MITIGATED DETERMINATION OF NON-SIGNIFICANCE (MDNS) WAC

Size: px
Start display at page:

Download "MITIGATED DETERMINATION OF NON-SIGNIFICANCE (MDNS) WAC"

Transcription

1 MITIGATED DETERMINATION OF NON-SIGNIFICANCE (MDNS) WAC Project Name: Prologis Park Tacoma Description of proposal: The proposal consists of the construction of up to four office/warehouse buildings totaling approximately 1,746,350 square feet and associated utilities, parking, driveways, and landscaping on an approximate 80.7-acre site. Extension and construction of utilities onsite and offsite includes water (domestic, fire, storm), sanitary sewer, power, natural gas, and other franchise utilities. The existing Tacoma/Fife city limit line along the project s entire 12th St E frontage (between 46th Ave E and 52nd Ave E) will be adjusted northward to avoid impacts to existing residences and businesses, and to allow improvements to be built along 12th St E to be entirely in the City of Fife. A portion of the existing Tacoma/Fife city limit line north and south of 8th St E will be adjusted in conjunction with property line adjustments to account for existing building encroachments such that the building encroachments are entirely in the City of Fife. Additional right-of-way along 8th St E will be acquired and dedicated to the City of Fife to encompass the new street improvements. The proposal includes mitigation measures including, but not limited to, a vegetated berm and fence constructed along the frontage of 12th St E, 8 th and 12 th St E street improvements, Willow Rd sidewalk improvement, 54 th Ave E improvements, SR 509 improvements at Taylor Way and Alexander Ave E, and monetary contributions for a future Pacific Highway/54th Ave E intersection improvement and for City of Fife traffic impact fees. Proponent: Prologis, Inc. Location of proposal, including street address, if any: The majority of the proposal will be on property located between 12 th St E and S.R.509, and between a reference point of approximately 46 th Ave E and 52 nd Ave E in Tacoma, WA, Pierce County (NE & SE quarters of Section 1, T20N, R3E, W.M.). Additional offsite improvements are located on Willow Rd, 8 th and 12 th St E (approximately west of 54 th Ave E), 54 th Ave E, and SR 509 (at Taylor Way and Alexander Ave E) in Fife and Tacoma, WA. Lead agency: The lead agency for this proposal has determined that the project does not have a probable significant adverse impact on the environment. The attached mitigation measures in Attachments A and B have been identified to mitigate probable significant adverse impacts of the proposal. Advisory notes are provided in Attachment C. An environmental impact statement (EIS) is not required under Revised Code of Washington (RCW) 43.21C.030(2)(c). This decision was made after review of a completed environmental checklist and other information on file with the lead agency. The MDNS and Attachments A, B, and C, as well as, additional project and/or State Environmental Policy Act (SEPA) information is available upon request at the s Administration building, located at One Sitcum Plaza, Tacoma, WA or at the Port s website at The lead agency s SEPA policy can be found at

2

3 Attachment A MITIGATION MEASURES Prologis Park Tacoma The probable environmental impacts of this proposal have been documented and are found in the environmental checklist and other information on file with the lead agency. Mitigation measures are permitted under the substantive authority of SEPA in accordance with Port policy. The below conditions have been identified as mitigation measures to mitigate probable significant adverse impacts of the proposal based on the environmental checklist and other information on file with the lead agency: Preserve Cultural Resources. The application proposes construction within the Puyallup Tribe of Indians reservation lands. 1. Cultural resource assessments of on-site and off-site improvement areas have been prepared for the project and submitted to the Puyallup Tribe of Indians. These assessments will inform the cities of Fife and Tacoma s engineering and permit review. The applicant, including all contractors and subcontractors, shall implement the associated inadvertent discovery plan during construction. Adjust Corporate City Limits. The application proposes adjusting northward the existing Tacoma/Fife city limit line along the projects entire 12 th St E frontage (between 46 th Ave E and 52 nd Ave E) to avoid impacts to existing residences and businesses and to allow improvements to be built along 12 th St E to be entirely in Fife and built to Fife standards. A portion of the existing Tacoma/Fife city limit line north and south of 8 th St E will be adjusted in conjunction with property line adjustments to account for existing building encroachments. Additional right-of-way along 8 th St E will be acquired and dedicated to the City of Fife to encompass the new street improvements. 2. The applicant and shall provide all the documents necessary to dedicate the necessary right-of-way to the City of Fife to encompass the 8 th St E improvements, and to support the adjustment of the municipal boundaries between the cities of Fife and Tacoma such that the entire 12th St E road section between 46 th St E and 52 nd St E, and the building encroachments near 8 th St E, are within the City of Fife. 3. The applicant and shall provide all the documents necessary to the cities of Fife and Tacoma addressing municipal engineering design standards, responsibilities for engineering and building plan review, construction inspection, maintenance, easements, general facility charges, and utility rates. Conduct Street Improvements. The application proposes constructing a sidewalk extension on Willow Rd E and widening the project s 12 th St E frontage (between 46 th Ave E and 52 nd Ave E) and 8 th St E west of, and including, a full 54 th Ave E intersection to current City of Fife engineering street standards. In addition, the applicant shall make contributions for other traffic, pedestrian, and emergency response improvements as detailed below. 4. The applicant shall acquire and dedicate to the City of Fife, and other appropriate jurisdictions, any and all rights-of-way necessary to facilitate installation of all 8 th St E and 12 th St E frontage and utility facilities. 5. Conditions 16, 17, and 18 (Attachment B Transportation, Pedestrian, and Emergency Service Improvements) shall be completed by the applicant to the satisfaction of the City of Fife Public Works Director prior to the first certificate of occupancy (COO) being issued for any of the Threshold Determination MDNS Page 3 Proposal Prologis Park Tacoma

4 buildings. If requested by the Applicant (with sufficient documentation showing safe ingress, egress, and no unmitigated significant adverse traffic impacts), COO s shall be issued for up to two buildings, excluding building(s) along 12th St E, with construction completed for a City of Fife Public Works Director approved phased build-out of Condition 16 (i.e., two traffic lanes) and appropriate bonding for any remaining work to complete the entire Condition 16. (Note: Attachment B contains SEPA conditions which are appealable and have the full force and effect on the permits.) 6. Except for emergency and construction vehicle access, Conditions 16 through 30 (Attachment B Transportation, Pedestrian, and Emergency Service Improvements) shall be completed to the satisfaction of the Public Works Directors (PWDs) of the cities of Fife and Tacoma prior to any vehicular access from the middle or west 12 th St E entrances. Access from the east entrance along 12 th St E will be allowed for any purpose during construction related to Condition 5 above. 7. If the use changes from what is presented in the Updated Transportation Impact Study (TIS) dated April 19, 2016 prepared by Transportation Engineering Northwest (TENW), the applicant shall retain a transportation consultant to conduct a study to determine if there would be any increase in peak hour trips generated by the change in use. The study shall be submitted to the PWDs, who will have the joint authority to require additional transportation improvements proportional to any increase in peak hour trips beyond those projected in the above-referenced TIS. Any mitigation identified by the PWDs through a potential future study would be required to be financially guaranteed prior to building permit issuance associated with the change in use. Install Water Services. The application proposes to connect to the City of Fife municipal water system. The water system has capacity to serve the project subject to the applicant installing and looping the proposed system to municipal engineering standards. 8. The applicant shall facilitate negotiations and provide all necessary information requested by the cities of Fife and Tacoma concerning municipal water service to enable the establishment of an agreement between Tacoma Public Utilities (TPU) Tacoma Water and the City of Fife that will address design, construction, installation, testing, maintenance, easements, and general facility charges and utility billing. Fire suppression and fire hydrants shall be designed, installed, tested, and maintained as required by the agreement and by the Tacoma Fire Department. Install Sewer Services. The application proposes to connect to the City of Fife municipal sewer system. The sewer system has capacity to serve the project subject to the applicant installing the proposed system to meet municipal engineering standards. 9. The applicant shall facilitate negotiations and provide all necessary information requested by the cities of Fife and Tacoma concerning municipal sewer service to enable the establishment of an agreement between the City of Tacoma Environmental Services and the City of Fife that will address design, construction, installation, testing, maintenance, easements, and general facility charges and utility billing. Threshold Determination MDNS Page 4

5 Erosion Control and Stormwater Facilities. The application proposes construction erosion control measures and stormwater facilities meeting the current Department of Ecology drainage design and erosion control standards. 10. The applicant shall construct stormwater infrastructure for the 8 th St E and 12 th St E improvements as required by the City of Fife as part of the design of the street improvements. 11. The applicant shall design, construct, and maintain onsite stormwater facilities in accordance with the current City of Tacoma Stormwater Management Manual (SWMM) and the Stormwater Management Guidance Manual (SWMGM). The will lead the stormwater review and act in collaboration with the cities of Fife and Tacoma. This will include among others: a. Install and maintain features that protect Wapato Creek and prevent damage to habitat and fisheries. b. Erosion control measures must be in place prior to any clearing, grading, or construction. These control measures must be effective to prevent sediment or sediment laden water from being carried to state waters through Wapato Creek and Fife/Drainage District 23 ditch. c. Stormwater requirements, including flow control, shall be implemented as required by the SWMM and SWMGM. d. Coverage under the National Pollution Discharge Elimination System (NPDES) and State Waste Discharge General Permit for Stormwater Discharges Associated with Construction Activities is required for construction sites which disturb an area of one acre or more and which have or will have a discharge of stormwater to surface water or a storm sewer. An application can be downloaded from Ecology's website at Upgrade Electricity service. The application proposes extending new electrical service to serve the project. 12. The applicant shall apply for electrical service from Tacoma Power. Tacoma Power, in cooperation with the applicant, will design the primary (13.8kV) distribution system within the site. The applicant will install the civil infrastructure to Tacoma Power standards and requirements with minimal disruption service to existing customers. This will include: a. Existing overhead 115kV and 13.8kV power lines within easements onsite shall remain overhead and site development within the easements shall be coordinated with Tacoma Power. b. Existing overhead 12.5kV power lines within the 12th St E right-of-way will be converted to underground lines per Tacoma Power and City of Fife requirements along the project s 12th St E frontage. The applicant will include within their right-of-way improvement design and contract conduit and vault systems required by Tacoma Power. c. Extension of the 13.8kV distribution system from the existing overhead lines onsite shall be designed and installed as an underground system. Threshold Determination MDNS Page 5

6 Mitigate Noise and Light Emissions. A portion of the proposal is adjacent to residential homes located south across 12 th St E between 46 th Ave E and approximately 49 th Ave E. The applicant s proposal and the below conditions provide measures to mitigate the potential impacts from noise and light from the proposal (trucks, on-site security lighting, utilities, mechanical, HVAC & generator equipment, solid waste facilities, and warehouse operations) as follows: 13. The applicant shall construct and maintain in a healthy condition (in perpetuity to City of Fife standards) a densely landscaped earthen berm and 8-foot tall cedar fence extending the length of the north side of the 12 th St E frontage (with the exceptions of three vehicular access driveways). The width and height shall be based upon final street alignment and grade and will provide a buffer height as depicted on the applicants proposed cross sections that varies between 16 4 to 19 6 (as measured from the 12 th St E final grade pursuant to the applicants November 10, 2015 cross sections A- D). This will include: a. An earthen berm width between approximately and b. Berm height between approximately 8 4 and 11 6 from the 12 th St E final grade. c. Berm topped with an 8-foot tall non-see through cedar wooden fence (i.e., not split rail). d. Dense landscape screen that provides an aesthetic mix including a variety of deciduous and evergreen trees and shrubs to buffer the impacts on existing residences, businesses, and the future City Center and preserve the aesthetics of a residential neighborhood. 14. The applicant shall install wall pack lights, yard parking lighting, and signage at minimum heights with effective directional shields that prevent light spillage off-site. 15. The applicant s warehouse, manufacturing and trucking operations shall comply with strict enforcement adherence with state noise limitations (WAC ). For adjacent residences, onsite noise shall not exceed 50 dba between 10:00 PM to 7:00 AM; and 60 dba 7:00 AM to 10:00 PM, as detailed by WAC This will include: a. Construction shall be limited to 7:00 AM and 6:00 PM weekdays with no construction before 9:00 AM on Saturday and Sundays (start time to include warm-up of machinery/heavy equipment considered part of construction). b. Solid waste & recycling containers shall be setback at least 500-ft from 12 th St E residences. c. Roof-top mechanical equipment on Building A visible from the 12 th St E residences and utilities along south side of building A (including generators) shall be screened. d. Forklifts operating on the site will be equipped with broadband backup beepers to minimize noise impacts. e. The applicant shall install signage and maintain provisions to ensure that no long-term idling of trucks, air brake releases without mufflers, or trucks and/or trailers with operating refrigeration units, are permitted within the parking area along 12 th St E west of the center driveway entrance between 10:00 PM to 7:00 AM. f. Provide electrical connections for refrigeration units at adjacent south-facing loading docks west of the 12 th St center entrance when there are refrigeration units operating in that location. g. All loudspeaker systems shall comply with state noise limitations Threshold Determination MDNS Page 6

7 Attachment B TRANSPORTATION, PEDESTRIAN, AND EMERGENCY SERVICE IMPROVEMENTS Prologis POT 14 Vehicular traffic is projected to increase per the Updated Transportation Impact Study (TIS) dated April 19, 2016 by Transportation Engineering Northwest (TENW). Response time for emergency services can be impacted by traffic congestion. Currently no bicyclists or pedestrian infrastructure is located on 8 th St E, 12 th Street E, or Willow Rd. The following MDNS Conditions provide mitigation in these categories (numbering is continued from Attachment A): 16. 8th St E to the west of 54th Ave E shall be improved by the applicant to a three-lane section per City of Fife street standards with street illumination, curb, gutter, four-foot planter, sidewalk (north side) and left turn lane and taper on westbound approach. Additional improvements at the 8th St E. and 54th Ave E intersection will include relocating Fife s 8th St E sewer pump station, widening the curb radius and providing additional sidewalks as well as reconstruction of the existing traffic signal and mast arms and utility relocations. The traffic signal will be furnished with a CCTV camera and associated wiring, equipment and controller components to provide a video feed for remote viewing. These additional CCTV provisions are being offered as the developer s contribution to support ITS (Intelligent Transportation System) needs to the Tacoma tide flats. 17. The applicant shall provide Do Not Block Intersection signage at the 54 th Ave E and 4 th St E, and 54 th Ave E and Taylor Way E intersections to the satisfaction of the City of Fife PWD. 18. The applicant shall pay the $16, pro-rata share contribution fee, as calculated in the April 19, 2016 TIS, to the City of Fife for planned traffic improvements at the intersection of 54th Ave E and Pacific Hwy to improve signalization and traffic flow. Credits against the fees will be in accordance with FMC Access to the property is proposed at 8th St E and at three locations along 12th St E (at approximately 46th Ave E, 175-lineal feet east of 49th Ave E (aka Wapato St E,) and 52nd Ave E th St E shall be improved by the applicant to a three-lane section per City of Fife street standards with a center two-way left-turn lane, bike lanes both sides, and a sidewalk on the south side of the roadway extending across the projects frontage (from the 46th Ave E westerly driveway entrance to connect with existing improvements near 52nd Ave E). The design will provide for pedestrian safety and emergency vehicle access. 21. As required and approved by the PWDs, applicant shall install a concrete-island, curbs, and signage within the existing right-of-way on 12 th St E at the intersection of Alexander Ave E th Ave E and 12th St E intersection, shall be improved by the applicant with a proposed site access on the north leg of the 46th Ave E and 12th St E intersection. The intersection will be designed with curb bulb-outs and raised/colored concrete-street features that narrow lanes, and signage to prohibit project related semi-trucks and trailers from using 46th Ave E and 12th St E west of 46th Ave E. The intersection will be constructed with input from the Puyallup Tribe of Indians and as approved by the City of Fife PWD. A conceptual plan is included in the proposed SEPA plans. 23. The applicant shall improve the pedestrian crosswalk on southbound approach at the 46th Ave E /Pacific Hwy intersection. 24. The applicant shall install bicycle and accessible pedestrian sidewalk intersection features at the 12 th St E sidewalk intersections of 47 th Ave E; Willow Rd, and 49 th Ave E designed with curbs and street marking features that narrow lanes, and signage to prohibit trucks from using these side streets as approved by the City of Fife PWD. Threshold Determination MDNS Page 7 Proposal Prologis Park Tacoma

8 25. In-lieu of planting street trees along the south side of 12 th St E, the applicant shall offer to each residential property owner that abuts 12 th St E a standard City of Fife street tree to be selected and planted by the Property owner. 26. The applicant shall install an at-grade sidewalk extensions between 12th St E and Pacific Hwy within existing right-of-way as a pedestrian link on Willow Rd E. 27. The applicant shall coordinate and maintain reasonable pedestrian and vehicle access to the 12 th St E and Willow Rd property owners throughout the course of street improvements and to include acceptable transitions to existing improvements as determined by the Fife City PWD. 28. The applicant is responsible for paying traffic impact fees to City of Fife as calculated per the TIS dated April 19, Credits against the impact fees will be in accordance with FMC The applicant shall provide updated signal timing sheets to the City of Tacoma to assist in the optimization of the north and south intersections of Alexander Ave E and SR 509. The applicant shall be responsible for paying any associated City of Tacoma right-of-way work order agreement costs. In lieu of the above signal timing improvement, upon mutual agreement between the City of Tacoma and the applicant, the applicant shall provide a monetary contribution toward a future improvement at this intersection in the amount corresponding to the above improvement. 30. If approved by WSDOT, at the intersection of Taylor Way E and SR 509, the applicant shall provide additional left-turn storage at the westbound left turn pocket on SR 509 to address the deficiencies identified in the above-referenced TIS for the City of Tacoma. In lieu of constructing the improvement, upon mutual agreement between the City of Tacoma and the applicant, the applicant shall provide a monetary contribution toward a future improvement at this intersection in the amount corresponding to the above improvement. Threshold Determination MDNS Page 8

9 Attachment C ADVISORY NOTES TO APPLICANT Prologis POT 14 The following notes are supplemental information provided by the City of Tacoma, City of Fife, Puyallup Tribe of Indians, and Tacoma Public Utilities that is being provided in conjunction with the SEPA threshold determination as information to the applicant. Because these notes are provided as information only, and are not mitigation measures, they are not subject to the SEPA appeal process. Electric Service 1. Electric service shall be constructed as indicated in the SEPA MDNS Conditions in coordination with Tacoma Public Utilities (Tacoma Power). Applicant is required to complete an Electric Service Application and submit plans and payment to Tacoma Power for application review. Storm and Sanitary Sewers (within City of Tacoma) 2. The proposal shall comply with all applicable requirements contained in the City of Tacoma Stormwater Management Manual (and the Stormwater Management Guidance Manual, as applicable), Side Sewer and Sanitary Sewer Availability Manual, Tacoma Municipal Code 12.08, Tacoma Municipal Code 2.19, Tacoma Municipal Code 10.14, Tacoma Municipal Code and the Public Works Design Manual in effect at time of vesting land use actions, building or construction permitting. 3. Any utility construction, relocation, or adjustment costs shall be at the applicant's expense. 4. All stormwater shall be managed in compliance with the City of Tacoma Stormwater Management Manual (SWMM) and the Stormwater Management Guidance Manual, as applicable. 5. Unless determined otherwise, each lot/building shall be independently connected to the City sanitary sewer at the building construction stage. Permits for this work shall be obtained. Multiple units and buildings that are under single ownership and located on a single parcel may use shared private side sewers that connect to the public sanitary sewer. In the event that this development is divided into more than one parcel in the future (whether from platting, boundary line adjustments, lot segregations, or any other land use actions), each new parcel shall have an individual side sewer connection to the public sanitary sewer. This may require re-routing any existing shared side sewers, or constructing new side sewers in order to individually connect each parcel to the public sanitary sewer. A public sanitary sewer extension may also be required in order to individually connect each parcel. Notice of this requirement will be recorded on title of this parcel. 6. An online version of the City of Tacoma Stormwater Management Manual is available at 7. An online version of the City of Tacoma Side Sewer and Sanitary Sewer Availability Manual is available at 8. An online version of the Public Works Design Manual is available at Threshold Determination MDNS Page 9 Proposal Prologis Park Tacoma

10 Streets, Driveways, and Sidewalks 9. Traffic and pedestrian offsite improvements shall be constructed and implemented according to the proposal and as indicated in the SEPA MDNS Conditions. Critical Areas (City of Tacoma) 10. During development permitting, critical areas, including 100-year floodplains, need to be accurately described and evaluated for the site. 11. If buildings are located within a 100-year floodplain, buildings which store materials which would be hazardous in flood waters must have finished floors elevated to 3 feet above Base Flood Elevation (BFE). This required minimum floor elevation (BFE+3 ) is Elevation 19.0 ft NAVD 88 datum. Note that this requirement extends into the X Zone also. Potable and Fire Water 12. Potable and fire water systems shall be constructed as indicated in the SEPA MDNS Conditions. Coordination and agreements (as necessary) are needed with Tacoma Public Utilities (Tacoma Water), City of Fife, and Tacoma Fire Department. Unless determined otherwise through the aforementioned coordination or agreements, the below City of Tacoma advisory notes would be applicable: 13. City of Tacoma ordinance requires a separate water service and meter for each parcel. 14. Extension of a permanent water main may be constructed by private contract. The applicant of the privately financed project will be responsible for all costs and expenses incurred by Tacoma Water for preparation of plans and specifications, construction inspection, testing, flushing, sampling of the mains, and other related work necessary to complete the new water main construction to Tacoma Water standards and specifications. The engineering charge for the preparation of plans and specifications will be estimated by Tacoma Water. The applicant will be required to pay a deposit in the amount of the estimated cost. The actual costs for the work will be billed against the applicant s deposit. The new mains will be installed by and at the expense of the applicant. The applicant will be required to provide a 20-foot wide easement over the entire length of the water main, fire hydrant, service laterals and meters. The applicant s Professional Land Surveyor shall prepare and submit the legal description of the easement to Tacoma Water for review and processing. Prior to construction, a second deposit in the estimated amount for construction inspection, testing, and sampling will be due to Tacoma Water. Upon completion of the project, the applicant will be either refunded the unused amount of the deposit or billed the cost overrun. Approximate design time is ten weeks. 15. Customer is advised to obtain private utility easements for any property-side water pipes leading from the City meter to the building on any portion(s) existing on adjacent parcels. 16. If fire sprinklering is required, contact the Tacoma Water Permit Counter at (253) for policies related to combination fire/domestic water service connections. 17. The Uniform Plumbing Code requires that a pressure-reducing valve (PRV) be installed on the customer's property side service line if pressure exceeds 80 PSI. Threshold Determination MDNS Page 10

11 18. New water services will be installed by Tacoma Water after payment of the Service Construction Charge and the Water Main Charge. New meters will be installed by Tacoma Water after payment of the System Development Charge. 19. If a new fire hydrant is required at a location with an existing water main, the hydrant will be installed by Tacoma Water after payment of an installation charge. 20. If existing water facilities need to be relocated or adjusted due to street improvements for this proposal they will be relocated by Tacoma Water at the applicant s expense. 21. Sanitary sewer mains and side-sewers shall maintain a minimum horizontal separation of ten feet from all water mains and water services. When extraordinary circumstances dictate the minimum horizontal separation is not achievable, the methods of protecting water facilities shall be in accordance with the most current State of Washington, Department of Ecology Criteria For Sewage Works Design. Traffic and Emergency Response 22. During preliminary project planning, the City of Fife, City of Tacoma, Puyallup Tribe of Indians, and expressed concerns about existing and project-related traffic and emergency response times because of traffic congestion. Applicant has prepared a traffic impact study and provided appropriate mitigation to compensate probable significant adverse impacts to the satisfaction of the aforementioned entities. Hazardous Materials 23. The Puyallup Tribe of Indians and the public have commented on hazardous materials use, storage, and management on-site. Hazardous materials use, storage, and management shall be in accordance with all environmental requirements and all applicable present and future statutes, regulations, ordinances, rules, codes, judgments, orders or other similar enactments of any governmental authority or agency regulating or relating to health, safety, or environmental conditions. The site shall comply with the Emergency Planning and Community Right to Know Act (EPCRA) and the Tacoma Fire Department Operational Permit every year, as required by the City of Tacoma. The fire department permit process requires the Tacoma Fire Department to inspect the premises annually to ensure operations comply with the International Fire Code and mandatory preventive measures are in place. Cultural Resources 24. Cultural resource assessments have been conducted for all project-related construction activities, including on-site and off-site activities. All ground disturbing construction contractors shall implement the project-specific inadvertent discovery plan and have a copy on-site during construction. Threshold Determination MDNS Page 11

12 Table 1 Impact & Mitigation Summary* Prologis POT 14 Finding / Impact Category Cultural Resources Adjustments to Property Lines, Rightof-Way, and Fife/Tacoma City Limits Traffic, Transportation, and Emergency Response Impact Description/Location Need for cultural resource assessments and an inadvertent discovery plan for on-site and off-site project improvements. The application proposes adjusting northward the existing Tacoma/Fife city limit line along the projects entire 12th St E frontage (between 46th Ave E and 52nd Ave E) to avoid impacts to existing residences and businesses and to allow improvements to be built along 12th St E to be entirely in Fife and built to Fife standards. A portion of the existing Tacoma/Fife city limit line north and south of 8th St E will be adjusted in conjunction with property line adjustments to account for existing building encroachments. Additional rightof-way along 8th St E will be acquired and dedicated to the City of Fife to encompass the new street improvements. Right-of-way adjustments needed for new improvements. Minimum transportation improvements required for applicant to obtain prior to the first certificate of occupancy (COO) being issued for any of the buildings accessed from 8 th St E. Minimum transportation improvements required prior to any non-emergency or non-construction vehicular access from any 12th St E entrance. Additional traffic impact study required if site use changes from that proposed. Mitigation (MDNS Conditions) 1. Cultural resource assessments of on-site and off-site improvement areas have been prepared for the project and submitted to the Puyallup Tribe of Indians. The applicant shall update the documents as necessary and appropriate based on any additional consultation with the Puyallup Tribe of Indians. These assessments will inform the cities of Fife and Tacoma s engineering and permit review. The applicant, including all contractors and subcontractors, shall implement the associated inadvertent discovery plan during construction. 2. The applicant and shall provide all the documents necessary to dedicate the necessary right-of-way to the City of Fife to encompass the 8th St E improvements, and to support the adjustment of the municipal boundaries between the cities of Fife and Tacoma such that the entire 12th St E road section between 46th St E and 52nd St E, and the building encroachments near 8th St E, are within the City of Fife. 3. The applicant and shall provide all the documents necessary to the cities of Fife and Tacoma addressing municipal engineering design standards, responsibilities for engineering and building plan review, construction inspection, maintenance, easements, general facility charges, and utility rates. 4. The applicant shall acquire and dedicate to the City of Fife, and other appropriate jurisdictions, any and all rights-of-way necessary to facilitate installation of all 8th St E and 12th St E frontage and utility facilities. 5. Conditions 16, 17, and 18 (Attachment B - Transportation, Pedestrian, and Emergency Service Improvements) shall be completed by the applicant to the satisfaction of the City of Fife Public Works Director prior to the first certificate of occupancy (COO) being issued for any of the buildings. If requested by the Applicant (with sufficient documentation showing safe ingress, egress, and no unmitigated significant adverse traffic impacts), COO s shall be issued for up to two buildings, excluding building(s) along 12th St E, with construction completed for a City of Fife Public Works Director approved phased build-out of Condition 16 (i.e., two traffic lanes) and appropriate bonding for any remaining work to complete the entire Condition 16. (Note: Attachment B contains SEPA conditions which are appealable and have the full force and effect on the permits.) 6. Except for emergency and construction vehicle access, Conditions 16 through 30 (Attachment B Transportation, Pedestrian, and Emergency Service Improvements) shall be completed to the satisfaction of the Public Works Directors (PWDs) of the cities of Fife and Tacoma prior to any vehicular access from any 12th St E entrance. Access from the east entrance along 12th St E will be allowed for any purpose during construction related to Condition 5 above. 7. If the use changes from what is presented in the Updated Transportation Impact Study (TIS) dated April 19, 2016 prepared by Transportation Engineering Northwest (TENW), the applicant shall retain a transportation consultant to conduct a study to determine if there would be any increase in peak hour trips generated by the change in use. The study shall be submitted to the PWDs, who will have the joint authority to require additional transportation improvements Threshold Determination MDNS Page 12 Proposal Prologis Park Tacoma

13 Finding / Impact Category Water Service Sewer Service Erosion Control and Stormwater Facilities Electricity Service Impact Description/Location Agreement needed between Tacoma Public Utilities (TPU) Tacoma Water and the City of Fife to determine water service. Agreement needed between City of Tacoma Environmental Services and the City of Fife to determine water service. 8th St E and 12th St E stormwater infrastructure. On-site stormwater design, construction, and maintenance requirements. On-site and off-site requirements for electrical service design, construction, and maintenance requirements. Mitigation (MDNS Conditions) proportional to any increase in peak hour trips beyond those projected in the above-referenced TIS. Any mitigation identified by the PWDs through a potential future study would be required to be financially guaranteed prior to building permit issuance associated with the change in use. 8. The applicant shall facilitate negotiations and provide all necessary information requested by the cities of Fife and Tacoma concerning municipal water service to enable the establishment of an agreement between Tacoma Public Utilities (TPU) Tacoma Water and the City of Fife that will address design, construction, installation, testing, maintenance, easements, and general facility charges and utility billing. Fire suppression and fire hydrants shall be designed, installed, tested, and maintained as required by the agreement and by the Tacoma Fire Department. 9. The applicant shall facilitate negotiations and provide all necessary information requested by the cities of Fife and Tacoma concerning municipal sewer service to enable the establishment of an agreement between the City of Tacoma Environmental Services and the City of Fife that will address design, construction, installation, testing, maintenance, easements, and general facility charges and utility billing. 10. The applicant shall construct stormwater infrastructure for the 8th St E and 12th St E improvements as required by the City of Fife as part of the design of the street improvements. 11. The applicant shall design, construct, and maintain onsite stormwater facilities in accordance with the current City of Tacoma Stormwater Management Manual (SWMM) and the Port of Tacoma Stormwater Management Guidance Manual (SWMGM). The will lead the stormwater review and act in collaboration with the cities of Fife and Tacoma. This will include among others: a. Install and maintain features that protect Wapato Creek and prevent damage to habitat and fisheries. b. Erosion control measures must be in place prior to any clearing, grading, or construction. These control measures must be effective to prevent sediment or sediment laden water from being carried to state waters through Wapato Creek and Fife/Drainage District 23 ditch. c. Stormwater requirements, including flow control, shall be implemented as required by the SWMM and SWMGM. d. Coverage under the National Pollution Discharge Elimination System (NPDES) and State Waste Discharge General Permit for Stormwater Discharges Associated with Construction Activities is required for construction sites which disturb an area of one acre or more and which have or will have a discharge of stormwater to surface water or a storm sewer. An application can be downloaded from Ecology's website at The applicant shall apply for electrical service from Tacoma Power. Tacoma Power, in cooperation with the applicant, will design the primary (13.8kV) distribution system within the site. The applicant will install the civil infrastructure to Tacoma Power standards and requirements with minimal disruption service to existing customers. This will include: a. Existing overhead 115kV and 13.8kV power lines within easements onsite shall remain overhead and site development within the easements shall be coordinated with Tacoma Power. b. Existing overhead 12.5kV power lines within the 12th St E right-of-way will be converted to underground lines per Tacoma Power and City of Fife requirements along the project s 12th St E frontage. The applicant will include within their right-of-way improvement design and contract conduit and vault systems required by Tacoma Power. Threshold Determination MDNS Page 13

14 Finding / Impact Category Noise, Light, and Visual Traffic, Transportation, and Emergency Response Impact Description/Location On-site design, construction, and operational requirements to mitigate noise, light, and visual impacts. Improvements needed to 8 th St E and the 8th St E and 54th Ave E intersection for trucks and vehicles. Mitigation (MDNS Conditions) Threshold Determination MDNS Page 14 c. Extension of the 13.8kV distribution system from the existing overhead lines onsite shall be designed and installed as an underground system. 13. The applicant shall construct and maintain in a healthy condition (in perpetuity to City of Fife standards) a densely landscaped earthen berm and 8-foot tall cedar fence extending the length of the north side of the 12th St E frontage (with the exceptions of three vehicular access driveways). The width and height shall be based upon final street alignment and grade and will provide a buffer height as depicted on the applicants proposed cross sections that varies between 16 4 to 19 6 (as measured from the 12th St E final grade pursuant to the applicants November 10, 2015 cross sections A- D). This will include: a. An earthen berm width between approximately and b. Berm height between approximately 8 4 and 11 6 from the 12th St E final grade. c. Berm topped with an 8-foot tall non-see through cedar wooden fence (i.e., not split rail). d. Dense landscape screen that provides an aesthetic mix including a variety of deciduous and evergreen trees and shrubs to buffer the impacts on existing residences, businesses, and the future City Center and preserve the aesthetics of a residential neighborhood. 14. The applicant shall install wall pack lights, yard parking lighting, and signage at minimum heights with effective directional shields that prevent light spillage off-site. 15. The applicant s warehouse, manufacturing and trucking operations shall comply with strict enforcement adherence with state noise limitations (WAC ). For adjacent residences, onsite noise shall not exceed 50 dba between 10:00 PM to 7:00 AM; and 60 dba 7:00 AM to 10:00 PM, as detailed by WAC This will include: a. Construction shall be limited to 7:00 AM and 6:00 PM weekdays with no construction before 9:00 AM on Saturday and Sundays (start time to include warm-up of machinery/heavy equipment considered part of construction). b. Solid waste & recycling containers shall be setback at least 500-ft from 12th St E residences. c. Roof-top mechanical equipment on Building A visible from the 12th St E residences and utilities along south side of building A (including generators) shall be screened. d. Forklifts operating on the site will be equipped with broadband backup beepers to minimize noise impacts. e. The applicant shall install signage and maintain provisions to ensure that no long-term idling of trucks, air brake releases without mufflers, or trucks and/or trailers with operating refrigeration units, are permitted within the parking area along 12th St E west of the center driveway entrance between 10:00 PM to 7:00 AM. f. Provide electrical connections for refrigeration units at adjacent south-facing loading docks west of the 12th St center entrance when there are refrigeration units operating in that location. g. All loudspeaker systems shall comply with state noise limitations. Attachment B Transportation, Pedestrian, and Emergency Improvements 16. 8th St E to the west of 54th Ave E shall be improved by the applicant to a three-lane section per City of Fife street standards with street illumination, curb, gutter, four-foot planter, sidewalk (north side) and left turn lane and taper on westbound approach. Additional improvements at the 8th St E and 54th Ave E intersection will include relocating Fife s 8th St E sewer pump station, widening the curb radius and providing additional sidewalks as well as reconstruction of the existing traffic signal and mast arms and utility relocations. The traffic signal will be furnished

15 Finding / Impact Category Traffic, Transportation, and Emergency Response Impact Description/Location Traffic blocking concerns at 54th Ave E and 4th St E, and 54th Ave E and Taylor Way E intersections. Increased congestion at the intersection of 54th Ave E and Pacific Hwy. Controlled access to the site to manage traffic entering and exiting the site. Improvements needed to 12 th St E (between 46 th St E and 52 nd St E) for trucks, vehicles, pedestrians, and bicyclists. Improvement needed to discourage trucks from entering 12 th St E from Alexander Ave E. Improvement needed to discourage trucks from heading west on 12 th St E. Pedestrian crosswalk improvement at 46 th Ave E / Pacific Hwy. Bicycle and pedestrian improvements and signage for transitions from 12 th St E to side streets. Landscaping improvements for south side of 12 th St E. Improve pedestrian connection between 12 th St E and Pacific Hwy. Access and disturbance during construction. Project associated traffic impact fees. Increased congestion at SR 509 and Alexander Ave E intersection. Mitigation (MDNS Conditions) with a CCTV camera and associated wiring, equipment and controller components to provide a video feed for remote viewing. These additional CCTV provisions are being offered as the developer s contribution to support ITS (Intelligent Transportation System) needs to the Tacoma tide flats. 17. The applicant shall provide Do Not Block Intersection signage at the 54th Ave E and 4th St E, and 54th Ave E and Taylor Way E intersections to the satisfaction of the City of Fife PWD. 18. The applicant shall pay the $16, pro-rata share contribution fee, as calculated in the April 19, 2016 TIS, to the City of Fife for planned traffic improvements at the intersection of 54th Ave E and Pacific Hwy to improve signalization and traffic flow. Credits against the fees will be in accordance with FMC Access to the property is proposed at 8th St E and at three locations along 12th St E (at approximately 46th Ave E, 175-lineal feet east of 49th Ave E (aka Wapato St E,) and 52nd Ave E th St E shall be improved by the applicant to a three-lane section per City of Fife street standards with a center two-way left-turn lane, bike lanes both sides, and a sidewalk on the south side of the roadway extending across the projects frontage (from the 46th Ave E westerly driveway entrance to connect with existing improvements near 52nd Ave E). The design will provide for pedestrian safety and emergency vehicle access. 21. As required and approved by the PWDs, applicant shall install a concrete-island, curbs, and signage within the existing right-of-way on 12th St E at the intersection of Alexander Ave E th Ave E and 12th St E intersection, shall be improved by the applicant with a proposed site access on the north leg of the 46th Ave E and 12th St E intersection. The intersection will be designed with curb bulb-outs and raised/colored concrete-street features that narrow lanes, and signage to prohibit project related semi-trucks and trailers from using 46th Ave E and 12th St E west of 46th Ave E. The intersection will be constructed with input from the Puyallup Tribe of Indians and as approved by the City of Fife PWD. A conceptual plan is included in the proposed SEPA plans. 23. The applicant shall improve the pedestrian crosswalk on southbound approach at the 46th Ave E /Pacific Hwy intersection. 24. The applicant shall install bicycle and accessible pedestrian sidewalk intersection features at the 12th St E sidewalk intersections of 47th Ave E; Willow Rd, and 49th Ave E designed with curbs and street marking features that narrow lanes, and signage to prohibit trucks from using these side streets as approved by the City of Fife PWD. 25. In-lieu of planting street trees along the south side of 12th St E, the applicant shall offer to each residential property owner that abuts 12th St E a standard City of Fife street tree to be selected and planted by the Property owner. 26. The applicant shall install an at-grade sidewalk extensions between 12th St E and Pacific Hwy within existing right-of-way as a pedestrian link on Willow Rd E. 27. The applicant shall coordinate and maintain reasonable pedestrian and vehicle access to the 12th St E and Willow Rd property owners throughout the course of street improvements and to include acceptable transitions to existing improvements as determined by the Fife City PWD. 28. The applicant is responsible for paying traffic impact fees to City of Fife as calculated per the TIS dated April 19, Credits against the impact fees will be in accordance with FMC The applicant shall provide updated signal timing sheets to the City of Tacoma to assist in the optimization of the north and south intersections of Alexander Ave E and SR 509. The applicant shall be responsible for paying any associated City of Tacoma right-of-way work order Threshold Determination MDNS Page 15

16 Finding / Impact Impact Description/Location Category Increased congestion at SR 509 and Taylor Way E. *Provided as a summary only. Mitigation (MDNS Conditions) agreement costs. In lieu of the above signal timing improvement, upon mutual agreement between the City of Tacoma and the applicant, the applicant shall provide a monetary contribution toward a future improvement at this intersection in the amount corresponding to the above improvement. 30. If approved by WSDOT, at the intersection of Taylor Way E and SR 509, the applicant shall provide additional left-turn storage at the westbound left turn pocket on SR 509 to address the deficiencies identified in the above-referenced TIS for the City of Tacoma. In lieu of constructing the improvement, upon mutual agreement between the City of Tacoma and the applicant, the applicant shall provide a monetary contribution toward a future improvement at this intersection in the amount corresponding to the above improvement. Threshold Determination MDNS Page 16

SITE PLAN REVIEW APPLICATION AND CHECKLIST

SITE PLAN REVIEW APPLICATION AND CHECKLIST SITE PLAN REVIEW APPLICATION AND CHECKLIST PROJECT SUMMARY: Project Name: City/ETA Location: City ETA (Application fee & number of copies needed are based on location) Property Location (Legal Description

More information

ARTICLE 17 SITE PLAN REVIEW

ARTICLE 17 SITE PLAN REVIEW ARTICLE 17 SITE PLAN REVIEW 17.01 INTENT AND PURPOSE The intent of this section is to provide for consultation and cooperation between the applicant and the township planning commission so that the applicant

More information

PRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016

PRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016 PRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016 The following items are required for the preliminary plat. Numbers correspond with those on the example preliminary plat. RENO COUNTY SUBDIVISION REQUIREMENTS

More information

SUBMITTAL REQUIREMENTS

SUBMITTAL REQUIREMENTS WHEN PROCESS TYPE III IS USED References to Process Type III applications are found in several places in the Milton Municipal Code (MMC), indicating that the development, activity, or use, is permitted

More information

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE 20000 Prairie St. DOT Case No. 41443 Date: November 5, 2014 To: R. Nicolas Brown, Associate Zoning Administrator Department of City Planning From:

More information

THE CITY OF MOBILE, ALABAMA

THE CITY OF MOBILE, ALABAMA THE CITY OF MOBILE, ALABAMA LETTER OF DECISION Ark of Safety, Inc. Mobile, AL 36617 Re: (Northwest corner of Main Street and First Avenue, extending to the Southwest corner of Esau Avenue and Main Street.)

More information

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017 & PUD-0000102-2017 PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017 NAME SUBDIVISION NAME Dauphin Creek Estates Subdivision Dauphin Creek Estates Subdivision LOCATION CITY COUNCIL

More information

City of Yelm. Tahoma Terra Final Master Plan Development Guidelines. Table of Contents

City of Yelm. Tahoma Terra Final Master Plan Development Guidelines. Table of Contents City of Yelm Tahoma Terra Final Master Plan Development Guidelines Table of Contents Table of Contents... 1 Purpose... 2 Low Density Residential (R4-6)... 3 Moderate Density Residential (R6-10)... 5 Neighborhood

More information

A/E REVIEW CHECKLIST SITE & LANDSCAPE

A/E REVIEW CHECKLIST SITE & LANDSCAPE A/E REVIEW CHECKLIST SITE & LANDSCAPE Reviewers should - Use Checklists when reviewing any type of VA construction project for the following disciplines: Architectural, Boiler Safety Devices Operation

More information

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST Applications: 5 copies of application - Applicant will reproduce the copies at his/her costs. The Township Clerk

More information

CARVER COUNTY DIVISION OF PUBLIC WORKS LANDSCAPE POLICY. Adopted by the Carver County Board of Commissioners March 3, 2015

CARVER COUNTY DIVISION OF PUBLIC WORKS LANDSCAPE POLICY. Adopted by the Carver County Board of Commissioners March 3, 2015 CARVER COUNTY DIVISION OF PUBLIC WORKS LANDSCAPE POLICY Adopted by the Carver County Board of Commissioners March 3, 2015 Policy Statement Goals It is the goal of Carver County Public Works to provide

More information

BUFFERS, TREE PROTECTION AND LANDSCAPING. Sec Purpose and Intent.

BUFFERS, TREE PROTECTION AND LANDSCAPING. Sec Purpose and Intent. ARTICLE 20 BUFFERS, TREE PROTECTION AND LANDSCAPING Sec. 20.1. Purpose and Intent. Trees improve air and water quality, reduce soil erosion, reduce noise and glare, provide habitat for desirable wildlife,

More information

AGENDA ITEM: IOWA. west] that were not FISCAL IMPACT. the City of Clive. STAFF REVIEW. Resolution II. Amendment PREPARED BY: REVIEWED BY:

AGENDA ITEM: IOWA. west] that were not FISCAL IMPACT. the City of Clive. STAFF REVIEW. Resolution II. Amendment PREPARED BY: REVIEWED BY: AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: March 7, 2016 AGENDA ITEM: Consideration of approval of a resolution approving Engineering Services Amendment No. 1 with

More information

CITY OF KITCHENER CONDITIONS REQUIRED FOR ISSUANCE OF SITE PLAN APPROVAL

CITY OF KITCHENER CONDITIONS REQUIRED FOR ISSUANCE OF SITE PLAN APPROVAL CITY OF KITCHENER CONDITIONS REQUIRED FOR ISSUANCE OF SITE PLAN APPROVAL The following is a list of conditions requiring completion to the City s Satisfaction prior to Site Plan Approval being granted

More information

LEGAL NOTICE. City of Tacoma Determination of Environmental Nonsignificance. Fred Wagner, Wagner Development. Demolition of Manitou school buildings

LEGAL NOTICE. City of Tacoma Determination of Environmental Nonsignificance. Fred Wagner, Wagner Development. Demolition of Manitou school buildings LEGAL NOTICE City of Tacoma Determination of Environmental Nonsignificance Lead Agency: Applicant: Proposal: Location: City of Tacoma Fred Wagner, Wagner Development Demolition of Manitou school buildings

More information

SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST

SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST City of Seminole 9199 113 th Street N. Seminole, FL 33772 Ph: (727) 392-1966 Fx: (727) 319-6583 SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST Note: This checklist is designed to aid designers in the review

More information

DESIGN CRITERIA PACKAGE

DESIGN CRITERIA PACKAGE RFQ: 17-C-00003 DESIGN-BUILD SERVICES FOR THE DESIGN CRITERIA PACKAGE PREPARED BY: JAMES E. JACKSON, JR. AIA CITY ARCHITECT CONTRACT ADMINISTRATION DEPARTMENT and INTERFLOW ENGINEERING, L.L.C DESIGN CRITERIA

More information

DEPARTMENT OF PUBLIC WORKS & UTILITIES

DEPARTMENT OF PUBLIC WORKS & UTILITIES CITY OF PORT ANGELES DEPARTMENT OF PUBLIC WORKS & UTILITIES URBAN SERVICES STANDARDS AND GUIDELINES January 2017 Craig Fulton, P.E., Director TABLE OF CONTENTS "URBAN SERVICES STANDARDS AND GUIDELINES"

More information

ARTICLE 3 LANDSCAPING AND SCREENING REQUIREMENTS

ARTICLE 3 LANDSCAPING AND SCREENING REQUIREMENTS ARTICLE 3 CHAPTER 4 LANDSCAPING AND SCREENING REQUIREMENTS SEC 3.401 SEC 3.402 (D) (E) PURPOSE: The purpose of this Chapter is to establish minimum standards for the design, installation, and maintenance

More information

Rezoning Transportation Analysis Petition Number: General Location Identifier: , ,

Rezoning Transportation Analysis Petition Number: General Location Identifier: , , From: Kelsie Anderson, PE Kelsie.Anderson@charlottenc.gov 704-432-5492 Staff Reviewer: Rick Grochoske, PE rgrochoske@charlottenc.gov 704-432-1556 CDOT s review of this rezoning petition is intended to

More information

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No. Date: 12-10-15 Leisure World Clubhouse II Addition Fitness Center, Limited Site Plan Amendment

More information

City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01

City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01 City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01 July 27, 2009 TABLE OF CONTENTS 1.0 Introduction... 1 1.1 Plan Area Location & Context... 1 1.2 Ownership

More information

Rezoning Transportation Analysis Petition Number: General Location Identifier:

Rezoning Transportation Analysis Petition Number: General Location Identifier: From: Kelsie Anderson, PE Kelsie.Anderson@charlottenc.gov 704-432-5492 Staff Reviewer: Kory Hedrick, PE, PMP Khedrick@charlottenc.gov 704-432-6511 CDOT s review of this rezoning petition is intended to

More information

APPENDIX J PERFORMANCE STANDARDS FOR GRAVEL MINE, PIT MINE, OR QUARRY

APPENDIX J PERFORMANCE STANDARDS FOR GRAVEL MINE, PIT MINE, OR QUARRY APPENDIX J PERFORMANCE STANDARDS FOR GRAVEL MINE, PIT MINE, OR QUARRY A. Purpose: 1. Regulatory Requirement and Use Mitigation: The purpose of this appendix is to provide a regulatory context (standards)

More information

Application for Site Plan Review

Application for Site Plan Review Application for Site Plan Review City of Pontiac Office of Land Use and Strategic Planning 47450 Woodward Ave, Pontiac, MI 48342 T: 248.758.2800 F: 248.758.2827 Property/Project Address: Sidwell Number:

More information

5.1 Commercial and Industrial Development. (Effective April 1, 2006)

5.1 Commercial and Industrial Development. (Effective April 1, 2006) 5.1 Commercial and Industrial Development. (Effective April 1, 2006) A. Applicability: The requirements of this section (5.10) shall apply to all uses within the LB Local Business; HB Highway Business;

More information

McDonald s Restaurant - Purcellville Town of Purcellville Special Use Permit Statement of Justification July 24, 2014

McDonald s Restaurant - Purcellville Town of Purcellville Special Use Permit Statement of Justification July 24, 2014 Introduction / Written Statement McDonald s Restaurant - Purcellville McDonald s Corporation is proposing to redevelop the existing McDonald s eating establishment with a drive-through located at 121 N

More information

SITE PLAN REVIEW PROCESS

SITE PLAN REVIEW PROCESS BOWNE TOWNSHIP PO Box 35, 8240 Alden Nash Road, Alto, Michigan 49302 Ph. 616-868-6846 Fax 616-868-0110 http://www.bownetwp.org SITE PLAN REVIEW PROCESS 1. Application Form and Fee Schedule Site Plan Review

More information

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number: Applicant: Contact Name: Phone Number: Email: Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Concept Plan Requirements: I. General Project Information 1. Address or parcel number

More information

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1150 OF PUTNAM COUNTY, WEST VIRGINIA Page 95 ARTICLE 1150 SITE PLAN REVIEW

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1150 OF PUTNAM COUNTY, WEST VIRGINIA Page 95 ARTICLE 1150 SITE PLAN REVIEW OF PUTNAM COUNTY, WEST VIRGINIA Page 95 1150.01 PURPOSE 1150.02 APPLICABILITY 1150.03 APPLICATION PROCESS 1150.04 REVIEW PROCESS 1150.05 REVIEW CRITERIA 1150.06 SITE PLAN GUIDELINES 1150.01 PURPOSE ARTICLE

More information

SPECIFIC PLAN Requirements

SPECIFIC PLAN Requirements CITY OF LANCASTER PLANNING DEPARTMENT 44933 Fern Avenue, Lancaster, California 93534 (661) 723-6100 SPECIFIC PLAN Requirements Purpose The purpose of a specific plan is to provide for the logical development

More information

PLANNING COMMISSION Work Session Meeting Agenda

PLANNING COMMISSION Work Session Meeting Agenda PLANNING COMMISSION Work Session Meeting Agenda 5200 85TH AVENUE NORTH BROOKLYN PARK MN 55443 PHONE (763) 424-8000 FAX (763) 493-8391 Wednesday, September 27, 2017-7:00 P.M. Brooklyn Township Room If due

More information

3. Are there any projects exempt from the definition of Regulated Projects?

3. Are there any projects exempt from the definition of Regulated Projects? STORMWATER REQUIREMENTS: OVERVIEW OF PROVISION C.3 Background: On October 14, 2009, the Regional Water Quality Control Board, San Francisco Bay Region, issued a municipal regional stormwater permit (MRP)

More information

GENERAL LANDSCAPE PROVISIONS. The following landscape provisions shall be adhered to by all land uses unless otherwise noted:

GENERAL LANDSCAPE PROVISIONS. The following landscape provisions shall be adhered to by all land uses unless otherwise noted: CHAPTER 1.18 Sections: 1.18.005 Purpose. 1.18.010 Landscaping, Buffering, and Fencing Improvements Required. 1.18.015 General Landscape Provisions. 1.18.020 Landscaping Plan. 1.18.025 Single-Family Dwellings

More information

ARTICLE V PLANNED UNIT DEVELOPMENT DISTRICT

ARTICLE V PLANNED UNIT DEVELOPMENT DISTRICT ARTICLE V PLANNED UNIT DEVELOPMENT DISTRICT A. Purpose and Objective The Planned Unit Development (PUD) procedure provides a flexible land use and design regulation through the use of performance criteria

More information

14 October 10, 2012 Public Hearing APPLICANT: MPB, INC

14 October 10, 2012 Public Hearing APPLICANT: MPB, INC 14 October 10, 2012 Public Hearing APPLICANT: MPB, INC PROPERTY OWNER: MUNDEN & ASSOCIATES, LP STAFF PLANNER: Karen Prochilo REQUEST: Conditional Change of Zoning (AG-1 & AG-2 to Conditional O-2) ADDRESS

More information

CITY OF ZEELAND PLANNING COMMISSION

CITY OF ZEELAND PLANNING COMMISSION APPLICATION FOR SITE PLAN REVIEW AND SPECIAL LAND USE Date City Official App. Filing Fee Rec'd ($350) NOTE TO APPLICANT: Please submit this application for Site Plan Review along with twenty (20) copies

More information

CASE NUMBER: 16SN0701 APPLICANT: Hanky, LLC

CASE NUMBER: 16SN0701 APPLICANT: Hanky, LLC STAFF S ANALYSIS AND RECOMMENDATION Planning Commission (CPC) Public Hearing Date: MAY 17, 2016 CPC Time Remaining: 100 DAYS Applicant s Agent: DANIEL L. CASKIE (804-569-7060) Applicant s Contact: MICHAEL

More information

Site Development Plan (SDP) Checklist

Site Development Plan (SDP) Checklist Development Services Department 100 N. Wilcox Street, Castle Rock CO 80104 303-660-1393 or CRGov.com Site Development Plan (SDP) Checklist A complete Site Development Plan (SDP) submittal will contain

More information

4.500 Preston Road Overlay District

4.500 Preston Road Overlay District Section 4.500 Preston Road Overlay District 2004 Zoning Ordinance 4.500 Preston Road Overlay District (ZC 98-29; Ordinance No. 98-9-12) 4.501 Purpose To provide appropriate design standards for the use

More information

WEST HILL BUSINESS PARK AREA STRUCTURE PLAN

WEST HILL BUSINESS PARK AREA STRUCTURE PLAN MUNICIPAL DISTRICT OF PEACE NO. 135 WEST HILL BUSINESS PARK AREA STRUCTURE PLAN Prepared by: TABLE OF CONTENTS 1.0 Introduction... 1 1.1 Purpose of Plan........ 1 1.2 Plan Area..... 1 1.3 Existing Conditions...

More information

SECTION 1 CLEARING /GRADING PERMIT APPLICATION:

SECTION 1 CLEARING /GRADING PERMIT APPLICATION: PLEASE REFER TO THE CLEARING & GRADING PERMIT CHECKLIST BELOW FOR SUBMITTAL REQUIREMENTS. SECTION 1 CLEARING /GRADING PERMIT APPLICATION: PROJECT ADDRESS (Street, Suite #): Parcel(s) #: Total Site Area

More information

ARTICLE IX SPECIAL PERMIT USES

ARTICLE IX SPECIAL PERMIT USES ARTICLE IX SPECIAL PERMIT USES All special permit uses cited in Article IX and Attachment A of this Ordinance or any other Section of this Ordinance shall be subject to Site Plan Review. The procedures

More information

EXHIBIT B PROJECT NARRATIVE POULSBO MEADOWS

EXHIBIT B PROJECT NARRATIVE POULSBO MEADOWS EXHIBIT B PROJECT NARRATIVE POULSBO MEADOWS Name of Project: Poulsbo Meadows; A Planned Residential Development (PRD)/Plat Applicants Name: PBH Group LLC/Byron Harris PO Box 1010 Silverdale, WA 98038 Description

More information

PUBLIC WORKS - COMMUNITY DEVELOPMENT. Staff Report. Site Plan Review. SP July 5, 2018

PUBLIC WORKS - COMMUNITY DEVELOPMENT. Staff Report. Site Plan Review. SP July 5, 2018 PUBLIC WORKS - COMMUNITY DEVELOPMENT 333 Broadalbin Street SW, PO Box 49, Albany, Oregon 97321-144 BUILDING 541-917-7553 PLANNING 541-917-755 Staff Report Site Plan Review SP-2-17 July 5, 218 Summary This

More information

CHAPTER 26 LANDSCAPING (Chapter added in its entirety 05-08)

CHAPTER 26 LANDSCAPING (Chapter added in its entirety 05-08) CHAPTER 26 LANDSCAPING (Chapter added in its entirety 05-08) 26.01 DESCRIPTION AND PURPOSE. Landscaping is an important element of the use, development and preservation of land, and a significant factor

More information

CONFORMED AGREEMENT INCORPORATED REVISIONS PER AMENDMENT DATED: APRIL 2, 2013 FOR REFERENCE

CONFORMED AGREEMENT INCORPORATED REVISIONS PER AMENDMENT DATED: APRIL 2, 2013 FOR REFERENCE CONFORMED AGREEMENT INCORPORATED REVISIONS PER AMENDMENT DATED: APRIL 2, 2013 FOR REFERENCE CITY STREETS AS PART OF STATE HIGHWAYS GUIDELINES REACHED BY THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION

More information

Site Plan Review Residential Accessory Building

Site Plan Review Residential Accessory Building COMMUNITY DEVELOPMENT DEPARTMENT Planning Division P.O. Box 490 333 Broadalbin Street SW Albany, OR 97321 Phone (541) 917-7550 Fax (541) 917-7598 www.cityofalbany.net Site Plan Review Residential Accessory

More information

Commercial Site Plan Review Checklist

Commercial Site Plan Review Checklist Commercial Site Plan Review Checklist Updated 1/5/2015 Project Name: EPM #: _ Street: Contact: Phone: Date Submitted: _ Fax: Reviewer: Email: First Review: Second Review: _ Third Review: Reviews Required

More information

VALLEY COUNTY MINIMUM STANDARDS FOR PRIVATE ROAD DESIGN AND CONSTRUCTION

VALLEY COUNTY MINIMUM STANDARDS FOR PRIVATE ROAD DESIGN AND CONSTRUCTION MINIMUM STANDARDS FOR PRIVATE ROAD DESIGN AND CONSTRUCTION Adopted November 28, 2005 TABLE OF CONTENTS DEFINITION OF TERMS...II I. DESIGN CRITERIA... 1 A. GENERAL DESIGN CRITERIA... 1 B. ROADWAY CLASSIFICATION...

More information

ZONING AMENDMENT & PLANNED UNIT DEVELOPMENT STAFF REPORT Date: April 4, 2013

ZONING AMENDMENT & PLANNED UNIT DEVELOPMENT STAFF REPORT Date: April 4, 2013 ZONING AMENDMENT & PLANNED UNIT DEVELOPMENT STAFF REPORT Date: April 4, 2013 NAME DEVELOPMENT NAME LOCATION DIP Exchange, LLC DIP Exchange, LLC 93 Sidney Phillips Drive (West side of Sidney Phillips Drive,

More information

CRESCENT RESOURCES INC.

CRESCENT RESOURCES INC. CRESCENT RESOURCES INC. Due Diligence Checklist Project Name: Client: Project No. Date: 1 Survey Review survey for compliance with Crescent Resources, Inc. s Instructions to Surveyors (see below): All

More information

4 January 11, 2012 Public Hearing APPLICANT:

4 January 11, 2012 Public Hearing APPLICANT: . 4 January 11, 2012 Public Hearing APPLICANT: MID-ATLANTIC AUTO PROPERTY OWNER: DZR, LLC STAFF PLANNER: Leslie Bonilla REQUEST: Conditional Use Permit (truck rental, automobile service, and automotive/bulk

More information

PLANNED UNIT DEVELOPMENT Date: April 5, 2018

PLANNED UNIT DEVELOPMENT Date: April 5, 2018 PLANNED UNIT DEVELOPMENT Date: April 5, 2018 DEVELOPMENT NAME SUBDIVISION NAME LOCATION Robert Myers Robert Myers 2955 and 2989 Dauphin Street (Southeast corner of Dauphin Street and Sage Avenue) CITY

More information

CHAPTER ADDITIONAL REQUIREMENTS IN THE NC, NEIGHBORHOOD COMMERCIAL ZONE

CHAPTER ADDITIONAL REQUIREMENTS IN THE NC, NEIGHBORHOOD COMMERCIAL ZONE CITY OF MOSES LAKE MUNICIPAL CODE CHAPTER 18.31 ADDITIONAL REQUIREMENTS IN THE NC, NEIGHBORHOOD COMMERCIAL ZONE Sections: 18.31.010 Purpose 18.31.020 Minimum Lot Area 18.31.030 Setbacks 18.31.040 Maximum

More information

RRW Stonebrook, LLC Tentative Map Findings

RRW Stonebrook, LLC Tentative Map Findings RRW Stonebrook, LLC Tentative Map Findings FINDING T1: The request conforms to the Master Plan and zoning ordinances. RELATIONSHIP TO THE MASTER PLAN 1. The respective development is located within an

More information

Application Number: SD Project Name: Walton Farms Preliminary Subdivision (acting as Master Plan)

Application Number: SD Project Name: Walton Farms Preliminary Subdivision (acting as Master Plan) STAFF REPORT Town of Clayton Planning Department 111 E. Second Street, Clayton, NC 27520 P.O. Box 879, Clayton, NC 27528 Phone: 919-553-5002 Fax: 919-553-1720 Planning Board May 22, 2017 Application Number:

More information

PLANNED UNIT DEVELOPMENT STAFF REPORT Date: June 2, 2016

PLANNED UNIT DEVELOPMENT STAFF REPORT Date: June 2, 2016 # 9 ZON2016-01032 PLANNED UNIT DEVELOPMENT STAFF REPORT Date: June 2, 2016 DEVELOPMENT NAME JJT Properties LLC LOCATION 1147 & 1151 East I-65 Service Road South and 1180 Sledge Drive (Southeast corner

More information

GENERAL INFORMATIONaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa

GENERAL INFORMATIONaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa To: Planning and Zoning Commission From: City Staff Date: November 15, 2016 Re: Case #16026 Raymore Activity Center Site Plan GENERAL INFORMATIONaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa Applicant/ Property Owner:

More information

Urban Design Manual 2.0 DRIVE-THROUGH FACILITIES. Background. Urban Design Challenges

Urban Design Manual 2.0 DRIVE-THROUGH FACILITIES. Background. Urban Design Challenges 222221 2.0 DRIVE-THROUGH FACILITIES Background In recent years, drive-through facilities have grown significantly in popularity with drive-through restaurants, in particular, being established on numerous

More information

FIRCREST PLANNING/BUILDING DEPARTMENT STAFF REPORT CASE # Preliminary Major Site Plan

FIRCREST PLANNING/BUILDING DEPARTMENT STAFF REPORT CASE # Preliminary Major Site Plan FIRCREST PLANNING/BUILDING DEPARTMENT STAFF REPORT CASE # 18-06 Preliminary Major Site Plan APPLICANT: Chick-fil-A, Steve Schwartz, Development Manager APPLICANT s AGENT: 4G Development and Consulting,

More information

ARTICLE 6: Special and Planned Development Districts

ARTICLE 6: Special and Planned Development Districts ARTICLE 6: Special and Planned Development Districts 6-10 Traditional Neighborhood Development (TND) District 6-10.10 Purpose and Intent The Traditional Neighborhood Development (TND) District provides

More information

Chapter 1: General Program Information

Chapter 1: General Program Information Chapter 1: General Program Information 1.1 Introduction The Montgomery County Stormwater Management Resolution (#03-1-5) was adopted by the County Board of Commissioners on January 22, 2003. The purpose

More information

PRELIMINARY CONDITIONAL USE SUBMITTAL CHECKLIST REQUIREMENTS

PRELIMINARY CONDITIONAL USE SUBMITTAL CHECKLIST REQUIREMENTS This checklist must accompany your submittal as the cover page. CONDITIONAL USE Application Submittal Checklist for PRELIMINARY AND FINAL APPROVAL Per Winter Park Land Development Code Sec. 58-90 PRELIMINARY

More information

Sanford/Lee County Technical Review Committee (TRC) DEADLINES & MEETING DATES

Sanford/Lee County Technical Review Committee (TRC) DEADLINES & MEETING DATES Sanford/Lee County Technical Review Committee (TRC) DEADLINES & MEETING DATES The following 2019 information is based on the information available to staff at the time of creation. Dates & time may change

More information

Rezoning Transportation Analysis Petition Number: General Location Identifier: , ,

Rezoning Transportation Analysis Petition Number: General Location Identifier: , , From: Felix Obregon, PE fobregon@charlottenc.gov 704-432-5729 Reviewer: Rick Grochoske, PE rgrochoske@charlottenc.gov 704-432-1556 Revision Log: Date Description 10-18-2018 First Review 11-19-2018 Second

More information

MEDWAY PLANNING BOARD MINOR SITE PLAN PROJECTS Application Guidelines

MEDWAY PLANNING BOARD MINOR SITE PLAN PROJECTS Application Guidelines Revised August 28, 2006 A. Procedure MEDWAY PLANNING BOARD MINOR SITE PLAN PROJECTS Application Guidelines 1) Before submitting a formal site plan application, prospective applicants are encouraged to

More information

Drexel, Barrell & Co.

Drexel, Barrell & Co. Drexel, Barrell & Co. June 18, 2018 Engineers/Surveyors Boulder Colorado Springs Greeley 3 South 7 th Street Colorado Springs, Colorado 80905-1501 719 260-0887 719 260-8352 Fax El Paso County Planning

More information

CITY OF MOBILE MOBILE CITY PLANNING COMMISSION LETTER OF DECISION. November 5, 2012

CITY OF MOBILE MOBILE CITY PLANNING COMMISSION LETTER OF DECISION. November 5, 2012 SAMUEL L. JONES MAYOR CITY OF MOBILE LETTER OF DECISION OFFICE OF THE CITYCOUNCIL COUNCIL MEMBERS REGGIE COPELAND, SR. PRESIDENT-DISTRICT 5 FREDRICK D. RICHARDSON, JR. VICE PRESIDENT-DISTRICT 1 WILLIAM

More information

Development Agreement Application

Development Agreement Application Development greement pplication pplication Fee: $2,500.00 Technology Fee: $50.00 6000 Main St. SW, Lakewood, W 98499 Phone: (253) 512-2261 Number Required: Description of Required Documents: Required:

More information

Landscaping Standards

Landscaping Standards CHAPTER 29 ARTICLE 403 29.403 Landscaping Standards Purpose: The purpose of this section is to protect and promote the public health, safety and general welfare by requiring landscaping in relation to

More information

M E M O R A N D U M. Chair and Members of North West Planning Advisory Committee

M E M O R A N D U M. Chair and Members of North West Planning Advisory Committee Item 9.1.1 PO Box 1749 Halifax, Nova Scotia B3J 3A5 Canada M E M O R A N D U M TO: FROM: Chair and Members of North West Planning Advisory Committee Stephanie Salloum, Planner II DATE: June 26, 2017 SUBJECT:

More information

that the Town Board of the Town of East Greenbush will hold a public hearing on April 11,

that the Town Board of the Town of East Greenbush will hold a public hearing on April 11, TOWN OF EAST GREENBUSH NOTICE OF PUBLIC HEARING PLEASE TAKE NOTICE that the Town Board of the Town of East Greenbush will hold a public hearing on April 11, 2018, at 5:45 p.m. at the East Greenbush Town

More information

Construction and Landscaping on Public Property

Construction and Landscaping on Public Property Construction and Landscaping on Public Property City of Manhattan Beach Community Development Department 1400 Highland Avenue 310-802-5504 www.citymb.info January, 2004 Construction and Landscaping on

More information

Preliminary Development Plan 07/ /2

Preliminary Development Plan 07/ /2 OWENSBORO METROPOLITAN PLANNING COMMISSION Preliminary Development Plan 07/06 120 1/2 Development Information The table at right refers to the application materials required for submission, unless otherwise

More information

From Sarasota County Optional Commercial Redevelopment Regulations. a. Intent.

From Sarasota County Optional Commercial Redevelopment Regulations. a. Intent. From Sarasota County Optional Commercial Redevelopment Regulations a. Intent. 1. In the County there are older commercial properties, particularly narrow strip commercial properties on arterial roadways

More information

The Town Board of the Town of Vienna, County of Dane, State of Wisconsin, does ordain and adopt as follows.

The Town Board of the Town of Vienna, County of Dane, State of Wisconsin, does ordain and adopt as follows. ORDINANCE DRIVEWAYS AND CULVERTS NO. 6-5-06 ORDINANCE CONCERNING DRIVEWAY AND CULVERT REQUIREMENTS 1-1-1 Driveway Permits; Culvert Requirements 1-1-2 Driveway and Culvert Location, Design and Construction

More information

Town of Portola Valley General Plan. Nathhorst Triangle Area Plan

Town of Portola Valley General Plan. Nathhorst Triangle Area Plan Town of Portola Valley General Plan Amended December 10, 1997 Table of Contents Introduction... 1 Planning Area... 1 Objectives... 2 Principles... 2 Standards... 4 Description... 4 Community Commercial...

More information

12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH

12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH 12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH STAFF PLANNER: Faith Christie REQUEST: Conditional Change of Zoning (from PD-H1 Planned

More information

CHESAPEAKE LANDSCAPE ORDINANCE

CHESAPEAKE LANDSCAPE ORDINANCE CHESAPEAKE LANDSCAPE ORDINANCE CONSERVATION PRESERVATION CZO 19-600 Effective October 16, 2008 BUFFER YARD C PARKING LOT REFORESTATION YEAR 1 REFORESTATION YEAR 4 BUFFER YARD F CBPA REFORESTATION Page

More information

R E S O L U T I O N. Single-Family Residence/ Church. 2,488 sq. ft. 2,488 sq. ft. Area Parking Required: Church

R E S O L U T I O N. Single-Family Residence/ Church. 2,488 sq. ft. 2,488 sq. ft. Area Parking Required: Church R E S O L U T I O N WHEREAS, the Prince George s County Planning Board is charged with the approval of Detailed Site Plans pursuant to Part 3, Division 9 of the Zoning Ordinance of the Prince George s

More information

The following specific definitions shall apply to the landscaping and screening regulations contained in this article:

The following specific definitions shall apply to the landscaping and screening regulations contained in this article: ARTICLE XII. LANDSCAPING Sec. 5-421. Purpose. The purpose of landscaping and screening requirements is to improve certain setback and yard areas, including off-street vehicular parking and open-lot sales

More information

TOP TEN LIST OF COMMUNITY CONCERNS REGARDING PROPOSED AMENDMENTS TO CHAPTER 42

TOP TEN LIST OF COMMUNITY CONCERNS REGARDING PROPOSED AMENDMENTS TO CHAPTER 42 TOP TEN LIST OF COMMUNITY CONCERNS REGARDING PROPOSED AMENDMENTS TO CHAPTER 42 1. Extend the urban area to Beltway 8 in stages, over say a three-year period, prioritizing development in transit and declining

More information

Request for Decision. Recommendation. Presented: Monday, Jul 07, Report Date Friday, Jun 20, Type: Public Hearings

Request for Decision. Recommendation. Presented: Monday, Jul 07, Report Date Friday, Jun 20, Type: Public Hearings Presented To: Planning Committee Request for Decision Application for rezoning in order to permit a place of worship on a vacant lot zoned for C1, Local Commercial uses, Cam Street, Sudbury Sitiri Investments

More information

Bostwick Road. Municipal Class Environmental Assessment. Public Information Centre #2 June 14, City of London

Bostwick Road. Municipal Class Environmental Assessment. Public Information Centre #2 June 14, City of London Bostwick Road Municipal Class Environmental Assessment Public Information Centre #2 June 14, 2017 Welcome! Welcome to the 2 nd Public Information Centre for the. Representatives from the and the consulting

More information

Town of Windham. Planning Department 8 School Road Windham, ME voice fax

Town of Windham. Planning Department 8 School Road Windham, ME voice fax Town of Windham Planning Department 8 School Road Windham, ME 04062 voice 207.864-5960 fax 207.892.1916 MEMO DATE: TO: Staff Review Committee FROM: Amanda Lessard, Planner Cc: Ellen Rathbone, St. Germain

More information

BYLAW C A Bylaw of Rocky View County to amend Land Use Bylaw C

BYLAW C A Bylaw of Rocky View County to amend Land Use Bylaw C BYLAW C-7720-2017 A Bylaw of Rocky View County to amend Land Use Bylaw C-4841-97. The Council of Rocky View County enacts as follows: PART 1 TITLE This Bylaw shall be known as Bylaw C-7720-2017. PART 2

More information

Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m.

Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m. Public Hearing Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, 2019 open house at 4 p.m., formal presentation at 5 p.m. Welcome to the Public Hearing for the Harborview Road (CR 776)

More information

Project Name: MELWOOD HOTEL. Date Accepted: 1/12/04. Waived. Planning Board Action Limit: Plan Acreage: 1.7 Zone: Dwelling Units:

Project Name: MELWOOD HOTEL. Date Accepted: 1/12/04. Waived. Planning Board Action Limit: Plan Acreage: 1.7 Zone: Dwelling Units: The Maryland-National Capital Park and Planning Commission Prince George's County Planning Department Development Review Division 301-952-3530 Note: Staff reports can be accessed at www.mncppc.org/pgco/planning/plan.htm.

More information

PART 1: PROJECT SUMMARY. Proposed Land Use: 120 single-family lots. The application is Attachment A. The site plan is Attachment B.

PART 1: PROJECT SUMMARY. Proposed Land Use: 120 single-family lots. The application is Attachment A. The site plan is Attachment B. PART 1: PROJECT SUMMARY Applicant: JBH Development, LLC and Hopper Communities, INC Project Size: +/- 80.48 acres Parcel Number: 01513107, 01513108, 01513109, 01513113, 01513120, 01513121, 01513122, 01513124,

More information

SITE PLAN SUBMISSION AND APPROVAL GUIDELINES

SITE PLAN SUBMISSION AND APPROVAL GUIDELINES SITE PLAN SUBMISSION AND APPROVAL GUIDELINES May, 2004 (last updated Jan 2019) 808 2 nd Avenue East Owen Sound, ON N4K 2H4 (519) 376-1440 TABLE OF CONTENTS SITE PLAN APPROVAL... 1 Mandate and Benefits

More information

ARTICLE 9: Landscaping

ARTICLE 9: Landscaping ARTICLE 9: Landscaping 9-10 Legislative Intent The purpose of this Article is to regulate the planting and preservation of landscape materials; to facilitate the creation of an attractive and healthy environment;

More information

STREAM BUFFERS

STREAM BUFFERS 88-415 STREAM BUFFERS 88-415-01 PURPOSE In the Kansas City region and throughout the nation, vegetated stream buffers have been clearly shown to protect stream stability and related infrastructure, improve

More information

Kitsap County Department of Community Development. Administrative Staff Report

Kitsap County Department of Community Development. Administrative Staff Report Kitsap County Department of Community Development Administrative Staff Report Report Date: Application Submittal Date: April 12, 2018 Application Complete Date: May 2, 2018 Project Name: Port Orchard McDonald's

More information

At Your Disposal CUP Amendment, Lot 20, Village Service Commercial, at 128 Bastille Dr. (PLN17-208)

At Your Disposal CUP Amendment, Lot 20, Village Service Commercial, at 128 Bastille Dr. (PLN17-208) MEMORANDUM Archuleta County Development Services Planning Department 1122 HWY 84 P. O. Box 1507 Pagosa Springs, Colorado 81147 970-264-1390 Fax 970-264-3338 TO: Archuleta County Planning Commission FROM:

More information

COMPLETE GREEN STREET CHECKLIST

COMPLETE GREEN STREET CHECKLIST COMPLETE GREEN STREET CHECKLIST This document was developed to dissect the structure of an urban street and explore opportunities to make our streets more complete while also integrating green street strategies.

More information

City of Mt. Juliet Planning & Zoning Department. Site Plan Checklist. Site plan cklist v1.18

City of Mt. Juliet Planning & Zoning Department. Site Plan Checklist. Site plan cklist v1.18 City of Mt. Juliet Planning & Zoning Department Site Plan Checklist Site Plan approval is required for all specified community facilities, all commercial, industrial, and multi-family residential activities

More information

INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities

INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities 7.01. EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities 7.02. PROPOSED INFRASTRUCTURE A. Overall Concept B. Circulation C. Signals D. Drainage 7.03. INFRASTRUCTURE MAP A. Key Infrastructure

More information

Northeast Ohio Regional Sewer District Stormwater Management Plan Review Policy

Northeast Ohio Regional Sewer District Stormwater Management Plan Review Policy Northeast Ohio Regional Sewer District Stormwater Management Plan Review Policy Introduction As a component of the Northeast Ohio Regional Sewer District s (District) Regional Stormwater Management Program,

More information

4.1 LAND USE AND HOUSING

4.1 LAND USE AND HOUSING 4.1 This section provides a project-level analysis of potential impacts to land use, Shorelines of the State (shorelines), and housing. The study area for the land use and housing analysis in the Final

More information