1 Section VI. Schedule of Requirements 1 1. List of Goods and Delivery Schedule Line Item N Description of Goods Quantity Physical unit 1. Branded and brand new Uninterruptible Power Supply (UPS) 40KVA UPS capacity, double-conversion technology, 8-10 mins runtime, with SNMP Configuration of UPS monitoring system software Refer to Annex A on Technical Specifications, for detailed specification Final (Project Site) Destination as specified in BDS 2 units DepEd CO, Ortigas, Pasig City Earliest Delivery Date Delivery (as per Incoterms) Date Latest Delivery Date Bidder s offered Delivery date [to be provided by the bidder] July 1, 2015 July 15, 2015 [insert the number of days following the date of effectiveness the Contract]
2 2. Branded and brand new Uninterruptible Power Supply (UPS) 20KVA UPS capacity, double-conversion technology, 8-10 mins runtime, with SNMP Configuration of UPS monitoring system software See Annex for detailed specification 3. Branded and brand new Generator Set with Automatic Transfer Switch (ATS) 200KVA diesel generator set Configurable ATS Must have all-weather and sound-proof enclosure With construction housing with elevated concrete ramp mount and roofing for the Genset unit 4. Brand new Automatic Transfer Switch (ATS) 2 units DepEd R7, Cebu City 1 unit DepEd CO, Ortigas, Pasig City 1 unit DepEd R7, Cebu City May 25, 2015 July 1, 2015 [insert the number of days following the date of effectiveness the Contract] July 1, 2015 July 15, 2015 May 18, 2015 May 25, 2015
3 5. Branded and brand new Precision Air-Condition Unit 5TR precision Air- Conditioning Unit (PACU) system down flow type System software programming and configuration for hot standby/backup Mechanical installation of 5TR PACU, including aircooled and refrigerant piping system, thermal rubber insulation, refrigerant charging and air-cooled drain system Hauling and positioning of PACU units Construction of pad mounts for the outdoor condensing units Integration with Fire Suppression System SNMP/Web monitoring configuration 3 Unit DepEd CO, Ortigas, Pasig City July 1, 2015 July 15, 2015
4 6. Branded and brand new Precision Air-Condition Unit 3TR precision Air- Conditioning Unit (PACU) system down flow type System software programming and configuration for hot standby/backup Mechanical installation of 3TR PACU, including aircooled and refrigerant piping system, thermal rubber insulation, refrigerant charging and air-cooled drain system Hauling and positioning of PACU units Construction of pad mounts for the outdoor condensing units Integration with Fire Suppression System SNMP/Web monitoring configuration 2 Unit DepED R7, Cebu City May 25, 2015 June 1, 2015
5 7. Branded and brand new Fire Suppression System in accordance with the guidelines contained in NFPA 2001 and based from the approved floor lay-out FM-200 cylinder with valve assembly to be filled of Fm- 200 clean agent Hydraulic Flow Calculation for Fire Suppression System Software Integration with PACU 8. Branded and brand new Fire Suppression System in accordance with the guidelines contained in NFPA 2001 and based from the approved floor lay-out FM-200 cylinder with valve assembly to be filled of Fm- 200 clean agent Hydraulic Flow Calculation for Fire Suppression System Software Integration with PACU 9. Branded and brand new Access Control System Dual Security Door Access Control System Biometric system with EM lock mechanism 1 Unit DepED CO, Ortigas, PasigCity 1 Unit DepED R7, Cebu City 3 Unit DepED CO, Pasig City July 1, 2015 July 15, 2015 September 28, 2015 October 5, 2015 July 1, 2015 July 15, 2015
6 10. Branded and brand new IPbased Surveillance System fixed dome IP-based PoE cameras with remote focus and zoom Provision of video recorder software includes of viewing and management software for multi-view and administration management Mounting and installation of IP cameras at designated area and adjusted to its perfect angle for the security monitoring Configuration and assignment of TCP/IP address, security address permissions for each IPbased security camera, recorder and storage Configuration of motion detection and video resolution for each camera Configuration and integration of IP-based cameras for real-time recording of events to be captured by the cameras Configuration of video recorder software for selected scheduled backup scheme and storage space assignment Configuration of video recorder for remote 6 Unit DepED CO, Pasig City July 1, 2015 July 15, 2015
7 11. Branded and brand new Server/Network Racks units of 42U enclosed rack with vertical cable management and power distribution unit w/ redundant switch Power Distribution Unit (PDU) 12. Branded and brand new Monitoring Display Panels supply, delivery and installation of four (4) 40 UHD LED monitors including HDMI cables 13. Branded and brand new Monitoring Display Panels supply, delivery and installation of two (2) 40 UHD LED monitors including HDMI cables and adapters 7 Unit DepED CO, Pasig City 4 Unit DepED CO, Pasig City 2 Unit DepED R7, Cebu City July 1, 2015 July 15, 2015 July 1, 2015 July 15, 2015 July 1, 2015 July 15, 2015
8 14. IP Equipment Monitoring System NMS server and clients must be compatible with Windows 8/7/Vista and Windows Server 2012/2008/2003, RHEL/Ubunto/CentOS/SUS E Unlimited licenses on performance monitoring for all network equipment discovered and monitored within DepEd network environment Automatic discovery of network devices and recognizing networks with sub-networks Presentation of the discovered devices on a user-defined interactive maps with important status/details and device prioritization capabilities Allows parallel/multiple use of management console on different workstations Allows monitoring of port status, connected devices and network traffic on each switch port It must be capable of seamless integration with other monitoring features (such as user-activity, hardware and software inventory, data leak protection and helpdesk unlimited license DepED CO, Pasig City July 1, 2015 July 15, 2015
9 15. IP Equipment Monitoring System NMS server and clients must be compatible with Windows 8/7/Vista and Windows Server 2012/2008/2003, RHEL/Ubunto/CentOS/SUS E Unlimited licenses on performance monitoring for all network equipment discovered and monitored within DepEd network environment Automatic discovery of network devices and recognizing networks with sub-networks Presentation of the discovered devices on a user-defined interactive maps with important status/details and device prioritization capabilities Allows parallel/multiple use of management console on different workstations Allows monitoring of port status, connected devices and network traffic on each switch port unlimited license DepED R7, Cebu City September 28, 2015 October 5, 2015
10 16. Warranty 20 years for structured cabling 5 years to all works and other supplied equipment from the date of completion of works
11 2. List of Related Services and Completion Schedule Service Description of Service Quantity 1 Physical Unit Place where Services shall be performed Final Completion Date(s) of Services 1. Architectural Works, Interior Works and Civil DepEd CO, Ortigas, Pasig September 15, 2015 Works City 2. Supply, delivery, installation, configuration and testing of equipment and its software components. 3. Electrical System Works 4. Improvement of ceiling, appropriate aesthetic finishing, painting and restoration works 5. Architectural Works, Interior Works and Civil DepEd R7, Cebu City October 15, 2015 Works 6. Supply, delivery, installation, configuration and testing of equipment and its software components. 7. Electrical System Works 8. Improvement of ceiling, appropriate aesthetic finishing, painting and restoration works 9. Maintenance of data center facility 2 year DepEd CO and DepED R7 For 2 years to commence from date of acceptance 10. Training on operations, maintenance and troubleshooting of data center facility to include meals, training materials, 12 pax DepED CO and DepEd R7 December, 2016
12 11. Documentation both for DepED CO and DepED R7 As-built plans Maintenance, troubleshooting, and Operation Manual of all equipment delivered Test results for all installed components where applicable Training and support to all users Development of Business Continuity and Sustainability Plan November, 2015
13 3. Technical Specifications Lot no. Item/Description Qty/Unit Agency s Delivery Schedule 1 DESIGN AND CONSTRUCTION OF THE NEW DEPARTMENT OF EDUCATION CENTRAL OFFICE DATA CENTER 1 lot Within One Hundred fifty (150) calendar days from the effective date indicated in the Contract 2 DESIGN AND RENOVATION OF DATA CENTER AT THE DEPARTMENT OF EDUCATION (REGION 7) REGIONAL OFFICE 1 Lot Within Forty Five (45) calendar days from the effective date indicated in the Contract 3 MAINTENANCE OF DATA CENTER FACILITY FOR DEPARTMENT OF EDUCATION CENTRAL OFFICE 4 MAINTENANCE OF DATA CENTER FACILITY FOR DEPARTMENT OF EDUCATION REGION 7 1 LOT For 2 years to commence from acceptance of the completed data center facility 1 LOT For 2 years to commence from acceptance of the completed data center facility
14 1. DESIGN AND CONSTRUCTION OF NEW DATA CENTER AT THE DEPARTMENT OF EDUCATION CENTRAL OFFICE QUANTITY : 1 LOT Item No. ITEM, TECHNICAL SPECIFICATIONS & CONDITIONS UNIT QTY 1 DATA CENTER ENGINEERING DESIGN AND SPACE PLANNING WORKS 1. Design and space plan based on the provided floor layout 2. Approval of the suitable design for the identified Data Center location based on industry best practices to include the following Data Center components: a. Architectural Works, Interior Works and Civil Works b. Electrical System Works c. Uninterruptible Power Supply d. Generator Set with ATS e. Precision Air Conditioning Unit f. Fire Suppression System g. Access Control System h. IP-based Surveillance System i. Network Racks j. Monitoring Display Panels k. IP Equipment Monitoring l. Structured Cabling System 3. Improvement of ceiling, appropriate aesthetic finishing, painting and restoration works 4. All major materials for use in the Data center shall have prior type approval before any installation is performed. 2 ARCHITECTURAL WORKS, INTERIOR WORKS & CIVIL WORKS 1. Floor Works a. Supply, delivery and installation of Steel Cement Raised Floor Panels, with high pressure laminated tiles, 610mm x 610mm panels complete with understructure for data center and auxiliary room. Total floor area approximately 46 sqm b. Ramp with anti-skid rubber matting c. Marking, positioning and installation of pedestals, proper elevation and mechanical anchoring d. Positioning and installation of raised floor panels e. Installation of thermal break Aluminum Foil insulation for concrete flooring prior to access raised floor pedestal installation f. Supply, delivery and installation of water leak detection system including control panel, sensing cables and related accessories g. Supply, delivery and installation of anti-static floor finish for console area, approximately 16 sqm h. Floor preparation works including checking of uneven condition of flooring for pedestal setting 1 lot
15 i. Hauling and cleaning 2. Ceiling a. Supply, delivery and installation of acoustic ceiling (2 feet x 2 feet panel) b. Supply, delivery and installation of ceiling lights (LED) with switches with motion sensors 3. Concrete Wall Partition a. Supply, delivery and installation of concrete wall partition including support for the Data Center entrance 4. Glass Wall Partition a. Supply, delivery and installation of glass wall partition including supports between the Data Center and Console Area and between the Data Center and Auxiliary Room 5. Waterproofing & Painting Works a. Cleaning and preparation of affected walls, floors and ceiling for water proofing works b. Perform water-proofing works on walls, floor and ceiling c. Application of final paint-finish on affected walls and ceilings 6. Doors a. Supply, delivery and installation of tempered glass door with Automatic Sliding Door Mechanism between the Data Center and Console Area b. Supply, delivery and installation of tempered, manual sliding glass door between the Data Center and Auxiliary Room c. Supply, delivery and installation of metal door with clear glass narrow lite for the main door Data center entrance d. Supply, delivery and installation of solid metal door for the Auxiliary entrance 7. Wall Finishing Works a. Cladding works for the aesthetic finishing of the data center and auxiliary concrete walls using Aluminum Composite Panels (ACP) complete with angular bars, sub-frames, brackets, backer rod and sealant prosil, approximately 98 sqm 3 ELECTRICAL SYSTEM Provide materials, labor, equipment and services necessary to complete the electrical system installation for the data center 1 Lot 1. Positioning, installation, electrical cabling, tapping and testing of lighting fixtures, convenience outlets and electrical panel 2. Electrical cabling, tapping and testing of PACU 3. Electrical cabling, tapping and testing of UPS from transformer and UPS to network racks 4. Electrical cabling, tapping and testing Power Distribution Unit and Twist locks to the UPS 5. Electrical cabling, tapping and testing of transformer from the main power source 6. Electrical cabling, tapping and testing of fire suppression system
16 7. Electrical cabling, tapping and testing of grounding system 8. Tapping of network rack grounding to the data center grounding system 9. Electrical cabling, tapping and testing from supply load to genset and ATS 4 DATA CENTER EQUIPMENT 1. Uninterruptible Power Supply - provide materials, labor, equipment and service necessary to finish, deliver and install UPS system a. Supply, delivery, installation, configuration and testing of two (2) units of 40KVA UPS capacity, double-conversion technology, 8-10 mins runtime, with SNMP b. Configuration of UPS monitoring system software c. Configuration and load balancing of data center equipment connected to and powered by the UPS d. Parallel testing, start-up testing, commissioning and system turnover 2. Generator Set with Automatic Transfer Switch (ATS) provide materials, labor, equipment and services necessary to finish, deliver and install one (1) unit of Generator Set with Automatic transfer Switch in accordance with the approved design and location a. one (1) unit of 200KVA generator set b. one (1) unit of Automatic Transfer Switch c. Must have all-weather and sound-proof enclosure d. With construction of concrete pad mount for the Genset unit 3. Precision Air Conditioning Unit provide materials, labor, equipment and service necessary to finish, deliver and install three (3) units of precision airconditioning units, testing and training services a. 5TR precision Air-Conditioning Unit (PACU) system down flow type b. System software programming and configuration for hot standby/backup c. Mechanical installation of 5TR PACU, including air-cooled and refrigerant piping system, thermal rubber insulation, refrigerant charging and aircooled drain system d. Hauling and positioning of PACU units e. Construction of pad mounts for the outdoor condensing units f. Integration with Fire Suppression System g. SNMP/Web monitoring configuration 4. Fire Suppression System provide materials, labor, equipment and service necessary to finish, deliver and install Fire Suppression System in accordance with the guidelines contained in NFPA 2001 and based from the approved floor lay-out a. FM-200 cylinder with valve assembly to be filled of FM-200 clean agent b. Hydraulic Flow Calculation for Fire Suppression System Software c. Must include all components necessary for the complete installation of the fire suppression system such as appropriate cylinder capacity, discharge nozzles, photo electric and ionization smoke detectors, alarm system (audio and visual), manual pull station, abort station, control panel among others d. Integration with PACU e. Installation, configuration, testing and training services 2 units 1 unit 3 units 1 unit
17 5. Access Control System provide materials, labor, equipment and service necessary to finish, deliver and install Dual Security Door Access Control System a. Installation and configuration of three (3) units Biometric system with EM lock mechanism b. Testing, commissioning and system turnover 6. IP-based Surveillance System provide materials, labor, equipment and service necessary to finish, deliver and install IP-based Surveillance System at the entrance and inside the data center in accordance with the approved design and location a. Provision of six (6) units of fixed dome IP-based PoE cameras with remote focus and zoom b. Provision of video recorder software c. Installation of viewing and management software for multi-view and administration management d. Mounting and installation of IP cameras at designated area and adjusted to its perfect angle for the security monitoring e. Configuration and assignment of TCP/IP address, security address permissions for each IP-based security camera, recorder and storage f. Configuration of motion detection and video resolution for each camera g. Configuration and integration of IP-based cameras for real-time recording of events to be captured by the cameras h. Configuration of video recorder software for selected scheduled back-up scheme and storage space assignment i. Configuration of video recorder for remote viewing of authorized and authenticated users such as security access, administration level and privilege j. Installation, configuration, testing and training services 7. Network Racks Supply, delivery, installation and configuration of the following: a. Ten (7) units of 42U enclosed rack with vertical cable management b. Ten (10) units of Power Distribution Unit 8. Monitoring Display Panels supply, delivery and installation of four (4) 40 UHD LED monitors including HDMI cables and adapter 5 IP EQUIPMENT MONITORING SYSTEM 3 units 6 units 7 units 4 units 1 unit Supply, delivery, installation and configuration of unlimited device licenses of IP Equipment Monitoring System with the following specifications and features: 1. NMS server and clients must be compatible with Windows 8/7/Vista and Windows Server 2012/ SNMP, IPv4 and IPv6 compliant 3. With Web-based management console 4. Unlimited licenses on performance monitoring for all network equipment, mobile devices and operating system discovered and monitored within DepEd network environment. 5. Automatic discovery of network devices and recognizing networks with subnetworks
18 6. Presentation of the discovered devices on a user-defined interactive maps with important status/details and device prioritization capabilities 7. Allows parallel/multiple use of management console on different workstations 8. Allows monitoring of port status, connected devices and network traffic on each switch port 9. It MUST be capable of seamless integration with other monitoring features (such as user-activity, hardware and software inventory, data leak protection and helpdesk system) using a single and centralized management dashboard 6 STRUCTURED CABLING SYSTEM 1. Supply, delivery and installation of 4-core, 50microns multi-mode fiber optic cable for backbone connectivity including fiber optic panels, connectors, fiber optic patch cords 2. Civil works for the affected areas for fiber optic backbone installation including concrete breaking, excavation works, pipe laying, backfilling, concrete restoration and construction of hand hole. 3. Supply and installation of related roughing-in materials such as PVC conduits and supports 4. Cable preparations, cable pulling and tagging 5. Termination, testing and AS-BUILT documentation 7 DATA CENTER WARRANTY WITH MAINTENANCE SERVICES 1 lot 2 Yrs 20 years for structured cabling 5 years to all works and other supplied equipment from the date of completion of works Maintenance services shall include the following equipment and systems: 1. Electrical System 2. Uninterruptible Power Supply (UPS) 3. Generator Set and Automatic Transfer Switch (ATS) 4. Precision Air-Conditioning System(PACU) 5. Fire Suppression System 6. Security Access Control System 7. Security Video Surveillance System 8. Access Raised Flooring with Water Leak Detection System 9. Structured cabling System (standard warranty of 20 yrs shall apply) 8 DOCUMENTATION AND TRAINING REQUIREMENTS The contractor shall furnish the Department of Education of the following: 1 Lot 1. As-built plans 2. Maintenance, troubleshooting, and Operation Manual of all equipment delivered 3. Test results for all installed components where applicable 4. Training and support to all users 6 pax 5. Development Business Continuity Plan to define alternative options and cost requirements in case of total site failure 6. Development Sustainability Plan to define annual operational and maintenance requirements and cost for the next five years.
19 9 PROJECT DURATION AND WORK SCHEDULE 1. One Hundred and Fifty (150) calendar days 2. Monday to Saturday, 9am to 5pm Proposed Data Center Lay-out Kitchen counter with sink 9 meters Wall partition Open shelves Cabinet = 16.8 sq.m 7 meters Auxiliary Area Office N E T W O R K R A C K S 378 sq. m. H Glass Wall O R I Z O N T A L B E A M S E R V E R R A C K S Console Area Stair landing Sliding Glass Door 39 sq. m. Raised 8 sq. m. floor ramp Cabinets = 5.2 sq.m.
20 TECHNICAL SPECIFICATIONS 2. DESIGN AND RENOVATION OF DATA CENTER AT THE DEPARTMENT OF EDUCATION (REGION 7 REGIONAL OFFICE QUANTITY : 1 LOT Item No. ITEM, TECHNICAL SPECIFICATIONS & CONDITIONS UNIT QTY 1 DATA CENTER ENGINEERING DESIGN AND SPACE PLANNING WORKS 1. Design and space plan based on the provided floor layout 2. Approval of the suitable design for the renovation of Data Center based on industry best practices to include the following components: a. Architectural Works, Interior Works and Civil Works b. Electrical System Works c. ATS d. Air Conditioning Unit e. Fire Suppression System 3. All major materials for use in the Data center shall have prior type approval before any installation is performed. 2 ARCHITECTURAL WORKS, INTERIOR WORKS & CIVIL WORKS 1 lot 1. Wall Partition a. Supply, delivery and installation of wall partition for the Data Center extension approximately 48 sqm b. Removal of existing windows to be replaced by CHB walls c. Removal of existing double wall plywood partition d. Supply and install of glass partition w/ sliding door 2. Ceiling a. Supply, delivery and installation of appropriate ceiling insulation approximately 9.7sqm b. Supply and installation of ceiling lights (LED) with switches. 3. Glass Partition a. Relocation and installation of glass partition 4. Painting Works a. Cleaning, preparation and application of final paint-finish on affected walls and ceilings 3 ELECTRICAL SYSTEM 1 Lot Provide materials, labor, equipment and services necessary to complete the electrical
21 system installation for the data center 1. Positioning, installation, electrical cabling, tapping and testing of lighting fixtures, convenience outlets and electrical panel 2. Electrical cabling, tapping and testing of ACU 3. Electrical cabling, tapping and testing of UPS 4. Electrical cabling, tapping and testing of ATS 5. Electrical cabling, tapping and testing of fire suppression system 6. Electrical cabling, tapping and testing of grounding system 4 DATA CENTER EQUIPMENT 1. Uninterruptible Power Supply - provide materials, labor, equipment and service necessary to finish, deliver and install UPS system a. Supply, delivery, installation, configuration and testing of two (2) units of 20KVA UPS capacity, rack-mounted b. Configuration and load balancing of data center equipment connected to and powered by the UPS c. Parallel testing, start-up testing, commissioning and system turnover 2. Automatic Transfer Switch (ATS) provide materials, labor, equipment and services necessary to finish, deliver and install one (1) unit of Automatic transfer Switch in accordance with the approved design and location 3. Air Conditioning Unit provide materials, labor, equipment and service necessary to finish, deliver and install two (2) units 3TR Precision Air-Conditioning Units, testing and training services a. 3TR Precision Air-Conditioning Unit (PACU) system floor mounted type b. Mechanical installation, including air-cooled and refrigerant piping system, thermal rubber insulation, refrigerant charging and air-cooled drain system c. Hauling and positioning of ACU units d. Construction of pad mounts for the outdoor condensing units 4. Fire Suppression System provide materials, labor, equipment and service necessary to finish, deliver and install Fire Suppression System in accordance with the guidelines contained in NFPA 2001 and based from the approved floor lay-out a. FM-200 cylinder with valve assembly to be filled of FM-200 clean agent b. Hydraulic Flow Calculation for Fire Suppression System Software c. Must include all components necessary for the complete installation of the fire suppression system such as appropriate cylinder capacity, discharge nozzles, photo electric and ionization smoke detectors, alarm system (audio and visual), manual pull station, abort station, control panel among others d. Installation, configuration, testing and training services 5. Monitoring Display Panels supply, delivery and installation of two (2) 40 UHD LED monitors including HDMI cables 5 IP EQUIPMENT MONITORING SYSTEM 2 units 1 unit 2 units 1 unit 2 unit 1 unit Supply, delivery, installation and configuration of unlimited device licenses of IP Equipment Monitoring System with the following specifications and features: 1. NMS server and clients must be compatible with Windows 8/7/Vista and Windows Server 2012/ SNMP, IPv4 and IPv6 compliant
22 3. With Web-based management console 4. Unlimited licenses on performance monitoring for all network equipment, mobile devices and operating system discovered and monitored within DepEd network environment. 5. Automatic discovery of network devices and recognizing networks with subnetworks 6. Presentation of the discovered devices on a user-defined interactive maps with important status/details and device prioritization capabilities 7. Allows parallel/multiple use of management console on different workstations 8. Allows monitoring of port status, connected devices and network traffic on each switch port 9. It MUST be capable of seamless integration with other monitoring features (such as user-activity, hardware and software inventory, data leak protection and helpdesk system) using a single and centralized management dashboard 6 WARRANTY ON WORKS AND EQUIPMENT 5 yrs 5 years to all works and other supplied equipment from the date of completion of works 7 DATA CENTER WARRANTY WITH MAINTENANCE SERVICES 2 Yrs Maintenance services shall include the following equipment and systems: 1. Electrical System 2. Uninterruptible Power Supply (UPS) 3. Automatic Transfer Switch (ATS) 4. Precision Air-Conditioning System(PACU) 5. Fire Suppression System 8 DOCUMENTATION AND TRAINING REQUIREMENTS 1 Lot The contractor shall furnish the Department of Education of the following: 1. As-built plans 2. Maintenance, troubleshooting, and Operation Manual of all equipment delivered 3. Test results for all installed components where applicable 4. Training and support to all users 6 pax 7. Sustainability Plan to define annual operational and maintenance requirements and cost for the next five years. 9 PROJECT DURATION AND WORK SCHEDULE 1 lot 1. Forty Five (45) calendar days 2. Monday to Saturday, 9am to 5pm
23 4.00m 7.50 m Existing BEST Office 4.25m Proposed BEST Stockroom Install CHB wall Proposed Data Center for Equipment Supply and install Glass partition w/ sliding Glass Door Supply and install Exit Door Door Existing Data Center 2,25m Kitchen Toilets Proposed IT Area Door Door
24 3. MAINTENANCE OF DATA CENTER FACILITY FOR THE DEPARTMENT OF EDUCATION CENTRAL OFFICE QUANTITY : 1 LOT SCOPE OF WORK Data Center Maintenance Services for DepED Manila Bidder shall provide comprehensive coverage and monthly preventive maintenance services for equipment and systems installed including replacement and/or replenishment of consumable items within the first year of standard warranty period and the succeeding year, with the following scope: I. Electrical System 1. Testing of circuit breakers and switches 2. Perform load balancing to prevent power overload and other power issues a) Study the system load during the actual operation b) Determine the unbalance phase load c) Transfer / reconfigure load to balance the phase load d) Monitor the balanced current load e) Project the additional load per phase f) Re-balance load as the change arise 3. Calibration of protective relays 4. Perform megger testing 5. Identification of potential electrical problems 6. Survey and identify high temperature excursions 7. Switchgear cleaning and inspection 8. Cleaning and tightening of all electrical connections and equipment closures 9. Replacement of defective lighting fixture and power outlets 10. Relocation and/or installation of new lighting fixture as needed II. Uninterruptable Power Supply (UPS) 1. Clean UPS and battery cabinet panels 2. Record UPS display parameters. 3. Measure actual UPS parameters. 4. Measure and record input and output filter current 5. Check for present alarm/s and note findings 6. Download alarm history and event alarms where applicable 7. Check and record environmental condition 8. Perform ocular inspection and check capacitors for signs of leakage; coils, wire/cables, PCB components for signs of burns; blowers for correct operation 9. Perform thermal scanning of all UPS electrical connections and power components using infrared scanner and note findings. 10. If a discrepancy from original calibration was identified, transfer the UPS to bypass mode (if allowed by customer) and perform control supply only calibration procedure otherwise, coordinate with customer for schedule of activity
25 11. If the unit needed corrective measures, through cleaning of internal components, and other activities that could endanger the safety of the personnel, perform orderly shutdown of the unit and do as necessary a) Shutdown the UPS following the recommended operating procedure b) Isolate the UPS input Mains supply externally and isolate the battery c) Clean battery tops and terminals for corrosion if present. Replace batteries as necessary d) Check electrolytic capacitors for signs of leakage, bucking, so forth e) Check magnetic components for signs of overheating, security of fixture and delamination. f) Check cables and connections for chaffing, fraying, and signs of overheating g) Check printed circuit boards for cleanliness and integrity. Replace bonds that show signs deterioration. Verify that all board connections are tight and secure h) Thoroughly clean inside the equipment enclosure using a vacuum cleaner and low pressure air to remove foreign debris i) Normalize UPS and double check all display parameters j) Perform battery test procedure and record parameters k) Reset alarm history and event alarms buffer l) Reconnect the UPS input Mains power m) Start the UPS and transfer the load to the inverter 12. Complete a battery check. Ensure that the available battery autonomy time meets the installation specifications III. Generator Set and Automatic Transfer Switch (ATS) 1. Inspect building interior for cleanliness and any oil spills. Clean or repair as needed. 2. Check fuel tank and record hour-meter reading. Refill fuel tank as needed. 3. Check the battery terminal connections for corrosion and looseness. Check for integrity of wire connections from the battery to the starter connections. 4. Check the coolant level on the radiator. Refill as necessary. 5. Check the engine oil for proper level and refill as necessary. 6. Replace oil and filter as necessary. 7. Check the fuel connections for leaks. 8. Verify if the battery charger is working as expected. 9. Test load and operate the generator to run 15 minutes once a week. Record all front panel parameters. Verify if operation shows proper voltage regulation and frequency. 10. Check the air filter. Replace as necessary. 11. Check water hoses for cracks or leaks and replace as necessary. 12. Load bank testing, compression and timing checks. IV. Precision Air-Conditioning System (PACU) 1. Visual inspection of all internal sub-assemblies and major components. 2. Recording of indicator readings on temperature and humidity. 3. Cleaning of any foreign material and dust from internal components. 4. Check thermostat settings to ensure the cooling system of the area is kept comfortable. 5. Check status alarm circuits. 6. Clean and pressure wash condenser coils. 7. Tighten all electrical connections and measure voltage and current on motors. 8. Check for possible defective or worn out electrical components, replace if necessary.
26 9. Lubricate all moving parts. 10. Check and inspect the condensate drain in central air conditioner, furnace and/or heat pump. 11. Check controls of the system to ensure proper and safe operation. 12. Check the starting cycle of the equipment to assure the system starts, operates, and shuts off properly. 13. Inspect evaporator (indoor blower) and condenser (outdoor unit) air conditioning coils. 14. Check central air conditioners refrigerant level and adjust if necessary. 15. Clean and adjust blower components to provide proper system airflow for greater comfort levels 16. Check all gas (or oil) connections, gas pressure, burner combustion and heat exchanger. 17. Inspect and adjust fan belts tension, replace if necessary. 18. Inspect, clean, and change air filters as necessary. V. Fire Suppression System 1. Inspection of Devices a) Hazard Enclosure Check original installation for any changes and equipment have not been replaced, modified, or relocated. Verify if the hazard volume is still the same and no walls or partition has been added. Verify protected rooms are effectively sealed of any significant air leaks that could result to agent leakage and a failure of the enclosure to hold the specified agent concentration level for the specified holding period. b) Agent Cylinder Verify containers and brackets are securely fastened. Check mounting position of horizontally mounted containers. Verify the status of agent in each cylinder. Check all containers pressure gauges. Check Solenoid Valve/Gas cartridge Actuator leads and wiring to agent release modules for corrosion and loosen or broken wires. c) Piping and Nozzles Verify discharge nozzles and pipe size. Verify piping joints & discharge nozzles securely fastened. Verify piping distribution system internally to detect the possibility of any oil or particulate matter soiling the hazard area or affecting the agent distribution due to a reduction in the effective nozzle orifice area. Verify the nozzle deflectors are positioned to obtain maximum benefits. Verify if discharge nozzle, pipe and fittings. d) Pipe Supports and Braces Inspect pipe supports hangers and braces. For loose, corrosion, and physical damage. e) Fire Detection, Alarm, releaseing Devices and Peripherals Verify all wiring systems are properly installed in compliance with local codes and the system drawings. Verify the control panels. Check all end-of-line resistors. Verify alternating current (ac) and direct current (dc) wiring. Verify all field circuits. Check the control panel power supplied to the control unit from a separate dedicated source that will
27 not be shut down on system operation. Verify availability of adequate and reliable primary and 24-hour minimum standby sources of energy Verify all auxiliary functions for proper operation in accordance with system requirements. Verify detection devices in proper type and location. Verify condition of detectors. Verify manual pull stations are properly installed, readily accessible, accurately identified, and properly protected to prevent damage. Verify all manual stations used to release agents require two separate and distinct actions for operation and properly identified. Verify the main/reserve switches are properly installed, readily accessible, and clearly identified. 2. Testing a) Disable each agent storage container release mechanism so that activation of the release circuit will not release agent. b) Verify that the control panel is connected to a dedicated circuit and labeled properly. c) Verify control panel is readily accessible, yet restricted from unauthorized personnel. d) Using smoke tester, check each detector for proper response. Verify all alarm functions occur according to design specification. e) Operate the necessary circuit to initiate a second alarm circuit if present. Check each detector for proper response. Verify that all second alarm functions occur according to design specifications. f) Operate manual release. Verify manual release functions occur according to design specifications. g) Operate abort switch circuit if supplied. Verify abort functions according to design specifications. h) Test all supervised circuits for proper trouble response. i) Operate one of each type of input device while on standby power. Verify that an alarm signal is received at remote panel after device is operated. Reconnect primary power supply. j) Operate each type of alarm condition on each signal circuit and verify receipt of trouble condition at the remote station. k) The system shall be returned to its fully operational design condition. l) Replacement of defective components as needed. m) Refilling of FM200 agent based on the following conditions: Accidentally discharge 1 time refill per year Tampered/deliberate discharge - chargeable to client. Due to actual fire Covered by Comprehensive Maintenance service. VI. Security Access Control System 1. Visual inspection of all internal sub-assemblies and major components. 2. Checking of primary and backup power supply. 3. Cleaning and maintenance inspection of the access control unit including its peripherals such as the electromagnetic lock mechanism, as necessary. 4. Hardware troubleshooting and problem isolation as needed. 5. Replacement of defective parts as needed. A set of equivalent access control unit shall be provided on site as backup unit. 6. Regular monitoring and generation of report as needed from the access control management software. VII. Security Video Surveillance System 1. Check cameras in accordance with the specification and any amendment.
28 2. Check indicator lamps condition. 3. Check that all cables and conduits are properly supported, undamaged and showing no signs of wear. 4. Check the picture quality of each camera and correct monitor selection. 5. Clean camera housings and lenses. 6. Check camera functions, movement and fields of view are free from obstruction. 7. Check overall performance of the system. 8. Check all power connections to ensure AC plugs are not loose or cable power frayed. 9. Check all control equipment running condition. 10. Clean monitor screen, control panel and keyboard with diluted cleaning solution. 11. Check monitor for proper brightness and contrast. 12. Replace camera as necessary. VIII. Structured Cabling System 1. Checking and re-testing of equipment patch cables. 2. Perform troubleshooting and provide problem resolution as needed. 3. Perform necessary re-termination and re-patching of cables. 4. Termination of patch cords and pigtails if necessary. 5. End to end cable labeling and tagging. 6. Update network layout and as built documentation. 7. All the necessary spare parts or consumable items to maintain the physical cabling system will be allotted from inventory for immediate replacement of defective components. IX. Access Raised Flooring with Water Leak Detection System 1. Panel rotation for even wear 2. Understructure adjustments 3. Replacement of broken edge trim 4. Replacement of warped panels 5. Refurbish delaminated panels 6. Sub-micron filter vacuuming 7. Sealant applied to sub flooring 8. Spot cleaning to remove stains 9. Professional surface cleaning 10. Detail cleaning of entry points 11. Check and clean sensing cables from end to end 12. Check water leak control panel display and / or indicator lights
29 4. MAINTENANCE OF DATA CENTER FACILITY FOR DEPARTMENT OF EDUCTATION REGION 7 QUANTITY : 1 LOT SCOPE OF WORK Data Center Maintenance Services for DepED Region 7 Bidder shall provide comprehensive coverage and monthly preventive maintenance services for equipment and systems installed including replacement and/or replenishment of consumable items, within the first year of standard warranty period and the succeeding year, with the following scope: I. Electrical System 1. Testing of circuit breakers and switches 2. Perform load balancing to prevent power overload and other power issues a) Study the system load during the actual operation b) Determine the unbalance phase load c) Transfer / reconfigure load to balance the phase load d) Monitor the balanced current load e) Project the additional load per phase f) Re-balance load as the change arise 3. Calibration of protective relays 4. Perform megger testing 5. Identification of potential electrical problems 6. Survey and identify high temperature excursions 7. Switchgear cleaning and inspection 8. Cleaning and tightening of all electrical connections and equipment closures 9. Replacement of defective lighting fixture and power outlets 10. Relocation and/or installation of new lighting fixture as needed II. Uninterruptable Power Supply (UPS) 1. Clean UPS and battery cabinet panels 2. Record UPS display parameters. 3. Measure actual UPS parameters. 4. Measure and record input and output filter current 5. Check for present alarm/s and note findings 6. Download alarm history and event alarms where applicable 7. Check and record environmental condition 8. Perform ocular inspection and check capacitors for signs of leakage; coils, wire/cables, PCB components for signs of burns; blowers for correct operation 9. Perform thermal scanning of all UPS electrical connections and power components using infrared scanner and note findings. 10. If a discrepancy from original calibration was identified, transfer the UPS to bypass mode (if allowed by customer) and perform control supply only calibration procedure otherwise, coordinate with customer for schedule of activity 11. If the unit needed corrective measures, through cleaning of internal components, and other activities that could
30 endanger the safety of the personnel, perform orderly shutdown of the unit and do as necessary a) Shutdown the UPS following the recommended operating procedure b) Isolate the UPS input Mains supply externally and isolate the battery c) Clean battery tops and terminals for corrosion if present. Replace batteries as necessary d) Check electrolytic capacitors for signs of leakage, bucking, so forth e) Check magnetic components for signs of overheating, security of fixture and delamination. f) Check cables and connections for chaffing, fraying, and signs of overheating g) Check printed circuit boards for cleanliness and integrity. Replace bonds that show signs deterioration. Verify that all board connections are tight and secure h) Thoroughly clean inside the equipment enclosure using a vacuum cleaner and low pressure air to remove foreign debris i) Normalize UPS and double check all display parameters j) Perform battery test procedure and record parameters k) Reset alarm history and event alarms buffer l) Reconnect the UPS input Mains power m) Start the UPS and transfer the load to the inverter 12. Complete a battery check. Ensure that the available battery autonomy time meets the installation specifications III. Generator Set and Automatic Transfer Switch (ATS) 1. Inspect building interior for cleanliness and any oil spills. Clean or repair as needed. 2. Check fuel tank and record hour-meter reading. Refill fuel tank as needed. 3. Check the battery terminal connections for corrosion and looseness. Check for integrity of wire connections from the battery to the starter connections. 4. Check the coolant level on the radiator. Refill as necessary. 5. Check the engine oil for proper level and refill as necessary. 6. Replace oil and filter as necessary. 7. Check the fuel connections for leaks. 8. Verify if the battery charger is working as expected. 9. Test load and operate the generator to run 15 minutes once a week. Record all front panel parameters. Verify if operation shows proper voltage regulation and frequency. 10. Check the air filter. Replace as necessary. 11. Check water hoses for cracks or leaks and replace as necessary. 12. Load bank testing, compression and timing checks. IV. Precision Air-Conditioning System (PACU) 1. Visual inspection of all internal sub-assemblies and major components. 2. Recording of indicator readings on temperature and humidity. 3. Cleaning of any foreign material and dust from internal components. 4. Check thermostat settings to ensure the cooling system of the area is kept comfortable. 5. Check status alarm circuits. 6. Clean and pressure wash condenser coils. 7. Tighten all electrical connections and measure voltage and current on motors. 8. Check for possible defective or worn out electrical components, replace if necessary. 9. Lubricate all moving parts.
31 10. Check and inspect the condensate drain in central air conditioner, furnace and/or heat pump. 11. Check controls of the system to ensure proper and safe operation. 12. Check the starting cycle of the equipment to assure the system starts, operates, and shuts off properly. 13. Inspect evaporator (indoor blower) and condenser (outdoor unit) air conditioning coils. 14. Check central air conditioners refrigerant level and adjust if necessary. 15. Clean and adjust blower components to provide proper system airflow for greater comfort levels 16. Check all gas (or oil) connections, gas pressure, burner combustion and heat exchanger. 17. Inspect and adjust fan belts tension, replace if necessary. 18. Inspect, clean, and change air filters as necessary. V. Fire Suppression System 1. Inspection of Devices a) Hazard Enclosure Check original installation for any changes and equipment have not been replaced, modified, or relocated. Verify if the hazard volume is still the same and no walls or partition has been added. Verify protected rooms are effectively sealed of any significant air leaks that could result to agent leakage and a failure of the enclosure to hold the specified agent concentration level for the specified holding period. b) Agent Cylinder Verify containers and brackets are securely fastened. Check mounting position of horizontally mounted containers. Verify the status of agent in each cylinder. Check all containers pressure gauges. Check Solenoid Valve/Gas cartridge Actuator leads and wiring to agent release modules for corrosion and loosen or broken wires. c) Piping and Nozzles Verify discharge nozzles and pipe size. Verify piping joints & discharge nozzles securely fastened. Verify piping distribution system internally to detect the possibility of any oil or particulate matter soiling the hazard area or affecting the agent distribution due to a reduction in the effective nozzle orifice area. Verify the nozzle deflectors are positioned to obtain maximum benefits. Verify if discharge nozzle, pipe and fittings. d) Pipe Supports and Braces Inspect pipe supports hangers and braces. For loose, corrosion, and physical damage. e) Fire Detection, Alarm, releaseing Devices and Peripherals Verify all wiring systems are properly installed in compliance with local codes and the system drawings. Verify the control panels. Check all end-of-line resistors. Verify alternating current (ac) and direct current (dc) wiring. Verify all field circuits. Check the control panel power supplied to the control unit from a separate dedicated source that will
32 not be shut down on system operation. Verify availability of adequate and reliable primary and 24-hour minimum standby sources of energy Verify all auxiliary functions for proper operation in accordance with system requirements. Verify detection devices in proper type and location. Verify condition of detectors. Verify manual pull stations are properly installed, readily accessible, accurately identified, and properly protected to prevent damage. Verify all manual stations used to release agents require two separate and distinct actions for operation and properly identified. Verify the main/reserve switches are properly installed, readily accessible, and clearly identified. 2. Testing a) Disable each agent storage container release mechanism so that activation of the release circuit will not release agent. b) Verify that the control panel is connected to a dedicated circuit and labeled properly. c) Verify control panel is readily accessible, yet restricted from unauthorized personnel. d) Using smoke tester, check each detector for proper response. Verify all alarm functions occur according to design specification. e) Operate the necessary circuit to initiate a second alarm circuit if present. Check each detector for proper response. Verify that all second alarm functions occur according to design specifications. f) Operate manual release. Verify manual release functions occur according to design specifications. g) Operate abort switch circuit if supplied. Verify abort functions according to design specifications. h) Test all supervised circuits for proper trouble response. i) Operate one of each type of input device while on standby power. Verify that an alarm signal is received at remote panel after device is operated. Reconnect primary power supply. j) Operate each type of alarm condition on each signal circuit and verify receipt of trouble condition at the remote station. k) The system shall be returned to its fully operational design condition. l) Replacement of defective components as needed. m) Refilling of FM200 agent based on the following conditions: Accidentally discharge 1 time refill per year Tampered/deliberate discharge - chargeable to client. Due to actual fire Covered by Comprehensive Maintenance service.
.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority.
Fitness Facility Addition Page 1 1.1 CODES AND STANDARDS.1 Do complete installation in accordance with the latest edition of the CSA C22.1 as amended by the latest editions of the National Building Code
More informationSECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM
SECTION 283111 - DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationSPECIFICATION MICROMIST FIRE SUPPRESSION SYSTEM WITH SHP-PRO CONTROL PANEL
SECTION 1 - GENERAL CONDITIONS I. SCOPE: This specification outlines the requirements for a Fike Micromist Water Mist Fire Suppression System with automatic detection and control. The work described in
More informationSPECIFICATION MICROMIST FIRE SUPPRESSION SYSTEM WITH CHEETAH Xi 50 CONTROL PANEL
SECTION 1 - GENERAL CONDITIONS I. SCOPE: This specification outlines the requirements for a Fike Micromist Water Mist Fire Suppression System with a Cheetah Xi 50 addressable detection and control system.
More informationSPECIFICATION FOR A TOTAL FLOOD ECARO-25 TM CLEAN AGENT FIRE SUPPRESSION SYSTEM FOR USE WITH THE CHEETAH Xi 50 CONTROL PANEL SYSTEM
SECTION 1 - GENERAL CONDITIONS I. SCOPE: This specification outlines the requirements for a Total Flood ECARO-25 TM clean agent fire suppression system utilizing HFC-125 as the fire extinguishing agent
More informationTable-1: Clarifications and modification in tender specifications based on Pre-bid meeting discussion
Table-1: Clarifications and modification in tender s based on Pre-bid meeting discussion Sr. Ref Page. 1 4 Clause Site Preparation and Partitions walls 2 11 SLD 3 18 Batteries 4 18 Batteries 5 32 to 34
More informationA. Drawings and general provisions of Contract, including General and Supplementary Conditions apply to work of this section.
SECTION 16770 PAGE 1 PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. Drawings and general provisions of Contract, including General and Supplementary Conditions apply to work of this section. B. Division 16
More informationAnnexure - 1. Detectors: Fire Alarm Control Panel :
Item 1. Supply Part This Specification includes Supply, Warranty, Installation, Testing and Commissioning and integration of the Fire Alarm System mainly consisting of the Fire Alarm Control Panel (FACP),
More informationNFPA CODE TESTING & INSPECTION. Requirements & Recommendations for. Licensed Florida Hospitals, Ambulatory Surgery Centers,
NFPA CODE TESTING & INSPECTION Requirements & Recommendations for Licensed Florida Hospitals, Ambulatory Surgery Centers, ICF/IID Healthcare, & In-patient Hospice Facilities per NFPA Life Safety Code 101
More informationGARCIA GALUSKA DESOUSA Consulting Engineers
L#57297 /Page 1/July 21, 2017 ELECTRICAL SYSTEMS NARRATIVE REPORT The following is the Electrical Systems narrative, which defines the scope of work and capacities of the Power and Lighting systems, as
More informationElectrical Preventive Maintenance (EPM) Program
Electrical Preventive Maintenance (EPM) Program Only qualified and properly trained persons may work on electric circuit parts or equipment. Such persons shall be capable of working safely and shall be
More information1.03 RELATED SECTIONS: The following sections contain requirements that relate to this section.
SECTION 15855 GAS FURNACE/DX COOLING UNIT PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of contract including General and Supplementary Conditions of Division 1 of Specification
More informationReplacement of Fire Pump and Generator Upgrade, H Building, Sexton Campus
ADDENDUM FORM INVITATION TO TENDER: 2016-067 ADDENDUM NO: 1 DATE ISSUED: June 23, 2016 ISSUED BY: Monty Thibeault DESCRIPTION: Replacement of Fire Pump and Generator Upgrade, H Building, Sexton Campus
More informationSECTION INTRUSION DETECTION
(NOTE TO DESIGNER: These Specifications are basic minimum criteria to be met in preparing the final specifications for this section, which is the responsibility of the Designer.) SECTION 28 16 00 INTRUSION
More informationENGINEERING SPECIFICATIONS FOR FM-200 CLEAN AGENT INDIRECT PRE-ENGINEERED FIRE SUPPRESSION SYSTEMS
ENGINEERING SPECIFICATIONS FOR FM-200 CLEAN AGENT INDIRECT PRE-ENGINEERED FIRE SUPPRESSION SYSTEMS SECTION 1 GENERAL SPECIFICATIONS I. SCOPE This specification outlines the requirements for a pre-engineered
More informationOPERATING AND MAINTENANCE MANUAL FOR PLATE HEAT EXCHANGER INDIRECT FIRED WATER HEATER. Electric Heater Company Base Model "BWXP"
OPERATING AND MAINTENANCE MANUAL FOR PLATE HEAT EXCHANGER INDIRECT FIRED WATER HEATER Electric Heater Company Base Model "BWXP" HUBBELL ELECTRIC HEATER COMPANY P.O. BOX 288 STRATFORD, CT 06615 PHONE: (203)
More informationINSTALLATION and OPERATION BALL WASHER, HIGH CAPACITY MODEL NO: BW-022AN
Easy Picker Golf Products, Inc. 415 LEONARD BLVD. N., LEHIGH ACRES, FL 33971 PH: 239-368-6600 FAX: 239-369-1579 Service: 800-982-4653 SALES: 800-641-4653 www.easypicker.com salesdept@easypicker.com INSTALLATION
More informationTypes of Detection. Fusible Link Detection - Most Common
Types of Detection Fusible Link Detection - Most Common Types of Detection Electric Detection Types of Detection Pneumatic Detection-Tubing Pneumatic Tubing 3 Year Service life Survey Hazard 1) List all
More informationSPECIFICATION FOR A TOTAL FLOOD ECARO-25 TM CLEAN AGENT FIRE SUPPRESSION SYSTEM FOR USE WITH THE SHP PRO CONTROL PANEL SYSTEM
SECTION 1 - GENERAL CONDITIONS SPECIFICATION FOR A TOTAL FLOOD I. SCOPE: This specification outlines the requirements for a Total Flood ECARO-25 TM clean agent fire suppression system utilizing HFC-125
More informationEcoAisle Thermal Containment System
Guide Specifications EcoAisle Thermal Containment System THIS GUIDE SPECIFICATION IS WRITTEN IN ACCORDANCE WITH THE CONSTRUCTION SPECIFICATIONS INSTITUTE (CSI) MASTERFORMAT. THIS SECTION MUST BE CAREFULLY
More informationSpringpoint Architects, pc SECTION Childcare Center Architect s Project No TABLE OF CONTENTS Monroe County Comm. Sch. Corp.
Volume 1 Bidding Requirements, Contract Forms, Conditions of the Contract, Division 1, Architectural and Site Specifications 000107 Certification Page 000110 Table of Contents DIV00 PROCUREMENT AND CONTRACTING
More informationKidde Nitrogen Inert Gas Clean Agent Fire Suppression System
1. GENERAL 1.1 INTENT OF SPECIFICATIONS A. This specification details the requirements for an engineered inert gas fire suppression system Model Kidde Nitrogen. These requirements, combined with good engineering
More informationSECTION PACKAGED COMPRESSOR AND CONDENSER UNITS
SECTION 236200 - PACKAGED COMPRESSOR AND CONDENSER UNITS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions apply
More informationSECTION INTERIOR LIGHTING
SECTION 26 51 00 INTERIOR LIGHTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2018
SECTION 26 2913 - ENCLOSED CONTROLLERS GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationDIVISION 21: FIRE SUPPRESSION SYSTEMS SECTION Fire Protection Systems Protecting Cold Storage and Unheated Warehouses
PART 1 - GENERAL 1.1 SCOPE A. Through Class III Commodity Classification, up to 12.2m of single, double or multiple row rack storage, up to 14.6m building height (VanQuish Fire Sprinkler System). Cartoned
More informationALABAMA. Downloaded
Housekeeping/Laundry/Maintenance ALABAMA Downloaded 01.15.11 (e) Maintain an effective pest control program so that the facility is free of pests and rodents. In the laundry, provision shall be made to
More informationTABLE OF CONTENTS GENERAL... 2 A. DEFINITIONS DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2
Division 28 ELECTRONIC SAFETY AND SECURITY TABLE OF CONTENTS 28 0000 GENERAL... 2 A. DEFINITIONS...2 28 3111 DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2 A. DESIGN REQUIREMENTS...2 B. CONSTRUCTION REQUIREMENTS...2
More informationSPECIFICATION FIKE CLEAN AGENT FIRE SUPPRESSION SYSTEM WITH IMPULSE VALVE, FK AGENT & CHEETAH Xi 50 CONTROL PANEL
SECTION 1 GENERAL CONDITIONS I. SCOPE: SPECIFICATION FIKE CLEAN AGENT FIRE SUPPRESSION SYSTEM WITH This specification outlines the requirements for a Total Flood Clean Agent Fire Suppression System utilizing
More informationMobile Food Units. A definition of mobile food unit added in OFC Rule 2 is as follows:
Technical Bulletin #18-002 February 2018 / 2017 OFC Mobile Food Units Referenced Codes and Standards: OAC 1301:7-7-3(T); OFC 320 OAC 1301:7-7-2(B); OFC 202 OAC 1301:7-7-9(F); OFC 906 NFPA 58 (2014) NFPA
More informationInspection Points Trailers & Fifth Wheels
Inspection Points Trailers & Fifth Wheels We at RVIS, LLC appreciate your business and look forward to providing you with the professional RV inspection you deserve. So that we may provide you with a thorough
More informationSheetz Inc. Fire Protection Service Guidelines
Sheetz Inc. Fire Protection Service Guidelines Overview The following are guidelines for Sheetz Fire Protection Services for the 2016/2018 contract year. Each key area is listed below with the appropriate
More informationPort of St Helens SIA Aircraft Hanger Scappoose, OR
Port of St Helens SIA Aircraft Hanger Scappoose, OR AUTOMATIC FIRE SPRINKLER SYSTEM REVISION 2 MARCH 12, 2018 Scope: Furnish and install foam and water fire protection system including underground entrance
More informationCONSTRUCTION REQUIREMENTS
CONSTRUCTION REQUIREMENTS Note: The buildings on the UCCS campus are divided into two categories: General Fund and Auxiliaries. General Fund Buildings include academic and administrative functions. Auxiliary
More informationFig.: A fire in a server room or data center may cause devastating damage. Protect your infrastructure.
Didactum`s IP-based monitoring devices have many uses: Monitoring of wiring closets and server room environments Remote monitoring of technical rooms in branch offices Monitoring of power supply systems
More informationDOCUMENT TABLE OF CONTENTS
DOCUMENT 00003 June 16, 2005 TABLE OF CONTENTS DOCUMENT NO. INTRODUCTORY INFORMATION DOCUMENT 00003 TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS SECTION 01011 SECTION 01025 SSP21.1-1 SECTION 01026
More informationINSTALLATION and OPERATION BALL WASHER MODEL NO: BW-022
Easy Picker Golf Products, Inc. 415 Leonard Blvd. N., Lehigh Acres, FL 33971 PH: 239-368-6600 FAX: 239-369-1579 Service: 800-982-4653 SALES: 800-641-4653 www.easypicker.com salesdept@easypicker.com INSTALLATION
More informationFunctional Performance Test
Fire Alarm Control Panel & Fire Alarm Annunciator Panel Notify all building occupants that testing will be conducted. Fire alarm contractor shall have personnel with 2-way radios at the fire alarm control
More informationUNIVERSITY OF ROCHESTER DESIGN STANDARDS NOVEMBER 1, 2013
SECTION 15800 - AIR HANDLING EQUIPMENT 1.1 GENERAL A. All air handlers installed shall conform to the University of Rochester specification Guideline for Semi-Custom and Pre-Engineered Air Handling Units.
More informationRevitalize Building Mechanical Systems (4619)
SECTION 235216 FIRE-TUBE CONDENSING BOILERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationNew Construction Fire Inspection Process
New Construction Fire Inspection Process This document is intended to provide the Owner, Designer, and/or Contractor of new construction with an outline of required fire inspections and with the specific
More informationKPHE24 SERIES WATER-TO-AIR HEAT EXCHANGER
Keep This Manual With Heat Exchanger Find additional information on this model at kooltronic.com or use the Technical Documents QR code below. Technical Documents KPHE24 SERIES WATER-TO-AIR HEAT EXCHANGER
More informationCommittee Input No. 9-NFPA [ Global Input ] Supplemental Information. Submitter Information Verification. Committee Statement
Committee Input No. 9-NFPA 2001-2016 [ Global Input ] Incorporate revisions per the attached file. Supplemental Information File Name 2001-CI_9.pdf Description Data and specific revisions presented at
More information5.07 Air Replenishment Systems
5.07 Air Replenishment Systems Reference: 2010 SFFC, Section 511.2 Definitions: CERTIFIED COMPRESSOR. A compressor used by a contractor for maintenance and testing of air replenishment systems that is
More informationAppendix 1 LACCD Districtwide Security Performance Requirements
Appendix 1 LACCD Districtwide Security Performance Requirements SECTION LISTING 28 01 10 Overview 28 13 00 Access Control System 28 13 01 Access Control System Installation 28 13 26 Access Control Remote
More informationrev3 INSTALLATION & OPERATION MANUAL OIL CIRCULATING HEATING SYSTEM MODEL OSM
216279-000 rev3 INSTALLATION & OPERATION MANUAL OIL CIRCULATING HEATING SYSTEM MODEL OSM IDENTIFYING YOUR SYSTEM IOM216279-000 The HOTSTART heating system is designed to heat fluids for use in marine
More informationPROJ. NO SECTION PAGING, SPEAKERS AND HARD-WIRED CLOCK SYSTEMS
SECTION 26 92 50 PAGING, SPEAKERS AND HARD-WIRED CLOCK SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions
More informationA. AMERICAN ARCHITECTURAL MANUFACTURERS ASSOCIATION (AAMA) 101: Appendix Dissimilar Materials.
B B11.0 DIVISION 08 - OPENINGS SECTION 08 17 00 INTEGRATED DOOR OPENING ASSEMBLIES Specifier Note: Coordinate and edit articles and paragraphs below to suit project requirements. Add section numbers and
More informationAssessing Your Airfield Electrical Distribution System
Assessing Your Airfield Electrical Distribution System PRESENTED AT The 2017 Airports Conference March 30, 2017 Hershey, PA PRESENTED BY Samuel Mullen, III - Burns Engineering, Inc. 1 Presentation Objective
More informationSECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL
SECTION 16400 AUTOMATIC TRANSFER SWITCHES 1.01 RELATED DOCUMENTS PART 1 - GENERAL A. Drawings and general provisions of Contract, including General Conditions and Division 1 Specification sections, apply
More informationPLP - TERMS AND CONDITIONS Philadelphia Gas Works Residential Parts & Labor Plan Contract
PLP - TERMS Residential Parts & Labor Plan Contract TERMS This Residential Parts & Labor Plan Contract (this Plan ) is available to customers of the ( PGW ) who have natural gas house heaters, gas water
More informationSECTION DOMESTIC WATER PUMPS
SECTION 22 11 23 DOMESTIC WATER PUMPS PART 1 - GENERAL 1.1 SUMMARY A. Section includes the following all-bronze and bronze-fitted centrifugal pumps for domestic cold- and hot-water circulation: 1. Close-coupled,
More informationUniversity of Houston Master Construction Specifications Insert Project Name SECTION DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL
SECTION 21 13 16 DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section
More informationNITROGEN-GENERATING SPRINKLER CORROSION INHIBITING SYSTEM
NITROGEN-GENERATING SPRINKLER CORROSION INHIBITING SYSTEM PART 1 - GENERAL 1.1 SUMMARY A. This section outlines the requirements for the nitrogen-generating sprinkler corrosion inhibiting system. The work
More informationTurin LED Ceiling Fan
Turin LED Ceiling Fan model no. no. 052-6972-6 Instruction Manual Toll-free: -866-827-4985 IMPORTANT: Please read and understand this manual before any assembly. Before beginning assembly of product, make
More informationSECTION SECURITY TESTING AND COMMISSIONING
SECTION 280800 - SECURITY TESTING AND COMMISSIONING PART 1 - GENERAL 1.1 WORK INCLUDES A. General Description: This specification section covers the provision of preliminary testing, acceptance testing,
More informationMODEL B2 INSTALLATION MANUAL
RELEASE DEVICES GENERAL DESCRIPTION MODEL B2 INSTALLATION MANUAL S/N: The B2 Series Time Delay Release Devices are UL Listed, Canadian Listed, and CSFM Listed for use on rolling doors, single-slide and
More informationSERVICING AND BREAKDOWN...
SCOPE OF WORKS Contents APPLIANCE SERVICING AND BREAKDOWN... 2 1.0 Evaporative Cooling... 3 1.1 Visual inspection (Breakdown and Service)... 3 1.2 Breakdown Works (Breakdown Only)... 3 1.3 Clean filter
More informationSECTION AUTOMATIC TRANSFER SWITCHES
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 36 23 SPEC WRITER NOTE: Use this section only for NCA projects. Delete between //--// if not applicable to project. Also, delete any other item or paragraph
More informationUSER S, MAINTENANCE and SERVICE INFORMATION MANUAL
CONTENTS SAFETY INFORMATION................ 2 FOR YOUR SAFETY...................... 2 SYSTEM OPERATION.................. 2 THERMOSTATS.......................... 2 INTERMITTENT IGNITION DEVICE..........
More informationPreventative Maintenance Tables
Preventative Maintenance Tables Table of Contents I. Table : Gas Fired Domestic Hot Water Heater II. III. IV. Table : Circulating Pump Table : Convectors Table 4: Grille and Diffusors V. Table 5: Unit
More informationUHIR Series. Horizontal or Vertical Mounting Industrial / Commercial Electric Unit Heater. Owner s Manual
UHIR Series Horizontal or Vertical Mounting Industrial / Commercial Electric Unit Heater Owner s Manual This manual covers installation, maintenance and repair parts. Read carefully before attempting to
More informationUNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:
SECTION 233423 - HVAC POWER VENTILATORS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Provisions of the Contract and of the Contract Documents apply to this Section. 1.2 PERFORMANCE REQUIREMENTS A. Operating
More informationC. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.
SECTION 236426 - ROTARY-SCREW WATER CHILLERS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes packaged, water cooled or air cooled as scheduled, electric-motor-driven, rotary-screw water chillers
More informationCombined CAN Sensor Unit Temperature, Humidity and Smoke
Combined CAN Sensor Unit Temperature, Humidity and Smoke Didactum`s IP-based monitoring devices have many uses: Monitoring of wiring closets and server room environments Remote monitoring of technical
More informationVACIE REFERENCE GUIDE REVISION 1.2.6
VACIE REFERENCE GUIDE REVISION 1.2.6 November 2016 INTRODUCTION... 3 SECTION 1... 4 VACIE CONFIGURATION... 4 Communications... 4 Vocia VACIE Devices... 4 Vocia Support devices:... 5 Power Supply and Network
More informationAccess CONTROL. MANAGEMENT Software
Software Guide Access CONTROL MANAGEMENT Software Engineered to meet today s demands and tomorrow s challenges, Keyscan s System VII software delivers unique features to provide an access control solution
More informationOutdoor Temperature Sensor
Didactum`s IP-based monitoring devices have many uses: Monitoring of wiring closets and server room environments Remote monitoring of technical rooms in branch offices Monitoring of power supply systems
More informationTypical applications include the vibration detector. Detection of vibrations and shocks
Didactum`s IP-based monitoring devices have many uses: Monitoring of wiring closets and server room environments Remote monitoring of technical rooms in branch offices Monitoring of power supply systems
More informationFIREFLY II PLUS RELEASE DEVICES INSTALLATION MANUAL
FIREFLY II PLUS RELEASE DEVICES INSTALLATION MANUAL MADE IN THE U.S.A. U.L. LISTED CANADIAN LISTED CSFM: 7300-1418:100 GENERAL DESCRIPTION SERIAL NUMBER The Cookson Company FIREFLY II PLUS Time Delay Release
More informationB.C.S. Shop Heaters 26, 30 & 36 (36 shown)
BIOMASS COMBUSTION SYSTEMS, INC. 67 MILLBROOK ST., SUITE 502 WORCESTER, MA 01606 508-798-5970 - FAX 508-798-5971 B.C.S. Shop Heaters 26, 30 & 36 (36 shown) INSTALLATION MANUAL HAND FIRED SYSTEMS 8-09 Biomass
More informationIndian National Trust for Art and Cultural Heritage (INTACH, 71, KK Birla Lane, Lodhi Estate, New Delhi , Ph. No.
Indian National Trust for Art and Cultural Heritage (INTACH, 71, KK Birla Lane, Lodhi Estate, New Delhi -110003, Ph. No. 011-49854100 TENDER NOTICE Sealed tender in two separate bids a) Technical bids,
More informationHOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District
HOLUM EDUCATION CENTER Architectural The existing building has approximately 41,823 square feet and sets on a lot about 4.14 acres in size. Parking lots are located along the east and west sides of the
More informationAUTOMATIC FIRE SPRINKLER SYSTEM STANDARDS Development Standard #4.1 (Commercial Installations)
AUTOMATIC FIRE SPRINKLER SYSTEM STANDARDS Development Standard #4.1 (Commercial Installations) This standard applies to the design and installation of automatic fire sprinkler systems in conjunction with
More informationDr. Infrared Heater Elite Series
Dr. Infrared Heater Elite Series 1500 Watts with Two Heat Settings Built-In Humidifier Rotatable Air Outlet Automatic Thermostat Tip-Over Switch Overheat Thermal Cut-Off Protection Room Temperature LED
More informationPower Flame Incorporated
Power Flame Incorporated SUGGESTED SPECIFICATION FOR MODEL NVC ULTRA LOW NOx GAS BURNERS SUB 9 PPM NOx THE POWER TO MANAGE ENERGY 2001 South 21st Street, Parsons, Kansas 67357 Telephone: 620-421-0480,
More informationQuick Start Guide. 4MP Vandal Dome Fixed Lens IP Camera O4D1
Quick Start Guide 4MP Vandal Dome Fixed Lens IP Camera O4D1 Version 1.1.1 Welcome Thank you for purchasing this Network camera! This manual is designed to be a reference tool for your system. Please read
More informationNATIONAL TRAINING BOARD (ELECTRICIAN) REGULATIONS 2008 BR 54/2008 NATIONAL OCCUPATIONAL CERTIFICATION ACT :38
BR 54/ NATIONAL OCCUPATIONAL CERTIFICATION ACT 2004 2004 :38 The National Training Board, with the approval of the Minister responsible for the National Training Board, in exercise of the powers conferred
More informationSECTION SPLIT-SYSTEM AIR-CONDITIONERS
SECTION 23 81 26 SPLIT-SYSTEM AIR-CONDITIONERS PART 1 - GENERAL 1.1 SUMMARY A. Section includes split-system air-conditioning units consisting of separate evaporator-fan and compressor-condenser components.
More informationPROFILE. industrial services rental trading
PROFILE industrial services rental trading Introduction Power Corp General Trading & Contracting Company W.L.L. is incorporated by technocrats having vast experience in Engineering and Construction field
More informationCAN unit for Analog Sensors
CAN unit for Analog Sensors Didactum`s Monitoring Systems have many uses: Monitoring of wring closets and server room environments Remote monitoring of technical rooms in branch offices Monitoring of power
More informationEquipment Maintenance Checklist
The Hartford Steam Boiler Inspection and Insurance Co. One State Street P.O. Box 5024 Hartford, CT 06102-5024 Tel: 800-333-4677 Fax: 484-582-1811 Internet: http://www.hsb.com Equipment Maintenance Checklist
More informationRELEASE DEVICES RELEASE DEVICE-WPS MODELS A/B INSTALLATION MANUAL U.L. LISTED CANADIAN LISTED CSFM: :100 GENERAL DESCRIPTION:
RELEASE DEVICES MADE IN THE U.S.A. RELEASE DEVICE-WPS MODELS A/B INSTALLATION MANUAL U.L. LISTED CANADIAN LISTED CSFM: 7300-1418:100 GENERAL DESCRIPTION: S/N: The "WPS" World Power Series, Time Delay Release
More informationSprinkler System Installer Level 2
Sprinkler System Installer Level 2 Sprinkler System Installer Unit: A8 Electrical Principles* Level: Two Duration: 17 hours Theory: Practical: 14 hours 3 hours Overview: Upon completion of this unit the
More informationCMHC HOME MAINTENANCE CHECKLIST
Make sure air vents indoors and outdoors (intake, exhaust and forced air) are not blocked by snow or debris. Check and clean range hood filters on a monthly basis. Test ground fault circuit interrupter(s)
More informationVocia VACIE. Reference Guide
Vocia VACIE Reference Guide Document Revision 1.2.3, August 2015 Biamp Systems 9300 SW Gemini Drive Beaverton, Oregon 97008, U.S.A. (503) 641-7287 www.biamp.com INTRODUCTION... 3 SECTION 1... 4 VACIE CONFIGURATION...
More informationCONTENTS AUTOMATIC TRANSFER SWITCHES
CONTENTS AUTOMATIC TRANSFER SWITCHES PART 1 GENERAL 1.1 Related Documents 1.2 Summary 1.3 References 1.4 Quality Assurance 1.5 Submittals 1.6 Delivery, Storage and Handling 1.7 Instructions And Training
More informationTT /97. Features INSTALLATION INSTRUCTIONS. Horn. Lamps
TT-1023 1/97 INSTALLATION INSTRUCTIONS Original Issue Date: 2/94 Model: 6-2000 kw Market: Industrial Subject: Flush- or Surface-Mount Remote Annunciator Kits PA-293991 and PA-293991-SD The remote annunciator
More informationUpdated: September 12, 2018 DIVISION INTEGRATED AUTOMATION. INTEGRATED AUTOMATION Page 1 of INTEGRATED AUTOMATION
Page 1 of 7 25 00 00 25 10 00 NETWORK EQUIPMENT Standby Power 1. Consider whether the controls system should be on standby/emergency power, or UPS when central applications are controlled or the equipment
More informationS a n F r a n c i s c o F i r e D e p a r t m e n t B u r e a u o f F i r e P r e v e n t i o n & I n v e s t i g a t i o n 1 of 8 P a g e
5.07 Air Replenishment Systems (2016) Reference: SFFC, Section 511.2. Purpose: The purpose of this bulletin is to describe the requirements for air replenishment systems intended to be used to fill firefighters'
More informationGen II Entree Bath. Maintenance Manual. All Models. Important Safety Instructions Read & Follow All Instructions Thoroughly
Gen II Entree Bath All Models Maintenance Manual Important Safety Instructions Read & Follow All Instructions Thoroughly Note: The serial tag is at the first page of this manual package. The Standards
More informationSPECIFICATION DELETED SECTION CENTRIFUGAL HVAC FANS
SECTION 23 34 16 CENTRIFUGAL HVAC FANS PART 1 - GENERAL 1.01 RELATED DOCUMENT A. Drawings and general provisions of the contract, including General and Special Conditions and Division 01 Specification
More informationEngineering Specifications
BL229 Rising Barrier NAM-BL229-ES-EN-A 1/8g ENGINEERING SPECIFICATIONS BL229 Rising Barrier PART I GENERAL SECTION 08 34 56 Security Gates SECTION 11 12 33 Parking Gates SECTION 28 13 00 Access Control
More informationSECTION WET-PIPE SPRINKLER SYSTEMS
SECTION 21 13 13 WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 SCOPE OF WORK A. Design, installation and testing shall be in accordance with NFPA 13 except for specified exceptions. B. The demolition
More informationSECTION GENERATOR PARALLELING CONTROLS
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 23 13 GENERATOR PARALLELING CONTROLS SPEC WRITER NOTE: Delete between // -- // if not applicable to project. Also delete any other item or paragraph not applicable
More informationSUMMARY 1234 Main St.Severn Buyer Name 07/18/2018 9:00AM
SUMMARY 1234 Main St.Severn 21144 Buyer Name 07/18/2018 9:00AM Henry Toman MD License 32391 1st American Home Inspection, LLC 443-685-4062 henrytoman61@gmail.com The summary is meant to organize the defects
More informationSECTION EMERGENCY POWER SYSTEMS
SECTION 16620 EMERGENCY POWER SYSTEMS A. Standby Engine/Generator Systems 1. Installations of stationary engine/generator (e/g) systems shall be designed in strict accordance with ANSI/NFPA 70 - National
More informationInBio X60 Series Access Control Panel User Manual
InBio X60 Series Access Control Panel User Manual Version: 1.4 Date: Nov., 2015 About This Manual This manual introduces the installation connection and user manual of the InBio X60 Series Access Control
More informationB. Section Transfer Switches: Automatic transfer switch.
SECTION 263213 - ENGINE GENERATORS PART 1 GENERAL 1.1 SECTION INCLUDES A. Packaged engine generator set. B. Exhaust silencer and fittings. C. Remote control panel. D. Battery and charger. E. Weatherproof
More informationBrown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA
PART 1 - GENERAL 1.1 Background SECTION 26 00 10- ELECTRICAL DESIGN CRITERIA A. Brown University maintains it own campus electrical distribution system which serves the majority of the buildings and facilities