Issue 6 Approved By H&S Forum Date September 2016 To be reviewed September2017 Policy Title Fire Safety Policy Glascote
More informationADMINISTRATOR S WEEKLY REPORT # September 12 th through 18 th, 2011
ADMINISTRATOR S WEEKLY REPORT # 2011-38 September 12 th through 18 th, 2011 CALLS FOR SERVICE % This Week 2011 YTD Change Fire 11 248 25.9% Aid 138 5,025 3.4% Other 35 1,290-14.3% Total 184 6,563 0.% Last
More informationWHAT IS FIRE DISASTER? Fire Disaster is an occurrence or an incident of such magnitude which creates a situation in which the normal life is suddenly
TOPIC : FIRE DISASTER MANAGEMENT PRESENTED BY :- AMALENDU BANERJEE, DIVISIONAL OFFICER, WBFES WHAT IS FIRE DISASTER? Fire Disaster is an occurrence or an incident of such magnitude which creates a situation
More informationINTEGRATED LIFE SAFETY COMPLIANCE TESTING AND ITS PROCEDURES
INTEGRATED LIFE SAFETY COMPLIANCE TESTING AND ITS PROCEDURES By: Mehrdad Ghods Integrated Engineering Student Sept. 06, 2002 University of British Columbia Vancouver, BC i PREFACE: The purpose of this
More informationHealth & Safety Plan For Emergencies Dixon and Coal Creek Buildings
Health & Safety Plan For Emergencies Dixon and Coal Creek Buildings November 20, 2002 Update: July 13, 2007 Update: October, 2008 Update: April, 2014 Following an emergency, only authorized Imagine! management
More informationPatrick County Horizons Jeb Stuart Hwy. Stuart, Va
Patrick County Horizons 24141 Jeb Stuart Hwy. Stuart, Va. 24171 Emergency Preparedness Plan Severe Weather/Earthquake/Building Damage/Fire/Missing Person Policy: Per page 22 of the PCS licensure manual:
More informationDMP & RISK MANAGEMENT PLAN
DMP & RISK MANAGEMENT PLAN An industry with its complex of activities involving various plant machineries, raw materials, products operations, intermediates and environmental discharge has a number of
More informationDUNCAN STUDENT CENTER. Emergency Action Plan
DUNCAN STUDENT CENTER Emergency Action Plan August 21, 2017 DUNCAN STUDENT CENTER - EMERGENCY ACTION PLAN An emergency action plan describes the actions employees should take in case of fire or other emergency
More informationREGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE EMERGENCY PLAN
REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE EMERGENCY PLAN This Emergency Plan has been developed following fire risk assessments of the relevant building. The purpose of the Plan is to ensure the
More informationFIRE SAFETY PLAN. Ceramics/Sculpture Building 47 Service Rd 1 S Winnipeg, MANITOBA. May / Prepared by: Chris Pancoe
FIRE SAFETY PLAN Ceramics/Sculpture Building 47 Service Rd 1 S Winnipeg, MANITOBA May / 2017 Prepared by: Chris Pancoe TABLE OF CONTENTS Contents A. BUILDING AUDIT:... 3 BUILDING DESCRIPTION... 3 1. Level
More information2010 Fire Log Fire Log. Annual Fire Safety Report
Annual Fire Safety Report The Higher Education Opportunity Act became law in August 2008 and requires all United States academic institutions to produce an annual fire safety report outlining fire safety
More informationFire outbreak inside a warehouse 5 December 2013 Crépy-En-Valois (Oise) France
Fire outbreak inside a warehouse 5 December 2013 Crépy-En-Valois (Oise) France Fire Warehouse Property damage Extinguishing water Environmental impact (analysis, monitoring) THE FACILITIES INVOLVED The
More informationCITY AND COUNTY OF DENVER
CITY AND COUNTY OF DENVER DEPARTMENT OF SAFETY FIRE POLICE SHERIFF 9-1-1 COMMUNITY CORRECTIONS CRIME PREVENTION & CONTROL SAFE CITY Office of Fire Prevention Denver Fire Department 745 W. Colfax Avenue
More informationReport For NHS Shetland
Report For NHS Shetland FIRE EMERGENCY MANAGEMENT PLAN GILBERT BAIN HOSPITAL C.S. TODD & ASSOCIATES LTD August 2014 FIRE EMERGENCY MANAGEMENT PLAN GILBERT BAIN HOSPITAL Report by: K. LOGIE GIFireE C.S.
More informationTake your keys, coat, and any important information with you.
7. Responsibilities Building Emergency Team Building Emergency Teams are present in most buildings on campus. It is the function of the Building Emergency Team to assist and coordinate a prompt and organized
More informationPollution Incident Response Management Plan
Pollution Incident Response Management Plan Location - 129 Mitchell Avenue, Kurri Kurri Nearest Cross Street - Johnson Avenue, Kurri Kurri Enter from - Mitchell Avenue, Kurri Kurri Version 6 August 2017
More informationREGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE EMERGENCY PLAN
REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE EMERGENCY PLAN This Emergency Plan has been developed following fire risk assessments of the relevant building. The purpose of the Plan is to ensure the
More informationSCALES NW EMERGENCY ACTION PLAN
Purpose Each SCALES NW, INC location shall have a written Emergency Action Plan, appropriate to the hazards of the workplace, in order to respond to an emergency that may require rescue or evacuation.
More informationC3 Fire Safety, including Emergency Preparedness and Response
C3 Fire Safety, including Emergency Preparedness and Response 1.0 Purpose The purpose of this procedure is to be prepared for any emergency which may arise, such as fire, gas leak, serious accident, bomb
More informationFIRE PREVENTION GUIDELINE
FIRE PREVENTION GUIDELINE 15-11-2016 1 PRESENTATION OUTLINE Introduction Objective Guideline outline Aspects to be addressed in the guideline Conclusions 2 INTRODUCTION Before the promulgation of the Prevention
More informationPlant Operations Cleaning and Sanitation Audits.
Plant Operations Cleaning and Sanitation Audits http://plantoperations.dadeschools.net/ DISTRICT-WIDE SCHOOLS Cleaning & Sanitation Audit (4 years) Overall Scores % Fail % Pass 90% 63% 37% 54% 46% 45%
More informationPASCOE S PTY LTD EMERGENCY RESPONSE MANUAL. (Public Version) SOP 517. July 2015
PASCOE S PTY LTD EMERGENCY RESPONSE MANUAL (Incorporating) Pollution Incident Response Management Plan (Public Version) SOP 517 July 2015 40-46 FAIRFIELD STREET FAIRFIELD EAST, NSW 2165 TELEPHONE: 02 8774
More informationFire evacuation drill
European guideline (handbook) Fire evacuation drill (draft document) Ver: 2010-06-02 Prepared by Aleš Jug, Slovenia Related guideline: CFPA E: 19_2009 Fire safety engineering concerning evacuation from
More informationBUSHFIRE MANAGEMENT PLAN (BMP)
Established 1907 BUSHFIRE MANAGEMENT PLAN (BMP) December 2015 Version Date Section Modified 1 February 2005 All 2 3 December 2010 December 2015 All All Reason for Modification Original Management Plan
More informationProperty Name & Address [ Property Name ] - [ Property Address ]
Emergency Procedure FIRE Property Name & Address [ Property Name ] - [ Property Address ] Purpose To ensure effective response and evacuation, by the property s Emergency Response Organization, to a fire
More informationPeninsula Dental Social Enterprise (PDSE)
Peninsula Dental Social Enterprise (PDSE) Fire Safety Policy and Procedure Version 2.0 Date approved: September 2016 Approved by: The Board Review due: September 2017 Policy will be updated as required
More informationRFH Evacuation Procedure for artists
FH Evacuation Procedure for artists 1. Telephone Number and Manual Call Points (MCP) The number to be used for all emergencies is 020 7921 0999, or extension 0999, which calls the telephone situated in
More informationReviewed and Agreed by the Health and Safety Committee October Health and Safety: Fire Safety Plan and Procedures
Reviewed and Agreed by the Health and Safety Committee October 2010 Health and Safety: Fire Safety Plan and Procedures 2010-2013 Contents Page(s) Fire Safety Policy Statement 3 1. Part One Fire Safety
More informationFIRE SAFETY FOR OFFICE WORKERS
2746 FIRE SAFETY FOR OFFICE WORKERS Leader s Guide ERI Safety Videos FIRE SAFETY FOR OFFICE WORKERS This easy-to-use Leader s Guide is provided to assist in conducting a successful presentation. Featured
More informationFire Prevention and Emergency Preparedness Plan for Black Oak Wind Farm
Fire Prevention and Emergency Preparedness Plan for Black Oak Wind Farm 1.0 Project Description The Black Oak Wind Farm Project is a commercial scale wind farm project proposed by Black Oak Wind Farm,
More informationHOLLY HILL FIRE DEPARTMENT
HOLLY HILL FIRE DEPARTMENT Frequently Asked Questions Q. How many people work for the Fire Department? A. Holly Hill Fire Department has 14 full time and 1 part time employees. We have three shifts of
More informationEMERGENCY EVACUATION PROCEDURE Temporary Instructions w.e.f 5 th September 2018
EMERGENCY EVACUATION PROCEDURE Temporary Instructions w.e.f 5 th September 2018 INTRODUCTION This document outlines the main procedures to be followed in the event of a fire incident at Sir Christopher
More informationTABLE OF CONTENTS Part 6 Legal Basis for Fire Safety Planning... 2
TABLE OF CONTENTS Part 6 Legal Basis for Fire Safety Planning... 2 6.1] GENERAL... 2 6.2] EXCERPTS FROM 2012 BC FIRE CODE PART 2 BUILDING AND OCCUPANT FIRE SAFETY... 3 6.3] EXCERPTS FROM 2012 BC FIRE CODE
More informationEmergency Evacuation or Lockdown
Emergency Evacuation and Lockdown Policy RATIONALE Emergency and evacuation situations in an education and care service can arise in a number of circumstances and for a variety of reasons. In the event
More informationQuarterly Stakeholder Call
Quarterly Training Summit Quarterly Stakeholder Call October 2016 U.S. Department of Labor October 16, 2018 U.S. U.S. Department of Labor Mine Safety and Health Administration 1 Agenda Introductory Remarks
More information[Name/title] is the Alternate Safety Officer/ Alternate Emergency Coordinator.
Community Health Center ================================================================= Subject: EMERGENCY EVACUATION PROCEDURE ================================================================= Policy
More informationYTD. IT Manager Smith attended the quarterly ESO Oversight Committee meeting on Monday, October 29 th in Bellevue.
2ADMINISTRATOR S 2018 WEEKLY REPORT # 2018-44 October 29 th November 4 th, 2018 CALLS FOR SERVICE This Week 2018 YTD YTD Change Fire 3 365-1.9% Aid 206 8483 4% Other 55 2330-8.2% Total 264 11178 1% Last
More informationANALYSIS OF CALLS RESPONDED TO BY THE CITY FIRE BRIGADE ~ YEAR
ANALYSIS OF CALLS RESPONDED TO BY THE CITY FIRE BRIGADE ~ YEAR. TOTAL ATTENDANCES a. Attendances by category FIRE CALLS SPECIAL SERVICES AMBULANCE ATTENDANCES GRAND TOTAL : 5 9 97,559 b. Analysis of individual
More informationSir Christopher Hatton Academy A Member of Hatton Academies Trust
EMERGENCY EVACUATION PROCEDURE June 2015 INTRODUCTION This document outlines the main procedures to be followed in the event of a fire incident at Sir Christopher Hatton Academy ( the Academy ). Whilst
More informationINCIDENT TYPE: Structure Fire Fire in mobile property used as a fixed structure
INCIDENT TYPE: Structure Fire 110 Structure fire, other 111 Building fire 112 Fires in structure other than in a building 113 Cooking fire, confined to container 114 Chimney or flue fire, confined to chimney
More informationWilson County Emergency Management Agency 110 Oak Street Lebanon, Tennessee 37087
SOG Name: Multi Family Dwelling SOG Number: 403.15 Effective Date: February 2, 2015 Approved: Joey Cooper, Director Reviewed: Scope This procedure has been developed to provide WEMA with a set of guidelines
More informationEnvironmental emergency preparedness and response
.0 Purpose The purpose of this procedure is to establish a system for handling emergencies arising out of fire or others. 2.0 Scope Activities, operations and services including maintenance that is associated
More information161 Rosebery Avenue, London, EC1 Fire Safety Management Plan & Evacuation Procedures
161 Rosebery Avenue, London, EC1 Fire Safety Management Plan & Evacuation Procedures Contents 1.0 Introduction 2.0 Means of Escape in Case of Fire 3.0 Means for Giving Warning in Case of Fire 4.0 Means
More informationLPI Lightning Warning System - LWS MKIII
LPI Lightning Warning System - LWS MKIII Features Early detection of lightning activity within approximately 25km Alarm signalled when lightning approaches within approximately 8-10km All Clear indication
More informationHospice of Rutherford County Policies and Procedures
Subject: Fire Prevention/Evacuation Page: 1 of 5 Policy Date: 1994 Revised: 10/06, 09/08, 09/09, 8/12 Approval: Date: I. P O L I C Y Hospice of Rutherford County identifies and corrects potential fire
More informationEMERGENCY ACTION PLANS HOW READY ARE YOU?
EMERGENCY ACTION PLANS HOW READY ARE YOU? Richard Pletz P.G. Safety Manager Amec Foster Wheeler is now part of Wood. PLC Wood is a global leader in the delivery of project, engineering and technical services
More informationFIRE SAFETY POLICY LEEDS METHODIST MISSION. Oxford Place Centre
FIRE SAFETY POLICY LEEDS METHODIST MISSION Oxford Place Centre P a g e 2 8 Version Draft 1 Name of responsible (ratifying) committee Leeds Methodist Mission Council Date ratified Document Manager (job
More informationRULES 1978 UNDERGROUND COAL MINES FIRE PRECAUTIONS
rr. 1-3 163 UNDERGROUND COAL MINES FIRE PRECAUTIONS [Published Gazette 14 October 1978, pp. 499-504; and as amended by Rules published Gazette 26 January 1980, pp. 199-200; 30 May 1981, p. 1077; 3 December
More informationCumru Township Fire Department 4/27/10 Standard Operating Guidelines Page: 1 of 6 Section 15.07
Standard Operating Guidelines Page: 1 of 6 15.07 Scope: Commercial properties shall include businesses, schools and shops with very limited special hazards. 15.0701 First engine placement: Positioning
More informationEvacuation and Lockdown Plan
Evacuation and Lockdown Plan Table of Contents 1 Introduction... 2 2 Evacuation... 2 2.1 General guidelines... 2 2.2 Evacuation of persons with disabilities... 3 2.3 Accountability for students... 3 2.4
More informationIRVING FIRE DEPARTMENT EMERGENCY PLANS
IRVING FIRE DEPARTMENT EMERGENCY PLANS INTERNATIONAL FIRE CODE, Selected Sections from 404.2-406.3 404.2 Where required. An approved fire safety and evacuation plan shall be prepared and maintained for
More informationAn all-in-one modular turnkey solution
MIMACS 1 An all-in-one modular turnkey solution Environmental Monitoring Portable gas detection instruments with reactive communication up-links. Location Monitoring Fully integrated system that can download
More informationAmbulance Operations (Fleet) Procedure Vehicle Evacuation Procedure. National Ambulance Service (NAS)
Ambulance Operations (Fleet) Procedure Vehicle Evacuation Procedure National Ambulance Service (NAS) Document reference number Revision number Approval date Revision date NASOF009 Document developed by
More informationTable of Contents. EMERGENCY PROCEDURES Policy 190
Table of Contents EMERGENCY PROCEDURES Policy 190 1. TRAINING ON EMERGENCY PROCEDURES... 2 2. EVACUATION PLAN... 2 2.1 Purpose... 2 2.2 Initiation Of Evacuation Alarm... 2 2.3 Evacuation Procedures...
More informationHazelwood Mine Fire Inquiry Actions Update. July 2015
Hazelwood Mine Fire Inquiry Actions Update Inquiry Outcomes Affirmation of actions intended to be taken by GDF SUEZ 17 Affirmations of which 16 are completed Nominate a group of staff to be trained in
More informationCODE RED (FIRE) Site:
Saskatoon Health Region is responsible for emergency preparedness planning and response to emergency situations and disasters, in addition to providing health care services for consumers during these times.
More informationEmergency Action Fire Prevention Plan
Emergency Action Fire Prevention Plan Table of Contents Section Title Page 1.0 Purpose 2 2.0 Scope and Application 2 3.0 Responsibilities 2-3 University Safety Coordinator 2-3 Department Heads, Supervisors
More informationThese telephone numbers are provided as a general aid to emergency notification. Be advised that additional agencies may be required to be notified.
Authority Cited: HSC 25504(b); 19 CCR 2731; 22 CCR 66262.34(a)(4), 22CCR 66265.50-.65 Page 1 of 7 All facilities that handle hazardous materials in HMBP quantities must have a written emergency response
More informationFire and Emergency Services Newfoundland and Labrador. Public Hearings Proposed Lower Churchill Hydroelectric Generation Project March 2011
Fire and Emergency Services Newfoundland and Labrador Public Hearings Proposed Lower Churchill Hydroelectric Generation Project March 2011 1 Overview Fire and Emergency Services- Newfoundland and Labrador
More informationSt Edward s Oxford FIRE SAFETY POLICY
FIRE SAFETY POLICY 1 CONTENTS Section Page No.(s) 1. Policy Statement 3-5 2. Organisation and Responsibilities 6 3. Responsibilities of Responsible Person 7-8 4. Responsibilities of Senior Management 9
More informationYTD. Administrator Robertson met with the police chiefs from Auburn and Pacific to discuss issues of mutual interest on Tuesday, August 4 th.
ADMINISTRATOR S WEEKLY REPORT # 2015-32 August 3 rd through 9 th, 2015 CALLS FOR SERVICE This Week 2015 YTD YTD Change Fire 21 325 20.8% Aid 162 5099 2% Other 59 1438 8.9% Total 242 6862 4.2% Last Week:
More informationCharlotte Building, 17 Gresse Street, London W1T 1QL
Charlotte Building, 17 Gresse Street, London W1T 1QL Fire Safety Management & Evacuation Procedures Contents 1.0 Introduction 2.0 Means of Escape in Case of Fire 3.0 Means for Giving Warning in Case of
More informationCable Handling, Remote Control Continuous Miners
Cable Handling, Remote Control Continuous Miners When handling the cable within the turning radius of the remote control continuous miner, de-energize the machine and remote control unit according to established
More informationWashington Metropolitan Area Transit Authority (WMATA)
Washington Metropolitan Area Transit Authority () National Transportation Safety Board (NTSB) Detailed Tracker As of 0/0/18 Description #s * Unacceptable: The hazard must be mitigated in the most expedient
More informationRE: BASIC FIRE SAFETY PROCEDURES AND OPERATION OF FIRE EQUIPMENT
March 15, 2016 Security Staff Training Memo RE: BASIC FIRE SAFETY PROCEDURES AND OPERATION OF FIRE EQUIPMENT Dear Staff Officers: As part of your daily rounds, security officers must look out for any unsafe
More informationFire Safety Policy & Fire Safety Management System Version October 2013 Emergency Evacuation Procedures
Emergency Evacuation Procedures Contents 1. Raising the fire alarm 2. Schedule of patient evacuation 3. Designated fire officer roles 3.1 The Fire Team Leader 3.2 Security personnel 3.3 Shift Technicians
More informationEmergency Preparedness
1 Emergency Preparedness Parents and society expect their children to be in a safe environment while in the care of child care programs. However, emergencies and disasters do occur in these settings and
More informationFire Evacuation Procedure
Fire Evacuation Procedure 1. ON HEARING THE FIRE ALARM or DISCOVERING FIRE during normal operating hours: With immediate effect the school staff listed below has the following responsibilities: Estates
More informationPhase 2 Security Response
Tivoli Village Security Procedures The following procedures are to be used for all contractor check in, permits for Roof Access, Hot Work, Electrical/Phone Room Access, Placing Fire Alarm System Notification
More informationEmergency Evacuation Plan South Patterson Building (SPB)
Emergency Evacuation Plan 1700 South Patterson Building (SPB) 2014 Table of Contents Section I: Purpose and Objectives Section II: General Guidelines Section III: Responsibilities of Emergency Coordinator
More informationCHAPTER 15: FIRE PREVENTION & AWARENESS POLICY
CHAPTER 15: FIRE PREVENTION & AWARENESS POLICY PURPOSE The fire prevention plan provides information and procedures to minimize the occurrence of an accidental fire at the job site or office, and an efficient
More informationEmergency Action Plans (OSHA ) Abstract. Introduction. Emergency Action Plan (EAP) Elements of an EAP
1 Fire Protection Report Number: FP-45-10 Release Date: July 12, 2000 Section Title: Emergency Management Abstract OSHA 1910.38 requires employers of more than ten people to establish a written emergency
More informationSports Grounds Directorate of Estates & Facilities - Document No. HS33 V1.0 Dated 16 September 2011
Contractors Site Induction Sports Grounds Directorate of Estates & Facilities - Document No. HS33 V1.0 Dated 16 September 2011 About King s College London One of the top 25 universities in the world (Times
More informationFIRE PLAN. In order to assure the safety of patients, visitors and staff, a standard response to fire or the potential of fire is required.
FIRE PLAN PURPOSE In order to assure the safety of patients, visitors and staff, a standard response to fire or the potential of fire is required. This fire plan sets out the standard response for all
More informationGEORGIA DEPARTMENT OF CORRECTIONS Standard Operating Procedures
Policy Number: 511.09 Effective Date: 4/13/2018 Page Number: 1 of 5 I. Introduction and Summary: This policy sets forth the guidelines and requirements for the development of the Facility Fire Safety/Emergency
More informationNECA S System Approach to Electrical Safety for NFPA 70E
NECA S System Approach to Electrical Safety for NFPA 70E NECA s Systems Approach to NFPA 70E Easy to understand NFPA 70E employer requirements, Provides Supervisors with key on the job information, De
More informationEmergency Action Plan for. Phase I of Deconstruction Operations. at 130 Liberty Street. New York, NY
Emergency Action Plan for Phase I of Deconstruction Operations at 130 Liberty Street New York, NY Lower Manhattan Development Corporation One Liberty Plaza, 20 th Floor New York, NY 10006 Emergency Action
More informationUNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY
Revision No.: 2 Page 1 of 5 I. PURPOSE This procedure establishes the steps to perform a fire drill for the URMC Surgical Center located at 180 Sawgrass Drive. II. PERSONNEL AFFECTED Fire Safety Specialist/Fire
More informationPOLICY. Code Announcement means an announcement (e.g. page or strobe light, verbal notification) to commence a Fire Drill without an audible alarm.
POLICY Number: 7311-95-001 Title: Fire Drill Policy Authorization [ ] President and CEO [ X] Vice President, Finance and Corporate Services Source: Director, Enterprise Risk Management Cross Index: Date
More information14 Shaft Fire. Jacey Kruger
Impala Rustenburg 14 Shaft Fire Jacey Kruger Index Overview Fire 22 January 2016 Conveyor rehabilitation Impala Rustenburg Impala Rustenburg Lease Area Introducing 14 Shaft Impala 14 Shaft is one of the
More informationFIRE PREVENTION PLAN EMERGENCY ACTION
FIRE PREVENTION PLAN EMERGENCY ACTION 1.0 PURPOSE This Plan is presented for University employees to be informed so that they react safely and effectively during an emergency situation. The Plan also reinforces
More informationEmergency Evacuation Plan and Implementation Guidelines The Pennsylvania State University
Emergency Evacuation Plan and Implementation Guidelines The Pennsylvania State University DOWNTOWN THEATRE CENTER (0998-141) SEPTEMBER 2015 Table of Contents Introduction Implementation Guidelines and
More informationLivingston Intl. Emergency Procedures Guide
Livingston Intl. Emergency Procedures Guide Table of Contents Introduction... 2 EMERGENCY CONTACTS... 3 Emergency Procedures... 3 Employee Responsibilities... 3 Management Responsibilities... 3 Fire Warden/Searcher
More informationANALYSIS OF CALLS RESPONDED TO BY THE CITY FIRE BRIGADE ~ YEAR GRAND TOTAL :
ANALYSIS OF CALLS RESPONDED TO BY THE CITY FIRE BRIGADE ~ YEAR. TOTAL ATTENDANCES a. Attendances by category FIRE CALLS SPECIAL SERVICES AMBULANCE ATTENDANCES GRAND TOTAL : 9 8,9 b. Analysis of individual
More informationEmergency Action and Fire Prevention
Emergency Action and Fire Prevention History Triangle Shirtwaist Factory Fire New York City: March 25, 1911 8 th, 9 th and 10 th floor of Asch building Shirtwaists (women s blouses) Fire broke out at 4:40
More informationTHE UNIVERSITY OF TEXAS AT SAN ANTONIO. Special Event Planning Considerations
Special Event Planning Considerations 2018 Contents UTSA OFFICE OF EMERGENCY MANAGEMENT... 3 OVERVIEW... 3 CONTACT INFORMATION... 3 SOCIAL MEDIA... 3 GENERAL EVACUATION PROCEDURES... 4 GUIDELINES FOR EVACUATING
More informationSTATEMENT OF THE HEALTH AND SAFETY STRATEGY FOR THE SYDNEY RUSSELL SCHOOL
Health & Safety Contents Health & Safety... 1 Contents... 2 HEALTH AND SAFETY STRATEGY... 3 GOVERNORS STATEMENT... 3 STATEMENT OF THE HEALTH AND SAFETY STRATEGY FOR THE SYDNEY RUSSELL SCHOOL... 3 HEALTH
More informationBased on NFPA 1001: Standard for Fire Fighter Professional Qualifications, 2013 Edition.
Based on NFPA 1001: Standard for Fire Fighter Professional Qualifications, 2013 Edition. Revised 02/10/2017 Alabama Fire College Firefighter II Instructional JPR Verification Sheet Full Name: Fire Department:
More information