1 Draft FPA Australia Technical Specification for Public Comment FPAA101D These preliminary pages provide information on the background to this Technical Specification, the system it covers and the context of this Technical Specification as well as instructions on how to provide your public comment. This information has been provided so that as a reader of this public comment draft you understand the context of this draft Technical Specification when providing public comment. Background FPAA101D, Automatic Fire Sprinkler System Design and Installation Domestic Water Supply provides for a fit for purpose, cost-effective automatic fire sprinkler system supplied from the domestic water supply. It was developed as a result of research and testing funded by Fire & Rescue New South Wales (FRNSW) and conducted by CSIRO in conjunction with FRNSW staff and FPA Australia members to identify a fit for purpose, cost-effective sprinkler system for Class 2 and 3 residential accommodation buildings, other than Aged Care. It was undertaken as a direct result of the NSW coronial inquest into the death of Connie Zhang and inquiry into the 6 September 2012 fire at Unit 53, Tower B, 4 West Terrace, Bankstown. Two fit for purpose sprinkler systems were developed, both based on existing requirements of current Australian Standards and the use of listed sprinkler heads within the scope of their listing with an emphasis of providing a more cost-effective system that provides a required level of safety. One of the key ways this was achieved was by using existing water supplies in the building either the domestic water supply or the hydrant system water supply. This Technical Specification covers a sprinkler system fed by the domestic water supply. System overview As above, the major difference between the system in this Technical Specification and those in other documents (namely, the AS 2118 standards) is that rather than having its own dedicated sprinkler water supply into the building, the sprinkler system is integrated with the domestic water supply for the building. This significantly reduces the cost of the system as it eliminates the need for a dedicated sprinkler system water supply tapping, pump set, control valve assembly and riser. Specifically, the FPAA101D system takes its water supply from the building s domestic water riser, downstream of the domestic pump. Each floor will have a branch from the domestic riser to feed the sprinkler system and domestic water for that floor. The branch shall include an isolation valve (to isolate the domestic water and sprinkler system on the floor) after which will
2 be a further branch to serve the sprinkler system and sole occupancy unit (SOU) toilets. This branch incorporates a backflow prevention device after the take-off point and then reticulates throughout the corridors and common areas and into each SOU on that floor. As this is connected to the domestic water, any interruption or reduction in water supply to domestic appliances (taps, showers, etc.) will also quickly alert occupants to an interruption or reduction in the water supply to the sprinkler system. Additionally, the connection to the SOU toilets helps quickly identify any water supply issues to the SOUs sprinkler system. See Clause 3.0 for more information and a diagram illustrating this design. Context of the Technical Specification Recent tests have shown that fires in modern buildings burn at a rate eight times faster than 50 years ago. This is principally due to the reduction of furniture and contents made from natural materials and significant increase in furniture and contents made of synthetic materials. This was illustrated in fire testing by Underwriters Laboratories (UL) which showed the fastest legacy room 1 tested transitioned to flashover in just over 29 minutes whereas all modern rooms 2 tested transitioned to flashover in less than 5 minutes and as fast as 3 minutes 45 seconds. 1 Room with older furniture and contents of natural materials ( 1970s) 2 Room with more modern furniture and contents of synthetic materials (2010s) Such quick burning fires and the difficulty faced by the firefighting services reaching an incident in urban areas (e.g. due to traffic, congestion, narrow roads, etc.) in this time was illustrated in the Bankstown fire. This event resulted in the death of one individual and life changing injuries to another prompting the coroner s recommendation for a fit-for-purpose, cost effective sprinkler systems for Class 2 and 3 buildings to be investigated. As a result of this recommendation, testing was funded by FRNSW and undertaken by CSIRO in conjunction with FRNSW and FPA Australia members to identify such a system. FPAA101D and FPAA101H were developed based on this research. FPAA101D and FPAA101H form part of a Proposal for Change (PFC) to the BCA to require sprinkler systems in Class 2 and 3 buildings less than 25 m in effective height. This proposal was submitted by FPA Australia, Fire and Rescue NSW and the Australasian Fire and Emergency Services Authorities Council (AFAC). This PFC s objective is to mitigate fire growth rates in modern residential buildings to: (i) maintain tenability to the degree necessary for occupants to safely evacuate or until fire service intervention, (ii) support fire service response, and (iii) improve firefighter safety. In summary, this PFC provides fit for purpose fire suppression in Class 2 and 3 buildings, other than Aged Care, less than 25 m in effective height where none has been previously required and manner. in a cost-effective
3 Providing public comment To provide feedback, go to and download the public comment form. Follow the instructions on the form to complete it then submit it to to have your feedback considered. Public comment on FPAA101D is due Friday 23 February All public comment will be reviewed by FPA Australia to identify whether any changes are required to improve the Technical Specification. IMPORTANT: Public comment is only sought on the content of FPAA101D not on its implementation. If the Australian Building Codes Board (ABCB) supports our Proposal For Change to reference FPAA101D and FPAA101H, the relevant changes will be included in the National Construction Code 2019 (NCC 2019) Public Comment draft due to be released in February As such, any feedback on the implementation should be made based on the changes includes in the public comment draft of the NCC 2019 and, as these relate to the NCC, should be directed to the ABCB.
4 2017 FPAA101D Automatic Fire Sprinkler System Design and Installation Domestic Water Supply 4 December
5 FPA Australia Fire Protection Association Australia (FPA Australia) is Australia s major technical and educational fire safety organisation and the national industry peak body for fire safety, which provides information, services and education to the fire protection industry and the community. FPA Australia is a not for profit association and is supported by approximately 1500 members, consisting of leading companies and organisations around Australia employing an estimated 30,000 individuals, and operating across every aspect of the fire protection, building and construction industry. Our vision is: Leading and supporting a professional industry to minimise the impact of fire on life, property and the environment, for a safer community. The objective of FPA Australia s Technical Specifications is to realise this vision by providing fit-for-purpose solutions to make buildings safer. 2 P age
6 Preface This Technical Specification provides for a fit for purpose, cost-effective automatic fire sprinkler system supplied from the domestic water supply. It was developed as a result of research and testing funded by Fire & Rescue New South Wales (NSW) and conducted by CSIRO in conjunction with FRNSW staff and FPA Australia members to identify a fit for purpose, cost-effective sprinkler system for residential accommodation namely Class 2 and 3 buildings and was undertaken as a direct result of the NSW coronial inquest into the death of Connie Zhang and inquiry into the 6 September 2012 fire at Unit 53, Tower B, 4 West Terrace, Bankstown. Two fit for purpose sprinkler systems were developed, both with reference to existing requirements of Australian Standards and the use of listed sprinkler heads within the scope of their listing but with an emphasis of providing a more cost-effective solution that still provided a suitable level of safety. One of the key ways this was achieved was by using existing water supplies in the building either the domestic water supply or the hydrant water supply. This Technical Specification covers a sprinkler system fed by the domestic water supply. 3 P age
7 Table of contents 1.0 Scope Application System Description Adoption of AS with variation Variations from AS P age
8 1.0 Scope This Technical Specification specifies minimum requirements for the components, design, installation, commissioning and routine service of a fit for purpose fire sprinkler system for Class 2 and 3 buildings not more than 25 m in effective height and fed from the domestic water system. Referred as a FPAA101D system. 2.0 Application This Technical Specification must be read in conjunction with Australian Standards AS , Automatic fire sprinkler systems - Home fire sprinkler systems and AS :2017, Automatic fire sprinkler systems General systems. See Clause System Description The FPAA101D system is a fit for purpose fire sprinkler system for Class 2 and 3 buildings not more than 25 m in effective height and fed from the domestic water system. The FPAA101D system takes its water supply from the building s domestic water riser, downstream of the domestic pump. This eliminates the need for a dedicated sprinkler system water supply tapping, pump set, control valve assembly and riser. Each floor will have a branch from the domestic riser to feed the sprinkler system and domestic water for that floor. The branch shall include an isolation valve to isolate the domestic water and sprinkler system on the floor. Downstream of the isolation valve is the take-off point for a branch serving the sprinkler system and sole occupancy unit (SOU) toilets. This branch starts with a backflow prevention device at the take-off point and then runs throughout the corridors and common areas and into each SOU on that floor. A FPAA101D system has the added benefit of having a continually monitored water supply. As the system is fed from the building s domestic water system, any interruption or reduction in water supply to domestic appliances (taps, showers, etc.) will indicate an interruption or reduction in the water supply to the FPAA101D system. See Figure 1 for an illustration of this system configuration. Note: As illustrated in Figure 1.3, a building with a FPAA101D system will have two pipes entering each SOU: The domestic service (as present); and The FPAA101D sprinkler system pipe. The connection of the toilets within the SOU to the sprinkler system pipework effectively provides end-of-line monitoring within each SOU. 5 P age
9 Figure 1 Sample system diagram of a FPAA101D system 4.0 Adoption of AS 2118 standards A sprinkler system in accordance with this Technical Specification shall meet the requirements of Australian Standard AS except where varied by this Technical Specification, see Clause 5.0. This Technical Specification also references some clauses from AS :2017, primarily in regards to components and the location of sprinklers. Note: AS has been referenced as the basis for this Technical Specification. However, this Technical Specification varies aspects of AS to create a fit for purpose and cost effective system for Class 2 and 3 buildings not more than 25 m in effective height fed from the domestic water supply. It has been informed by research and testing conducted by CSIRO in conjunction with Fire and Rescue NSW and FPA Australia members. 6 P age
10 5.0 Variations from AS Sprinkler systems in accordance with this Technical Specification shall meet AS with the following variations: NOTE: The below text includes a number of notes in blue boxes like this one. These notes are not part of the variations to AS but rather notes to this FPAA101D Technical Specification intended to clarify why certain information is added, modified or deleted. Notes that are not in these boxes are part of the variation itself, such as that for Clause below. There is also one commentary box which is clear (no fill) and is also part of the variation itself, see C4.2.3 in Clause below. Global change (entire Standard) All instances of home fire sprinkler system are references to a FPAA101D system and any variations on this are to be read accordingly, e.g. a reference to a home sprinkler is a reference to a sprinkler in a FPAA101D system. Preface and Foreword (page 2 and 5) Delete Preface and Foreword. SECTION 1 SCOPE AND GENERAL Clause 1.1 (page 6) Delete text (including Notes) and replace with the following: This Standard specifies minimum requirements for the components, design, installation, commissioning and routine service of a fit for purpose fire sprinkler system for sole-occupancy units (SOUs) in Class 2 and 3 buildings less than 25 m in effective height and fed from the domestic water supply. An FPAA101D system shall not be used to protect buildings where more than 25% of the floor area is not classified as Class 2 or Class 3. See Clause for guidance on protection of ancillary areas. Clause (page 7) Delete text (including notes) and replace with; The sprinkler system installation downstream of the floor take-off backflow prevention device shall be installed by a licenced plumber or sprinkler fitter who 7 P age
11 also holds the specific licence/accreditation to conduct work on FPAA101D systems. Clause (page 8) Delete Clause Clause (page 8) Delete Clause Clause (page 8) Delete tank or and Note. Clause (page 9) NEW Domestic water system Domestic plumbing system comprising all components from the water supply tapping, including backflow prevention, pump, pipework and plumbing fixtures. Clause (page 9) NEW Floor isolation valve Valve used to isolate the sprinkler system and domestic water for the residential floor. Clause (page 9) NEW FPAA101D system A fit for purpose sprinkler system for Class 2 and Class 3 buildings not more than 25m in effective height, fed from the domestic water system. Clause (page 9) NEW Shadowed area An area rendered unprotected by a vertical feature, such as a protruding wall, obstructing the spray pattern of a sprinkler. 8 P age
12 Clause (page 9) NEW Sole-occupancy unit (SOU) Has the meaning as per the NCC definition except that (c) and (d) of that definition are not relevant in the context of this Standard. Clause (page 9) NEW Sprinkler, residential (RES) See Clause of AS :2017. Clause (page 9) NEW Sprinkler, sidewall See Clause of AS :2017. SECTION 2 INSTALLATION Clause 2.2 (page 10) Delete text (including Table 2.2 and Figures) and replace with the following: The building shall be sprinkler protected throughout except in the following areas: (a) For the entire building: (i) Concealed floor, ceiling and roof spaces not used as living areas. (ii) Toilets, bathrooms and ensuites, excluding dual use as a laundry. (b) For SOUs only: (i) Hallways, entries, stairs and the like not exceeding 1.5m in width. (ii) Cupboards, wardrobes, walk-in wardrobes, pantries, alcoves and recesses less than 3.0 m 2 ; not containing clothes driers, gas water heaters, cooking appliances and the like, or used for the storage of flammable liquids. (iii) Small architectural features such as planter box windows and bay windows. 9 P age
13 Clause (page 10) NEW Covered balconies Balconies on residential floors shall be protected in accordance with Clause of AS :2017. Clause 2.3 (page 12) Delete Clause. NOTE: Smoke alarms or smoke detection is also an important fire protection measure in Class 2 and 3 buildings but already required by the National Construction Code and state legislation and therefore does not need to be included in this Technical Specification. Clause (page 13) Delete Clause Clause (page 13) Delete Clause including associated Figures. Clause (page 13) Delete text including Figures and replace with the following: General The FPAA101D system is a fit for purpose fire sprinkler system for Class 2 and 3 buildings not more than 25 m in effective height and fed from the domestic water system. The FPAA101D system takes its water supply from the building s domestic water riser, downstream of the domestic pump Sprinkler system Take-offs feeding the sprinkler system for the floor shall incorporate a floor isolation valve to allow the supply to the sprinkler system on that floor to be isolated. This valve shall be upstream of the branch feeding the domestic water meters on the protected floor. NOTE: The floor isolation valve is fitted upstream of the water meters so that domestic water usage monitors the floor isolation valve. If the valve is 10 P age
14 inadvertently left shut, occupants are alerted that the sprinkler system is inoperative as they will have no water available at their SOU taps Connection to SOU toilets All SOU toilets shall be fed directly from the SOU s sprinkler system. Pipework and connection to the toilet cistern shall be in accordance with AS/NZS except that the feed shall be from the sprinkler system. NOTE: The purpose of the connection to SOU toilets is to monitor the water availability at every SOU in the building. Such end-of-line monitoring increases system reliability by protecting against deliberate or inadvertent isolation to parts of the protected floor Ancillary Areas The whole building shall be sprinkler protected subject to the minor exceptions specified in Clause 2.2. If more than 25% of the floor area of a building is not classified as Class 2 or Class 3, an FPAA101D system shall not be used. If other classifications apply to ancillary parts of a Class 2 or 3 building protected by a FPAA101D system (e.g. Class 7 carparks, Class 6 retail etc.), these parts of the building shall not be located above the fourth storey; be sprinkler protected in accordance with Clause of AS and be provided with end-of-line sprinkler system monitoring via also providing water supply to toilets serving these ancillary parts of the building Connection to other systems No part of the sprinkler system shall be connected to any other service including drencher systems, hose reels or the like. 11 P age
15 SECTION 3 WATER SUPPLIES Clause 3.3 (page 18) Delete Clause 3.3 (including Clauses and and associated Figures) and replace with the following: Clause 3.3 Source of supply The domestic water system shall be fed from the network utility operator drinking water supply and the FPAA101D system shall be fed from this domestic water system. NOTE: See typical FPAA101D system configuration in Figure 1 of FPAA101D. Clause 3.4 Delete Clause 3.4. Clause 3.5 Delete 100 L/Min and replace with 132 L/min. Delete 10 min and replace with 60 min. Clause (page 23) Delete text and replace with Pumpsets shall be installed in accordance with AS/NZS Clause (page 23) Delete Clause Clause (page 23) Delete Clause Clause (page 23) Delete Clause Clause (page 24) Delete Figure P age
16 Clause (page 25) Figure Delete FIRE SPRINKLER PUMP and replace with FIRE SPRINKLER/POTABLE WATER PUMP Clause (page 25) Delete Clause Clause (page 25) Delete Clause Clause (page 25) Delete Clause Clause (page 25) Delete Clause Clause 3.7 (page 26) Delete Clause 3.7 including Figures. SECTION 4 DESIGN AND HYDRAULICS Clause (page 27) Delete 50 L/min and replace with 66 L/min. Clause (page 27) Delete Clause Clause (page 27) NEW Simultaneous flow The network utility operator drinking water supply shall be capable of supplying simultaneously the FPAA101D system flow demand, the domestic flow demand and the demand of the wet or dry hydrant system. C4.2.3 Where a network utility operator drinking water supply supplies a sprinkler system, it should be capable of providing simultaneously the 13 P age
17 required flow for the domestic water system and fire hydrants. It is expected that the fire brigade would not isolate the sprinkler system until the fire is extinguished and may use the hydrants to supplement sprinkler operation. Clause (page 32) NEW Ceiling fans Sprinklers shall be located a minimum of 300mm beyond the outside radius of ceiling fans. NOTE: A ceiling fan blade may present a significant obstruction if stopped immediately below a sprinkler. Clause (page 32) NEW Shadowed Areas Shadow areas shall be treated in accordance with Clause of AS :2017. Clause (page 32) NEW Pendant sprinkler near columns Pendent sprinklers near columns shall be located in accordance with Clause of AS Clause (page 32) NEW Ceiling pockets Ceiling pockets shall be sprinkler protected in accordance with Clause of AS :2017. Clause (pages 39-42) Delete text including all Tables and associated notes and replace with the following: FPAA101D systems shall be fully hydraulically calculated in accordance with Section 14 of AS :2017 using the design criteria as per Clause 4.2, the sprinkler spacing as per Clause 4.3 and the minimum sprinkler pressure as per Clause NOTE: This Clause uses 4.2, 4.3 and to hydraulically calculate the requirement for an FPAA101D system. The required flow and pressure determined will need to be made available from the domestic water system. 14 P age
18 Clause (pages 42-51) Delete Clause including all Tables and Figures. SECTION 5 COMPONENTS Clause 5.1 (page 52) Delete Items (c) and (f). Clause (page 10) NEW WaterMark All components installed downstream of the floor backflow prevention device (including sprinklers) shall be certified and authorised under the WaterMark Certification Scheme. Clause (page 52) Delete Clause. Clause (page 52) Delete Clause. Clause (page 52) 1. Delete first sentence. 2. Delete Plastics at the start of the second sentence and replace with plastic. 3. Delete Note. Clause (pages 52 and 53) Delete Clause Clause 5.3 (page 53) Delete entire Clause and replace with the following new Subclauses: Backflow protection The floor backflow valve shall be a non-testable dual check valve and shall not be fitted with isolation valves. 15 P age
19 NOTE: Minimising the possibility of inadvertent isolation of the sprinkler system in Class 2 and 3 buildings is of paramount importance. Isolation valves fitted at backflow devices are used to perform testing on the device and to facilitate its maintenance or replacement. As a non-testable device is specified and provisions for isolation and drainage are available, dedicated isolation valves are not required to be installed Drain Valve A 15mm locked shut drain valve shall be installed immediately downstream of the dual check valve backflow device to facilitate de-pressurizing the installation downstream of the device if required. NOTE: This Technical Specification does not include test valve assemblies. Such assemblies are used for routine testing ( maintenance under AS ). The requirements to use this have been removed due to the nature of the system whereby the availability of water will be monitored with day to day water usage of the occupants Location plate Where the floor isolation valves are located within a cupboard, a location plate shall be installed on the exterior of the cupboard bearing the following words SPRINKLER STOP VALVE INSIDE in clear permanent lettering, in letters at least 25mm high and in a contrasting colour to the background. Clause 5.4 (pages 54-55) Delete Clause 5.4 (including Figure). Clause (page 55) 1. Delete text in Clause 5.5.1(b) and replace with the following: (b) be of the concealed, flush or domed pendent type or sidewall type; and 2. Delete last sentence and Note. Clause Delete text (excluding note) and replace with the following: Six (6) spare sprinklers and a compatible spanner shall be kept in a locked box fixed adjacent to the fire indication panel (FIP), where fitted. Where no FIPs are used, the spares box shall be installed adjacent to the ground level floor isolation valve. 16 P age
20 Clause 5.5 (pages 56 to 57) 1. Delete Figure 5.5(A). 2. Delete Figure 5.5 (B). 3. Delete Figure 5.5(C). SECTION 6 COMMISSIONING Section 6 (page 59) 1. Add 6.1 GENERAL between the Section heading and the first paragraph. 2. Delete Item (d). NOTE: This Standard does not include test valve assemblies. 3. Delete Item (e). 4. Delete Item (f). 5. Delete Item (g). 6. Delete Item (h). 7. Delete Item (i). SECTION 7 ROUTINE SERVICE Section 7 (page 59) NEW Add new Section 7 as follows: SECTION 7 ROUTINE SERVICE 7.1 GENERAL Routine service of a FPAA101D system shall consist of an annual inspection of the sprinkler system to ensure that sprinklers have not been damaged, painted or unduly obstructed. Stock of spare sprinklers and spanner should also be checked at this time. NOTE: This activity could be conducted at the same time that the SOU is accessed to undertake the annual inspection of smoke alarms. APPENDICES Delete all appendices. 17 P age
Draft FPA Australia Technical Specification for Public Comment FPAA101H DRAFT
Draft FPA Australia Technical Specification for Public Comment FPAA101H These preliminary pages provide information on the background to this Technical Specification, the system it covers and the context
More informationFIRE RESCUE NSW RESEARCH PROJECT FOR SPRINKLERS IN BUILDINGS UNDER 25 METRES IN HEIGHT
FIRE RESCUE NSW RESEARCH PROJECT FOR SPRINKLERS IN BUILDINGS UNDER 25 METRES IN HEIGHT John Clampett & Morgan Cook (Churchill Fellow 2012) Consultant & Team Leader Fire Research John Clampett Consulting
More informationAS 2419 OVERVIEW OF PROPOSED CHANGES. Gary Nenadovich Director G N Consulting
AS 2419 OVERVIEW OF PROPOSED CHANGES Gary Nenadovich Director G N Consulting Disclaimer FPA Australia's policy is one of continuous improvement, details of products, procedures or methods described within
More informationInformation Bulletin
Consideration of emergency response in Alternative Solutions Version 1 Approved for release May 2015 1.0 Purpose statement The purpose of this document is to increase awareness and consideration of the
More informationAS/NZS :2015. Plumbing and drainage AS/NZS :2015. Part 4: Heated water services. Australian/New Zealand Standard
AS/NZS 3500.4:2015 Incorporating Amendment No. 1 Australian/New Zealand Standard Plumbing and drainage Part 4: Heated water services Superseding AS/NZS 3500.4:2003 AS/NZS 3500.4:2015 AS/NZS 3500.4:2015
More informationAustralian Standard. Fixed fire protection installations Pumpset systems AS AS 2941
AS 2941 2002 AS 2941 Australian Standard Fixed fire protection installations Pumpset systems This Australian Standard was prepared by Committee FP-008, Fire Service Pumps. It was approved on behalf of
More informationCERTIFICATION SAFETY & BEYOND
CERTIFICATION SAFETY & BEYOND Ferhun Emeksiz & R.M ( Max) Bradbury Client Manager & Fire Products Program Manager Global-Mark Pty Ltd Content Product Certification Understanding the framework Fundamental
More informationAustralian Standard. Fire hydrant installations. Part 1: System design, installation and commissioning AS
AS 2419.1 1994 (Incorporating Amendment Nos 1 and 2) AS 2419.1 1994 Australian Standard Fire hydrant installations Part 1: System design, installation and commissioning This Australian Standard was prepared
More informationAustralian/New Zealand Standard
AS/NZS 3500.4:2003 (Incorporating Amendment Nos 1 and 2) AS/NZS 3500.4:2003 Australian/New Zealand Standard Plumbing and drainage Part 4: Heated water services AS/NZS 3500.4:2003 This Joint Australian/New
More informationDomestic and Residential Fire Sprinklers Design Policy
Domestic and Residential Fire Sprinklers Design Policy Content Section Page No 1. Background: Fire Sprinklers 3 2. Scope 3 3. Types of Fire Sprinklers 3 4. Types of Supply 4 5. Operating pressures and
More informationFire Protection, Inspection and Testing Qualifications Forums. Jeremy Rose (Artibus Innovation) Chris Wyborn (FPA Australia)
Fire Protection, Inspection and Testing Qualifications Forums Presenters: Jeremy Rose (Artibus Innovation) Chris Wyborn (FPA Australia) Welcome Agenda New arrangements for training package development
More informationNZS 4517:2010. New Zealand Standard. Fire sprinkler systems for houses. Superseding NZS 4517:2002 NZS 4517:2010
New Zealand Standard Fire sprinkler systems for houses Superseding NZS 4517:2002 NZS 4517:2010 NZS 4517:2010 COMMITTEE REPRESENTATION This Standard was prepared under the supervision of the P 4517 Committee,
More informationHousehold and similar electrical appliances Safety
AS/NZS 60335.2.69:2012 (IEC 60335-2-69 Ed 4, MOD) Australian/New Zealand Standard Household and similar electrical appliances Safety Part 2.69: Particular requirements for wet and dry vacuum cleaners,
More informationAustralian Standard. Fire detection, warning, control and intercom systems System design, installation and commissioning. Part 1: Fire AS 1670.
AS 1670.1 2004 (Incorporating Amendment No. 1) AS 1670.1 2004 Australian Standard Fire detection, warning, control and intercom systems System design, installation and commissioning Part 1: Fire This Australian
More informationAS/NZS :2011. Household and similar electrical appliances Safety AS/NZS :2011. Part 1: General requirements
AS/NZS 60335.1:2011 (IEC 60335-1, Ed 5.2:2016, MOD) Incorporating Amendment No. 1, 2, 3 and 4 Australian/New Zealand Standard Household and similar electrical appliances Safety Part 1: General requirements
More informationAS/NZS :2009. Performance of household electrical appliances Refrigerating appliances AS/NZS :2009
AS/NZS 4474.2:2009 (Incorporating Amendment Nos 1 and 2) Australian/New Zealand Standard Performance of household electrical appliances Refrigerating appliances Part 2: Energy labelling and minimum energy
More informationFirefighting operations on automatic sprinklers systems F5-06 GD
DESIGNER S GUIDE Firefighting operations on automatic sprinklers systems F5-06 GD Introduction When to use Scope Use this chapter to provide a consistent Fire and Emergency New Zealand position on design
More informationQueensland Building Plan (Licensing Reform) FPA Australia Submission
Queensland Building Plan (Licensing Reform) FPA Australia Submission Table of contents 1.0 Executive Summary... 2 2.0 About FPA Australia... 3 3.0 Introduction... 6 4.0 Background... 6 5.0 Fire Occupational
More informationFirefighting operations on multi-tiered vehicle stacking buildings F5-13 GD
DESIGNER S GUIDE Firefighting operations on multi-tiered vehicle stacking buildings F5-13 GD Introduction When to use Scope Use this chapter to provide a consistent Fire and Emergency New Zealand position
More informationTechnical Seminar on the Code of Practice for Fire Safety in Buildings 2011
Technical Seminar on the Code of Practice for Fire Safety in Buildings 2011 The Code of Practice for Fire Safety in Buildings 2011 The FS Code comprises 7 parts and 1 annex: Part A Introduction Part B
More informationReport on First Revisions with Statement June 2014 NFPA 101
101 FR6005 SAF-BCF (32.2.1.1.2) Recommendation: 32.2.1.1.2 Where there are sleeping accommodations for more than 16 residents are provided, the occupancy shall be classified as a large facility in accordance
More informationDear Customer. Section Old F8 January 2017 Amendment 4. Replace with new title page and document history pages 1 2B
Dear Customer Please find enclosed Amendment 4, effective 14 February 2014, to the Acceptable Solution and Verification Method for Clause F8 Signs of the New Zealand Building Code. THe previous amendment
More informationAustralian Standard. Fire detection, warning, control and intercom systems Control and indicating equipment. Part 1: Fire
AS 4428.1 1998 (Incorporating Amendment No. 1) AS 4428.1 Australian Standard Fire detection, warning, control and intercom systems Control and Part 1: Fire This Australian Standard was prepared by Committee
More informationAS AS Australian Standard. Installation of fire hose reels. This is a free 6 page sample. Access the full version online.
AS 2441 2005 AS 2441 2005 Australian Standard Installation of fire hose reels This Australian Standard was prepared by Committee FP-007, Fire Hose Reels. It was approved on behalf of the Council of Standards
More informationWATER TEMPERATURE MANAGEMENT POLICY
WATER TEMPERATURE MANAGEMENT POLICY DOCUMENT DETAILS DOCUMENT NAME Water Temperature Management Policy NRS PERFORMANCE OUTCOME Housing Assets APPROVAL Board of Management VERSION 1.0 STATUS Draft ISSUED
More informationAustralian Standard. Emergency escape lighting and exit signs for buildings. Part 1: System design, installation and operation AS 2293.
AS 2293.1 2005 AS 2293.1 2005 Australian Standard Emergency escape lighting and exit signs for buildings Part 1: System design, installation and operation This Australian Standard was prepared by Committee
More informationMontgomery County Government Building and Codes Department 350 Pageant Lane, Suite 309 Clarksville, TN 37040
Montgomery County Government Building and Codes Department 350 Pageant Lane, Suite 309 Clarksville, TN 37040 SPRINKLER SHOP DRAWINGS 2007 NFPA 13 and 2007 NFPA 24 Project: Listed items require sprinkler
More informationAS/NZS IEC :2016
AS/NZS IEC 60601.2.2:2016 (IEC 60601-2-2, Ed.5.0 (2009) IEC 60601-2-2:2009/COR1:2014, IDT) Australian/New Zealand Standard Medical electrical equipment Part 2.2: Particular requirements for the basic safety
More informationAS/NZS :2016
Australian/New Zealand Standard Luminaires Part 2.2: Particular requirements Recessed luminaires Superseding AS/NZS 60598.2.2:2001 AS/NZS 60598.2.2:2016 (IEC 60598-2-2, Ed. 3.0:2011, MOD) Incorporating
More informationAS/NZS 4012:1999 AS/NZS
Australian/New Zealand Standard AS/NZS 4012:2014 Incorporating Amendment No. 1 Domestic solid fuel burning appliances Method for determination of power output and efficiency Superseding AS/NZS 4012:1999
More informationAustralian Standard. Degrees of protection provided by enclosures (IP Code) AS IEC Ed 2.1:2001 AS 60529
AS 60529 2004 IEC 60529 Ed 2.1:2001 AS 60529 Australian Standard Degrees of protection provided by enclosures (IP Code) This Australian Standard was prepared by Committee EL-026, Protective Enclosures
More informationAustralian/New Zealand Standard
AS/NZS 4586:2004 (Incorporating Amendment No. 1) AS/NZS 4586:2004 Australian/New Zealand Standard Slip resistance classification of new pedestrian surface materials AS/NZS 4586:2004 This Joint Australian/New
More informationDevelopments in Australian Standard AS (Emergency Lighting)
Developments in Australian Standard AS2293.2 (Emergency Lighting) Russell Porteous Chief Executive Officer, Firewize Australian Standards Committee LG-007 Disclaimer Firewize policy is one of continuous
More informationBaseline Data Required for AS
Baseline Data Required for AS 1851-2012 Name: Brett Dundules Position: Technical Officer Organisation Fire Protection Association Australia Introduction Brief History of AS 1851-2012 Introduction of Baseline
More informationEnvironmental Planning and Assessment Amendment (Smoke Alarms) Regulation 2006
New South Wales Environmental Planning and Assessment Amendment (Smoke Alarms) under the Environmental Planning and Assessment Act 1979 Her Excellency the Governor, with the advice of the Executive Council,
More informationAS/NZS 4821:2014. Protective footwear for firefighters Requirements and test methods AS/NZS 4821:2014. Australian/New Zealand Standard
Australian/New Zealand Standard AS/NZS 4821:2014 (EN 15090:2012, MOD) Protective footwear for firefighters Requirements and test methods Superseding AS/NZS 4821:2006 AS/NZS 4821:2014 This standard, is
More informationAustralian Standard. Automatic fire detection and alarm systems System design, installation, and commissioning AS
AS 1670 1986 Australian Standard Automatic fire detection and alarm systems System design, installation, and commissioning This Australian standard was prepared by Committee FP/2, Automatic Fire Detection
More informationAS/NZS :2009
Australian/New Zealand Standard AS/NZS 61558.2.6:2009 Incorporating Amendment No. 1 (IEC 61558-2-6 Ed 2, MOD) Safety of transformers, reactors, power supply units and similar products for supply voltages
More informationOccupational Health & Safety Practitioner. Reading BUILDING FIRE SAFETY
Occupational Health & Safety Practitioner Reading BUILDING FIRE SAFETY January 2009 Contents OVERVIEW...1 SECTION 1: INTRODUCTION...2 SECTION 2: BUILDING CLASSIFICATIONS...4 SECTION 3: PASSIVE AND ACTIVE
More informationAS/NZS 3190:2011 AS/NZS
AS/NZS 3190:2016 Australian/New Zealand Standard Approval and test specification Residual current devices (currentoperated earth-leakage devices) Superseding AS/NZS 3190:2011 AS/NZS 3190:2016 AS/NZS 3190:2016
More informationReview of Residential Fire Sprinkler Systems for One- and Two-Family Dwellings
Review of Residential Fire Sprinkler Systems for One- and Two-Family Dwellings Reprinted with permission from NFPA 13D Installation of Sprinkler Systems in One- and two-family Dwellings and Manufactured
More informationAustralian/New Zealand Standard
AS/NZS 3760:2003 (Incorporating Amendment No. 1) AS/NZS 3760:2003 Australian/New Zealand Standard In-service safety inspection and testing of electrical equipment AS/NZS 3760:2003 This Joint Australian/New
More informationFIRE SAFETY MANAGEMENT PLAN
FIRE SAFETY MANAGEMENT PLAN February 2014 2 Document Control Revision: 1 Date: 4 February 2014 Status: Document change control: Approved by EPC Revision # Change Description Date Author 1 Initial document
More informationClient Advisory Note June 2015:
Client Advisory Note June 2015: Topics: 1. Substantially revised Fire Alarm and Smoke Control Standards for proposed adoption in NCC Volume One BCA 2016; 2. Independent review of Building Professionals
More informationThe Code of Practice for Fire Safety in Buildings 2011 It comprises 7 parts and 1 annex:
The Code of Practice for Fire Safety in Buildings 2011 It comprises 7 parts and 1 annex: Mr. Junkers Lam Senior Building Surveyor of Buildings Department (9 Sept 2013) Part A Introduction Part B Means
More informationAustralian Standard. Components for the protection of openings in fire-resistant walls. Part 1: Fire-resistant doorsets AS AS 1905.
AS 1905.1 2005 AS 1905.1 2005 Australian Standard Components for the protection of openings in fire-resistant walls Part 1: Fire-resistant doorsets This Australian Standard was prepared by Committee FP-019,
More informationAS/NZS :1995. Emergency escape lighting and exit signs for buildings AS/NZS :1995. Part 2: Inspection and maintenance
Australia/New Zealand Standard AS/NZS 2293.2:1995 Incorporating Amendment No. 1, 2, and 3 Emergency escape lighting and exit signs for buildings Superseding in part NZS 6742:1971 and AS 2293.2 1987 AS/NZS
More informationA. Hydraulic calculations shall be prepared in accordance with Chapter 23 of NFPA 13 with the following exceptions:
SECTION 21 13 13 WET-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section
More informationCURTIN UNIVERSITY PROJECT DELIVERY GUIDELINES
CURTIN UNIVERSITY PROJECT DELIVERY GUIDELINES EMERGENCY MANAGEMENT DESIGN GUIDELINES 000331 Details of revisions Level Details Date Initial 1 Document created from 20150513NewBuildsAndRedevelopments.docx
More informationSouth Australian Regulatory Requirements
South Australian Regulatory Requirements Australian Legislative Framework Act Act of Parliament Establishes the Law Primary legislation Regulation Subordinate legislation authorised by a specific Act Therefore
More informationFollowing are the systems proposed as per NBC & Local Fire Authority:
1. OBJECTIVES AND STRATEGIES OF THE FIRE PROTECTION DESIGN This report describes the design parameters, system requirements of fire protection system for mixed occupancy (Assembly + Business) building
More informationFire protection on chemical manufacturing sites
CFPA-E No 18:2008 Fire protection on chemical manufacturing sites FOREWORD The European fire protection associations have decided to produce common guidelines in order to achieve similar interpretation
More informationSpecified Systems List
Specified Systems List Index: SS 1 Automatic systems for fire suppression SS 2 Automatic or manual emergency warning systems for fire or other dangers SS 3 Electromagnetic or automatic doors or windows
More informationFire Management Guide
Fire Management Guide Meeting day to day fire management obligations in WA requires reference to Health and Safety legislation, the Building Code of Australia, and multiple Australian Standards. This guide
More informationAustralian/New Zealand Standard
AS/NZS 1680.5:2012 AS/NZS 1680.5:2012 Australian/New Zealand Standard Interior and workplace lighting Part 5: Outdoor workplace lighting AS/NZS 1680.5:2012 This Joint Australian/New Zealand Standard was
More informationAustralian Standard. Gaseous fire extinguishing systems AS (Incorporating Amendment No. 1) AS
AS 4214 2002 (Incorporating Amendment No. 1) AS 4214 2002 Australian Standard Gaseous fire extinguishing systems This Australian Standard was prepared by Committee FP-011, Gaseous Fire Protection. It was
More information2004 AUSTRALIAN STANDARDS UPDATE
2004 AUSTRALIAN STANDARDS UPDATE PREPARED by Peter Parsons Chairman of SAI FP-002 Chairman of ISO TC 21/SC 3 TSP Strategic Product Management Kjell Jawerth Chairman FPA Aust. TC/2 Member SAI FP-002 TSP
More informationAS/NZS :2016. Refrigerating systems and heat pumps Safety and environmental requirements AS/NZS :2016. Part 3: Installation site
Australian/New Zealand Standard (ISO 5149-3:2014, MOD) Refrigerating systems and heat pumps Safety and environmental requirements Part 3: Installation site Superseding in part AS/NZS 1677.2:1998 This joint
More informationIllinois Fire Safety Alliance
The Benefits of Home Fire Sprinklers Illinois Fire Safety Alliance www.ifsa.org 847-390-0911 The Problem: Home Fires Fire kills more people in the United States annually than all natural disasters combined,
More informationTo: All SAAS Accredited Certification Bodies Subject: Clarification to Emergency and Health & Safety Requirements in the SA8000 Standard
SOCIAL ACCOUNTABILITY ACCREDITATION SERVICES To: All SAAS Accredited Certification Bodies Subject: Clarification to Emergency and Health & Safety Requirements in the SA8000 Standard Background: After an
More informationDRAFT COMBINED POSTAL BALLOT/ AUSTRALIAN / NEW ZEALAND STANDARD FOR COMMENT
COMMITTEE: EL-002 Safety of Household and Similar Electrical Appliances and Small Power Transformers ATTENTION: Bev Harniss DR 18926 CP DRAFT COMBINED POSTAL BALLOT/ AUSTRALIAN / NEW ZEALAND STANDARD FOR
More informationAS/NZS 4234:2008 AS/NZS
AS/NZS 4234:2008 Incorporating Amendment No. 1, 2, and 3 Australian/New Zealand Standard Heated water systems Calculation of energy consumption Superseding AS/NZS 4234:2008 AS/NZS 4234:2008 AS/NZS 4234:2008
More informationBritish Columbia Building Code 2006 Division B Part 3 Fire Protection, Occupant Safety and Accessibility Section 3.2 Building Fire Safety
Div B 3.2.1.1.(4), (5) & (6) Exceptions in Determining Building Height BCBC1998-3.2.1.1.(4), (5) & (7) replace (harmonize with NBC) - NBC 2005 has significant revisions to provisions for mezzanines. These
More informationApplication Form. Qualified Accreditation
Inspect and Test Application Form Qualified Accreditation Application Process Important Note: Please ensure you have read the Qualified Accreditation FACT SHEET available on: http://www.fpaa.com.au/fpas/factsheets-application-forms
More informationFire Protection Accreditation Scheme (FPAS)
Fire Protection Scheme (FPAS) A voluntary accreditation scheme for the fire protection industry covering inspect and test activities Information Guide December 2013 Fire Protection Association Australia
More informationSUMEDD03 Endorse the Positioning, Fixing and Fitting of Electrical Wiring Systems, Wiring Enclosures, Equipment and
Endorse the Positioning, Fixing and Fitting of Electrical Wiring Systems, Wiring Enclosures, Equipment and Accessories In Dwellings In Accordance with Building Regulations Overview This standard is for
More informationBUILDING CODE ACCESS CONSULTING ESSENTIAL SERVICES
Essential Safety Measures - Fire & Smoke Control of Mechanical Services Antony Rickards Building Compliance BUILDING CODE ACCESS CONSULTING ESSENTIAL SERVICES Essential Safety Measures What we will cover.
More informationScope of Section 2. AS vs. Application Issues. Schedules & Log- Contents. Books
Contents Scope of Section 2 Application Issues AS 1851-1997 vs 2005 Schedules & Log- Books Scope of AS1851 Section 2 Review and rewrite of all sprinkler maintenance activities AS 1851.3 1997 becomes General
More informationAS/NZS :2008
AS/NZS 60079.29.2:2008 Australian/New Zealand Standard Explosive atmospheres Part 29.2: Gas detectors Selection, installation, use and maintenance of detectors for flammable gases and oxygen AS/NZS 60079.29.2:2008
More informationBuilding Standards Division. Whisky Maturation Warehouses Storage Buildings (Class 1) Automatic Fire Suppression Systems
Building Standards Division Whisky Maturation Warehouses Storage Buildings (Class 1) Automatic Fire Suppression Systems Crown Copyright 2015 Produced by the Buildings Standards Division February 2015 Version
More informationPROPOSED CODE CHANGES FOR REVIEW BY THE FIRE CODE ACTION COMMITTEE
PROPOSED CODE CHANGES FOR REVIEW BY THE FIRE CODE ACTION COMMITTEE Developed by the Midwestern Regional Work Group CONTENTS Item 15 Limited area sprinkler systems Item 20 Scope of IFC Ch 7 Item 21 Fire-resistance-rated
More informationSprinkler Permit Applications
REQUIREMENTS FOR NFPA 13 SYSTEM Building Inspections Sprinkler Permit Applications A complete application for a Sprinkler Permit will comply with the requirements of Chapter 8 of NFPA 13. Hydraulic calculations
More informationDear Customer. Please find attached the January 2017 amendments to C/AS4 Acceptable Solution for Buildings with. Innovation and Employment.
Dear Customer Please find attached the January 2017 amendments to C/AS4 Acceptable Solution for Buildings with Public Access and Educational Facilities (Risk Group CA), published by the Ministry of Business,
More informationBlack Diamond Fire Department Building Owner s Responsibilities for Fire Safety Equipment
Black Diamond Fire Department Building Owner s Responsibilities for Fire Safety Equipment February 2017 Alberta Fire Code safety equipment maintenance requirements: The Black Diamond Fire Department has
More informationFire detection and alarm systems. Part 4: Power supply equipment (ISO :2003, MOD) AS (Incorporating Amendment No.
AS 7240.4 2004 (Incorporating Amendment No. 1) AS 7240.4 2004 Fire detection and alarm systems Part 4: Power supply equipment (ISO 7240-4:2003, MOD) This Australian Standard was prepared by Committee FP-002,
More informationAgency for Health Care Administration
Page 1 of 51 FED - K0000 - INITIAL COMMENTS Title INITIAL COMMENTS CFR Type Memo Tag FED - K0130 - MISCELLANEOUS Title MISCELLANEOUS OTHER LSC DEFICIENCY NOT ON 2786 FED - K9999 - FINAL OBSERVATIONS Title
More informationERRATA TO THE 2000 INTERNATIONAL FIRE CODE. Fourth Printing, January 2002 Updated March 29, 2002
ERRATA TO THE 2000 INTERNATIONAL FIRE CODE Fourth Printing, January 2002 Updated March 29, 2002 Table 2306.2 General Fire Protection and Life Safety Requirements In column 2 (Size of High Piled Storage
More informationAS/NZS :2014. Electrical equipment for coal mines Introduction, inspection and maintenance AS/NZS :2014. Part 1: For hazardous areas
AS/NZS 2290.1:2014 Australian/New Zealand Standard Electrical equipment for coal mines Introduction, inspection and maintenance Part 1: For hazardous areas Superseding AS/NZS 2290.1:2005 AS/NZS 2290.1:2014
More informationZurn Pex, Inc. Residential Fire Protection Presentation. PEX Plumbing, Radiant Heating and Residential Fire Protection Systems
Residential Fire Protection Presentation Zurn Pex, Inc PEX Plumbing, Radiant Heating and Residential Fire Protection Systems Matt Lawrence BDM-North Central Region 1 Presentation Outline I. IRC Mandate
More informationSECTION (13900) - FIRE SUPPRESSION SYSTEMS
PART 1 GENERAL 1.01 SUMMARY SECTION 21 10 00 (13900) - FIRE SUPPRESSION SYSTEMS A. Section Includes: 1. Pipe and Fittings. 2. Sprinklers. B. Related Documents: 1. Marriott s Fire Protection and Life Safety
More informationSCHEDULE. Essential Safety Measures taken from Schedule 9 of the Building Regulations PART 1 BUILDING FIRE INTEGRITY
SCHEDULE Essential s taken from Schedule 9 of the Building Regulations 2006 43 PART 1 BUILDING FIRE INTEGRITY 1 Building elements required to satisfy prescribed fire-resistance levels 2 Materials and assemblies
More informationAustralian Standard. Fire protection for mobile and transportable equipment AS AS
AS 5062 2006 AS 5062 2006 Australian Standard Fire protection for mobile and transportable equipment This Australian Standard was prepared by Committee FP-022, Fire Protection of Mobile Transportable Equipment.
More informationRecommended Amendments to the 2015 International Existing Building Code North Central Texas Council of Governments Region
Recommended Amendments to the 2015 International Existing Building Code North Central Texas Council of Governments Region The following sections, paragraphs, and sentences of the 2015 International Existing
More informationARCHIVED. Compliance Document for New Zealand Building Code Clause G4 Ventilation Second Edition. Prepared by the Department of Building and Housing
Compliance Document for New Zealand Building Code Clause G4 Ventilation Second Edition Prepared by the Department of Building and Housing This Compliance Document is prepared by the Department of Building
More informationAS/NZS :2015
AS/NZS 60598.2.10:2015 (IEC 60598.2.10, Ed.2.0:2003, MOD) Australian/New Zealand Standard Luminaires Part 2.10: Particular requirements Portable luminaires for children Superseding AS/NZS 60598.2.10:1998
More informationCommittee Input No. 28-NFPA 13R-2013 [ Global Input ]
Page 1 of 6 Committee Input No. 28-NFPA 13R-2013 [ Global Input ] 6.2.2 Outside Dwelling Units. 6.2.2.1 All sprinklers used outside of the dwelling units shall be in accordance with 6.2.2 7.2 and 7.3.
More informationDispute over the requirement for fire door signage to hotel suites at 124 Devon Street West, New Plymouth
Determination 2016/058 Dispute over the requirement for fire door signage to hotel suites at 124 Devon Street West, New Plymouth Summary This determination considers whether signage is required between
More informationPLUMBING AND SERVICES. TRAINING PACKAGE. CPC08. CPCPWT3030A. Install home fire sprinkler systems.
PLUMBING AND SERVICES. TRAINING PACKAGE. CPC08. CPCPWT3030A. Install home fire sprinkler systems. LEARNING GUIDE. ACKNOWLEDGEMENTS National Plumbing Services Training Advisory Group Plumbing Industry Commission
More informationHot water safety in bathrooms
Consumer Factsheet Hot water safety in bathrooms The purpose of this factsheet is to assist people to have hot water at a safe temperature. Hot water in the bathroom can be a hazard if the temperature
More informationAustralian Standard. Smoke alarms. AS (Incorporating Amendment Nos 1, 2, 3 and 4) AS 3786
AS 3786 1993 (Incorporating Amendment Nos 1, 2, 3 and 4) AS 3786 Australian Standard Smoke alarms This Australian Standard was prepared by Committee FP-002, Automatic Fire Detection and Alarm Systems.
More informationInternational Water Mist Conference, Istanbul October 22-23, 2014 The background and development of the guidelines in IMO Resolution A.
International Water Mist Conference, Istanbul October 22-23, 2014 The background and development of the guidelines in IMO Resolution A.800(19) Magnus Arvidson SP Fire Research SP Technical Research Institute
More informationMAINTENANCE OF ESSENTIAL SAFETY MEASURES EXPLAINED (Building Regulations 2006)
MAINTENANCE OF ESSENTIAL SAFETY MEASURES EXPLAINED (Building Regulations 2006) 1. INTRODUCTION 1.1 Essential Safety Measures Defined Essential Safety Measures (previously called essential services) are
More informationModule 3. Water-Based Suppression Systems (WBSS) Part II: Highlights of Code Requirements
Module 3 Water-Based Suppression Systems (WBSS) Part II: Highlights of Code Requirements 1 WATER-BASED SUPPRESSION SYSTEMS-PART TWO This module covers: 1. Ohio Building Code requirements and when and why
More informationAustralian/New Zealand Standard
AS/NZS 61779.6:2000 (Incorporating Amendment No. 1) AS/NZS 61779.6:2000 Australian/New Zealand Standard Electrical apparatus for the detection and measurement of flammable gases Part 6: Guide for the selection,
More informationBCBC 2012 CHANGES TO PART 3
BCBC 2012 CHANGES TO PART 3 Focus on changes that will have an practical effect. Basic concepts reviewed details to be confirmed. Material from Part 3 and related material from Part 9 Generally a harmonization
More informationRequirements for the protection of High-Piled Combustible Storage (HPCS) Effective Date: January 2011
1.0 GENERAL: Requirements for the protection of High-Piled Combustible Storage (HPCS) Effective Date: January 2011 1.1 PURPOSE -The intent of this guideline is to provide the requirements for the protection
More informationEL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD
EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD STANDARD #F-002 EFFECTIVE 05-27-2009 PURPOSE: To define the requirements for a License. To facilitate the quick application and review of new or changed
More informationWinnipeg Fire Department Fire Prevention Branch
Winnipeg Fire Department Fire Prevention Branch Manitoba Fire Code Life-Safety Equipment Maintenance Requirements The Fire Prevention Branch of the Winnipeg Fire Department has prepared this document of
More informationDraft for Comment Please comments to Part A(i)
Draft for Comment Please email comments to info@plcouncil.com.au Part A(i) PRODUCT SPECIFICATION OF PHOTOLUMINESCENT EXIT SIGNS (v2.1) SECTION 1 - PRINCIPLES 1.1 Scope This standard sets out the product
More informationPRESSURE SEWER SYSTEMS GUIDE FOR HOME OWNERS AND BUILDERS
PRESSURE SEWER SYSTEMS GUIDE FOR HOME OWNERS AND BUILDERS VERSION: 1.0 VERSION: 1.0 Pressure Sewer Hydraulic Design Guidelines 1 Version: 1.0 Page 1 of 15 Contents 1 Introduction... 4 Pressure Sewer System
More information